This presentation by Maria YARMALCHUK was made at the 7th Meeting on Public-Private Partnerships held on 17-18 February 2014. Find more information at http://www.oecd.org/gov/budgeting/ppp.htm
PPPs and Public Works - Grazia Sgarra, Giovanni Coletta, Giovanni Rizzo, ItalyOECD Governance
Presentation made by Grazia Sgarra, Giovanni Coletta, Giovanni Rizzo, Ministry of Economy and Finance, Italy, at the 9th annual network meeting of Senior Infrastructure & PPP Officials held at the OECD, Paris, on 1 March 2016
Legal Informatics and Interoperability patterns supporting the Greek Executiv...Dr. Fotios Fitsilis
Presented on 11 February 2021 at the
2020 virtual conference of the International Association of Legislation
Research jointly conducted with Victoria Kalogirou, European Commission
Програма розвитку державно-приватного партнерстваKukurudziak Ivan
Програма розвитку ДПП – п’ятирічна програма Агентства США з міжнародного
розвитку (USAID), що впроваджується компанією FHI Development 360, LLC,
з метою поширення державно-приватного партнерства (ДПП) як
механізму для покращення надання комунальних послуг та
інфраструктури в Україні.
An outline of the European project FAStGO, lead by the Association of Issuing Bodies AIB. This project aims at facilitating Standards for Guarantees of Origin.
This project provides expert advice to the European Commission DG ENER, based on the terms of Reference N° ENER/C1/2019-517: “Technical support for RES policy development & implementation. Establishing technical requirements and facilitating the standardisation process for guarantees of origin on basis of Dir (EU) 2018/2001.”
Project on Connectivity Infrastructure to Enhance Productivity and GVCs - Fer...OECD Governance
Presentation made by Fernando Mistura, Investment Division, DAF, OECD, at the 9th annual network meeting of Senior Infrastructure & PPP Officials held at the OECD, Paris, on 1 March 2016
PPPs and Public Works - Grazia Sgarra, Giovanni Coletta, Giovanni Rizzo, ItalyOECD Governance
Presentation made by Grazia Sgarra, Giovanni Coletta, Giovanni Rizzo, Ministry of Economy and Finance, Italy, at the 9th annual network meeting of Senior Infrastructure & PPP Officials held at the OECD, Paris, on 1 March 2016
Legal Informatics and Interoperability patterns supporting the Greek Executiv...Dr. Fotios Fitsilis
Presented on 11 February 2021 at the
2020 virtual conference of the International Association of Legislation
Research jointly conducted with Victoria Kalogirou, European Commission
Програма розвитку державно-приватного партнерстваKukurudziak Ivan
Програма розвитку ДПП – п’ятирічна програма Агентства США з міжнародного
розвитку (USAID), що впроваджується компанією FHI Development 360, LLC,
з метою поширення державно-приватного партнерства (ДПП) як
механізму для покращення надання комунальних послуг та
інфраструктури в Україні.
An outline of the European project FAStGO, lead by the Association of Issuing Bodies AIB. This project aims at facilitating Standards for Guarantees of Origin.
This project provides expert advice to the European Commission DG ENER, based on the terms of Reference N° ENER/C1/2019-517: “Technical support for RES policy development & implementation. Establishing technical requirements and facilitating the standardisation process for guarantees of origin on basis of Dir (EU) 2018/2001.”
Project on Connectivity Infrastructure to Enhance Productivity and GVCs - Fer...OECD Governance
Presentation made by Fernando Mistura, Investment Division, DAF, OECD, at the 9th annual network meeting of Senior Infrastructure & PPP Officials held at the OECD, Paris, on 1 March 2016
Competition and state aid implications of minimum wage in procurementAlbert Sanchez Graells
This presentation explores the competition law and State aid implications of the RegioPost Judgment of the Court of Justice of the European Union. It was presented at the University of Bristol Law School on 9 May 2016
This presentation is the basis for a lunchtime seminar on the interaction between competition, State aid and public procurement rules, and the challenges in designing an effective enforcement mechanism that ensures coordinated substantive assessments.
These are the slides of my presentation at the UEA Law School on 23 November 2016. They synthesise my current thoughts about the analysis of public procurement as a case study from the perspective of the potential emergence of trans-EU public law.
Presentation given on 14 April 2016 at the "ERA annual public procurement conference 2016", covering issues of procurement centralisation and public registers of public contracts
Public Private Partnerships in Italy - Marco Tranquilli, ItalyOECD Governance
Presentation made by Marco Tranquilli, Presidency of tne council of Ministers, Italy, at the 9th annual network meeting of Senior Infrastructure & PPP Officials held at the OECD, Paris, on 1 March 2016
This paper investigates public procurement in Broadband Infrastructure Projects in the Republic of Croatia, the funding of which is provided by the European Regional Development Fund for the period 2014-2020. Since successfully implemented procurement procedure for the infrastructure solution is one of the key factors for grant approval and the start of project implementation, the question arises as to which public procurement techniques contribute best to achieving the goals and meeting the objectives of these specific projects. It is estimated that the available literature and legal cases are not sufficient to make a decision on the selection of the procedure. Therefore, a conclusion of possible procedures was reached on the efficient and effective process through a comparison, as well as multicriteria analysis, leading to the successful completion of the procurement process.
This presentation by the Brazilian Competition Authority (CADE) was made during Break-out Session 2: Enforcement in the framework of the discussion on “Overcoming adversity and attaining success: Small and developing competition agencies” held at the 16th meeting of the OECD Global Forum on Competition on 8 December 2017. More papers and presentations on the topic can be found out at oe.cd/sda.
The insurance business is rapidly migrating from paper-based processes through digitalization and automation to electronic processes. Digitalization and automation require standardization of information interchange if electronic business processes connect independent organizations. The standards developed by CEN/TC 445 will focus on the information interchange which connects insurance companies with their customers and their market partners, e.g. brokers, sales organizations, portals, service providers, and other insurers. This CEN/TC 445 newsletter intends to be a progress report and will inform on actual developments.
This presentation by Susanna METSÄLAMPI from the Ministry of Transport and Communications (Finland) was made during the roundtable discussion on competition and innovation in land transport held during the 62nd meeting of the OECD Working Party No. 2 on Competition and Regulation on 28 November 2016. More papers and presentations on the topic can be found out at www.oecd.org/daf/competition/competition-and-innovation-in-land-transport.htm
Public Private Partnership and EducationGhulam Ghaus
This paper discuss in detail the concept of Public-Private Partnership [ppp]. The author has described different models of PPP. Along with models, he has written its relationship with education. The paper is helpful for students and teachers who wants to understand PPP and its relation with education.
Competition and state aid implications of minimum wage in procurementAlbert Sanchez Graells
This presentation explores the competition law and State aid implications of the RegioPost Judgment of the Court of Justice of the European Union. It was presented at the University of Bristol Law School on 9 May 2016
This presentation is the basis for a lunchtime seminar on the interaction between competition, State aid and public procurement rules, and the challenges in designing an effective enforcement mechanism that ensures coordinated substantive assessments.
These are the slides of my presentation at the UEA Law School on 23 November 2016. They synthesise my current thoughts about the analysis of public procurement as a case study from the perspective of the potential emergence of trans-EU public law.
Presentation given on 14 April 2016 at the "ERA annual public procurement conference 2016", covering issues of procurement centralisation and public registers of public contracts
Public Private Partnerships in Italy - Marco Tranquilli, ItalyOECD Governance
Presentation made by Marco Tranquilli, Presidency of tne council of Ministers, Italy, at the 9th annual network meeting of Senior Infrastructure & PPP Officials held at the OECD, Paris, on 1 March 2016
This paper investigates public procurement in Broadband Infrastructure Projects in the Republic of Croatia, the funding of which is provided by the European Regional Development Fund for the period 2014-2020. Since successfully implemented procurement procedure for the infrastructure solution is one of the key factors for grant approval and the start of project implementation, the question arises as to which public procurement techniques contribute best to achieving the goals and meeting the objectives of these specific projects. It is estimated that the available literature and legal cases are not sufficient to make a decision on the selection of the procedure. Therefore, a conclusion of possible procedures was reached on the efficient and effective process through a comparison, as well as multicriteria analysis, leading to the successful completion of the procurement process.
This presentation by the Brazilian Competition Authority (CADE) was made during Break-out Session 2: Enforcement in the framework of the discussion on “Overcoming adversity and attaining success: Small and developing competition agencies” held at the 16th meeting of the OECD Global Forum on Competition on 8 December 2017. More papers and presentations on the topic can be found out at oe.cd/sda.
The insurance business is rapidly migrating from paper-based processes through digitalization and automation to electronic processes. Digitalization and automation require standardization of information interchange if electronic business processes connect independent organizations. The standards developed by CEN/TC 445 will focus on the information interchange which connects insurance companies with their customers and their market partners, e.g. brokers, sales organizations, portals, service providers, and other insurers. This CEN/TC 445 newsletter intends to be a progress report and will inform on actual developments.
This presentation by Susanna METSÄLAMPI from the Ministry of Transport and Communications (Finland) was made during the roundtable discussion on competition and innovation in land transport held during the 62nd meeting of the OECD Working Party No. 2 on Competition and Regulation on 28 November 2016. More papers and presentations on the topic can be found out at www.oecd.org/daf/competition/competition-and-innovation-in-land-transport.htm
Public Private Partnership and EducationGhulam Ghaus
This paper discuss in detail the concept of Public-Private Partnership [ppp]. The author has described different models of PPP. Along with models, he has written its relationship with education. The paper is helpful for students and teachers who wants to understand PPP and its relation with education.
Public Private Partnership in Teacher Education: Its Prospect and Strategiesiosrjce
India has one of the largest systems of teacher education in the world. Besides the University
departments of education and their affiliated colleges there are a number of govt. and govt. aided institutions and
self financing colleges and open universities who are engaged in teacher education. Though most teacher
education programmes are nearly identical their standard vary. Uncontrolled growth of the number of
self-financing teacher training institutions in the recent years has led to the unevenness in the quality of teacher
training institutions. The implementation of RTE Act creates an enormous need for teacher education of 12.84
lakh teachers for providing quality education to all children in the country irrespective of
gender,caste,creed,religion and geographies. This study is formulated to identify the role of public private
partnership in teacher education to meet the crisis of trained teachers and to reform the teacher education
programme ensuring quality
Our schools today are outdated with focus solely on exam results that is insufficient to face the real world after school. We want to promote new school framework supporting holistic education with practical and relevant skills while uphold family values and giving back mindset. Purpose of school is about educating students to make positive contributions; contribute positively to individual, family, economy and society.
Presentations from Meet the Buyer event for the DIT Grangegorman Campus PPP p...Orlagh Murphy
Enterprise Ireland in partnership with the National Development Finance Agency and Grangegorman Development Finance Agency hosted a free “Meet the Buyer” event on 13th Aug 2014. The event provided information on supply chain opportunities on the DIT Grangegorman East & Central Quad PPP developments.
This presentation is all about Critical Success Factors for Internet Business. E Business, what are the reasons of failures. The Great Failures and Why do they collapse. Critical Success Factors are very important even before we start working on project or idea.
ERP, PDM, CRM, and EDM system critical success factors (CSF) have significant impacts on the success or failure of the project.
What are these CSF’s and how can a project asses their compliance against them?
This presentation was made by Nurlan Shokbarbayev, Kazakhstan, at the 12th Annual Meeting of the OECD Network of Senior PPP and Infrastructure Officials, held in Paris on 16 April 2019.
This presentation by Sonia Araujo from the OECD Economics department was made during a session on Competition in Public-Private Partnerships held at the 57th meeting of the Working Party 2 of the Competition Committee on 16 June 2014. Find out more at http://www.oecd.org/daf/competition/competition-public-private-partnerships.htm
This presentation was made by Hulya Pasaogullari, Turkey, at the 8th Meeting of Senior Public-Private Partnerships and Infrastructure Officials held in Paris on 23-24 March 2015.
Presentation "PPPs and concessions, the planning, procurement, implementation and management" made during the SIGMA workshop on Auditing Public Private Partnerships and Concessions. Ankara, 2-3 May 2018. Presentation made by Mag. Martin Oder, LL.M., SIGMA.
Presentation of the “SIGMA Workshop on PPP characteristics, models & sectors”, held in Ankara on 11-12 April 2018. Presentation made by Mr. Mario Turkovic, SIGMA.
Presentation_Public Procurement in International Construction and Infrastruct...Svitlana Teush
In my presentation "FIDIC Conditions of Contract in the Context of Harmonization of Public Procurement System in Ukraine with EU Standards" discussed were topics related to application of the international forms of contracts in the context of the ongoing reform of the public procurement system in Ukraine and its harmonization with the EU standards (and PP Directives). Also accommodated were the issues of how such contracts fit into mandatory legal framework, selection criteria and qualification requirements for bidders, applicable constraints on variations and changes. An update is also given on recent developments of the engineering industry and its transformations toward further institutionalization and self-governance.
The Romanian A1 highway (Autostrada A1) is a partially built highway in Romania, planned to connect Bucharest (capital) with the western part of the country, and further with Hungary and Western Europe. The highway it will be approximately 581 km long and will follow the route: Pitesti, Sibiu, Orastie, Deva, Timisoara, Arad, connecting with Hungary's highway M43.
The A1 highway it is part of the Pan-European Corridor IV. It is also the Priority Project 7 of the Trans-European Transport Networks and construction receives 85% funding from the European Union Cohesion Fund.
As of November 2014, the sections in service include a 110-kilometer long highway linking Bucharest with Pitesti, the Sibiu – Deva segment (132 km), the Traian Vuia – Balinț segment (17.1 km), the Timisoara – Arad highway (54 km, in the western part of Romania) and the Pecica – Nădlac segment (28.5 km). The total length of the opened sections is 341 km, with another 91 km under construction.
Currently, construction works are being performed between Deva and Nădlac. Several sections between Lugoj and Deva, comprising a total length of 71.8 km were tendered in 2013, and construction began in 2014, while for two segments (38.9 km) between Nădlac and Arad works have been finished only in 2015. Works are also finished on the remaining segment between Lugoj and Timișoara.
Highway Pitești – Sibiu
The highway section between Pitesti and Sibiu was scheduled to be tendered in the fourth quarter of 2012, but a new feasibility study will first have to be tendered for review. Total construction costs of the 116.6 km section of the highway, that would be crossing the Carpathian Mountains, partly along the Olt Valley, are estimated at 3.25 billion euro and were previously planned to be completed by 2020.
This section has been subject to much controversy during 2013, when the Romanian Government declared the priority highway route for crossing the Carpathian Mountains will be the A3 highway (between Brasov and Comarnic) instead of the A1 highway (between Sibiu and Pitesti).
According to the same plans, the A3 highway is planned to be connected to the A1 highway via another highway between Sibiu and Fagaras, thus creating a nearly complete highway corridor between Bucharest and Sibiu, whereas the section between Sibiu and Pitești is no longer a short-term priority.] It is considered that this is possibly to avoid a competing alternative route to the section of the A3 highway, which will be built via a concession contract.
According to the government announcements in December 2013, this section of the highway is planned to be built however in the following years, between Pitești and Curate de Argeș, as part of a highway extension towards Râmnicu Valcea.
International Journal of Business and Management Invention (IJBMI) is an international journal intended for professionals and researchers in all fields of Business and Management. IJBMI publishes research articles and reviews within the whole field Business and Management, new teaching methods, assessment, validation and the impact of new technologies and it will continue to provide information on the latest trends and developments in this ever-expanding subject. The publications of papers are selected through double peer reviewed to ensure originality, relevance, and readability. The articles published in our journal can be accessed online
The main goal of the Public-Private Partnership is the development of infrastructure in the public interests via the combination of resources and experiences of the government and business, and implementation of
socially significant projects with minimum expenditures and risks while still providing services of high quality to economic subjects.
Summary of the OECD expert meeting: Construction Risk Management in Infrastru...OECD Governance
Presented at the OECD expert meeting "Construction Risk Management in Infrastructure Procurement: The Loss of Appetite for Fixed-Price Contracts", held on 17 May 2023 at the OECD, Paris and online.
Using AI led assurance to deliver projects on time and on budget - D. Amratia...OECD Governance
Presented at the OECD expert meeting "Construction Risk Management in Infrastructure Procurement: The Loss of Appetite for Fixed-Price Contracts", held on 17 May 2023 at the OECD, Paris and online.
ECI in Sweden - A. Kadefors, KTH Royal Institute of Technology, Stockholm (SE)OECD Governance
Presented at the OECD expert meeting "Construction Risk Management in Infrastructure Procurement: The Loss of Appetite for Fixed-Price Contracts", held on 17 May 2023 at the OECD, Paris and online.
Building Client Capability to Deliver Megaprojects - J. Denicol, professor at...OECD Governance
Presented at the OECD expert meeting "Construction Risk Management in Infrastructure Procurement: The Loss of Appetite for Fixed-Price Contracts", held on 17 May 2023 at the OECD, Paris and online.
Procurement strategy in major infrastructure: The AS-IS and STEPS - D. Makovš...OECD Governance
Presented at the OECD expert meeting "Construction Risk Management in Infrastructure Procurement: The Loss of Appetite for Fixed-Price Contracts", held on 17 May 2023 at the OECD, Paris and online.
Procurement of major infrastructure projects 2017-22 - B. Hasselgren, Senior ...OECD Governance
Presented at the OECD expert meeting "Construction Risk Management in Infrastructure Procurement: The Loss of Appetite for Fixed-Price Contracts", held on 17 May 2023 at the OECD, Paris and online.
ECI Dutch Experience - A. Chao, Partner, Bird&Bird & J. de Koning, Head of Co...OECD Governance
Presented at the OECD expert meeting "Construction Risk Management in Infrastructure Procurement: The Loss of Appetite for Fixed-Price Contracts", held on 17 May 2023 at the OECD, Paris and online.
ECI in Sweden - A. Kadefors, KTH Royal Institute of Technology, StockholmOECD Governance
Presented at the OECD expert meeting "Construction Risk Management in Infrastructure Procurement: The Loss of Appetite for Fixed-Price Contracts", held on 17 May 2023 at the OECD, Paris and online.
EPEC's perception of market developments - E. Farquharson, Principal Adviser,...OECD Governance
Presented at the OECD expert meeting "Construction Risk Management in Infrastructure Procurement: The Loss of Appetite for Fixed-Price Contracts", held on 17 May 2023 at the OECD, Paris and online.
Geographical scope of the lines in Design and Build - B.Dupuis, Executive Dir...OECD Governance
Presented at the OECD expert meeting "Construction Risk Management in Infrastructure Procurement: The Loss of Appetite for Fixed-Price Contracts", held on 17 May 2023 at the OECD, Paris and online.
Executive Agency of the Dutch Ministry of Infrastructure and Water Management...OECD Governance
Presented at the OECD expert meeting "Construction Risk Management in Infrastructure Procurement: The Loss of Appetite for Fixed-Price Contracts", held on 17 May 2023 at the OECD, Paris and online.
Presentation of OECD Government at a Glance 2023OECD Governance
Paris, 30 June, 2023
Presentation by Elsa Pilichowski, Director for Public Governance, OECD.
The 2023 edition of Government at a Glance provides a comprehensive overview of public governance and public administration practices in OECD Member and partner countries. It includes indicators on trust in public institutions and satisfaction with public services, as well as evidence on good governance practices in areas such as the policy cycle, budgeting, procurement, infrastructure planning and delivery, regulatory governance, digital government and open government data. Finally, it provides information on what resources public institutions use and how they are managed, including public finances, public employment, and human resources management. Government at a Glance allows for cross-country comparisons and helps identify trends, best practices, and areas for improvement in the public sector.
See: https://www.oecd.org/publication/government-at-a-glance/2023/
The Protection and Promotion of Civic Space: Strengthening Alignment with Int...OECD Governance
Infographics from the OECD report "The Protection and Promotion of Civic Space Strengthening Alignment with International Standards and Guidance".
See: https://www.oecd.org/gov/the-protection-and-promotion-of-civic-space-d234e975-en.htm
OECD Publication "Building Financial Resilience
to Climate Impacts. A Framework for Governments to manage the risks of Losses and Damages.
Governments are facing significant climate-related risks from the expected increase in frequency and intensity of cyclones, floods, fires, and other climate-related extreme events. The report Building Financial Resilience to Climate Impacts: A Framework for Governments to Manage the Risks of Losses and Damages provides a strategic framework to help governments, particularly those in emerging market and developing economies, strengthen their capacity to manage the financial implications of climate-related risks. Published in December 2022.
OECD presentation "Strengthening climate and environmental considerations in infrastructure and budget appraisal tools"
by Margaux Lelong and Ana Maria Ruiz during the 9th Meeting of the OECD Paris Collaborative on Green Budgeting held on 17 and 18 of April 2023 in Paris.
OECD presentation "Building Financial Resilience to Climate Impacts. A Framework to Manage the Risks of Losses and Damages" by Andrew Blazey, Stéphane Jacobzone and Titouan Chassagne. Presented during the 9th Meeting of the OECD Paris Collaborative on Green Budgeting held on 17 and 18 of April 2023 in Paris
OECD Presentation "Financial reporting, sustainability information and assurance" by Peter Welch during the 5th Session during the 9th Meeting of the OECD Paris Collaborative on Green Budgeting held on 17 and 18 of April 2023 in Paris
Presentation "Developments in sovereign green bond markets" by Ms. Fatos Koc during the 4th Session of 9th Meeting of the OECD Paris Collaborative on Green Budgeting held on 17 and 18 of April 2023 in Paris.
Here is Gabe Whitley's response to my defamation lawsuit for him calling me a rapist and perjurer in court documents.
You have to read it to believe it, but after you read it, you won't believe it. And I included eight examples of defamatory statements/
An astonishing, first-of-its-kind, report by the NYT assessing damage in Ukraine. Even if the war ends tomorrow, in many places there will be nothing to go back to.
El Puerto de Algeciras continúa un año más como el más eficiente del continente europeo y vuelve a situarse en el “top ten” mundial, según el informe The Container Port Performance Index 2023 (CPPI), elaborado por el Banco Mundial y la consultora S&P Global.
El informe CPPI utiliza dos enfoques metodológicos diferentes para calcular la clasificación del índice: uno administrativo o técnico y otro estadístico, basado en análisis factorial (FA). Según los autores, esta dualidad pretende asegurar una clasificación que refleje con precisión el rendimiento real del puerto, a la vez que sea estadísticamente sólida. En esta edición del informe CPPI 2023, se han empleado los mismos enfoques metodológicos y se ha aplicado un método de agregación de clasificaciones para combinar los resultados de ambos enfoques y obtener una clasificación agregada.
04062024_First India Newspaper Jaipur.pdfFIRST INDIA
Find Latest India News and Breaking News these days from India on Politics, Business, Entertainment, Technology, Sports, Lifestyle and Coronavirus News in India and the world over that you can't miss. For real time update Visit our social media handle. Read First India NewsPaper in your morning replace. Visit First India.
CLICK:- https://firstindia.co.in/
#First_India_NewsPaper
03062024_First India Newspaper Jaipur.pdfFIRST INDIA
Find Latest India News and Breaking News these days from India on Politics, Business, Entertainment, Technology, Sports, Lifestyle and Coronavirus News in India and the world over that you can't miss. For real time update Visit our social media handle. Read First India NewsPaper in your morning replace. Visit First India.
CLICK:- https://firstindia.co.in/
#First_India_NewsPaper
31052024_First India Newspaper Jaipur.pdfFIRST INDIA
Find Latest India News and Breaking News these days from India on Politics, Business, Entertainment, Technology, Sports, Lifestyle and Coronavirus News in India and the world over that you can't miss. For real time update Visit our social media handle. Read First India NewsPaper in your morning replace. Visit First India.
CLICK:- https://firstindia.co.in/
#First_India_NewsPaper
‘वोटर्स विल मस्ट प्रीवेल’ (मतदाताओं को जीतना होगा) अभियान द्वारा जारी हेल्पलाइन नंबर, 4 जून को सुबह 7 बजे से दोपहर 12 बजे तक मतगणना प्रक्रिया में कहीं भी किसी भी तरह के उल्लंघन की रिपोर्ट करने के लिए खुला रहेगा।
01062024_First India Newspaper Jaipur.pdfFIRST INDIA
Find Latest India News and Breaking News these days from India on Politics, Business, Entertainment, Technology, Sports, Lifestyle and Coronavirus News in India and the world over that you can't miss. For real time update Visit our social media handle. Read First India NewsPaper in your morning replace. Visit First India.
CLICK:- https://firstindia.co.in/
#First_India_NewsPaper
OECD, 7th Meeting on Public-Private Partnerships - Maria YARMALCHUK
1. PPP: current status & perspectives
18 february 2014
Public Governance Committee OECD
Maria Yarmalchuk,
Department of investment policy and development of PPP
2. The Federal Law of 21 July 2005 № 115-FZ
"On Concession Agreements"
Legislation on concessions
The ability to implement projects using BTO model.
Legislation contains a limited list of objects of the agreements:
- objects of transport infrastructure (road, port, railway and other)
- social infrastructure (health, education, culture)
- production facilities, transmission and distribution
of electric and thermal energy
- utilities
Approved 12 model concession agreements stipulated by the Law.
Concessions are concluded at the federal, regional and local levels,
depending on the level of decision-making and risks in project
implementation
2
3. Concession agreements
Quantity of concession agreements
concluded in 2009-2013
1500
2013 breakdown by sector
Utilities,
housing
Municipal
infrastructure
16%
1000
Energy
infrastructure
22%
Healthcare,
education,
culture, sport
Social
infrastructure
infrastructure
35%
Transport
infrastructure
27%
500
0
2009
2010
2011
2012
2013
3
4. Improvement of the concession law
Conclusion of concession agreements with the subsequent fee
of the grantor with respect to any kind of objects
Expansion of the list of objects of the concession
Private initiation of concession agreement
The guarantee of rights and lawful interests
of private partners and creditors
Are able to participate in concession agreement
several public entities
other
4
5. Regional laws on PPP
The absence of regulation
of contractual PPP instruments
at the Federal level
Russian regions began to develop
and adopt regional laws on PPP
Regional laws on PPP enacted in 67 regions of the Russian Federation
Half of them are declarative
Half of them are functioning
Even functioning laws collide with:
Land Code
Legislation on Competition
Legislation on traditional procurement
53 agreements have been concluded on the basis of regional PPP laws
5
6. Factors limiting the development of PPPs in Russia
Limited number of PPP models utilized
Risk of recognition of regional PPP law invalid
Budget code constraints
Limited possibility to attract loan financing
(lack of possibility of the object ownership and pledge)
Unable to allocate publicly owned property, including land plots,
for purposes of PPP project within single tender procedure
Lack of unified terminology
The lack of a unified process of selection, preparation,
approval of projects, and also the organization of tender procedures
6
7. The bill of PPP low
The highlights:
Opportunity for public partner utilize different forms of PPP
Introducing the notion “authorized government body”
responsible for PPP
Conclusion of PPP contract beyond single tender procedure
Opportunity for conclusion of PPP contract on several infrastructure
objects simultaneously
Opportunity for public partner, private partner, and financing company
to make direct agreement for step-in right mechanism
The pledge of the object of agreement is not limited
The list of infrastructure objects constructed (rehabilitated) according
to PPP project is not limited
7
8. Forthcoming PPP legislation development
Adoption of:
preparation order of PPP agreements
methods and criteria for assessment of PPP project effectiveness
procedure of monitoring and statistical accounting of PPP projects
PPP project’s KPI
procedure of public debates on decisions of the authorities
on the conclusion of PPP agreements
private partner selection guidelines
professional development programs (educational programs)
8
9. PPP Projects in Transport System
Planned projects and projects which are being implemented
Project
Investmets, billion
USD
High-speed Railroad Moscow - St.Petersburg
18,8
International transport corridor "Europe - West China"
18,4
Railroad "Prohorovka - Batayisk"
16,8
Federal road "M-4 Don"
7,7
Federal road "M-4 The Urals"
6,5
By-pass Railroad in Omsk
4,7
Railroad "Polunochnoye - Salekhard"
4,1
Railroad "Komi - Arkhangelsk (Belkomur)"
4,1
"Vostochniy" Spaceport (First Stage)
4,0
Murmansk transport nodal point
3,5
9