SlideShare a Scribd company logo
1 of 2
1
Saleh Ibrahim Abd El Migid Ibrahim Saleh
10, Ismail El Falaky St. Heliopolis, Cairo, Egypt
Mobile: +2 0122 0044 769
salehib1999@yahoo.com
salehib1999@gmail.com
sabdelmigid.ext@orange.com
PERSONAL DATA
 Date of Birth: November 29, 1981 - Place of Birth: Egypt
 Nationality: Egyptian - Marital Status: Married
 Military Service: Exempted
OBJECTIVE
Seeking a position in a multinational mobile operator whereby my technical and interpersonal skills along with my
experience can be applied and developed.
EDUCATION
Bachelor in Civil Engineering, August 2006
PROFESSIONAL EXPERIENCE
Deployment Engineer,” Orange” June 2007 – till date
(Acting as team leader)
 2007 working in modification department in different areas such as Delta, and Cairo, making several DCS sites,
and new BSC`s
 2008 working in modification department in different areas such as Red Sea, Sinai, upper, and Cairo making
several DCS sites, 3G sites and new BSC`s
 2009 making twenty one new sites in different areas such as HELIOPLICE,NASRCITY and HURGHADA; also
making modification in several hotels in Cairo like (JW MARRIOT, MARRIOT EL ZAMALEK,
SAMIRAMIS, and INTERCONTINENTAL CITY STARS)
 2009 making six indoor sites at CITY STARS A1,A3,A6,A8, AHLY BANK, and EGYTECH company
 2010 working as a site engineer in different areas such as 6th
of October (25 sites was installed), Helioplice (10
sites was installed), and Nasr City (10 sites was installed).
 2011 working as a site engineer in different areas such as 6th
of October (20 sites was installed), Helioplice (12
sites was installed), and Nasr City (8 sites was installed).
 2012 working as site engineer in Helioplice (4 sites was installed), Nasr City (6 sites was installed, Ismalya (3
sites was installed), New Cairo (13 sites was installed), Obour (2 sites was installed), 10th
of Ramadan (3
sites was installed), Shourok (1 site was installed), old cairo (1 site was installed), Ring road (5 sites was
installed), and Port Said (1 site was installed).
 2013 working as site engineer in Helioplice (1 site was installed), Nasr City (5 sites was installed, Ismalya (3
sites was installed), New Cairo (18 sites was installed), Obour (3 sites was installed), 10th
of Ramadan (6
sites was installed), Shourok (2 sites was installed), old cairo (1 site was installed), Ring road (3 sites was
installed), and Port Said (4 sites was installed).
 2014 working as site engineer in Helioplice (2 site was installed), Nasr City (3 sites was installed, Ismalya (8
sites was installed), New Cairo (15 sites was installed), Obour (1 site was installed), 10th
of Ramadan (2
sites was installed), Shourok (6 sites was installed), old cairo (3 site was installed), Ring road (1 site was
installed), and Port Said (1 site was installed).
 2015 working as site engineer in Helioplice (3 site was installed), Nasr City (7 sites was installed, Ismalya (2
sites was installed), New Cairo (16 sites was installed), Obour (9 sites was installed), 10th
of Ramadan (10
2
sites was installed), Shourok (4 sites was installed), old cairo (1 site was installed), Ring road (2 sites was
installed), and Port Said (5 sites was installed).
 2016 working as site engineer in Port Sasid (2 site was installed), Ismailia (4 sites was installed), Shobra Kheima
(33 sites was installed), New Cairo (21 sites was installed), 10th of Ramadan (1 site was installed), and
Ring Road (2 sites was installed).
 About two hundred and 50 macro site have been installed in the past seven years.
 Rollout of 3G Network.
 Following up the consultants regarding construction supervision on contractors.
 Supervising site construction to ensure compliance with work standards and timely delivery.
 Expansion of the sites from 900MHZ to 1800MHZ.
 Expansion of the sites from 1800MHZ to 2110MHZ.
 Site acceptance (Civil work, Earth system and GSM work, feeder measurements …etc).
 Make commission and installing for Avitec repeaters.
Site Engineer, Specialized Engineering Contracting Company (S.E.C.C) July 2006– Jan
2007
 Make isolation for ducts of the A/C and pipe lines of sellers.
Site Engineer, Adnan Company Jan 2007-June 2007
 Supervising on finishing Blue Bay hotel at Ras Seder at Red Sea Egypt.
PROFESSIONAL TRAINING
 Trainee, El-Araby office for design, June 2005 - Aug. 2005
 Trainee, EPICO construction company, June 2004 - Aug. 2004
 Trainee, General authorization for Educational Buildings, June 2003 - Aug. 2003
 Trainee, Training center for construction, June 2002 - Aug. 2002
SKILLS
COMPUTER:
 Extensive Knowledge on use of computers and most of its applications (MS Office, Photoshop, etc.)
 Extensive knowledge of using the Internet
 Extensive knowledge of CAD packages such as AutoCAD (2005), Primavera P3, and Sap (2000).
LANGUAGE:
 Excellent in spoken and written English.
 Arabic mother tongue
OTHER SKILLS:
 Good research capabilities
 Capable of working in groups
 Capable of working under pressure
 Capable of working in multi-cultural environment
REFRENCES FURNISHED UPON REQUEST

More Related Content

What's hot

What's hot (18)

CV update
CV updateCV update
CV update
 
Senior Land surveyor
Senior Land surveyorSenior Land surveyor
Senior Land surveyor
 
Ahm elbouz cv 2016 new
Ahm elbouz cv  2016 newAhm elbouz cv  2016 new
Ahm elbouz cv 2016 new
 
Baher Massoud - Structural Engineer-
Baher  Massoud - Structural Engineer-Baher  Massoud - Structural Engineer-
Baher Massoud - Structural Engineer-
 
cv (1)
cv (1)cv (1)
cv (1)
 
george nasralla CV
george nasralla CVgeorge nasralla CV
george nasralla CV
 
أغسطس 2015AHMED SANOSY C.V NEW
أغسطس 2015AHMED SANOSY C.V NEWأغسطس 2015AHMED SANOSY C.V NEW
أغسطس 2015AHMED SANOSY C.V NEW
 
CV_M ASKAR 2017
CV_M ASKAR 2017CV_M ASKAR 2017
CV_M ASKAR 2017
 
RESJC2015
RESJC2015RESJC2015
RESJC2015
 
my_c_v
my_c_vmy_c_v
my_c_v
 
Hossam resume 09-2016
Hossam resume 09-2016Hossam resume 09-2016
Hossam resume 09-2016
 
Projects List 2010 to 2015
Projects List 2010 to 2015Projects List 2010 to 2015
Projects List 2010 to 2015
 
cv 16
cv 16cv 16
cv 16
 
Eng Ahmed Ali Updated CV
Eng Ahmed Ali Updated CVEng Ahmed Ali Updated CV
Eng Ahmed Ali Updated CV
 
Curriculum vitae
Curriculum vitae Curriculum vitae
Curriculum vitae
 
Mohamed ashraf land surveyor cv
Mohamed ashraf land surveyor cvMohamed ashraf land surveyor cv
Mohamed ashraf land surveyor cv
 
Mohamed ashraf 15 10-2019 cv
Mohamed ashraf 15 10-2019 cvMohamed ashraf 15 10-2019 cv
Mohamed ashraf 15 10-2019 cv
 
Mohamed ashraf 15 10-2019 cv
Mohamed ashraf 15 10-2019 cvMohamed ashraf 15 10-2019 cv
Mohamed ashraf 15 10-2019 cv
 

Viewers also liked

香港六合彩
香港六合彩香港六合彩
香港六合彩sinazou
 
Challenges Implementing Web 2.0 Technologies
Challenges Implementing Web 2.0 TechnologiesChallenges Implementing Web 2.0 Technologies
Challenges Implementing Web 2.0 TechnologiesSam Davis
 
Sintesis 01 De Agosto
Sintesis 01 De AgostoSintesis 01 De Agosto
Sintesis 01 De Agostojanet_adriana
 
Wolfquest Wolves Slide Show
Wolfquest Wolves Slide ShowWolfquest Wolves Slide Show
Wolfquest Wolves Slide Showguest26c24a
 
Brochure
BrochureBrochure
BrochureEva Woo
 
certificate of ubaid bin tahir
certificate of ubaid bin tahircertificate of ubaid bin tahir
certificate of ubaid bin tahirUbaid Bin Tahir
 
Tutorial Video
Tutorial VideoTutorial Video
Tutorial VideoIoRobot
 
Nixon mangones argumedo
Nixon mangones argumedoNixon mangones argumedo
Nixon mangones argumedoNIXON MANGONE
 
SAP EXECUTIVE Conference 2008
SAP EXECUTIVE Conference 2008SAP EXECUTIVE Conference 2008
SAP EXECUTIVE Conference 2008IoRobot
 
Micro-targeting en datagebruik in digitale marketing - Peter Sprenger
Micro-targeting en datagebruik in digitale marketing - Peter SprengerMicro-targeting en datagebruik in digitale marketing - Peter Sprenger
Micro-targeting en datagebruik in digitale marketing - Peter SprengerDigital Sports Day
 

Viewers also liked (20)

香港六合彩
香港六合彩香港六合彩
香港六合彩
 
Challenges Implementing Web 2.0 Technologies
Challenges Implementing Web 2.0 TechnologiesChallenges Implementing Web 2.0 Technologies
Challenges Implementing Web 2.0 Technologies
 
Sintesis 01 De Agosto
Sintesis 01 De AgostoSintesis 01 De Agosto
Sintesis 01 De Agosto
 
COMMUNITY MANAGER
COMMUNITY MANAGERCOMMUNITY MANAGER
COMMUNITY MANAGER
 
Presentation_NEW.PPTX
Presentation_NEW.PPTXPresentation_NEW.PPTX
Presentation_NEW.PPTX
 
Jussi
JussiJussi
Jussi
 
Mara
MaraMara
Mara
 
Wolfquest Wolves Slide Show
Wolfquest Wolves Slide ShowWolfquest Wolves Slide Show
Wolfquest Wolves Slide Show
 
Texto Plastificado
Texto PlastificadoTexto Plastificado
Texto Plastificado
 
12 vem já pecador
12   vem já pecador12   vem já pecador
12 vem já pecador
 
Brochure
BrochureBrochure
Brochure
 
certificate of ubaid bin tahir
certificate of ubaid bin tahircertificate of ubaid bin tahir
certificate of ubaid bin tahir
 
Tutorial Video
Tutorial VideoTutorial Video
Tutorial Video
 
Sustrans in East Sussex
Sustrans in East SussexSustrans in East Sussex
Sustrans in East Sussex
 
Nixon mangones argumedo
Nixon mangones argumedoNixon mangones argumedo
Nixon mangones argumedo
 
基金懂了再買
基金懂了再買基金懂了再買
基金懂了再買
 
SAP EXECUTIVE Conference 2008
SAP EXECUTIVE Conference 2008SAP EXECUTIVE Conference 2008
SAP EXECUTIVE Conference 2008
 
Burka
BurkaBurka
Burka
 
Micro-targeting en datagebruik in digitale marketing - Peter Sprenger
Micro-targeting en datagebruik in digitale marketing - Peter SprengerMicro-targeting en datagebruik in digitale marketing - Peter Sprenger
Micro-targeting en datagebruik in digitale marketing - Peter Sprenger
 
RavindraResume
RavindraResumeRavindraResume
RavindraResume
 

Similar to Saleh.CV

Similar to Saleh.CV (20)

M. Elsawey CV CIVIL ENGINEER
M. Elsawey CV CIVIL ENGINEERM. Elsawey CV CIVIL ENGINEER
M. Elsawey CV CIVIL ENGINEER
 
Omar Khattab_CVECG
Omar Khattab_CVECGOmar Khattab_CVECG
Omar Khattab_CVECG
 
ATT_lotfy farouk CV25-10-2014
ATT_lotfy farouk  CV25-10-2014ATT_lotfy farouk  CV25-10-2014
ATT_lotfy farouk CV25-10-2014
 
CV (1)1
CV (1)1CV (1)1
CV (1)1
 
Ahmed CV
Ahmed CVAhmed CV
Ahmed CV
 
Mostafa Abbassy CV-2016(All Project)
Mostafa Abbassy CV-2016(All Project)Mostafa Abbassy CV-2016(All Project)
Mostafa Abbassy CV-2016(All Project)
 
My cv (en.)
My cv (en.)My cv (en.)
My cv (en.)
 
C.V -moh-8-16
C.V -moh-8-16C.V -moh-8-16
C.V -moh-8-16
 
Hesham Magdy curriculum vitae
Hesham Magdy curriculum vitaeHesham Magdy curriculum vitae
Hesham Magdy curriculum vitae
 
Maged George Kamel C.V
Maged George Kamel C.VMaged George Kamel C.V
Maged George Kamel C.V
 
Mohammad Ballah C V
Mohammad Ballah C VMohammad Ballah C V
Mohammad Ballah C V
 
cm cv
cm cvcm cv
cm cv
 
Hossam_Elkholy_CV
Hossam_Elkholy_CVHossam_Elkholy_CV
Hossam_Elkholy_CV
 
Cv @Ali maruoof
Cv @Ali maruoofCv @Ali maruoof
Cv @Ali maruoof
 
reusme survey
reusme surveyreusme survey
reusme survey
 
CV-M'Mohsen
CV-M'MohsenCV-M'Mohsen
CV-M'Mohsen
 
CV - Civil Enginner - Amr Atef - English - 2017
CV - Civil Enginner - Amr Atef - English - 2017CV - Civil Enginner - Amr Atef - English - 2017
CV - Civil Enginner - Amr Atef - English - 2017
 
C.V E. Mahmoud -
C.V E. Mahmoud -C.V E. Mahmoud -
C.V E. Mahmoud -
 
John Botros
John BotrosJohn Botros
John Botros
 
CV_Ashraf Nazme_2016 -1
CV_Ashraf Nazme_2016 -1CV_Ashraf Nazme_2016 -1
CV_Ashraf Nazme_2016 -1
 

Saleh.CV

  • 1. 1 Saleh Ibrahim Abd El Migid Ibrahim Saleh 10, Ismail El Falaky St. Heliopolis, Cairo, Egypt Mobile: +2 0122 0044 769 salehib1999@yahoo.com salehib1999@gmail.com sabdelmigid.ext@orange.com PERSONAL DATA  Date of Birth: November 29, 1981 - Place of Birth: Egypt  Nationality: Egyptian - Marital Status: Married  Military Service: Exempted OBJECTIVE Seeking a position in a multinational mobile operator whereby my technical and interpersonal skills along with my experience can be applied and developed. EDUCATION Bachelor in Civil Engineering, August 2006 PROFESSIONAL EXPERIENCE Deployment Engineer,” Orange” June 2007 – till date (Acting as team leader)  2007 working in modification department in different areas such as Delta, and Cairo, making several DCS sites, and new BSC`s  2008 working in modification department in different areas such as Red Sea, Sinai, upper, and Cairo making several DCS sites, 3G sites and new BSC`s  2009 making twenty one new sites in different areas such as HELIOPLICE,NASRCITY and HURGHADA; also making modification in several hotels in Cairo like (JW MARRIOT, MARRIOT EL ZAMALEK, SAMIRAMIS, and INTERCONTINENTAL CITY STARS)  2009 making six indoor sites at CITY STARS A1,A3,A6,A8, AHLY BANK, and EGYTECH company  2010 working as a site engineer in different areas such as 6th of October (25 sites was installed), Helioplice (10 sites was installed), and Nasr City (10 sites was installed).  2011 working as a site engineer in different areas such as 6th of October (20 sites was installed), Helioplice (12 sites was installed), and Nasr City (8 sites was installed).  2012 working as site engineer in Helioplice (4 sites was installed), Nasr City (6 sites was installed, Ismalya (3 sites was installed), New Cairo (13 sites was installed), Obour (2 sites was installed), 10th of Ramadan (3 sites was installed), Shourok (1 site was installed), old cairo (1 site was installed), Ring road (5 sites was installed), and Port Said (1 site was installed).  2013 working as site engineer in Helioplice (1 site was installed), Nasr City (5 sites was installed, Ismalya (3 sites was installed), New Cairo (18 sites was installed), Obour (3 sites was installed), 10th of Ramadan (6 sites was installed), Shourok (2 sites was installed), old cairo (1 site was installed), Ring road (3 sites was installed), and Port Said (4 sites was installed).  2014 working as site engineer in Helioplice (2 site was installed), Nasr City (3 sites was installed, Ismalya (8 sites was installed), New Cairo (15 sites was installed), Obour (1 site was installed), 10th of Ramadan (2 sites was installed), Shourok (6 sites was installed), old cairo (3 site was installed), Ring road (1 site was installed), and Port Said (1 site was installed).  2015 working as site engineer in Helioplice (3 site was installed), Nasr City (7 sites was installed, Ismalya (2 sites was installed), New Cairo (16 sites was installed), Obour (9 sites was installed), 10th of Ramadan (10
  • 2. 2 sites was installed), Shourok (4 sites was installed), old cairo (1 site was installed), Ring road (2 sites was installed), and Port Said (5 sites was installed).  2016 working as site engineer in Port Sasid (2 site was installed), Ismailia (4 sites was installed), Shobra Kheima (33 sites was installed), New Cairo (21 sites was installed), 10th of Ramadan (1 site was installed), and Ring Road (2 sites was installed).  About two hundred and 50 macro site have been installed in the past seven years.  Rollout of 3G Network.  Following up the consultants regarding construction supervision on contractors.  Supervising site construction to ensure compliance with work standards and timely delivery.  Expansion of the sites from 900MHZ to 1800MHZ.  Expansion of the sites from 1800MHZ to 2110MHZ.  Site acceptance (Civil work, Earth system and GSM work, feeder measurements …etc).  Make commission and installing for Avitec repeaters. Site Engineer, Specialized Engineering Contracting Company (S.E.C.C) July 2006– Jan 2007  Make isolation for ducts of the A/C and pipe lines of sellers. Site Engineer, Adnan Company Jan 2007-June 2007  Supervising on finishing Blue Bay hotel at Ras Seder at Red Sea Egypt. PROFESSIONAL TRAINING  Trainee, El-Araby office for design, June 2005 - Aug. 2005  Trainee, EPICO construction company, June 2004 - Aug. 2004  Trainee, General authorization for Educational Buildings, June 2003 - Aug. 2003  Trainee, Training center for construction, June 2002 - Aug. 2002 SKILLS COMPUTER:  Extensive Knowledge on use of computers and most of its applications (MS Office, Photoshop, etc.)  Extensive knowledge of using the Internet  Extensive knowledge of CAD packages such as AutoCAD (2005), Primavera P3, and Sap (2000). LANGUAGE:  Excellent in spoken and written English.  Arabic mother tongue OTHER SKILLS:  Good research capabilities  Capable of working in groups  Capable of working under pressure  Capable of working in multi-cultural environment REFRENCES FURNISHED UPON REQUEST