SlideShare a Scribd company logo
NOA No.: 13-0122.07
Expiration Date: 04/04/18
Approval Date: 04/11/13
Page 1 of 9
MIAMI-DADE COUNTY
PRODUCT CONTROL SECTION
DEPARTMENT OF REGULATORY AND ECONOMIC RESOURCES (RER) 11805 SW 26 Street, Room 208
BOARD AND CODE ADMINISTRATION DIVISION Miami, Florida 33175-2474
T (786) 315-2590 F (786) 315-2599
NOTICE OF ACCEPTANCE (NOA) www.miamidade.gov/economy
O’Hagin Manufacturing, LLC
210 Classic Court, Suite #100
Rohnert Park, CA 94928
SCOPE:
This NOA is being issued under the applicable rules and regulations governing the use of construction materials. The
documentation submitted has been reviewed and accepted by Miami-Dade County RER - Product Control Section to be
used in Miami Dade County and other areas where allowed by the Authority Having Jurisdiction (AHJ).
This NOA shall not be valid after the expiration date stated below. The Miami-Dade County Product Control Section
(In Miami Dade County) and/or the AHJ (in areas other than Miami Dade County) reserve the right to have this product
or material tested for quality assurance purposes. If this product or material fails to perform in the accepted manner, the
manufacturer will incur the expense of such testing and the AHJ may immediately revoke, modify, or suspend the use
of such product or material within their jurisdiction. RER reserves the right to revoke this acceptance, if it is
determined by Miami-Dade County Product Control Section that this product or material fails to meet the requirements
of the applicable building code.
This product is approved as described herein, and has been designed to comply with the Florida Building Code
including the High Velocity Hurricane Zone of the Florida Building Code.
DESCRIPTION: O'Hagin's Cloaked Vent Tile
LABELING: Each unit shall bear a permanent label with the manufacturer's name or logo, city, state and following
statement: "Miami-Dade County Product Control Approved", unless otherwise noted herein.
RENEWAL of this NOA shall be considered after a renewal application has been filed and there has been no change
in the applicable building code negatively affecting the performance of this product.
TERMINATION of this NOA will occur after the expiration date or if there has been a revision or change in the
materials, use, and/or manufacture of the product or process. Misuse of this NOA as an endorsement of any product, for
sales, advertising or any other purposes shall automatically terminate this NOA. Failure to comply with any section of
this NOA shall be cause for termination and removal of NOA.
ADVERTISEMENT: The NOA number preceded by the words Miami-Dade County, Florida, and followed by the
expiration date may be displayed in advertising literature. If any portion of the NOA is displayed, then it shall be done
in its entirety.
INSPECTION: A copy of this entire NOA shall be provided to the user by the manufacturer or its distributors and
shall be available for inspection at the job site at the request of the Building Official.
This renew NOA# 09-0316.04 and consists of pages 1 through 9.
The submitted documentation was reviewed by Alex Tigera.
NOA No.: 13-0122.07
Expiration Date: 04/04/18
Approval Date: 04/11/13
Page 2 of 9
ROOFING COMPONENT APPROVAL
Category: Roofing
Sub-Category: Ventilation
Material: 26ga. Steel; 0.032” Aluminum; 16 oz. Copper
Minimum Slope: 2:12
TRADE NAMES OF PRODUCTS MANUFACTURED OR LABELED BY APPLICANT
Product Dimensions Test
Specification
Product
Description
O'Hagin's Cloaked Vent
Tile S-Profile
29" x 19" x 2" TAS 100 Metal roof vent for tile roofs
O'Hagin's Cloaked Vent
Tile M-Profile
26-1
/4" x 19" x 2" TAS 100 Metal roof vent for tile roofs
O'Hagin's Cloaked Vent
Tile Flat-Profile
26" x 19-1
/2" x 4" TAS 100 Metal roof vent for tile roofs
Primary Vent - Standard
Flange
24" x 11" x ½” TAS 100 Primary metal vent flashing for Flat, M, and S
Profile vents
Primary Vent - Diverter
Flange
24" x 11" x ½” TAS 100 Primary metal vent flashing with a diverter for
Flat, M, and S Profile vents
MANUFACTURING LOCATION
1. Rohnert Park, CA
2. Lakeland, FL
EVIDENCE SUBMITTED
Test Agency/Identifier Name Report Date
PRI Construction Materials Technologies TAS 100(A) OHI-025-02-01 01/10/08
TAS 100(A) OHI-014-02-02 12/08/07
TAS 100(A) OHI-026-02-01 01/10/08
Center For Applied Engineering, Inc. PA 100A MTS No. 257732b 07/30/96
NOA No.: 13-0122.07
Expiration Date: 04/04/18
Approval Date: 04/11/13
Page 3 of 9
APPROVED APPLICATIONS:
Trade Name: O’Hagin’s Cloaked Vent Tile
System Type A: Mechanical attachment of vent under tile.
Slot: Mark a 19" x 7" opening centered between layout lines and aligned approximately as shown
on exposure lines as seen in Detail A. Set blade to thickness of sheathing and cut opening.
Brush away sawdust and debris.
Installation: Set primary vent (with or without diverter) in a 1/8" (2.54cm) bed of asphalt roofing cement.
Secure primary vent to the roof deck with 1-1/4" x 3/8" (3.16 x .953cm) galvanized ring
shank roofing nails spaced 4" (10.16cm) o.c. Seal nails with an approved ASTM D 4586
roofing cement, sealing primary vent flange with a layer of Perma glass mesh buttered into
the roof cement around the flange.
The tile vent can now be centered over the primary vent and nailed at the head with 2 ea. 1-
1/4" x 3/8" (3.16 x .953cm) galvanized ring shank roofing nails. See Detail A.
Ventilation
Calculations:
See manufacturer’s published literature for net free area
LIMITATIONS:
1. Refer to applicable Building Code required ventilation.
2. The installation shall be applied in compliance with the manufacturer's current published application instruction
and the requirements set forth in applicable building code.
3. Wind Clip hooks shall be fully engaged under head of preceding tiles.
4. O'Hagin's Cloaked vent tile may be installed on roofs up to roof mean heights of 40 ft.
5. All products listed herein shall have a quality assurance audit in accordance with the Florida Building Code and
Rule 9N-3 of the Florida Administrative Code.
NOA No.: 13-0122.07
Expiration Date: 04/04/18
Approval Date: 04/11/13
Page 4 of 9
DETAIL A
PRIMARY VENT (WITH OR WITHOUT DIVERTER FLANGE) INSTALLATION
1.Mark and cut a 19” x 7” hole in the roof deck 2. Seal using sufficient amount of locally
Centered between layout lines and aligned approved sealant around outer flange of
Approximately as shown on the exposure lines. Primary vent.
(Set blade to the thickness of the sheathing)
3. Attach at 4-inch centers using approved roofing 4. Flash using locally approved peel and
Nails of sufficient length to penetrate the stick.
Sheathing.
NOA No.: 13-0122.07
Expiration Date: 04/04/18
Approval Date: 04/11/13
Page 5 of 9
S-TILE VENT INSTALLATION
1. Install secondary vent cover, bending the 2. Secure with approved roofing nails of
Wind clip tightly under the preceeding course sufficient length to penetrate the
Of tile, adjusting for head lap. Sheathing.
M-TILE VENT INSTALLATION
1. Tile is inserted between perforated top of secondary vent cover and bottom flanged with water
channel. Bend the wind clip tightly under the preceding course of tile, asjusting for head lap. The
secondary vent cover takes the place of two field tiles.
NOA No.: 13-0122.07
Expiration Date: 04/04/18
Approval Date: 04/11/13
Page 6 of 9
FLAT-TILE VENT INSTALLATION
1. Tile is inserted between louvered top of secondary vent cover and bottom flanged with water
channel. Bend the wind clip tightly under the preceding course of tile, asjusting for head lap.
Remove 2 to 3 inches of the tile batten lug on either side of the secondary vent cover for proper
fit. For tiles with continuous lugs, a portion of the lug may be removed as needed for wind clip
installation. The secondary vent cover takes the place of two field tiles.
NOA No.: 13-0122.07
Expiration Date: 04/04/18
Approval Date: 04/11/13
Page 7 of 9
DETAIL "B"
M-PROFILE
S-PROFILE
NOA No.: 13-0122.07
Expiration Date: 04/04/18
Approval Date: 04/11/13
Page 8 of 9
FLAT-PROFILE
NOA No.: 13-0122.07
Expiration Date: 04/04/18
Approval Date: 04/11/13
Page 9 of 9
PRIMARY VENT DETAIL
END OF THIS ACCEPTANCE

More Related Content

What's hot

Building inspection
Building inspectionBuilding inspection
Building inspection
AlaymAguilar
 
2012.10.26_Blanco Residence - full permit set
2012.10.26_Blanco Residence - full permit set2012.10.26_Blanco Residence - full permit set
2012.10.26_Blanco Residence - full permit setSadaf Mohammadi
 
Construction pdf major project
Construction pdf major projectConstruction pdf major project
Construction pdf major project
Yolanda Sewpersad
 
Brisbane ferries project drawings
Brisbane ferries project drawingsBrisbane ferries project drawings
Brisbane ferries project drawings
Girish Ravikumar
 
03-Addendum-1-Office-Drawings.pdf
03-Addendum-1-Office-Drawings.pdf03-Addendum-1-Office-Drawings.pdf
03-Addendum-1-Office-Drawings.pdf
Min Khant Kyaw
 

What's hot (8)

Building inspection
Building inspectionBuilding inspection
Building inspection
 
2012.10.26_Blanco Residence - full permit set
2012.10.26_Blanco Residence - full permit set2012.10.26_Blanco Residence - full permit set
2012.10.26_Blanco Residence - full permit set
 
20150811-Allied Telecom
20150811-Allied Telecom20150811-Allied Telecom
20150811-Allied Telecom
 
20150330_R4D_Permit Set
20150330_R4D_Permit Set20150330_R4D_Permit Set
20150330_R4D_Permit Set
 
Construction pdf major project
Construction pdf major projectConstruction pdf major project
Construction pdf major project
 
Brisbane ferries project drawings
Brisbane ferries project drawingsBrisbane ferries project drawings
Brisbane ferries project drawings
 
201
201201
201
 
03-Addendum-1-Office-Drawings.pdf
03-Addendum-1-Office-Drawings.pdf03-Addendum-1-Office-Drawings.pdf
03-Addendum-1-Office-Drawings.pdf
 

Similar to Roofing component approval

Spray Polyurethane Foam Roof: An Incredibly Easy Method That Works For All
Spray Polyurethane Foam Roof: An Incredibly Easy Method That Works For AllSpray Polyurethane Foam Roof: An Incredibly Easy Method That Works For All
Spray Polyurethane Foam Roof: An Incredibly Easy Method That Works For All
weathertightsystemsinc
 
Spray Polyurethane Foam (SPF) Roofing: Installation & Performance
Spray Polyurethane Foam (SPF) Roofing: Installation & PerformanceSpray Polyurethane Foam (SPF) Roofing: Installation & Performance
Spray Polyurethane Foam (SPF) Roofing: Installation & Performance
weathertightsystemsinc
 
Polyurethane Spray Foam Roofing – Hi-rise specialists, when the storm comes
Polyurethane Spray Foam Roofing – Hi-rise specialists, when the storm comesPolyurethane Spray Foam Roofing – Hi-rise specialists, when the storm comes
Polyurethane Spray Foam Roofing – Hi-rise specialists, when the storm comes
weathertightsystemsinc
 
WeatherTight Systems - Spray Foam Roofing Contractor
WeatherTight Systems - Spray Foam Roofing ContractorWeatherTight Systems - Spray Foam Roofing Contractor
WeatherTight Systems - Spray Foam Roofing Contractor
weathertightsystemsinc
 
2011 CTM Session 2: Terminology for Products
2011 CTM Session 2: Terminology for Products2011 CTM Session 2: Terminology for Products
2011 CTM Session 2: Terminology for Products
novacsi
 
New Aia Hurricane 2007
New Aia Hurricane 2007New Aia Hurricane 2007
New Aia Hurricane 2007jbgask
 
Fire dampers installation
Fire dampers installationFire dampers installation
Fire dampers installation
Construction Technical Services Arabia
 
Fire Extinguisher and Cabinets Catalog
Fire Extinguisher and Cabinets CatalogFire Extinguisher and Cabinets Catalog
Fire Extinguisher and Cabinets Catalog
fireextcabinet
 
Selecting the Correct Underslab Membrane
Selecting the Correct Underslab MembraneSelecting the Correct Underslab Membrane
Selecting the Correct Underslab Membrane
W. R. Meadows
 
Roll a-way storm protection
Roll a-way storm protectionRoll a-way storm protection
Roll a-way storm protectionlisaqmiusa
 
General Arrangement Drawings
General Arrangement DrawingsGeneral Arrangement Drawings
General Arrangement DrawingsMark Flynn
 
Home Shelter Fallout Shelter Below Ground
Home Shelter Fallout Shelter Below GroundHome Shelter Fallout Shelter Below Ground
Home Shelter Fallout Shelter Below Ground
JTRourke
 
Home Fallout/Bomb Shelter Outside Concrete
Home Fallout/Bomb Shelter Outside ConcreteHome Fallout/Bomb Shelter Outside Concrete
Home Fallout/Bomb Shelter Outside Concrete
JTRourke
 
General Specification for Thermofoil Heater, All-Polyimide, Space Applications
General Specification for Thermofoil Heater, All-Polyimide, Space ApplicationsGeneral Specification for Thermofoil Heater, All-Polyimide, Space Applications
General Specification for Thermofoil Heater, All-Polyimide, Space Applications
Belilove Company-Engineers
 
EagleBurgmann FSA Article
EagleBurgmann FSA ArticleEagleBurgmann FSA Article
EagleBurgmann FSA ArticleMatt Long
 
Assmann doublewall tank specification
Assmann doublewall tank specificationAssmann doublewall tank specification
Assmann doublewall tank specification
OSWALDO OLIVARES
 
Spec u kon fsi 2021
Spec u kon fsi 2021Spec u kon fsi 2021
Spec u kon fsi 2021
Blair Davies, P.Eng., M.B.A.
 

Similar to Roofing component approval (20)

Spray Polyurethane Foam Roof: An Incredibly Easy Method That Works For All
Spray Polyurethane Foam Roof: An Incredibly Easy Method That Works For AllSpray Polyurethane Foam Roof: An Incredibly Easy Method That Works For All
Spray Polyurethane Foam Roof: An Incredibly Easy Method That Works For All
 
Spray Polyurethane Foam (SPF) Roofing: Installation & Performance
Spray Polyurethane Foam (SPF) Roofing: Installation & PerformanceSpray Polyurethane Foam (SPF) Roofing: Installation & Performance
Spray Polyurethane Foam (SPF) Roofing: Installation & Performance
 
Polyurethane Spray Foam Roofing – Hi-rise specialists, when the storm comes
Polyurethane Spray Foam Roofing – Hi-rise specialists, when the storm comesPolyurethane Spray Foam Roofing – Hi-rise specialists, when the storm comes
Polyurethane Spray Foam Roofing – Hi-rise specialists, when the storm comes
 
WeatherTight Systems - Spray Foam Roofing Contractor
WeatherTight Systems - Spray Foam Roofing ContractorWeatherTight Systems - Spray Foam Roofing Contractor
WeatherTight Systems - Spray Foam Roofing Contractor
 
2011 CTM Session 2: Terminology for Products
2011 CTM Session 2: Terminology for Products2011 CTM Session 2: Terminology for Products
2011 CTM Session 2: Terminology for Products
 
New Aia Hurricane 2007
New Aia Hurricane 2007New Aia Hurricane 2007
New Aia Hurricane 2007
 
Roof maintenance
Roof maintenanceRoof maintenance
Roof maintenance
 
Fire dampers installation
Fire dampers installationFire dampers installation
Fire dampers installation
 
Fire Extinguisher and Cabinets Catalog
Fire Extinguisher and Cabinets CatalogFire Extinguisher and Cabinets Catalog
Fire Extinguisher and Cabinets Catalog
 
Selecting the Correct Underslab Membrane
Selecting the Correct Underslab MembraneSelecting the Correct Underslab Membrane
Selecting the Correct Underslab Membrane
 
Roll a-way storm protection
Roll a-way storm protectionRoll a-way storm protection
Roll a-way storm protection
 
Simmons Feb 13
Simmons Feb 13Simmons Feb 13
Simmons Feb 13
 
General Arrangement Drawings
General Arrangement DrawingsGeneral Arrangement Drawings
General Arrangement Drawings
 
Home Shelter Fallout Shelter Below Ground
Home Shelter Fallout Shelter Below GroundHome Shelter Fallout Shelter Below Ground
Home Shelter Fallout Shelter Below Ground
 
Home Fallout/Bomb Shelter Outside Concrete
Home Fallout/Bomb Shelter Outside ConcreteHome Fallout/Bomb Shelter Outside Concrete
Home Fallout/Bomb Shelter Outside Concrete
 
General Specification for Thermofoil Heater, All-Polyimide, Space Applications
General Specification for Thermofoil Heater, All-Polyimide, Space ApplicationsGeneral Specification for Thermofoil Heater, All-Polyimide, Space Applications
General Specification for Thermofoil Heater, All-Polyimide, Space Applications
 
EagleBurgmann FSA Article
EagleBurgmann FSA ArticleEagleBurgmann FSA Article
EagleBurgmann FSA Article
 
Assmann doublewall tank specification
Assmann doublewall tank specificationAssmann doublewall tank specification
Assmann doublewall tank specification
 
15-0478_WD_B
15-0478_WD_B15-0478_WD_B
15-0478_WD_B
 
Spec u kon fsi 2021
Spec u kon fsi 2021Spec u kon fsi 2021
Spec u kon fsi 2021
 

Recently uploaded

VAT Registration Outlined In UAE: Benefits and Requirements
VAT Registration Outlined In UAE: Benefits and RequirementsVAT Registration Outlined In UAE: Benefits and Requirements
VAT Registration Outlined In UAE: Benefits and Requirements
uae taxgpt
 
FINAL PRESENTATION.pptx12143241324134134
FINAL PRESENTATION.pptx12143241324134134FINAL PRESENTATION.pptx12143241324134134
FINAL PRESENTATION.pptx12143241324134134
LR1709MUSIC
 
The effects of customers service quality and online reviews on customer loyal...
The effects of customers service quality and online reviews on customer loyal...The effects of customers service quality and online reviews on customer loyal...
The effects of customers service quality and online reviews on customer loyal...
balatucanapplelovely
 
5 Things You Need To Know Before Hiring a Videographer
5 Things You Need To Know Before Hiring a Videographer5 Things You Need To Know Before Hiring a Videographer
5 Things You Need To Know Before Hiring a Videographer
ofm712785
 
3.0 Project 2_ Developing My Brand Identity Kit.pptx
3.0 Project 2_ Developing My Brand Identity Kit.pptx3.0 Project 2_ Developing My Brand Identity Kit.pptx
3.0 Project 2_ Developing My Brand Identity Kit.pptx
tanyjahb
 
What are the main advantages of using HR recruiter services.pdf
What are the main advantages of using HR recruiter services.pdfWhat are the main advantages of using HR recruiter services.pdf
What are the main advantages of using HR recruiter services.pdf
HumanResourceDimensi1
 
Brand Analysis for an artist named Struan
Brand Analysis for an artist named StruanBrand Analysis for an artist named Struan
Brand Analysis for an artist named Struan
sarahvanessa51503
 
amptalk_RecruitingDeck_english_2024.06.05
amptalk_RecruitingDeck_english_2024.06.05amptalk_RecruitingDeck_english_2024.06.05
amptalk_RecruitingDeck_english_2024.06.05
marketing317746
 
What is the TDS Return Filing Due Date for FY 2024-25.pdf
What is the TDS Return Filing Due Date for FY 2024-25.pdfWhat is the TDS Return Filing Due Date for FY 2024-25.pdf
What is the TDS Return Filing Due Date for FY 2024-25.pdf
seoforlegalpillers
 
Cracking the Workplace Discipline Code Main.pptx
Cracking the Workplace Discipline Code Main.pptxCracking the Workplace Discipline Code Main.pptx
Cracking the Workplace Discipline Code Main.pptx
Workforce Group
 
LA HUG - Video Testimonials with Chynna Morgan - June 2024
LA HUG - Video Testimonials with Chynna Morgan - June 2024LA HUG - Video Testimonials with Chynna Morgan - June 2024
LA HUG - Video Testimonials with Chynna Morgan - June 2024
Lital Barkan
 
Business Valuation Principles for Entrepreneurs
Business Valuation Principles for EntrepreneursBusiness Valuation Principles for Entrepreneurs
Business Valuation Principles for Entrepreneurs
Ben Wann
 
ikea_woodgreen_petscharity_dog-alogue_digital.pdf
ikea_woodgreen_petscharity_dog-alogue_digital.pdfikea_woodgreen_petscharity_dog-alogue_digital.pdf
ikea_woodgreen_petscharity_dog-alogue_digital.pdf
agatadrynko
 
Enterprise Excellence is Inclusive Excellence.pdf
Enterprise Excellence is Inclusive Excellence.pdfEnterprise Excellence is Inclusive Excellence.pdf
Enterprise Excellence is Inclusive Excellence.pdf
KaiNexus
 
Discover the innovative and creative projects that highlight my journey throu...
Discover the innovative and creative projects that highlight my journey throu...Discover the innovative and creative projects that highlight my journey throu...
Discover the innovative and creative projects that highlight my journey throu...
dylandmeas
 
20240425_ TJ Communications Credentials_compressed.pdf
20240425_ TJ Communications Credentials_compressed.pdf20240425_ TJ Communications Credentials_compressed.pdf
20240425_ TJ Communications Credentials_compressed.pdf
tjcomstrang
 
Digital Transformation and IT Strategy Toolkit and Templates
Digital Transformation and IT Strategy Toolkit and TemplatesDigital Transformation and IT Strategy Toolkit and Templates
Digital Transformation and IT Strategy Toolkit and Templates
Aurelien Domont, MBA
 
Memorandum Of Association Constitution of Company.ppt
Memorandum Of Association Constitution of Company.pptMemorandum Of Association Constitution of Company.ppt
Memorandum Of Association Constitution of Company.ppt
seri bangash
 
Tata Group Dials Taiwan for Its Chipmaking Ambition in Gujarat’s Dholera
Tata Group Dials Taiwan for Its Chipmaking Ambition in Gujarat’s DholeraTata Group Dials Taiwan for Its Chipmaking Ambition in Gujarat’s Dholera
Tata Group Dials Taiwan for Its Chipmaking Ambition in Gujarat’s Dholera
Avirahi City Dholera
 
Sustainability: Balancing the Environment, Equity & Economy
Sustainability: Balancing the Environment, Equity & EconomySustainability: Balancing the Environment, Equity & Economy
Sustainability: Balancing the Environment, Equity & Economy
Operational Excellence Consulting
 

Recently uploaded (20)

VAT Registration Outlined In UAE: Benefits and Requirements
VAT Registration Outlined In UAE: Benefits and RequirementsVAT Registration Outlined In UAE: Benefits and Requirements
VAT Registration Outlined In UAE: Benefits and Requirements
 
FINAL PRESENTATION.pptx12143241324134134
FINAL PRESENTATION.pptx12143241324134134FINAL PRESENTATION.pptx12143241324134134
FINAL PRESENTATION.pptx12143241324134134
 
The effects of customers service quality and online reviews on customer loyal...
The effects of customers service quality and online reviews on customer loyal...The effects of customers service quality and online reviews on customer loyal...
The effects of customers service quality and online reviews on customer loyal...
 
5 Things You Need To Know Before Hiring a Videographer
5 Things You Need To Know Before Hiring a Videographer5 Things You Need To Know Before Hiring a Videographer
5 Things You Need To Know Before Hiring a Videographer
 
3.0 Project 2_ Developing My Brand Identity Kit.pptx
3.0 Project 2_ Developing My Brand Identity Kit.pptx3.0 Project 2_ Developing My Brand Identity Kit.pptx
3.0 Project 2_ Developing My Brand Identity Kit.pptx
 
What are the main advantages of using HR recruiter services.pdf
What are the main advantages of using HR recruiter services.pdfWhat are the main advantages of using HR recruiter services.pdf
What are the main advantages of using HR recruiter services.pdf
 
Brand Analysis for an artist named Struan
Brand Analysis for an artist named StruanBrand Analysis for an artist named Struan
Brand Analysis for an artist named Struan
 
amptalk_RecruitingDeck_english_2024.06.05
amptalk_RecruitingDeck_english_2024.06.05amptalk_RecruitingDeck_english_2024.06.05
amptalk_RecruitingDeck_english_2024.06.05
 
What is the TDS Return Filing Due Date for FY 2024-25.pdf
What is the TDS Return Filing Due Date for FY 2024-25.pdfWhat is the TDS Return Filing Due Date for FY 2024-25.pdf
What is the TDS Return Filing Due Date for FY 2024-25.pdf
 
Cracking the Workplace Discipline Code Main.pptx
Cracking the Workplace Discipline Code Main.pptxCracking the Workplace Discipline Code Main.pptx
Cracking the Workplace Discipline Code Main.pptx
 
LA HUG - Video Testimonials with Chynna Morgan - June 2024
LA HUG - Video Testimonials with Chynna Morgan - June 2024LA HUG - Video Testimonials with Chynna Morgan - June 2024
LA HUG - Video Testimonials with Chynna Morgan - June 2024
 
Business Valuation Principles for Entrepreneurs
Business Valuation Principles for EntrepreneursBusiness Valuation Principles for Entrepreneurs
Business Valuation Principles for Entrepreneurs
 
ikea_woodgreen_petscharity_dog-alogue_digital.pdf
ikea_woodgreen_petscharity_dog-alogue_digital.pdfikea_woodgreen_petscharity_dog-alogue_digital.pdf
ikea_woodgreen_petscharity_dog-alogue_digital.pdf
 
Enterprise Excellence is Inclusive Excellence.pdf
Enterprise Excellence is Inclusive Excellence.pdfEnterprise Excellence is Inclusive Excellence.pdf
Enterprise Excellence is Inclusive Excellence.pdf
 
Discover the innovative and creative projects that highlight my journey throu...
Discover the innovative and creative projects that highlight my journey throu...Discover the innovative and creative projects that highlight my journey throu...
Discover the innovative and creative projects that highlight my journey throu...
 
20240425_ TJ Communications Credentials_compressed.pdf
20240425_ TJ Communications Credentials_compressed.pdf20240425_ TJ Communications Credentials_compressed.pdf
20240425_ TJ Communications Credentials_compressed.pdf
 
Digital Transformation and IT Strategy Toolkit and Templates
Digital Transformation and IT Strategy Toolkit and TemplatesDigital Transformation and IT Strategy Toolkit and Templates
Digital Transformation and IT Strategy Toolkit and Templates
 
Memorandum Of Association Constitution of Company.ppt
Memorandum Of Association Constitution of Company.pptMemorandum Of Association Constitution of Company.ppt
Memorandum Of Association Constitution of Company.ppt
 
Tata Group Dials Taiwan for Its Chipmaking Ambition in Gujarat’s Dholera
Tata Group Dials Taiwan for Its Chipmaking Ambition in Gujarat’s DholeraTata Group Dials Taiwan for Its Chipmaking Ambition in Gujarat’s Dholera
Tata Group Dials Taiwan for Its Chipmaking Ambition in Gujarat’s Dholera
 
Sustainability: Balancing the Environment, Equity & Economy
Sustainability: Balancing the Environment, Equity & EconomySustainability: Balancing the Environment, Equity & Economy
Sustainability: Balancing the Environment, Equity & Economy
 

Roofing component approval

  • 1. NOA No.: 13-0122.07 Expiration Date: 04/04/18 Approval Date: 04/11/13 Page 1 of 9 MIAMI-DADE COUNTY PRODUCT CONTROL SECTION DEPARTMENT OF REGULATORY AND ECONOMIC RESOURCES (RER) 11805 SW 26 Street, Room 208 BOARD AND CODE ADMINISTRATION DIVISION Miami, Florida 33175-2474 T (786) 315-2590 F (786) 315-2599 NOTICE OF ACCEPTANCE (NOA) www.miamidade.gov/economy O’Hagin Manufacturing, LLC 210 Classic Court, Suite #100 Rohnert Park, CA 94928 SCOPE: This NOA is being issued under the applicable rules and regulations governing the use of construction materials. The documentation submitted has been reviewed and accepted by Miami-Dade County RER - Product Control Section to be used in Miami Dade County and other areas where allowed by the Authority Having Jurisdiction (AHJ). This NOA shall not be valid after the expiration date stated below. The Miami-Dade County Product Control Section (In Miami Dade County) and/or the AHJ (in areas other than Miami Dade County) reserve the right to have this product or material tested for quality assurance purposes. If this product or material fails to perform in the accepted manner, the manufacturer will incur the expense of such testing and the AHJ may immediately revoke, modify, or suspend the use of such product or material within their jurisdiction. RER reserves the right to revoke this acceptance, if it is determined by Miami-Dade County Product Control Section that this product or material fails to meet the requirements of the applicable building code. This product is approved as described herein, and has been designed to comply with the Florida Building Code including the High Velocity Hurricane Zone of the Florida Building Code. DESCRIPTION: O'Hagin's Cloaked Vent Tile LABELING: Each unit shall bear a permanent label with the manufacturer's name or logo, city, state and following statement: "Miami-Dade County Product Control Approved", unless otherwise noted herein. RENEWAL of this NOA shall be considered after a renewal application has been filed and there has been no change in the applicable building code negatively affecting the performance of this product. TERMINATION of this NOA will occur after the expiration date or if there has been a revision or change in the materials, use, and/or manufacture of the product or process. Misuse of this NOA as an endorsement of any product, for sales, advertising or any other purposes shall automatically terminate this NOA. Failure to comply with any section of this NOA shall be cause for termination and removal of NOA. ADVERTISEMENT: The NOA number preceded by the words Miami-Dade County, Florida, and followed by the expiration date may be displayed in advertising literature. If any portion of the NOA is displayed, then it shall be done in its entirety. INSPECTION: A copy of this entire NOA shall be provided to the user by the manufacturer or its distributors and shall be available for inspection at the job site at the request of the Building Official. This renew NOA# 09-0316.04 and consists of pages 1 through 9. The submitted documentation was reviewed by Alex Tigera.
  • 2. NOA No.: 13-0122.07 Expiration Date: 04/04/18 Approval Date: 04/11/13 Page 2 of 9 ROOFING COMPONENT APPROVAL Category: Roofing Sub-Category: Ventilation Material: 26ga. Steel; 0.032” Aluminum; 16 oz. Copper Minimum Slope: 2:12 TRADE NAMES OF PRODUCTS MANUFACTURED OR LABELED BY APPLICANT Product Dimensions Test Specification Product Description O'Hagin's Cloaked Vent Tile S-Profile 29" x 19" x 2" TAS 100 Metal roof vent for tile roofs O'Hagin's Cloaked Vent Tile M-Profile 26-1 /4" x 19" x 2" TAS 100 Metal roof vent for tile roofs O'Hagin's Cloaked Vent Tile Flat-Profile 26" x 19-1 /2" x 4" TAS 100 Metal roof vent for tile roofs Primary Vent - Standard Flange 24" x 11" x ½” TAS 100 Primary metal vent flashing for Flat, M, and S Profile vents Primary Vent - Diverter Flange 24" x 11" x ½” TAS 100 Primary metal vent flashing with a diverter for Flat, M, and S Profile vents MANUFACTURING LOCATION 1. Rohnert Park, CA 2. Lakeland, FL EVIDENCE SUBMITTED Test Agency/Identifier Name Report Date PRI Construction Materials Technologies TAS 100(A) OHI-025-02-01 01/10/08 TAS 100(A) OHI-014-02-02 12/08/07 TAS 100(A) OHI-026-02-01 01/10/08 Center For Applied Engineering, Inc. PA 100A MTS No. 257732b 07/30/96
  • 3. NOA No.: 13-0122.07 Expiration Date: 04/04/18 Approval Date: 04/11/13 Page 3 of 9 APPROVED APPLICATIONS: Trade Name: O’Hagin’s Cloaked Vent Tile System Type A: Mechanical attachment of vent under tile. Slot: Mark a 19" x 7" opening centered between layout lines and aligned approximately as shown on exposure lines as seen in Detail A. Set blade to thickness of sheathing and cut opening. Brush away sawdust and debris. Installation: Set primary vent (with or without diverter) in a 1/8" (2.54cm) bed of asphalt roofing cement. Secure primary vent to the roof deck with 1-1/4" x 3/8" (3.16 x .953cm) galvanized ring shank roofing nails spaced 4" (10.16cm) o.c. Seal nails with an approved ASTM D 4586 roofing cement, sealing primary vent flange with a layer of Perma glass mesh buttered into the roof cement around the flange. The tile vent can now be centered over the primary vent and nailed at the head with 2 ea. 1- 1/4" x 3/8" (3.16 x .953cm) galvanized ring shank roofing nails. See Detail A. Ventilation Calculations: See manufacturer’s published literature for net free area LIMITATIONS: 1. Refer to applicable Building Code required ventilation. 2. The installation shall be applied in compliance with the manufacturer's current published application instruction and the requirements set forth in applicable building code. 3. Wind Clip hooks shall be fully engaged under head of preceding tiles. 4. O'Hagin's Cloaked vent tile may be installed on roofs up to roof mean heights of 40 ft. 5. All products listed herein shall have a quality assurance audit in accordance with the Florida Building Code and Rule 9N-3 of the Florida Administrative Code.
  • 4. NOA No.: 13-0122.07 Expiration Date: 04/04/18 Approval Date: 04/11/13 Page 4 of 9 DETAIL A PRIMARY VENT (WITH OR WITHOUT DIVERTER FLANGE) INSTALLATION 1.Mark and cut a 19” x 7” hole in the roof deck 2. Seal using sufficient amount of locally Centered between layout lines and aligned approved sealant around outer flange of Approximately as shown on the exposure lines. Primary vent. (Set blade to the thickness of the sheathing) 3. Attach at 4-inch centers using approved roofing 4. Flash using locally approved peel and Nails of sufficient length to penetrate the stick. Sheathing.
  • 5. NOA No.: 13-0122.07 Expiration Date: 04/04/18 Approval Date: 04/11/13 Page 5 of 9 S-TILE VENT INSTALLATION 1. Install secondary vent cover, bending the 2. Secure with approved roofing nails of Wind clip tightly under the preceeding course sufficient length to penetrate the Of tile, adjusting for head lap. Sheathing. M-TILE VENT INSTALLATION 1. Tile is inserted between perforated top of secondary vent cover and bottom flanged with water channel. Bend the wind clip tightly under the preceding course of tile, asjusting for head lap. The secondary vent cover takes the place of two field tiles.
  • 6. NOA No.: 13-0122.07 Expiration Date: 04/04/18 Approval Date: 04/11/13 Page 6 of 9 FLAT-TILE VENT INSTALLATION 1. Tile is inserted between louvered top of secondary vent cover and bottom flanged with water channel. Bend the wind clip tightly under the preceding course of tile, asjusting for head lap. Remove 2 to 3 inches of the tile batten lug on either side of the secondary vent cover for proper fit. For tiles with continuous lugs, a portion of the lug may be removed as needed for wind clip installation. The secondary vent cover takes the place of two field tiles.
  • 7. NOA No.: 13-0122.07 Expiration Date: 04/04/18 Approval Date: 04/11/13 Page 7 of 9 DETAIL "B" M-PROFILE S-PROFILE
  • 8. NOA No.: 13-0122.07 Expiration Date: 04/04/18 Approval Date: 04/11/13 Page 8 of 9 FLAT-PROFILE
  • 9. NOA No.: 13-0122.07 Expiration Date: 04/04/18 Approval Date: 04/11/13 Page 9 of 9 PRIMARY VENT DETAIL END OF THIS ACCEPTANCE