Completions Report for the CHK Stephens Rogersville Shale Vertical Well less the important data still held confidential via the Confidentiality of the Stratigraphic Test phase of this well. Differences in adjacent control are noted on report. Thinking back on completions report where the PKV was so wet, noticed Chesapeake had pumped in 7660 bbl water and x link jel with 425 Klbs sand and only recovered 5700 bbl water just 8 days before the Pumpkin Valley completion where they pumped in 50 bbl water and got back 50 bo, 252 mcfg, 815 bbl water. These zones are 400' apart vert but directly on or adjacent to a small reverse fault, could be they recovered the Rome input water from the adjacent PKV treatment zone.