Rongmei Naga Baptist Association -Manipur
Source of Income



• JTT :                  Rs.1,05,59,000 =(89 %)
• Own Means :            Rs.13,53,638 = (11%)
• Total budget :         Rs.1,19,12,638 =(100%)

• Project Period: April 2010 – 31 March 2011

• Project Location: Manipur
Command area: 2138.5 Acres.
(This is including waste land/abandoned terrace due to water shortage
(457 acres out of 14 Partner NGOs).

The total existing terrace before DBI program is 1681 acres.

It is calculated the paddy production is increased by 1/3.

Household benefited: 798

Total village covered: 32

Total investment per acre: Rs. 4937

Total investment per household: Rs.13,232

District:06
Partners & Operational Areas
Sl.     Organization                                                 No.       Total no.of      No. of     Districts
No.                                                                Villages   house-hold in   household
                                                                                a village     benefitted
1       Chamdil Khobul Social Welfare Arts & Culture Association                  109            107       CHANDEL
                                                                      3
        (CKSWACA)
2                                                                                 135            48        CHURACHANDPUR
        Rural Women Upliftment Society (RWUS)                         2
3                                                                                 204            64        TAMENGLONG
        Rongmei Naga Baptist Association (RNBA)                       3
4                                                                                 241            182       CHANDEL
        Rural Education and Action for Change-Manipur (REACH-M)       3
5       Yeomen Extension Service (YES)                                2           43             55        SENAPATI
6                                                                                 185            28        TAMENGLONG
        Zeliangrong Evangelical Fellowship (ZEF)                      2
7                                                                                 149            42        UKHRUL
        Women Action for Reconstruction and Reformation (WARR)        2
8                                                                                 195            51        BISHNUPUR
        Rongmei Christian Development Society (RCDS)                  2
9       Rural Aid Service (RAS)                                       2           45             45        CHURACHANDPUR
10                                                                                138            63        BISHNUPUR
        People Resource Development Association (PRDA)                3
11      Evangelical Assembly Church (EAC)                             2           75             38        CHURACHANDPUR
12                                                                                391            33        UKHRUL
        Action for Women in Development (AWID)                        2
13                                                                                195            24        CHANDEL
        Weaker Section Development Council (WSDC)                     2
14                                                                                 62            18        TAMENGLONG
        Development Agency for Tribal People (DATP)                   2
Total   14-PIOs                                                      32           2167           798       6 (six)
Physical Achievement/Approved Fulfillment of Deviation/additional
    Activities/original plan      activities
1   check dam no.24
                      Physical Achievements
                                         21      18 (increase in the component of Boulder Sausage
                                                 and Retaining walls
2   Renovation of check dam no.04         0      NIL

3   Intake chamber no.20                   20       20

4   Distribution outlet box/reservoir      51       27. nos 2 additional
    no.24
5   Irrigationanal             canal    2643.90 m   This has been adjusted lying of pipeline
    lining/excavation 11,785 m
6   Boulder Sausage wall                  91 m      This is additional work: Boulder Sausage wall = 91 m
                                                    length
7   Pipelines fitting/ 61 m             5138.95 m   Additional Pipeline fitting = 5077.95 m length
    culvert/pick up wire no.2
8   Revolving no. 32 villages                       Second crops through “Revolving fund” :
                                                    297 beneficiaries/households @ Rs. 1000/- -2500/- in
                                                    32 villages.

9   Workshop & meeting                              • 2.nos additional training at RRC/RNBA level
    RNBA/RRC level: 04                              • Additional 16 nos. of Training at Partners level
    Partners level:28                               • RNBA. 6 no. training programs at 5 different
                                                      places.
                                                    • Partners could organize 44 no. training programs
Achievement
•   DBI is implemented through 32 User Groups to maintain the assets.

•   Facilitated village level User Groups including village population about the importance of
    natural resources; their immediate environment and how to assess and manage their local
    natural resources of land, water, biodiversity in the long run.

•   Village Authority; village institutions involved in the program implementation and
    beneficiary as well.

•   The DBI has provided drinking water cum irrigation for their fields in two villages 2 . The
    total households benefitted are 94 (Taphou village under YES is 20 + Langja village under
    RWUS is 74).

•   The program has triggered to take up second crops through “Revolving fund” to 297
    beneficiaries/households @ Rs. 1000/- -2500/- in 32 villages.
Innovations
Difficulties faced & steps taken

• Frequent bandh and strikes. (3 months bandhs and
  price hike of fuel and transport of raw materials)
 (Raised local contributions)

• Social problems like single cropping & cattle grazing
  after paddy harvest.
 Creating Revolving Fund for seconds/third crops.

• Deforestation at catchment area
 Awareness/adult education for Village authority/tribal apex
 body/Churches etc.
Leveraging for DBI (Scope)


• RNBA is lobbying state Government to include DBI
  in the NERGA schemes. There is strong possibility
  for this.
Suggestions to make the DBI program
               better
• Please continue to support DBI projects
  because DBI is appropriate rural base
  technology in lieu of huge infrastructures
  dams which are not maintained.
• Pre-sanction visit by Livolink Foundation will
  be helpful to the partners.
• Cost of materials for NE region is higher.
Types of water source
Types of water sources
Traditional DBI/Existing DBI
Technical survey & Assistance
Peoples’ participation
Irrigated terrace lands
Some activities
Cross learning
On-site training
Difficult and challenging area
Thank you

RNBA

  • 1.
    Rongmei Naga BaptistAssociation -Manipur
  • 2.
    Source of Income •JTT : Rs.1,05,59,000 =(89 %) • Own Means : Rs.13,53,638 = (11%) • Total budget : Rs.1,19,12,638 =(100%) • Project Period: April 2010 – 31 March 2011 • Project Location: Manipur
  • 3.
    Command area: 2138.5Acres. (This is including waste land/abandoned terrace due to water shortage (457 acres out of 14 Partner NGOs). The total existing terrace before DBI program is 1681 acres. It is calculated the paddy production is increased by 1/3. Household benefited: 798 Total village covered: 32 Total investment per acre: Rs. 4937 Total investment per household: Rs.13,232 District:06
  • 4.
    Partners & OperationalAreas Sl. Organization No. Total no.of No. of Districts No. Villages house-hold in household a village benefitted 1 Chamdil Khobul Social Welfare Arts & Culture Association 109 107 CHANDEL 3 (CKSWACA) 2 135 48 CHURACHANDPUR Rural Women Upliftment Society (RWUS) 2 3 204 64 TAMENGLONG Rongmei Naga Baptist Association (RNBA) 3 4 241 182 CHANDEL Rural Education and Action for Change-Manipur (REACH-M) 3 5 Yeomen Extension Service (YES) 2 43 55 SENAPATI 6 185 28 TAMENGLONG Zeliangrong Evangelical Fellowship (ZEF) 2 7 149 42 UKHRUL Women Action for Reconstruction and Reformation (WARR) 2 8 195 51 BISHNUPUR Rongmei Christian Development Society (RCDS) 2 9 Rural Aid Service (RAS) 2 45 45 CHURACHANDPUR 10 138 63 BISHNUPUR People Resource Development Association (PRDA) 3 11 Evangelical Assembly Church (EAC) 2 75 38 CHURACHANDPUR 12 391 33 UKHRUL Action for Women in Development (AWID) 2 13 195 24 CHANDEL Weaker Section Development Council (WSDC) 2 14 62 18 TAMENGLONG Development Agency for Tribal People (DATP) 2 Total 14-PIOs 32 2167 798 6 (six)
  • 5.
    Physical Achievement/Approved Fulfillmentof Deviation/additional Activities/original plan activities 1 check dam no.24 Physical Achievements 21 18 (increase in the component of Boulder Sausage and Retaining walls 2 Renovation of check dam no.04 0 NIL 3 Intake chamber no.20 20 20 4 Distribution outlet box/reservoir 51 27. nos 2 additional no.24 5 Irrigationanal canal 2643.90 m This has been adjusted lying of pipeline lining/excavation 11,785 m 6 Boulder Sausage wall 91 m This is additional work: Boulder Sausage wall = 91 m length 7 Pipelines fitting/ 61 m 5138.95 m Additional Pipeline fitting = 5077.95 m length culvert/pick up wire no.2 8 Revolving no. 32 villages Second crops through “Revolving fund” : 297 beneficiaries/households @ Rs. 1000/- -2500/- in 32 villages. 9 Workshop & meeting • 2.nos additional training at RRC/RNBA level RNBA/RRC level: 04 • Additional 16 nos. of Training at Partners level Partners level:28 • RNBA. 6 no. training programs at 5 different places. • Partners could organize 44 no. training programs
  • 6.
    Achievement • DBI is implemented through 32 User Groups to maintain the assets. • Facilitated village level User Groups including village population about the importance of natural resources; their immediate environment and how to assess and manage their local natural resources of land, water, biodiversity in the long run. • Village Authority; village institutions involved in the program implementation and beneficiary as well. • The DBI has provided drinking water cum irrigation for their fields in two villages 2 . The total households benefitted are 94 (Taphou village under YES is 20 + Langja village under RWUS is 74). • The program has triggered to take up second crops through “Revolving fund” to 297 beneficiaries/households @ Rs. 1000/- -2500/- in 32 villages.
  • 7.
  • 8.
    Difficulties faced &steps taken • Frequent bandh and strikes. (3 months bandhs and price hike of fuel and transport of raw materials) (Raised local contributions) • Social problems like single cropping & cattle grazing after paddy harvest. Creating Revolving Fund for seconds/third crops. • Deforestation at catchment area Awareness/adult education for Village authority/tribal apex body/Churches etc.
  • 9.
    Leveraging for DBI(Scope) • RNBA is lobbying state Government to include DBI in the NERGA schemes. There is strong possibility for this.
  • 10.
    Suggestions to makethe DBI program better • Please continue to support DBI projects because DBI is appropriate rural base technology in lieu of huge infrastructures dams which are not maintained. • Pre-sanction visit by Livolink Foundation will be helpful to the partners. • Cost of materials for NE region is higher.