                        OBJECTIVES
Gravity flow of water is harvested through check/weird dam, irrigational
canal and pipelines       for agriculture purpose and      increase food
production.
Income increased for small & marginal farmers through cultivation of
different crops.
Water and land resource are utilized judiciously by the community.


                                                         Presented by;
                                                         Mumai Pheiga
                                                         Secretary RNBA
   YEOMEN EXTENSION SERVICES (YES)                           -SENAPATI
   ACTION OF WOMEN IN DEVELOPMENT (AWID)                      -UKHRUL
   DEVELOPMENT AGENCY FOR TRIBLE PEOPLE (DATP)          -TAMENGLONG
   EVANGELICAL ASSEMBLY CHURCH (EAC)                 -CHURACHANDPUR
   PEOPLE’S RESOURCE DEVELOPMENT ASSOCIATION (PRDA)       -BISHNUPUR
   RURAL AID SERVICES (RAS)                          -CHURACHANDPUR
   WOMEN ACTION FOR RECONSTRUCTION & REFORMATION (WARR)        -UKHRUL
   CHAMDIL KHUBUL SOCIAL WELFARE ARTS & CULTURE ASSOCIATION
                                                   (CKSWACA) -CHANDEL
   WEAKER SECTION’S DEVELOPMENT COUNCIL (WSDC)               -CHANDEL
   RURAL EDUCATON & ACTION FOR CHANGE,MANIPUR (REACH-M)      -CHANDEL
   ZELIANGRONG EVENGELICAL FELLOWSHIP (ZEF)             -TAMENGLONG
   RURAL WOMEN UPLIFTMENT SOCIETY (RWUS)             -CHURACHANDPUR
   RONGMEI CHRISTIAN DEVELOPMENT SOCIETY (RCDS)            -BISHNUPUR
   RONGMEI NAGA BAPTIST ASSOCIATION (RNBA)              -TAMENGLONG
PROJECT PEOPLE
ORGANISATION      NO.     NO. OF POPULATION TO BE      DISTRICT
               VILLAGES           BENIFITED
    YES           3                240                 SENAPATI
   AWID           2                267                 UKHRUL

    DATP          2                145               TAMENGLONG

    EAC           2                255              CHURACHANDPUR

    PRDA          2                415                BISHNUPUR

    RAS           2                253              CHURACHANDPUR
   WARR           4                640                 UKHRUL

   WSDC           2                517                 CHANDEL
  REACH-M         5                810                 CHANDEL

    ZEF           2                330               TAMENGLONG

   RWUS           8                233              CHURACHANDPUR

    RCDS          2                275                BISHNUPUR

  CKSWACA         5                385                 CHANDEL

 RNBA-NGO         3                318               TAMENGLONG

 Total= 14       44               5083                    6
PROGRAM COMPONENTS
A    CONSTRUCTION WORK INFRASTRUCTURE INPUTS                     No./Metre

1   Check dam                                                        23
2   Renovation of check dam                                          04
3   Intake chamber/structure construction                            21
4   Distribution chamber/reservoir & Outlet Box                      24
5   Canal lining/excavation of irrigational canal           3593 Metre (Expected)

6   Water Transport pipelines (HDP), Culvert & Pick-up       63 Metre (Expected)
7   Boulder Sausage                                                  Nil
B                  SOCIAL MOBILISATION
1   Joint meetings of implementing Partner NGO and User           28 times
    Groups
2   Data Collection from villages (1st year and 2nd year)        75 villages
C                     CAPACITY BUILDING
1   Joint workshops of SDTT/JTT/RNBA/NGO partners                  4 times
DETAILS OF PROJECT ACTIVITIES/VILLAGE/LOCATION/AREA COVERAGE OF PARTNER WISE.

Sl.   Name of                    Name of villages                     Activities to be taken up                 Total family   Area to be
No    PIO’s                         involved                                                                       to be        covered
                                                                                                                  covered       (Acres)
1     Action of Women in T-chanhong                      Renovation of Check Dam/ Irrigation                        19            33.5
      Development (AWID)                                 Canal Lining
                         Taishar-2                       Construction of Check Dam/ Intake Chamber.                 14             22
                                                                                                     TOTAL          33            55.5
2     People’s       Resource G.Mongjang                 Check Dam                                                  21             45
      Development             Gothol                     Check Dam-(I) ,nCheck Dam-(2)                              42             73
      Association (PRDA)
                                                                                                      TOTAL         63            118
3     Rongmei Naga Baptist Lonjang (Kabui Khullen)       Intake Chamber/ Irrigational Canal Lining                  27            45.5
      Association (RNBA)
                           Bakuwa                        Intake Chamber(5 no.)                                      26             50
                              Bwanruangh                 Check Dam/Intake Chamber-(1)/                              23            69.5
                                                         Intake Chamber-(2)/
                                                         Distribution Out-let Boxes.
                                                                                                       TOTAL        76            165
4     Development Agency      Duigaram                   Check Dam./Intake Chamber.                                 14            36
      for Tribal People                                  Excavation of open canal
      (DATP)                  Guangram                   Check Dam/Intake Chamber/                                  10            23
                                                         Excavation of open canal with pipeline for hard rock
                                                         portion.
                                                         Total                                                      24            59
5     Chamdil Khubul Social Chandel Christian            Check Dam/ Irrigation Canalining/ Excavation.              40            114
      Welfare Arts & Culture Chamdil Khubul,             Renovation of Check Dam/ lining/Excavation.                41           215.6
      Association (CKSWACA)
                             Chandel Christian-Hnatham   Check Dam/Lining/Excavation                                22            90

                                                         Total                                                     103           420

6     Rural Women Upliftment Thenmuol                    Check Dam-(1)                                              16             33
      Society (RWUS)
                             Hmarveng                    Distribution Outlet Reservoir                              19             50
                                                                                                     TOTAL          35            83
Sl.   Name of                           Name of villages            Activities to be taken up                Total family to be    Area to be covered
No    PIO’s                                involved                                                               covered                Acres


7     Zeliangrong           Evangelical Phallong           Check Dam                                                25                    53
      Fellowship (ZEF)
                                        Machiengluang      Intake Chamber/Canal Lining Excavation.                  30                    27
                                                                                                 TOTAL              55                    80

8     Rural Aid Service (RAS)           B.Kaljang          Construction of Check Dam/ Distribution                  28                    148
                                                           Outlet Box.
                                        Boljol             Check Dam/ Distribution Outlet/                          25                    105
                                                           Irrigational canal Lining/ Pipeline Outlet Box.
                                                                                            TOTAL                    53                   253
9     Rural Education and Action for Langol                Distribution Outlet-Box/ Pipeline fitting/               106                  111.15
      Change-Manipur                                       Culvert Pick up weir
      (REACH-M)                      Kangshang-2           Check Dam/ Distribution Outlet-Box/ lining.              16                   34.58
                                        Machi,             Check Dam/ DistributionOutlet-Box/ Lining                15            10

                                                                                                TOTAL               137                   186

10    Weaker Section’s    Development Laiching Khunman     Check Dam/Lining/Excavation                              19                    49
      Council (WSDC)
                                        Lainingkhul        Check Dam/Lining/Excavation                              23                    35
                                                                                                 TOTAL              42                    84

11    WomenAction For Reconstruction Phange 1&2            Check Dam-(1)Check Dam-(2)                               15                    22.0
      & Reformation (WARR)
                                        Maku               Check Dam(1)Check Dam-(2)                                 43                   50
                                                                                                                     51                   50
                                                                                                 TOTAL              109                   122

12    (EAC)                             Tuiningkhal        Renovation of Check Dam/ Pipeline fitting/               21                    80
                                                           Culvert Pick up weir.
                                        G. Khonom          Check Dam                                                20                    100

                                                                                                 TOTAL               41                   180
Sl. No Name of                                Name of             Activities to be              Total family   Area to be
       PIO’s                                   villages              taken up                  to be covered    covered
                                              involved                                                          (Acres)

13    Yeomen Extension Services (YES)    Amesiiphro            Check Dam-(1)/                       17             47
                                                               Check Dam-(2)/
                                                               Canal Lining Excavation



                                         Taphou    Maram   & Check      Dam/          Intake        17             37
                                         Rongmei Namthan     Chamber/       Irrigation-Canal
                                                             Lining Excavation



                                                                                   TOTAL            34             84



 14   Rongmei     Christian   Development Wainem               Intake Chamber/Structure/            30             67
      Society (RCDS)                                           Canal Lining/ Excavation


                                         Thenjang              Renovation of Check Dam/             21             43
                                                               Irrigation of
                                                               Canal lining.



                                                                                TOTAL               51            110


                                                                   Grand Total                     849           2782
Zou, 1%
                                                                 Mao
     Puimei(Kabui), Paite, 0%           Chothe, 4%               Poumei
                                                                 Maram
          2%                               , Mao, 1%             Thangal
                                              Poumei, 1%         Rongmei
      Liangmei, 1%                                               Tangkhul
                                               Maram, 1%         Kuki
      Chiru, 0%                                                  Meitei
                                               Thangal, 1%
      Khoibu, 5%                                                 Vaiphei
                                                                 Neihsil
      Maring, 18%                                 Rongmei,       Gangte
      Lamkang, 0%                                   25%          Anal
                                                 Tangkhul, 17%   Monsang
      Monsang, 0%                                                Lamkang
                                                                 Aimol
       Aimol, 2%                         Kuki, 10%               Maring
         Anal, 5%                                                Khoibu
                                              Meitei, 0%         Chiru
      Gangte, 3%                                                 Liangmei
                                   Vaiphei, 1%                   Puimei(Kabui)
                     Neihsil, 0%
                                                                 Paite
                                                                 Zou
                                                                 Chothe



It will cover 44,villages / No. of district: 06 / No. of tribes involved: 23
Approximate calculation

Total land (to be covered) = 2800 Acres (Expected)

Total family = 849 (Expected Beneficiaries)

Total population = 5083 (Expected)

Average size of land per beneficiary = 1-3 acres (Expected)

Project Cost = Rs.1,19,12,893/-

Per acre investment = Rs.4250/-
Before-construction (CKSWACA)




On-construction (CKSWACA)   After-construction (CKSWACA)
Re-survey in RNBA operating areas
Work in process-EAC



    Before -DBI   On Process




     Before DBI   After-DBI
Proposed Sites
Technical training
PRDA
PRDA
PRDA
PRDA
REACH-M
REACH-M
CKASWACA
REACH-M
RNBA

More Related Content

More from livolinkfoundation

Conservation agriculture and SRI
Conservation agriculture and SRIConservation agriculture and SRI
Conservation agriculture and SRIlivolinkfoundation
 
sri secretariat, livolink foundation
sri secretariat, livolink foundationsri secretariat, livolink foundation
sri secretariat, livolink foundationlivolinkfoundation
 
Third national symposium on sri
Third national symposium on sriThird national symposium on sri
Third national symposium on srilivolinkfoundation
 
Second national symposium on sri
Second national symposium on sriSecond national symposium on sri
Second national symposium on srilivolinkfoundation
 
One step towards SRI -a document in hindi developed by SPWD
One step towards SRI -a document in hindi developed by SPWDOne step towards SRI -a document in hindi developed by SPWD
One step towards SRI -a document in hindi developed by SPWDlivolinkfoundation
 
SDTT CSO collaboration in chhattisgarh for promotion of sri among small farmers
SDTT CSO collaboration in chhattisgarh for promotion of sri among small farmersSDTT CSO collaboration in chhattisgarh for promotion of sri among small farmers
SDTT CSO collaboration in chhattisgarh for promotion of sri among small farmerslivolinkfoundation
 
Innovative technologies in agriculture and rural development
Innovative technologies in agriculture and rural developmentInnovative technologies in agriculture and rural development
Innovative technologies in agriculture and rural developmentlivolinkfoundation
 
Cover image (innovative technologies)
Cover image (innovative technologies)Cover image (innovative technologies)
Cover image (innovative technologies)livolinkfoundation
 

More from livolinkfoundation (20)

Conservation agriculture and SRI
Conservation agriculture and SRIConservation agriculture and SRI
Conservation agriculture and SRI
 
SCI by Pradan bihar
SCI by Pradan biharSCI by Pradan bihar
SCI by Pradan bihar
 
SCI by PSI uttarakhand
SCI by PSI uttarakhandSCI by PSI uttarakhand
SCI by PSI uttarakhand
 
DOA government of bihar
DOA government of biharDOA government of bihar
DOA government of bihar
 
sri secretariat, livolink foundation
sri secretariat, livolink foundationsri secretariat, livolink foundation
sri secretariat, livolink foundation
 
Third national symposium on sri
Third national symposium on sriThird national symposium on sri
Third national symposium on sri
 
Second national symposium on sri
Second national symposium on sriSecond national symposium on sri
Second national symposium on sri
 
About sri
About sriAbout sri
About sri
 
Journey of sdtt in sri
Journey of sdtt in sriJourney of sdtt in sri
Journey of sdtt in sri
 
Sri timeline updated
Sri timeline updatedSri timeline updated
Sri timeline updated
 
Updated info for sdtt sri map
Updated info for sdtt sri mapUpdated info for sdtt sri map
Updated info for sdtt sri map
 
One step towards SRI -a document in hindi developed by SPWD
One step towards SRI -a document in hindi developed by SPWDOne step towards SRI -a document in hindi developed by SPWD
One step towards SRI -a document in hindi developed by SPWD
 
SDTT CSO collaboration in chhattisgarh for promotion of sri among small farmers
SDTT CSO collaboration in chhattisgarh for promotion of sri among small farmersSDTT CSO collaboration in chhattisgarh for promotion of sri among small farmers
SDTT CSO collaboration in chhattisgarh for promotion of sri among small farmers
 
Sri drought study report
Sri drought study reportSri drought study report
Sri drought study report
 
Innovative technologies in agriculture and rural development
Innovative technologies in agriculture and rural developmentInnovative technologies in agriculture and rural development
Innovative technologies in agriculture and rural development
 
Idpm manual
Idpm manualIdpm manual
Idpm manual
 
Cover image (innovative technologies)
Cover image (innovative technologies)Cover image (innovative technologies)
Cover image (innovative technologies)
 
DBI SUB GROUP II
DBI SUB GROUP IIDBI SUB GROUP II
DBI SUB GROUP II
 
DBI PRESENTATION GRUOP 4
DBI PRESENTATION GRUOP 4DBI PRESENTATION GRUOP 4
DBI PRESENTATION GRUOP 4
 
GROUP 1
GROUP 1GROUP 1
GROUP 1
 

RNBA

  • 1. Supported by JTT-MUMBAI development & relief department Rongmei Naga Baptist Association (RNBA) OBJECTIVES Gravity flow of water is harvested through check/weird dam, irrigational canal and pipelines for agriculture purpose and increase food production. Income increased for small & marginal farmers through cultivation of different crops. Water and land resource are utilized judiciously by the community. Presented by; Mumai Pheiga Secretary RNBA
  • 2. YEOMEN EXTENSION SERVICES (YES) -SENAPATI  ACTION OF WOMEN IN DEVELOPMENT (AWID) -UKHRUL  DEVELOPMENT AGENCY FOR TRIBLE PEOPLE (DATP) -TAMENGLONG  EVANGELICAL ASSEMBLY CHURCH (EAC) -CHURACHANDPUR  PEOPLE’S RESOURCE DEVELOPMENT ASSOCIATION (PRDA) -BISHNUPUR  RURAL AID SERVICES (RAS) -CHURACHANDPUR  WOMEN ACTION FOR RECONSTRUCTION & REFORMATION (WARR) -UKHRUL  CHAMDIL KHUBUL SOCIAL WELFARE ARTS & CULTURE ASSOCIATION (CKSWACA) -CHANDEL  WEAKER SECTION’S DEVELOPMENT COUNCIL (WSDC) -CHANDEL  RURAL EDUCATON & ACTION FOR CHANGE,MANIPUR (REACH-M) -CHANDEL  ZELIANGRONG EVENGELICAL FELLOWSHIP (ZEF) -TAMENGLONG  RURAL WOMEN UPLIFTMENT SOCIETY (RWUS) -CHURACHANDPUR  RONGMEI CHRISTIAN DEVELOPMENT SOCIETY (RCDS) -BISHNUPUR  RONGMEI NAGA BAPTIST ASSOCIATION (RNBA) -TAMENGLONG
  • 3. PROJECT PEOPLE ORGANISATION NO. NO. OF POPULATION TO BE DISTRICT VILLAGES BENIFITED YES 3 240 SENAPATI AWID 2 267 UKHRUL DATP 2 145 TAMENGLONG EAC 2 255 CHURACHANDPUR PRDA 2 415 BISHNUPUR RAS 2 253 CHURACHANDPUR WARR 4 640 UKHRUL WSDC 2 517 CHANDEL REACH-M 5 810 CHANDEL ZEF 2 330 TAMENGLONG RWUS 8 233 CHURACHANDPUR RCDS 2 275 BISHNUPUR CKSWACA 5 385 CHANDEL RNBA-NGO 3 318 TAMENGLONG Total= 14 44 5083 6
  • 4. PROGRAM COMPONENTS A CONSTRUCTION WORK INFRASTRUCTURE INPUTS No./Metre 1 Check dam 23 2 Renovation of check dam 04 3 Intake chamber/structure construction 21 4 Distribution chamber/reservoir & Outlet Box 24 5 Canal lining/excavation of irrigational canal 3593 Metre (Expected) 6 Water Transport pipelines (HDP), Culvert & Pick-up 63 Metre (Expected) 7 Boulder Sausage Nil B SOCIAL MOBILISATION 1 Joint meetings of implementing Partner NGO and User 28 times Groups 2 Data Collection from villages (1st year and 2nd year) 75 villages C CAPACITY BUILDING 1 Joint workshops of SDTT/JTT/RNBA/NGO partners 4 times
  • 5. DETAILS OF PROJECT ACTIVITIES/VILLAGE/LOCATION/AREA COVERAGE OF PARTNER WISE. Sl. Name of Name of villages Activities to be taken up Total family Area to be No PIO’s involved to be covered covered (Acres) 1 Action of Women in T-chanhong Renovation of Check Dam/ Irrigation 19 33.5 Development (AWID) Canal Lining Taishar-2 Construction of Check Dam/ Intake Chamber. 14 22 TOTAL 33 55.5 2 People’s Resource G.Mongjang Check Dam 21 45 Development Gothol Check Dam-(I) ,nCheck Dam-(2) 42 73 Association (PRDA) TOTAL 63 118 3 Rongmei Naga Baptist Lonjang (Kabui Khullen) Intake Chamber/ Irrigational Canal Lining 27 45.5 Association (RNBA) Bakuwa Intake Chamber(5 no.) 26 50 Bwanruangh Check Dam/Intake Chamber-(1)/ 23 69.5 Intake Chamber-(2)/ Distribution Out-let Boxes. TOTAL 76 165 4 Development Agency Duigaram Check Dam./Intake Chamber. 14 36 for Tribal People Excavation of open canal (DATP) Guangram Check Dam/Intake Chamber/ 10 23 Excavation of open canal with pipeline for hard rock portion. Total 24 59 5 Chamdil Khubul Social Chandel Christian Check Dam/ Irrigation Canalining/ Excavation. 40 114 Welfare Arts & Culture Chamdil Khubul, Renovation of Check Dam/ lining/Excavation. 41 215.6 Association (CKSWACA) Chandel Christian-Hnatham Check Dam/Lining/Excavation 22 90 Total 103 420 6 Rural Women Upliftment Thenmuol Check Dam-(1) 16 33 Society (RWUS) Hmarveng Distribution Outlet Reservoir 19 50 TOTAL 35 83
  • 6. Sl. Name of Name of villages Activities to be taken up Total family to be Area to be covered No PIO’s involved covered Acres 7 Zeliangrong Evangelical Phallong Check Dam 25 53 Fellowship (ZEF) Machiengluang Intake Chamber/Canal Lining Excavation. 30 27 TOTAL 55 80 8 Rural Aid Service (RAS) B.Kaljang Construction of Check Dam/ Distribution 28 148 Outlet Box. Boljol Check Dam/ Distribution Outlet/ 25 105 Irrigational canal Lining/ Pipeline Outlet Box. TOTAL 53 253 9 Rural Education and Action for Langol Distribution Outlet-Box/ Pipeline fitting/ 106 111.15 Change-Manipur Culvert Pick up weir (REACH-M) Kangshang-2 Check Dam/ Distribution Outlet-Box/ lining. 16 34.58 Machi, Check Dam/ DistributionOutlet-Box/ Lining 15 10 TOTAL 137 186 10 Weaker Section’s Development Laiching Khunman Check Dam/Lining/Excavation 19 49 Council (WSDC) Lainingkhul Check Dam/Lining/Excavation 23 35 TOTAL 42 84 11 WomenAction For Reconstruction Phange 1&2 Check Dam-(1)Check Dam-(2) 15 22.0 & Reformation (WARR) Maku Check Dam(1)Check Dam-(2) 43 50 51 50 TOTAL 109 122 12 (EAC) Tuiningkhal Renovation of Check Dam/ Pipeline fitting/ 21 80 Culvert Pick up weir. G. Khonom Check Dam 20 100 TOTAL 41 180
  • 7. Sl. No Name of Name of Activities to be Total family Area to be PIO’s villages taken up to be covered covered involved (Acres) 13 Yeomen Extension Services (YES) Amesiiphro Check Dam-(1)/ 17 47 Check Dam-(2)/ Canal Lining Excavation Taphou Maram & Check Dam/ Intake 17 37 Rongmei Namthan Chamber/ Irrigation-Canal Lining Excavation TOTAL 34 84 14 Rongmei Christian Development Wainem Intake Chamber/Structure/ 30 67 Society (RCDS) Canal Lining/ Excavation Thenjang Renovation of Check Dam/ 21 43 Irrigation of Canal lining. TOTAL 51 110 Grand Total 849 2782
  • 8. Zou, 1% Mao Puimei(Kabui), Paite, 0% Chothe, 4% Poumei Maram 2% , Mao, 1% Thangal Poumei, 1% Rongmei Liangmei, 1% Tangkhul Maram, 1% Kuki Chiru, 0% Meitei Thangal, 1% Khoibu, 5% Vaiphei Neihsil Maring, 18% Rongmei, Gangte Lamkang, 0% 25% Anal Tangkhul, 17% Monsang Monsang, 0% Lamkang Aimol Aimol, 2% Kuki, 10% Maring Anal, 5% Khoibu Meitei, 0% Chiru Gangte, 3% Liangmei Vaiphei, 1% Puimei(Kabui) Neihsil, 0% Paite Zou Chothe It will cover 44,villages / No. of district: 06 / No. of tribes involved: 23
  • 9. Approximate calculation Total land (to be covered) = 2800 Acres (Expected) Total family = 849 (Expected Beneficiaries) Total population = 5083 (Expected) Average size of land per beneficiary = 1-3 acres (Expected) Project Cost = Rs.1,19,12,893/- Per acre investment = Rs.4250/-
  • 10.
  • 12. Re-survey in RNBA operating areas
  • 13. Work in process-EAC Before -DBI On Process Before DBI After-DBI
  • 16. PRDA
  • 17. PRDA
  • 18. PRDA
  • 19. PRDA

Editor's Notes

  1. By; Kasan-gai Pheiga Gangmei Program CoordinatorRNBA / RRC
  2. Re-survey in RNBA operating areas
  3. On Process
  4. Technical training
  5. PRDA
  6. REACH-M
  7. CKASWACA
  8. REACH-M