SlideShare a Scribd company logo
1 of 3
RIZWAN RIASAT
Mujahid Colony Street# 1-F SadiqAbad District Rahim Yar Khan
Cell: 00923009676313
Email: rizwanriasat@ymail.com
Objective
To work as UTILITY OPERATOR with a progressive organization where, I can
utilize my skills for improving operational performance and contributing substantially
towards the growth of the organization.
Personal
Information
Father’s Name Riasat Ali
Date of Birth 31 August 1993
Religion Islam
Marital Status Single
Domicile RahimYarKhan(Punjab)
Nationality Pakistani
N.I.C. Number 31304-2815619-7
Passport # CY9916191
Academic
Record
Course Title Institute/Board Year Division
FSc. (pre-engg) Bahawalpur Board 2010 1st
(A)
Matric (Science) Bahawalpur Board 2008 1st
(A+
)
Technical
Qualifications
Two Years Apprenticeship (2011-2013) as a CHEMICAL PLANT OPERATOR From
Fauji Fertilizer Company Ltd., Goth Machhi, Sadiqabad.
TOTAL WORKING EXPERIENCE 4 YEARS 4 MONTHS
PROFESSIONAL EXPERIENCE
COMPANY DESIGNATION FROM T0 PLANT
FAUJI FERTILIZER
COMPANY GOTH
MACHHI
FIELD OPERATOR 28-02-2011 Continue Fertilizers
Technical
skills
I have worked
at different
equipments &
machinery
 Steam turbine
 P D Pumps
 Centrifugal
Pumps
 Waste heat
recovery
section
 N Gas
Condensate
separators
 Chemical
solution
preparation
 Data
managing
 Several audits
 Control valves
& control
system
 Power Failure
 Instrument
Air Failure
COMPANY’S PROFILE
Fauji Fertilizer Company is one of the the Largest Fertilizer Complex of South Asia which
produces 60% of total Urea Production of Pakistan.
COMPANY FFC AMMONIA/UREA COMPLEX
PRODUCT SONA UREA,46% NITROGEN
DESIGN SNAM PROGETTI (ITALY)
CATALYSTS & TECHNOLOGY HALDOR TOPSOE (DENMARK)
CAPACITY 6000 MTPD (UREA)
The company is certified for :
 ISO 9001:2008 for Quality Management System
 ISO14001:2004 for maintaining Environmental standards
 OHSAS 18001:2007 Occupational Health & Safety Assessment
Series standards
MAJOR WORK EXPERIENCE
POWER GENERATION UNIT:
• Two combined cycle gas turbines.
• MS-5001 GENERAL ELECTRIC CO. OF USA.
• CAP.18 MW EACH.
• GENERATOR RATING 31375 KVA, 6.3 KV, 50 Hz & 18 MW.
• SKY-1 Speedtronic solid state electronic control system.
• control MARK-VIe and MARK-V
• DUAL FUEL SYSTEM i.e GAS, DIESEL OR BOTH.
• EMERGENCY DIESEL GENERATOR OF 2.0 MW.
Safety & skill
improvement
courses
o Fire
fighting
o Rescue
training
o Work
permit
procedure
o Process
control
o Centrifuga
l pump &
compress-
ors
o Steam &
steam
turbine
o Furnace
operation
o Heat &
heat
exchanger
EMERGENCY LOAD MANAGEMENT SYSTEM:
I briefly studied about the emergency load management system (ELMS) in case of partial or
complete power plant trip.
POWER DISTRIBUTION SYSTEM:
I learned about the power distribution electric substation, types of breakers and breakers
operation i.e MS, MCCM, PC, MCC according to their distribution.
During my experience learned about all the control and protection systems of gas turbine,
emergency handling, startup & shutdown, turn around activities, turbine rotor replacement,
generator rotor and winding servicing, various generator tests,wetwashing and carboblasting,all
work procedures, several audits on daily basis, chemical solutions preparation, Instrument air
plant and nitrogen plant combustion process etc.
INSTRUMENT AIR COMPRESSORS
Two Pd Reciprocating Air Compressor Made By Worthington. Each Having Capacity
2300 Nm3/Hr. (9.7 Kg/Cm2 & 40 o
C ) .Instrument Air Dryer (2300 Nm3/Hr.) Supply Air At
8.5 Kg/Cm2 With Storage Capacity Of 1500 Nm3.
NITROGEN GENERATION PLANT
This Section Consists Of Forced Draft Furnace (745 Nm3/Hr.) Reactor, Absorber, Pd
Reciprocating N2 Compressors And Nitrogen Storage Tank (3700 Nm3) Made By
Kemp USA Supply N2
(7.0 Kg/Cm2
& 40o
C) At 400 Nm3/Hr.
KEY ACHIEVEMENTS :
♠ Commissioning of Mark-VIe gas turbine control system.
♠ Complete overhauling of generator rotor with its auxiliaries.
♠ Complete servicing of turbine auxiliaries and rotor replacement.
Over All Job
Scope
 Monitoring & controlling parameters in defined limits during normal operation
 Carry out routine jobs and activities in accordance to defined standard operating
procedures.
 Ensure maximum safety of plant equipments and working personnel.
 Trouble shooting routine operational parameters & safe emergency handling.
 Safe chemical handling.
 Smooth start up & shut down activities of post assigned.
 Safe turn around activities.

More Related Content

Similar to RIZWAN RIASAT CV (20)

Arslan Cv OIL&GAS
Arslan Cv OIL&GASArslan Cv OIL&GAS
Arslan Cv OIL&GAS
 
Process plant operator Shabeer Ahmad
Process plant operator Shabeer AhmadProcess plant operator Shabeer Ahmad
Process plant operator Shabeer Ahmad
 
Radha Krishna 06-08-2015
Radha      Krishna  06-08-2015Radha      Krishna  06-08-2015
Radha Krishna 06-08-2015
 
remesh new
remesh newremesh new
remesh new
 
RESUME RKS.doc
RESUME RKS.docRESUME RKS.doc
RESUME RKS.doc
 
Sanjay_Shah
Sanjay_ShahSanjay_Shah
Sanjay_Shah
 
Naseem hayat RO PLANT OPERATOR CV (1).docx
Naseem hayat RO PLANT OPERATOR CV (1).docxNaseem hayat RO PLANT OPERATOR CV (1).docx
Naseem hayat RO PLANT OPERATOR CV (1).docx
 
chemical engineer Resume (2)
chemical engineer Resume (2)chemical engineer Resume (2)
chemical engineer Resume (2)
 
final report
final reportfinal report
final report
 
SYED MOHAMMAD REHAN SALEH CV
SYED MOHAMMAD REHAN SALEH CVSYED MOHAMMAD REHAN SALEH CV
SYED MOHAMMAD REHAN SALEH CV
 
Iftikhar_Anjum_(1)_(1)
Iftikhar_Anjum_(1)_(1)Iftikhar_Anjum_(1)_(1)
Iftikhar_Anjum_(1)_(1)
 
Corporate presentation 2
Corporate presentation 2Corporate presentation 2
Corporate presentation 2
 
CV
CVCV
CV
 
CV
CVCV
CV
 
Wasif Tahir 1
Wasif Tahir 1Wasif Tahir 1
Wasif Tahir 1
 
Manager Maintenance in Nectar lifesciences Limited
Manager Maintenance in Nectar lifesciences LimitedManager Maintenance in Nectar lifesciences Limited
Manager Maintenance in Nectar lifesciences Limited
 
Sornaboopathi Resume
Sornaboopathi ResumeSornaboopathi Resume
Sornaboopathi Resume
 
RSMML training report
RSMML  training report RSMML  training report
RSMML training report
 
Muhammad Imran Mugha1
Muhammad Imran Mugha1Muhammad Imran Mugha1
Muhammad Imran Mugha1
 
Prabhu
PrabhuPrabhu
Prabhu
 

RIZWAN RIASAT CV

  • 1. RIZWAN RIASAT Mujahid Colony Street# 1-F SadiqAbad District Rahim Yar Khan Cell: 00923009676313 Email: rizwanriasat@ymail.com Objective To work as UTILITY OPERATOR with a progressive organization where, I can utilize my skills for improving operational performance and contributing substantially towards the growth of the organization. Personal Information Father’s Name Riasat Ali Date of Birth 31 August 1993 Religion Islam Marital Status Single Domicile RahimYarKhan(Punjab) Nationality Pakistani N.I.C. Number 31304-2815619-7 Passport # CY9916191 Academic Record Course Title Institute/Board Year Division FSc. (pre-engg) Bahawalpur Board 2010 1st (A) Matric (Science) Bahawalpur Board 2008 1st (A+ ) Technical Qualifications Two Years Apprenticeship (2011-2013) as a CHEMICAL PLANT OPERATOR From Fauji Fertilizer Company Ltd., Goth Machhi, Sadiqabad. TOTAL WORKING EXPERIENCE 4 YEARS 4 MONTHS PROFESSIONAL EXPERIENCE COMPANY DESIGNATION FROM T0 PLANT FAUJI FERTILIZER COMPANY GOTH MACHHI FIELD OPERATOR 28-02-2011 Continue Fertilizers
  • 2. Technical skills I have worked at different equipments & machinery  Steam turbine  P D Pumps  Centrifugal Pumps  Waste heat recovery section  N Gas Condensate separators  Chemical solution preparation  Data managing  Several audits  Control valves & control system  Power Failure  Instrument Air Failure COMPANY’S PROFILE Fauji Fertilizer Company is one of the the Largest Fertilizer Complex of South Asia which produces 60% of total Urea Production of Pakistan. COMPANY FFC AMMONIA/UREA COMPLEX PRODUCT SONA UREA,46% NITROGEN DESIGN SNAM PROGETTI (ITALY) CATALYSTS & TECHNOLOGY HALDOR TOPSOE (DENMARK) CAPACITY 6000 MTPD (UREA) The company is certified for :  ISO 9001:2008 for Quality Management System  ISO14001:2004 for maintaining Environmental standards  OHSAS 18001:2007 Occupational Health & Safety Assessment Series standards MAJOR WORK EXPERIENCE POWER GENERATION UNIT: • Two combined cycle gas turbines. • MS-5001 GENERAL ELECTRIC CO. OF USA. • CAP.18 MW EACH. • GENERATOR RATING 31375 KVA, 6.3 KV, 50 Hz & 18 MW. • SKY-1 Speedtronic solid state electronic control system. • control MARK-VIe and MARK-V • DUAL FUEL SYSTEM i.e GAS, DIESEL OR BOTH. • EMERGENCY DIESEL GENERATOR OF 2.0 MW. Safety & skill improvement courses o Fire fighting o Rescue training o Work permit procedure o Process control o Centrifuga l pump & compress- ors o Steam & steam turbine o Furnace operation o Heat & heat exchanger EMERGENCY LOAD MANAGEMENT SYSTEM: I briefly studied about the emergency load management system (ELMS) in case of partial or complete power plant trip. POWER DISTRIBUTION SYSTEM: I learned about the power distribution electric substation, types of breakers and breakers operation i.e MS, MCCM, PC, MCC according to their distribution. During my experience learned about all the control and protection systems of gas turbine, emergency handling, startup & shutdown, turn around activities, turbine rotor replacement, generator rotor and winding servicing, various generator tests,wetwashing and carboblasting,all work procedures, several audits on daily basis, chemical solutions preparation, Instrument air plant and nitrogen plant combustion process etc. INSTRUMENT AIR COMPRESSORS Two Pd Reciprocating Air Compressor Made By Worthington. Each Having Capacity 2300 Nm3/Hr. (9.7 Kg/Cm2 & 40 o C ) .Instrument Air Dryer (2300 Nm3/Hr.) Supply Air At 8.5 Kg/Cm2 With Storage Capacity Of 1500 Nm3. NITROGEN GENERATION PLANT This Section Consists Of Forced Draft Furnace (745 Nm3/Hr.) Reactor, Absorber, Pd Reciprocating N2 Compressors And Nitrogen Storage Tank (3700 Nm3) Made By Kemp USA Supply N2 (7.0 Kg/Cm2 & 40o C) At 400 Nm3/Hr. KEY ACHIEVEMENTS : ♠ Commissioning of Mark-VIe gas turbine control system. ♠ Complete overhauling of generator rotor with its auxiliaries. ♠ Complete servicing of turbine auxiliaries and rotor replacement.
  • 3. Over All Job Scope  Monitoring & controlling parameters in defined limits during normal operation  Carry out routine jobs and activities in accordance to defined standard operating procedures.  Ensure maximum safety of plant equipments and working personnel.  Trouble shooting routine operational parameters & safe emergency handling.  Safe chemical handling.  Smooth start up & shut down activities of post assigned.  Safe turn around activities.