The filming risk assessment document summarizes the proposed filming for a short film called "DEPTH" by group 016. It will involve filming at the college grounds and a local park. The document lists 4 potential hazards: assault by a person in a mask, cold environment, drowning in a water shot, and objects or people falling/moving. It identifies the students as being at risk. Control measures for each hazard are provided such as removing the mask except when filming, bringing warm clothes, having the actor hold the bowl herself in the water shot, and staying on pavements away from traffic. A risk matrix is also included to assess the likelihood and severity of potential harms.