This document provides information about Ripley tools pencil termination tools. It lists four models of pencil tools - the WS 7A, WS 8A, WS 7, and WS 8. For each model it provides the part number, nominal cable size it can accommodate, taper length, and replacement blade part number. It describes that the tools are for terminating underground residential distribution cables ranging from #8 to 1000 MCM in size. It notes the tools provide a fast, smooth taper without damaging the conductor and have a guarded cutting blade for safety. Each tool is designed for a specific cable and conductor size.
http://www.radioworld.co.uk/opek-cb-1178-small-mobile-cb-antenna-with-mag-mount
Buy Ham Radio Antennas for best prices at radioworld.co.uk We offer Low Prices, with Fast Worldwide Delivery.
http://www.radioworld.co.uk/opek-cb-1178-small-mobile-cb-antenna-with-mag-mount
Buy Ham Radio Antennas for best prices at radioworld.co.uk We offer Low Prices, with Fast Worldwide Delivery.
The portable VLF Test System 20 kV of Seba KMT can be used to test the cables in conjunction with the according local regulations for operating voltage levels up to 11 kV for new cables and 16 kV for aged cables at 3 μF cable capacity.
By using the patented Seba KMT 0.1 Hz Cosine Square Wave Voltage, weak and for further operation critical spots in PE, XLPE but also in paper cables are brought to a controlled breakdown very fast without causing additional damage or ageing to the cable insulation.
The SEBA KMT VLF Test System consists of a DC source, which charges the test object up to the required test voltage level and the commutator unit, which performs the regular 5 second interval polarity change.
Positioning/Addressable/Locating water leak detection,
Hi Sensitivity 4 wires, length can be customized
Matches with most of the Positioning Controller Alarm
For Environment Monitoring Solution
Non-locating Water Leak Detection CableJohnny Tsai
Sensitivity could be set, length customized,2 wires only,
For Environment Monitoring projects water leakage detection,
Compatible with most Non-positioning controller alarms in the market...
Here is a “Cable Engineering Datasheet Template“. TDSmaker offer you free Datasheet/ Specsheet/ Techsheet. Visit to ( https://www.tdsmaker.com ) to get start with free template.
Globe valves are linear motion valves with rounded globular shaped bodies. The Globe valves is an excellent valve to use for on-off service, but is highly suited for frequent cycling and control of fluids anywhere in amount or volume between the open and closed positions.
3M heat shrink end caps provide a reliable and easy method of sealing cables for both indoor and outdoor applications whilst offering excellent electrical and mechanical protection.The standard 3M heatshrink cable end cap is supplied without the printed lightning strike - printed heat shrink cable caps available upon request. 3M heat shrink cable end caps are ideally suited for cap-ending of cables on cable drums and for direct burial.
Wire & Cable Preparation Tools- Power, Transmission & Distribution.
Ripley Utility Tool Cable Preparation Tools for Power Transmission & Distribution - Underground Cables & Overhead Lines
Ripley Utility Tools are cable preparation tools used to cable splice, cable joint and cable terminate low voltage (LV), high voltage (HV) and extra high voltage (EHV) power, transmission and distribution cables. Cable preparation and cable jointing tools are suitable for both underground cable and overhead line applications - this includes 3.3kV, 11kV, 33kV, 66kV, 132kV and 400kV cable preparation.
Ripley Utility Tools are designed to meet specific cable jointing, terminating and overhead line applications - this includes removal of cable insulation, semi-conductive screens, cable strippers, cable sheath jacket strippers and other cable materials to ensure uniform cable preparation of cable ends prior to cable jointing and cable terminating, both underground cables and overhead lines.
Importance of Cable Jointing, Splicing & Terminating Tools LV-HV
Cable joints, cable splices and cable terminations can fail prematurely whilst in service or during pressure testing - upon investigation the reasons for cable failures are usually determined as careless cable jointer workmanship in constructing the cable joint or cable termination. Some practises identified not only contributed to the failure of the cable joint or termination but also placed cable jointers and public at risk from injury from flashover.
Cable Jointer Errors & Reasons For Cable Joint Failures
* Non standard or poorly applied earthing arrangements
* Incorrect mixing of cable jointing resin
* Incorrect cable stripping dimensions being used
* Cable sheaths and insulation being scored or damaged
* Using incorrect cable jointing materials or lack of cable jointer tools
* Discarded waste materials such as shear off bolt heads left within the cable joint body or within shrink down insulation tubes.
The portable VLF Test System 20 kV of Seba KMT can be used to test the cables in conjunction with the according local regulations for operating voltage levels up to 11 kV for new cables and 16 kV for aged cables at 3 μF cable capacity.
By using the patented Seba KMT 0.1 Hz Cosine Square Wave Voltage, weak and for further operation critical spots in PE, XLPE but also in paper cables are brought to a controlled breakdown very fast without causing additional damage or ageing to the cable insulation.
The SEBA KMT VLF Test System consists of a DC source, which charges the test object up to the required test voltage level and the commutator unit, which performs the regular 5 second interval polarity change.
Positioning/Addressable/Locating water leak detection,
Hi Sensitivity 4 wires, length can be customized
Matches with most of the Positioning Controller Alarm
For Environment Monitoring Solution
Non-locating Water Leak Detection CableJohnny Tsai
Sensitivity could be set, length customized,2 wires only,
For Environment Monitoring projects water leakage detection,
Compatible with most Non-positioning controller alarms in the market...
Here is a “Cable Engineering Datasheet Template“. TDSmaker offer you free Datasheet/ Specsheet/ Techsheet. Visit to ( https://www.tdsmaker.com ) to get start with free template.
Globe valves are linear motion valves with rounded globular shaped bodies. The Globe valves is an excellent valve to use for on-off service, but is highly suited for frequent cycling and control of fluids anywhere in amount or volume between the open and closed positions.
3M heat shrink end caps provide a reliable and easy method of sealing cables for both indoor and outdoor applications whilst offering excellent electrical and mechanical protection.The standard 3M heatshrink cable end cap is supplied without the printed lightning strike - printed heat shrink cable caps available upon request. 3M heat shrink cable end caps are ideally suited for cap-ending of cables on cable drums and for direct burial.
Wire & Cable Preparation Tools- Power, Transmission & Distribution.
Ripley Utility Tool Cable Preparation Tools for Power Transmission & Distribution - Underground Cables & Overhead Lines
Ripley Utility Tools are cable preparation tools used to cable splice, cable joint and cable terminate low voltage (LV), high voltage (HV) and extra high voltage (EHV) power, transmission and distribution cables. Cable preparation and cable jointing tools are suitable for both underground cable and overhead line applications - this includes 3.3kV, 11kV, 33kV, 66kV, 132kV and 400kV cable preparation.
Ripley Utility Tools are designed to meet specific cable jointing, terminating and overhead line applications - this includes removal of cable insulation, semi-conductive screens, cable strippers, cable sheath jacket strippers and other cable materials to ensure uniform cable preparation of cable ends prior to cable jointing and cable terminating, both underground cables and overhead lines.
Importance of Cable Jointing, Splicing & Terminating Tools LV-HV
Cable joints, cable splices and cable terminations can fail prematurely whilst in service or during pressure testing - upon investigation the reasons for cable failures are usually determined as careless cable jointer workmanship in constructing the cable joint or cable termination. Some practises identified not only contributed to the failure of the cable joint or termination but also placed cable jointers and public at risk from injury from flashover.
Cable Jointer Errors & Reasons For Cable Joint Failures
* Non standard or poorly applied earthing arrangements
* Incorrect mixing of cable jointing resin
* Incorrect cable stripping dimensions being used
* Cable sheaths and insulation being scored or damaged
* Using incorrect cable jointing materials or lack of cable jointer tools
* Discarded waste materials such as shear off bolt heads left within the cable joint body or within shrink down insulation tubes.
RAXTON EExe Adaptors, EExd Right Angle Adaptors,EExd Male to Male and
Female to Female Adaptors,EExe Reducers,EExe Stopping Plugs,EExe Breather - Drain Plugs,EExd Compound Stopper Box/Adaptor,Raxton Part Number System,Accessories
Send enquires to mail@akbartrading.com
Isolation Procedures for Safe Working on Electrical Systems and Equipment by the JIB | solation Procedures for Safe Working on Electrical Systems and Equipment
This chart shows the safe isolation procedure that you should use when working on electrical systems and equipment.
You'll receive a printed copy of this from your Training Provider, but it's also here as a handy reference to keep electronically.
THE RULES OF SAFE ISOLATION ARE:
Obtain permission to start work (a Permit may be required in some situations)
Identify the source(s) of supply using an approved voltage indicator or test lamp
Prove that the approved voltage indicator or test lamp is functioning correctly
Isolate the supply(s)
Secure the isolation
Prove the system/equipment is DEAD using an approved voltage indicator or test lamp
Prove that the approved voltage indicator or test lamp is functioning correctly
Put up warning signs to tell other people that the electrical installation has been isolated
Once the system/equipment is proved DEAD, work can begin
Uploaded by THORNE & DERRICK LV HV Jointing, Earthing, Substation & Electrical Eqpt | Explosive Atmosphere Experts & ATEX IECEx.
THORNE & DERRICK based in the UK are international distributors of LV, MV & HV Cable Installation, Jointing, Substation & Electrical Equipment.
Since 1985, T&D have established an international reputation based on SERVICE | INTEGRITY | TRUST.
Contact us for 3M, ABB, Alroc, AN Wallis, CATU, Cembre, Centriforce, CMP, CSD, Elastimold, Ellis Patents, Emtelle, Euromold, Filoform , Furse, Lucy Electric & Zodion, Nexans, Pfisterer, Polypipe, Prysmian, Roxtec, Sicame, WT Henley.
Transcript: Selling digital books in 2024: Insights from industry leaders - T...BookNet Canada
The publishing industry has been selling digital audiobooks and ebooks for over a decade and has found its groove. What’s changed? What has stayed the same? Where do we go from here? Join a group of leading sales peers from across the industry for a conversation about the lessons learned since the popularization of digital books, best practices, digital book supply chain management, and more.
Link to video recording: https://bnctechforum.ca/sessions/selling-digital-books-in-2024-insights-from-industry-leaders/
Presented by BookNet Canada on May 28, 2024, with support from the Department of Canadian Heritage.
UiPath Test Automation using UiPath Test Suite series, part 4DianaGray10
Welcome to UiPath Test Automation using UiPath Test Suite series part 4. In this session, we will cover Test Manager overview along with SAP heatmap.
The UiPath Test Manager overview with SAP heatmap webinar offers a concise yet comprehensive exploration of the role of a Test Manager within SAP environments, coupled with the utilization of heatmaps for effective testing strategies.
Participants will gain insights into the responsibilities, challenges, and best practices associated with test management in SAP projects. Additionally, the webinar delves into the significance of heatmaps as a visual aid for identifying testing priorities, areas of risk, and resource allocation within SAP landscapes. Through this session, attendees can expect to enhance their understanding of test management principles while learning practical approaches to optimize testing processes in SAP environments using heatmap visualization techniques
What will you get from this session?
1. Insights into SAP testing best practices
2. Heatmap utilization for testing
3. Optimization of testing processes
4. Demo
Topics covered:
Execution from the test manager
Orchestrator execution result
Defect reporting
SAP heatmap example with demo
Speaker:
Deepak Rai, Automation Practice Lead, Boundaryless Group and UiPath MVP
Connector Corner: Automate dynamic content and events by pushing a buttonDianaGray10
Here is something new! In our next Connector Corner webinar, we will demonstrate how you can use a single workflow to:
Create a campaign using Mailchimp with merge tags/fields
Send an interactive Slack channel message (using buttons)
Have the message received by managers and peers along with a test email for review
But there’s more:
In a second workflow supporting the same use case, you’ll see:
Your campaign sent to target colleagues for approval
If the “Approve” button is clicked, a Jira/Zendesk ticket is created for the marketing design team
But—if the “Reject” button is pushed, colleagues will be alerted via Slack message
Join us to learn more about this new, human-in-the-loop capability, brought to you by Integration Service connectors.
And...
Speakers:
Akshay Agnihotri, Product Manager
Charlie Greenberg, Host
GDG Cloud Southlake #33: Boule & Rebala: Effective AppSec in SDLC using Deplo...James Anderson
Effective Application Security in Software Delivery lifecycle using Deployment Firewall and DBOM
The modern software delivery process (or the CI/CD process) includes many tools, distributed teams, open-source code, and cloud platforms. Constant focus on speed to release software to market, along with the traditional slow and manual security checks has caused gaps in continuous security as an important piece in the software supply chain. Today organizations feel more susceptible to external and internal cyber threats due to the vast attack surface in their applications supply chain and the lack of end-to-end governance and risk management.
The software team must secure its software delivery process to avoid vulnerability and security breaches. This needs to be achieved with existing tool chains and without extensive rework of the delivery processes. This talk will present strategies and techniques for providing visibility into the true risk of the existing vulnerabilities, preventing the introduction of security issues in the software, resolving vulnerabilities in production environments quickly, and capturing the deployment bill of materials (DBOM).
Speakers:
Bob Boule
Robert Boule is a technology enthusiast with PASSION for technology and making things work along with a knack for helping others understand how things work. He comes with around 20 years of solution engineering experience in application security, software continuous delivery, and SaaS platforms. He is known for his dynamic presentations in CI/CD and application security integrated in software delivery lifecycle.
Gopinath Rebala
Gopinath Rebala is the CTO of OpsMx, where he has overall responsibility for the machine learning and data processing architectures for Secure Software Delivery. Gopi also has a strong connection with our customers, leading design and architecture for strategic implementations. Gopi is a frequent speaker and well-known leader in continuous delivery and integrating security into software delivery.
Smart TV Buyer Insights Survey 2024 by 91mobiles.pdf91mobiles
91mobiles recently conducted a Smart TV Buyer Insights Survey in which we asked over 3,000 respondents about the TV they own, aspects they look at on a new TV, and their TV buying preferences.
Kubernetes & AI - Beauty and the Beast !?! @KCD Istanbul 2024Tobias Schneck
As AI technology is pushing into IT I was wondering myself, as an “infrastructure container kubernetes guy”, how get this fancy AI technology get managed from an infrastructure operational view? Is it possible to apply our lovely cloud native principals as well? What benefit’s both technologies could bring to each other?
Let me take this questions and provide you a short journey through existing deployment models and use cases for AI software. On practical examples, we discuss what cloud/on-premise strategy we may need for applying it to our own infrastructure to get it to work from an enterprise perspective. I want to give an overview about infrastructure requirements and technologies, what could be beneficial or limiting your AI use cases in an enterprise environment. An interactive Demo will give you some insides, what approaches I got already working for real.
"Impact of front-end architecture on development cost", Viktor TurskyiFwdays
I have heard many times that architecture is not important for the front-end. Also, many times I have seen how developers implement features on the front-end just following the standard rules for a framework and think that this is enough to successfully launch the project, and then the project fails. How to prevent this and what approach to choose? I have launched dozens of complex projects and during the talk we will analyze which approaches have worked for me and which have not.
Neuro-symbolic is not enough, we need neuro-*semantic*Frank van Harmelen
Neuro-symbolic (NeSy) AI is on the rise. However, simply machine learning on just any symbolic structure is not sufficient to really harvest the gains of NeSy. These will only be gained when the symbolic structures have an actual semantics. I give an operational definition of semantics as “predictable inference”.
All of this illustrated with link prediction over knowledge graphs, but the argument is general.