SlideShare a Scribd company logo
How to Measure BCWP
(Earned Value)


Ricardo Viana Vargas, MSc, IPMA-B, PMP
ricardo.vargas@macrosolutions.com.br

                  © BY RICARDO VIANA VARGAS. TODOS OS DIREITOS RESERVADOS
Ricardo Viana Vargas, MSc, IPMA-B, PMP
Ricardo Viana Vargas is a project, portfolio and risk management specialist. During the past 15 years, he has been responsible
for over 80 major projects in various countries in the areas of petroleum, energy, infrastructure, telecommunications,
information technology and finances, comprising an investment portfolio of over 18 billion dollars.


He was the first Latin American volunteer to be elected Chairman of the Board for the Project Management Institute
(PMI), the largest project management organization in the world with close to 500,000 members and certified professionals in
175 countries.

Ricardo Vargas has written ten books on project management, published in Portuguese and English, which have sold over
200,000 copies throughout the world. In 2005 he received the PMI Distinguished Award for his contribution to the
development of project management and the PMI Professional Development Product of the Year award for the PMDome®
workshop, considered the best project management training solution in the world.

He is a project management professor for various MBA courses, and actively participates on editorial boards for specialized
journals in Brazil and the United States. Vargas is a recognized reviewer of the PMBOK Guide, the most important reference in
the world for project management, and also chaired the official translation of PMBOK into Portuguese.

He is a chemical engineer and holds a master’s degree in Industrial Engineering from UFMG (Federal University of Minas
Gerais). Ricardo Vargas also holds a Master Certificate in Project Management from George Washington University and is
certified both as a Project Management Professional (PMP) by PMI and as IPMA-B by the International Project Management
Association. He attended the Program on Negotiation for Executives at Harvard Law School.

Over an eleven year timeframe, which began in 1995, Ricardo, in conjunction with two partners, established one of the most
solid Brazilian businesses in the area of technology, project management and outsourcing, which had a staff of 4,000
collaborators and an annual income of 50 million dollars in 2006, when Ricardo Vargas sold his share of the company to
dedicate himself on a fulltime basis to the internationalization of his project management activities.

He is a member of the Association for Advancement of Cost Engineering (AACE), the American Management Association
(AMA), the International Project Management Association (IPMA), the Institute for Global Ethics and the Professional Risk
Management International Association (PRMIA).

                                                                                                                                 2
                      © BY MACROSOLUTIONS SA. TODOS OS DIREITOS RESERVADOS
Measuring Earned Value (BCWP)

 The way used to plan the project
 impacts directly on how its earned
 value (BCWP) is to be measured:
 • Milestones with weighted values;
 • Fixed formula by task;
 • Percente complete estimates;
 • Equivalent completed units;
 • Apportioned relationships to other discrete
   work packages
       © BY RICARDO VIANA VARGAS. TODOS OS DIREITOS RESERVADOS
Milestones with Weighted Values

The work package is converted into two or
 more milestones, and each milestone is
 considered to be a partial delivery. The total
 sum of these milestones is the cost of the work
 package.

      P a c o te          Jan            Fe v           M ar       T otal


     P a c o te 1                                                  200
                            100            25             75




         © BY RICARDO VIANA VARGAS. TODOS OS DIREITOS RESERVADOS
Fixed Formula by Task

The work package is split into two parts that
 together make up 100% (25/75, 50/50 and
 75/25)


       P a c o te           Jan           Fe v          M ar      T otal


      P a c o te 1                                                200
                             50                          150




        © BY RICARDO VIANA VARGAS. TODOS OS DIREITOS RESERVADOS
Percent complete estimates

Attributes to each work package a percent
 complete estimate (between 0 and 100%)




       P a c o te           Jan           Fe v           M ar      T otal

                            6 6 ,7         6 6 ,7         6 6 ,7
      P a c o te 1                                                 200




        © BY RICARDO VIANA VARGAS. TODOS OS DIREITOS RESERVADOS
Equivalent completed units

Earned value is calculated based on each full
 unit of work completed, and also for a fractional
 equivalent of a full unit.



      P a co te           Ja n           Fev           Mar        Total
                                                                  50m²
                         12,5 m ²       12,5 m ²      25,0 m ²
     P a co te 1
      4 ,0 /m ²                                                   2 0 0 ,0
                           50,0           50,0         100,0




        © BY RICARDO VIANA VARGAS. TODOS OS DIREITOS RESERVADOS
Apportioned relationships to other discrete
work packages
Work packages that have similar performance
 are considered as measurement base to other
 work packages.


      P a c o te           Ja n           Fev            Mar        Total
                                                                    2 0 0 ,0
                             50,0          50,0          100,0
   Pac ote de Ref

   Pac ote A n alis                                                 3 0 0 ,0
                             75,0          75,0          150,0




          © BY RICARDO VIANA VARGAS. TODOS OS DIREITOS RESERVADOS
Conclusions


 Most used methods: percent complete estimates and
 equivalent completed units

 • Percent complete estimates is popular due to being easy to use, despite
   its subjectivity
 • Equivalent completed units is widely used in projects that have repeating
   activities that can be accounted using unit costs.

 One method that is gaining momentum uses a fixed formula
 for each CAP. That’s because it is more precise than percent
 complete estimates and also because it delimits two distinct
 execution points, i.e., its start and its end.


            © BY RICARDO VIANA VARGAS. TODOS OS DIREITOS RESERVADOS
Visit
   www.ricardo-vargas.com
        to access other
presentations, podcasts, videos
  and technical content about
   project , risk and portfolio
         management.

           © BY MACROSOLUTIONS SA

More Related Content

Viewers also liked

Ethics in Contracts
Ethics in ContractsEthics in Contracts
Ethics in Contracts
Ricardo Viana Vargas
 
Project risk management focus on risk identification techniques
Project risk management   focus on risk identification techniquesProject risk management   focus on risk identification techniques
Project risk management focus on risk identification techniques
Marco De Santis, PMP, CFPP
 
Leadership in Projects
Leadership in ProjectsLeadership in Projects
Leadership in Projects
Ricardo Viana Vargas
 
The Development of Risk Responses
The Development of Risk ResponsesThe Development of Risk Responses
The Development of Risk Responses
Ricardo Viana Vargas
 
Examples of Project Prioritization Criteria
Examples of Project Prioritization CriteriaExamples of Project Prioritization Criteria
Examples of Project Prioritization Criteria
Ricardo Viana Vargas
 
Why Communications Management?
Why Communications Management?Why Communications Management?
Why Communications Management?
Ricardo Viana Vargas
 
Skills and Characteristics of a Project Manager
Skills and Characteristics of a Project ManagerSkills and Characteristics of a Project Manager
Skills and Characteristics of a Project Manager
Ricardo Viana Vargas
 
The Subdivision of Project Scope
The Subdivision of Project ScopeThe Subdivision of Project Scope
The Subdivision of Project Scope
Ricardo Viana Vargas
 
Supplier Selection
Supplier SelectionSupplier Selection
Supplier Selection
Ricardo Viana Vargas
 
Project, Program and Portfolio Comparison
Project, Program and Portfolio ComparisonProject, Program and Portfolio Comparison
Project, Program and Portfolio Comparison
Ricardo Viana Vargas
 
Pert Analysis in Projects
Pert Analysis in ProjectsPert Analysis in Projects
Pert Analysis in Projects
Ricardo Viana Vargas
 
Risk identification
Risk identificationRisk identification
Risk identificationmurukkada
 
Itto
IttoItto
Types of Cost in Projects
Types of Cost in ProjectsTypes of Cost in Projects
Types of Cost in Projects
Ricardo Viana Vargas
 
Aplicando Redes Neurais e Estimativa Análoga para Determinar o Orçamento do P...
Aplicando Redes Neurais e Estimativa Análoga para Determinar o Orçamento do P...Aplicando Redes Neurais e Estimativa Análoga para Determinar o Orçamento do P...
Aplicando Redes Neurais e Estimativa Análoga para Determinar o Orçamento do P...
Ricardo Viana Vargas
 
The Project's Network Diagram
The Project's Network DiagramThe Project's Network Diagram
The Project's Network Diagram
Ricardo Viana Vargas
 
Project Charter and Scope Statement: Content and Differences
Project Charter and Scope Statement: Content and DifferencesProject Charter and Scope Statement: Content and Differences
Project Charter and Scope Statement: Content and Differences
Ricardo Viana Vargas
 
PMP Chap 2- Org. Influence and Project Life Cycle
PMP Chap 2- Org. Influence and Project Life CyclePMP Chap 2- Org. Influence and Project Life Cycle
PMP Chap 2- Org. Influence and Project Life Cycle
Anand Bobade
 
PMP Chap 6 - Project Time management - Part2
PMP Chap 6 - Project Time management - Part2PMP Chap 6 - Project Time management - Part2
PMP Chap 6 - Project Time management - Part2
Anand Bobade
 

Viewers also liked (20)

Ethics in Contracts
Ethics in ContractsEthics in Contracts
Ethics in Contracts
 
Project risk management focus on risk identification techniques
Project risk management   focus on risk identification techniquesProject risk management   focus on risk identification techniques
Project risk management focus on risk identification techniques
 
Leadership in Projects
Leadership in ProjectsLeadership in Projects
Leadership in Projects
 
The Development of Risk Responses
The Development of Risk ResponsesThe Development of Risk Responses
The Development of Risk Responses
 
Examples of Project Prioritization Criteria
Examples of Project Prioritization CriteriaExamples of Project Prioritization Criteria
Examples of Project Prioritization Criteria
 
Why Communications Management?
Why Communications Management?Why Communications Management?
Why Communications Management?
 
PMP study TTT
PMP study TTTPMP study TTT
PMP study TTT
 
Skills and Characteristics of a Project Manager
Skills and Characteristics of a Project ManagerSkills and Characteristics of a Project Manager
Skills and Characteristics of a Project Manager
 
The Subdivision of Project Scope
The Subdivision of Project ScopeThe Subdivision of Project Scope
The Subdivision of Project Scope
 
Supplier Selection
Supplier SelectionSupplier Selection
Supplier Selection
 
Project, Program and Portfolio Comparison
Project, Program and Portfolio ComparisonProject, Program and Portfolio Comparison
Project, Program and Portfolio Comparison
 
Pert Analysis in Projects
Pert Analysis in ProjectsPert Analysis in Projects
Pert Analysis in Projects
 
Risk identification
Risk identificationRisk identification
Risk identification
 
Itto
IttoItto
Itto
 
Types of Cost in Projects
Types of Cost in ProjectsTypes of Cost in Projects
Types of Cost in Projects
 
Aplicando Redes Neurais e Estimativa Análoga para Determinar o Orçamento do P...
Aplicando Redes Neurais e Estimativa Análoga para Determinar o Orçamento do P...Aplicando Redes Neurais e Estimativa Análoga para Determinar o Orçamento do P...
Aplicando Redes Neurais e Estimativa Análoga para Determinar o Orçamento do P...
 
The Project's Network Diagram
The Project's Network DiagramThe Project's Network Diagram
The Project's Network Diagram
 
Project Charter and Scope Statement: Content and Differences
Project Charter and Scope Statement: Content and DifferencesProject Charter and Scope Statement: Content and Differences
Project Charter and Scope Statement: Content and Differences
 
PMP Chap 2- Org. Influence and Project Life Cycle
PMP Chap 2- Org. Influence and Project Life CyclePMP Chap 2- Org. Influence and Project Life Cycle
PMP Chap 2- Org. Influence and Project Life Cycle
 
PMP Chap 6 - Project Time management - Part2
PMP Chap 6 - Project Time management - Part2PMP Chap 6 - Project Time management - Part2
PMP Chap 6 - Project Time management - Part2
 

Similar to How to Measure BCWP (Earned Value)

Buying Into The Budget
Buying Into The BudgetBuying Into The Budget
Buying Into The Budgetjdparfett
 
Jose Garcia Salgado V.
Jose Garcia Salgado V.Jose Garcia Salgado V.
Jose Garcia Salgado V.Jose Garcia
 
OpenERP Benchmark : How to test performance and robustness against your volum...
OpenERP Benchmark : How to test performance and robustness against your volum...OpenERP Benchmark : How to test performance and robustness against your volum...
OpenERP Benchmark : How to test performance and robustness against your volum...Odoo
 
Risk based cost estimating for water infrastructure projects
Risk based cost estimating for water infrastructure projectsRisk based cost estimating for water infrastructure projects
Risk based cost estimating for water infrastructure projects
Advisian
 
Resume - Marcela Thedim - Project Manager - 2016.
Resume - Marcela Thedim - Project Manager - 2016.Resume - Marcela Thedim - Project Manager - 2016.
Resume - Marcela Thedim - Project Manager - 2016.Marcela Thedim
 
Value At Risk Sep 22
Value At Risk Sep 22Value At Risk Sep 22
Value At Risk Sep 22
av vedpuriswar
 

Similar to How to Measure BCWP (Earned Value) (6)

Buying Into The Budget
Buying Into The BudgetBuying Into The Budget
Buying Into The Budget
 
Jose Garcia Salgado V.
Jose Garcia Salgado V.Jose Garcia Salgado V.
Jose Garcia Salgado V.
 
OpenERP Benchmark : How to test performance and robustness against your volum...
OpenERP Benchmark : How to test performance and robustness against your volum...OpenERP Benchmark : How to test performance and robustness against your volum...
OpenERP Benchmark : How to test performance and robustness against your volum...
 
Risk based cost estimating for water infrastructure projects
Risk based cost estimating for water infrastructure projectsRisk based cost estimating for water infrastructure projects
Risk based cost estimating for water infrastructure projects
 
Resume - Marcela Thedim - Project Manager - 2016.
Resume - Marcela Thedim - Project Manager - 2016.Resume - Marcela Thedim - Project Manager - 2016.
Resume - Marcela Thedim - Project Manager - 2016.
 
Value At Risk Sep 22
Value At Risk Sep 22Value At Risk Sep 22
Value At Risk Sep 22
 

More from Ricardo Viana Vargas

PMBOK® Guide Processes Flow – 6th Edition
PMBOK® Guide Processes Flow – 6th EditionPMBOK® Guide Processes Flow – 6th Edition
PMBOK® Guide Processes Flow – 6th Edition
Ricardo Viana Vargas
 
PMBOK® Guide Processes Flow – 6th Edition (Simplified version)
PMBOK® Guide Processes Flow – 6th Edition (Simplified version)PMBOK® Guide Processes Flow – 6th Edition (Simplified version)
PMBOK® Guide Processes Flow – 6th Edition (Simplified version)
Ricardo Viana Vargas
 
Fluxo de Processos do Guia PMBOK® – 6ª Edição
Fluxo de Processos do Guia PMBOK® – 6ª EdiçãoFluxo de Processos do Guia PMBOK® – 6ª Edição
Fluxo de Processos do Guia PMBOK® – 6ª Edição
Ricardo Viana Vargas
 
Fluxo de Processos do Guia PMBOK® – 6ª Edição (Versão simplificada)
Fluxo de Processos do Guia PMBOK® – 6ª Edição (Versão simplificada)Fluxo de Processos do Guia PMBOK® – 6ª Edição (Versão simplificada)
Fluxo de Processos do Guia PMBOK® – 6ª Edição (Versão simplificada)
Ricardo Viana Vargas
 
Applying Neural Networks and Analogous Estimating to Determine the Project Bu...
Applying Neural Networks and Analogous Estimating to Determine the Project Bu...Applying Neural Networks and Analogous Estimating to Determine the Project Bu...
Applying Neural Networks and Analogous Estimating to Determine the Project Bu...
Ricardo Viana Vargas
 
Modelando Linhas de Balanço com Relacionamentos “Início-Término”
Modelando Linhas de Balanço com Relacionamentos “Início-Término”Modelando Linhas de Balanço com Relacionamentos “Início-Término”
Modelando Linhas de Balanço com Relacionamentos “Início-Término”
Ricardo Viana Vargas
 
Sustainability Marker to Support the Project Selection Process: the UNOPS Case
Sustainability Marker to Support the Project Selection Process: the UNOPS CaseSustainability Marker to Support the Project Selection Process: the UNOPS Case
Sustainability Marker to Support the Project Selection Process: the UNOPS Case
Ricardo Viana Vargas
 
Milestones Trend Analysis (MTA) - Conceitos Básicos
Milestones Trend Analysis (MTA) - Conceitos BásicosMilestones Trend Analysis (MTA) - Conceitos Básicos
Milestones Trend Analysis (MTA) - Conceitos Básicos
Ricardo Viana Vargas
 
Diagrammes de Flux Guide PMBOK® 5e Édition en Français
Diagrammes de Flux Guide PMBOK® 5e Édition en FrançaisDiagrammes de Flux Guide PMBOK® 5e Édition en Français
Diagrammes de Flux Guide PMBOK® 5e Édition en Français
Ricardo Viana Vargas
 
Diagrammes de Flux Guide PMBOK® 5e Édition en Français - Version simplifiée
Diagrammes de Flux Guide PMBOK® 5e Édition en Français - Version simplifiéeDiagrammes de Flux Guide PMBOK® 5e Édition en Français - Version simplifiée
Diagrammes de Flux Guide PMBOK® 5e Édition en Français - Version simplifiée
Ricardo Viana Vargas
 
Diagrammi di Flusso della Guida PMBOK® 5ª Edizione in Italiano
Diagrammi di Flusso della Guida PMBOK® 5ª Edizione in ItalianoDiagrammi di Flusso della Guida PMBOK® 5ª Edizione in Italiano
Diagrammi di Flusso della Guida PMBOK® 5ª Edizione in Italiano
Ricardo Viana Vargas
 
Diagrammi di Flusso della Guida PMBOK® 5ª Edizione in Italiano - Versione sem...
Diagrammi di Flusso della Guida PMBOK® 5ª Edizione in Italiano - Versione sem...Diagrammi di Flusso della Guida PMBOK® 5ª Edizione in Italiano - Versione sem...
Diagrammi di Flusso della Guida PMBOK® 5ª Edizione in Italiano - Versione sem...
Ricardo Viana Vargas
 
Ricardo vargas pmbok_flow_5ed_color_es
Ricardo vargas pmbok_flow_5ed_color_esRicardo vargas pmbok_flow_5ed_color_es
Ricardo vargas pmbok_flow_5ed_color_es
Ricardo Viana Vargas
 
Flujo de Procesos de la Guía PMBOK® 5ª edición en Español - Versión simplificada
Flujo de Procesos de la Guía PMBOK® 5ª edición en Español - Versión simplificadaFlujo de Procesos de la Guía PMBOK® 5ª edición en Español - Versión simplificada
Flujo de Procesos de la Guía PMBOK® 5ª edición en Español - Versión simplificada
Ricardo Viana Vargas
 
Ablaufplan des PMBOK® Guide 5. Auflage auf Deutsch (vereinfachte Version)
Ablaufplan des PMBOK® Guide 5. Auflage auf Deutsch (vereinfachte Version)Ablaufplan des PMBOK® Guide 5. Auflage auf Deutsch (vereinfachte Version)
Ablaufplan des PMBOK® Guide 5. Auflage auf Deutsch (vereinfachte Version)
Ricardo Viana Vargas
 
Ablaufplan des PMBOK® Guide 5. Auflage auf Deutsch
Ablaufplan des PMBOK® Guide 5. Auflage auf DeutschAblaufplan des PMBOK® Guide 5. Auflage auf Deutsch
Ablaufplan des PMBOK® Guide 5. Auflage auf Deutsch
Ricardo Viana Vargas
 
Understanding Opportunities, Challenges and Strategies to Build Your Career i...
Understanding Opportunities, Challenges and Strategies to Build Your Career i...Understanding Opportunities, Challenges and Strategies to Build Your Career i...
Understanding Opportunities, Challenges and Strategies to Build Your Career i...
Ricardo Viana Vargas
 
Fluxo de Processos do Guia PMBOK® 5ª Edição em Português
Fluxo de Processos do Guia PMBOK® 5ª Edição em PortuguêsFluxo de Processos do Guia PMBOK® 5ª Edição em Português
Fluxo de Processos do Guia PMBOK® 5ª Edição em Português
Ricardo Viana Vargas
 
Fluxo de Processos de Gerenciamento de Portfólio em Português - 3ª Edição - V...
Fluxo de Processos de Gerenciamento de Portfólio em Português - 3ª Edição - V...Fluxo de Processos de Gerenciamento de Portfólio em Português - 3ª Edição - V...
Fluxo de Processos de Gerenciamento de Portfólio em Português - 3ª Edição - V...
Ricardo Viana Vargas
 
Fluxo de Processos de Gerenciamento de Portfólio em Português - 3ª Edição
Fluxo de Processos de Gerenciamento de Portfólio em Português - 3ª EdiçãoFluxo de Processos de Gerenciamento de Portfólio em Português - 3ª Edição
Fluxo de Processos de Gerenciamento de Portfólio em Português - 3ª Edição
Ricardo Viana Vargas
 

More from Ricardo Viana Vargas (20)

PMBOK® Guide Processes Flow – 6th Edition
PMBOK® Guide Processes Flow – 6th EditionPMBOK® Guide Processes Flow – 6th Edition
PMBOK® Guide Processes Flow – 6th Edition
 
PMBOK® Guide Processes Flow – 6th Edition (Simplified version)
PMBOK® Guide Processes Flow – 6th Edition (Simplified version)PMBOK® Guide Processes Flow – 6th Edition (Simplified version)
PMBOK® Guide Processes Flow – 6th Edition (Simplified version)
 
Fluxo de Processos do Guia PMBOK® – 6ª Edição
Fluxo de Processos do Guia PMBOK® – 6ª EdiçãoFluxo de Processos do Guia PMBOK® – 6ª Edição
Fluxo de Processos do Guia PMBOK® – 6ª Edição
 
Fluxo de Processos do Guia PMBOK® – 6ª Edição (Versão simplificada)
Fluxo de Processos do Guia PMBOK® – 6ª Edição (Versão simplificada)Fluxo de Processos do Guia PMBOK® – 6ª Edição (Versão simplificada)
Fluxo de Processos do Guia PMBOK® – 6ª Edição (Versão simplificada)
 
Applying Neural Networks and Analogous Estimating to Determine the Project Bu...
Applying Neural Networks and Analogous Estimating to Determine the Project Bu...Applying Neural Networks and Analogous Estimating to Determine the Project Bu...
Applying Neural Networks and Analogous Estimating to Determine the Project Bu...
 
Modelando Linhas de Balanço com Relacionamentos “Início-Término”
Modelando Linhas de Balanço com Relacionamentos “Início-Término”Modelando Linhas de Balanço com Relacionamentos “Início-Término”
Modelando Linhas de Balanço com Relacionamentos “Início-Término”
 
Sustainability Marker to Support the Project Selection Process: the UNOPS Case
Sustainability Marker to Support the Project Selection Process: the UNOPS CaseSustainability Marker to Support the Project Selection Process: the UNOPS Case
Sustainability Marker to Support the Project Selection Process: the UNOPS Case
 
Milestones Trend Analysis (MTA) - Conceitos Básicos
Milestones Trend Analysis (MTA) - Conceitos BásicosMilestones Trend Analysis (MTA) - Conceitos Básicos
Milestones Trend Analysis (MTA) - Conceitos Básicos
 
Diagrammes de Flux Guide PMBOK® 5e Édition en Français
Diagrammes de Flux Guide PMBOK® 5e Édition en FrançaisDiagrammes de Flux Guide PMBOK® 5e Édition en Français
Diagrammes de Flux Guide PMBOK® 5e Édition en Français
 
Diagrammes de Flux Guide PMBOK® 5e Édition en Français - Version simplifiée
Diagrammes de Flux Guide PMBOK® 5e Édition en Français - Version simplifiéeDiagrammes de Flux Guide PMBOK® 5e Édition en Français - Version simplifiée
Diagrammes de Flux Guide PMBOK® 5e Édition en Français - Version simplifiée
 
Diagrammi di Flusso della Guida PMBOK® 5ª Edizione in Italiano
Diagrammi di Flusso della Guida PMBOK® 5ª Edizione in ItalianoDiagrammi di Flusso della Guida PMBOK® 5ª Edizione in Italiano
Diagrammi di Flusso della Guida PMBOK® 5ª Edizione in Italiano
 
Diagrammi di Flusso della Guida PMBOK® 5ª Edizione in Italiano - Versione sem...
Diagrammi di Flusso della Guida PMBOK® 5ª Edizione in Italiano - Versione sem...Diagrammi di Flusso della Guida PMBOK® 5ª Edizione in Italiano - Versione sem...
Diagrammi di Flusso della Guida PMBOK® 5ª Edizione in Italiano - Versione sem...
 
Ricardo vargas pmbok_flow_5ed_color_es
Ricardo vargas pmbok_flow_5ed_color_esRicardo vargas pmbok_flow_5ed_color_es
Ricardo vargas pmbok_flow_5ed_color_es
 
Flujo de Procesos de la Guía PMBOK® 5ª edición en Español - Versión simplificada
Flujo de Procesos de la Guía PMBOK® 5ª edición en Español - Versión simplificadaFlujo de Procesos de la Guía PMBOK® 5ª edición en Español - Versión simplificada
Flujo de Procesos de la Guía PMBOK® 5ª edición en Español - Versión simplificada
 
Ablaufplan des PMBOK® Guide 5. Auflage auf Deutsch (vereinfachte Version)
Ablaufplan des PMBOK® Guide 5. Auflage auf Deutsch (vereinfachte Version)Ablaufplan des PMBOK® Guide 5. Auflage auf Deutsch (vereinfachte Version)
Ablaufplan des PMBOK® Guide 5. Auflage auf Deutsch (vereinfachte Version)
 
Ablaufplan des PMBOK® Guide 5. Auflage auf Deutsch
Ablaufplan des PMBOK® Guide 5. Auflage auf DeutschAblaufplan des PMBOK® Guide 5. Auflage auf Deutsch
Ablaufplan des PMBOK® Guide 5. Auflage auf Deutsch
 
Understanding Opportunities, Challenges and Strategies to Build Your Career i...
Understanding Opportunities, Challenges and Strategies to Build Your Career i...Understanding Opportunities, Challenges and Strategies to Build Your Career i...
Understanding Opportunities, Challenges and Strategies to Build Your Career i...
 
Fluxo de Processos do Guia PMBOK® 5ª Edição em Português
Fluxo de Processos do Guia PMBOK® 5ª Edição em PortuguêsFluxo de Processos do Guia PMBOK® 5ª Edição em Português
Fluxo de Processos do Guia PMBOK® 5ª Edição em Português
 
Fluxo de Processos de Gerenciamento de Portfólio em Português - 3ª Edição - V...
Fluxo de Processos de Gerenciamento de Portfólio em Português - 3ª Edição - V...Fluxo de Processos de Gerenciamento de Portfólio em Português - 3ª Edição - V...
Fluxo de Processos de Gerenciamento de Portfólio em Português - 3ª Edição - V...
 
Fluxo de Processos de Gerenciamento de Portfólio em Português - 3ª Edição
Fluxo de Processos de Gerenciamento de Portfólio em Português - 3ª EdiçãoFluxo de Processos de Gerenciamento de Portfólio em Português - 3ª Edição
Fluxo de Processos de Gerenciamento de Portfólio em Português - 3ª Edição
 

Recently uploaded

Hamster Kombat' Telegram Game Surpasses 100 Million Players—Token Release Sch...
Hamster Kombat' Telegram Game Surpasses 100 Million Players—Token Release Sch...Hamster Kombat' Telegram Game Surpasses 100 Million Players—Token Release Sch...
Hamster Kombat' Telegram Game Surpasses 100 Million Players—Token Release Sch...
SOFTTECHHUB
 
Event Report - SAP Sapphire 2024 Orlando - lots of innovation and old challenges
Event Report - SAP Sapphire 2024 Orlando - lots of innovation and old challengesEvent Report - SAP Sapphire 2024 Orlando - lots of innovation and old challenges
Event Report - SAP Sapphire 2024 Orlando - lots of innovation and old challenges
Holger Mueller
 
Cree_Rey_BrandIdentityKit.PDF_PersonalBd
Cree_Rey_BrandIdentityKit.PDF_PersonalBdCree_Rey_BrandIdentityKit.PDF_PersonalBd
Cree_Rey_BrandIdentityKit.PDF_PersonalBd
creerey
 
ModelingMarketingStrategiesMKS.CollumbiaUniversitypdf
ModelingMarketingStrategiesMKS.CollumbiaUniversitypdfModelingMarketingStrategiesMKS.CollumbiaUniversitypdf
ModelingMarketingStrategiesMKS.CollumbiaUniversitypdf
fisherameliaisabella
 
Set off and carry forward of losses and assessment of individuals.pptx
Set off and carry forward of losses and assessment of individuals.pptxSet off and carry forward of losses and assessment of individuals.pptx
Set off and carry forward of losses and assessment of individuals.pptx
HARSHITHV26
 
The Influence of Marketing Strategy and Market Competition on Business Perfor...
The Influence of Marketing Strategy and Market Competition on Business Perfor...The Influence of Marketing Strategy and Market Competition on Business Perfor...
The Influence of Marketing Strategy and Market Competition on Business Perfor...
Adam Smith
 
一比一原版加拿大渥太华大学毕业证(uottawa毕业证书)如何办理
一比一原版加拿大渥太华大学毕业证(uottawa毕业证书)如何办理一比一原版加拿大渥太华大学毕业证(uottawa毕业证书)如何办理
一比一原版加拿大渥太华大学毕业证(uottawa毕业证书)如何办理
taqyed
 
Authentically Social by Corey Perlman - EO Puerto Rico
Authentically Social by Corey Perlman - EO Puerto RicoAuthentically Social by Corey Perlman - EO Puerto Rico
Authentically Social by Corey Perlman - EO Puerto Rico
Corey Perlman, Social Media Speaker and Consultant
 
Training my puppy and implementation in this story
Training my puppy and implementation in this storyTraining my puppy and implementation in this story
Training my puppy and implementation in this story
WilliamRodrigues148
 
Buy Verified PayPal Account | Buy Google 5 Star Reviews
Buy Verified PayPal Account | Buy Google 5 Star ReviewsBuy Verified PayPal Account | Buy Google 5 Star Reviews
Buy Verified PayPal Account | Buy Google 5 Star Reviews
usawebmarket
 
Agency Managed Advisory Board As a Solution To Career Path Defining Business ...
Agency Managed Advisory Board As a Solution To Career Path Defining Business ...Agency Managed Advisory Board As a Solution To Career Path Defining Business ...
Agency Managed Advisory Board As a Solution To Career Path Defining Business ...
Boris Ziegler
 
Mastering B2B Payments Webinar from BlueSnap
Mastering B2B Payments Webinar from BlueSnapMastering B2B Payments Webinar from BlueSnap
Mastering B2B Payments Webinar from BlueSnap
Norma Mushkat Gaffin
 
Project File Report BBA 6th semester.pdf
Project File Report BBA 6th semester.pdfProject File Report BBA 6th semester.pdf
Project File Report BBA 6th semester.pdf
RajPriye
 
ikea_woodgreen_petscharity_dog-alogue_digital.pdf
ikea_woodgreen_petscharity_dog-alogue_digital.pdfikea_woodgreen_petscharity_dog-alogue_digital.pdf
ikea_woodgreen_petscharity_dog-alogue_digital.pdf
agatadrynko
 
Call 8867766396 Satta Matka Dpboss Matka Guessing Satta batta Matka 420 Satta...
Call 8867766396 Satta Matka Dpboss Matka Guessing Satta batta Matka 420 Satta...Call 8867766396 Satta Matka Dpboss Matka Guessing Satta batta Matka 420 Satta...
Call 8867766396 Satta Matka Dpboss Matka Guessing Satta batta Matka 420 Satta...
bosssp10
 
ikea_woodgreen_petscharity_cat-alogue_digital.pdf
ikea_woodgreen_petscharity_cat-alogue_digital.pdfikea_woodgreen_petscharity_cat-alogue_digital.pdf
ikea_woodgreen_petscharity_cat-alogue_digital.pdf
agatadrynko
 
Authentically Social Presented by Corey Perlman
Authentically Social Presented by Corey PerlmanAuthentically Social Presented by Corey Perlman
Authentically Social Presented by Corey Perlman
Corey Perlman, Social Media Speaker and Consultant
 
Auditing study material for b.com final year students
Auditing study material for b.com final year  studentsAuditing study material for b.com final year  students
Auditing study material for b.com final year students
narasimhamurthyh4
 
Discover the innovative and creative projects that highlight my journey throu...
Discover the innovative and creative projects that highlight my journey throu...Discover the innovative and creative projects that highlight my journey throu...
Discover the innovative and creative projects that highlight my journey throu...
dylandmeas
 
Understanding User Needs and Satisfying Them
Understanding User Needs and Satisfying ThemUnderstanding User Needs and Satisfying Them
Understanding User Needs and Satisfying Them
Aggregage
 

Recently uploaded (20)

Hamster Kombat' Telegram Game Surpasses 100 Million Players—Token Release Sch...
Hamster Kombat' Telegram Game Surpasses 100 Million Players—Token Release Sch...Hamster Kombat' Telegram Game Surpasses 100 Million Players—Token Release Sch...
Hamster Kombat' Telegram Game Surpasses 100 Million Players—Token Release Sch...
 
Event Report - SAP Sapphire 2024 Orlando - lots of innovation and old challenges
Event Report - SAP Sapphire 2024 Orlando - lots of innovation and old challengesEvent Report - SAP Sapphire 2024 Orlando - lots of innovation and old challenges
Event Report - SAP Sapphire 2024 Orlando - lots of innovation and old challenges
 
Cree_Rey_BrandIdentityKit.PDF_PersonalBd
Cree_Rey_BrandIdentityKit.PDF_PersonalBdCree_Rey_BrandIdentityKit.PDF_PersonalBd
Cree_Rey_BrandIdentityKit.PDF_PersonalBd
 
ModelingMarketingStrategiesMKS.CollumbiaUniversitypdf
ModelingMarketingStrategiesMKS.CollumbiaUniversitypdfModelingMarketingStrategiesMKS.CollumbiaUniversitypdf
ModelingMarketingStrategiesMKS.CollumbiaUniversitypdf
 
Set off and carry forward of losses and assessment of individuals.pptx
Set off and carry forward of losses and assessment of individuals.pptxSet off and carry forward of losses and assessment of individuals.pptx
Set off and carry forward of losses and assessment of individuals.pptx
 
The Influence of Marketing Strategy and Market Competition on Business Perfor...
The Influence of Marketing Strategy and Market Competition on Business Perfor...The Influence of Marketing Strategy and Market Competition on Business Perfor...
The Influence of Marketing Strategy and Market Competition on Business Perfor...
 
一比一原版加拿大渥太华大学毕业证(uottawa毕业证书)如何办理
一比一原版加拿大渥太华大学毕业证(uottawa毕业证书)如何办理一比一原版加拿大渥太华大学毕业证(uottawa毕业证书)如何办理
一比一原版加拿大渥太华大学毕业证(uottawa毕业证书)如何办理
 
Authentically Social by Corey Perlman - EO Puerto Rico
Authentically Social by Corey Perlman - EO Puerto RicoAuthentically Social by Corey Perlman - EO Puerto Rico
Authentically Social by Corey Perlman - EO Puerto Rico
 
Training my puppy and implementation in this story
Training my puppy and implementation in this storyTraining my puppy and implementation in this story
Training my puppy and implementation in this story
 
Buy Verified PayPal Account | Buy Google 5 Star Reviews
Buy Verified PayPal Account | Buy Google 5 Star ReviewsBuy Verified PayPal Account | Buy Google 5 Star Reviews
Buy Verified PayPal Account | Buy Google 5 Star Reviews
 
Agency Managed Advisory Board As a Solution To Career Path Defining Business ...
Agency Managed Advisory Board As a Solution To Career Path Defining Business ...Agency Managed Advisory Board As a Solution To Career Path Defining Business ...
Agency Managed Advisory Board As a Solution To Career Path Defining Business ...
 
Mastering B2B Payments Webinar from BlueSnap
Mastering B2B Payments Webinar from BlueSnapMastering B2B Payments Webinar from BlueSnap
Mastering B2B Payments Webinar from BlueSnap
 
Project File Report BBA 6th semester.pdf
Project File Report BBA 6th semester.pdfProject File Report BBA 6th semester.pdf
Project File Report BBA 6th semester.pdf
 
ikea_woodgreen_petscharity_dog-alogue_digital.pdf
ikea_woodgreen_petscharity_dog-alogue_digital.pdfikea_woodgreen_petscharity_dog-alogue_digital.pdf
ikea_woodgreen_petscharity_dog-alogue_digital.pdf
 
Call 8867766396 Satta Matka Dpboss Matka Guessing Satta batta Matka 420 Satta...
Call 8867766396 Satta Matka Dpboss Matka Guessing Satta batta Matka 420 Satta...Call 8867766396 Satta Matka Dpboss Matka Guessing Satta batta Matka 420 Satta...
Call 8867766396 Satta Matka Dpboss Matka Guessing Satta batta Matka 420 Satta...
 
ikea_woodgreen_petscharity_cat-alogue_digital.pdf
ikea_woodgreen_petscharity_cat-alogue_digital.pdfikea_woodgreen_petscharity_cat-alogue_digital.pdf
ikea_woodgreen_petscharity_cat-alogue_digital.pdf
 
Authentically Social Presented by Corey Perlman
Authentically Social Presented by Corey PerlmanAuthentically Social Presented by Corey Perlman
Authentically Social Presented by Corey Perlman
 
Auditing study material for b.com final year students
Auditing study material for b.com final year  studentsAuditing study material for b.com final year  students
Auditing study material for b.com final year students
 
Discover the innovative and creative projects that highlight my journey throu...
Discover the innovative and creative projects that highlight my journey throu...Discover the innovative and creative projects that highlight my journey throu...
Discover the innovative and creative projects that highlight my journey throu...
 
Understanding User Needs and Satisfying Them
Understanding User Needs and Satisfying ThemUnderstanding User Needs and Satisfying Them
Understanding User Needs and Satisfying Them
 

How to Measure BCWP (Earned Value)

  • 1. How to Measure BCWP (Earned Value) Ricardo Viana Vargas, MSc, IPMA-B, PMP ricardo.vargas@macrosolutions.com.br © BY RICARDO VIANA VARGAS. TODOS OS DIREITOS RESERVADOS
  • 2. Ricardo Viana Vargas, MSc, IPMA-B, PMP Ricardo Viana Vargas is a project, portfolio and risk management specialist. During the past 15 years, he has been responsible for over 80 major projects in various countries in the areas of petroleum, energy, infrastructure, telecommunications, information technology and finances, comprising an investment portfolio of over 18 billion dollars. He was the first Latin American volunteer to be elected Chairman of the Board for the Project Management Institute (PMI), the largest project management organization in the world with close to 500,000 members and certified professionals in 175 countries. Ricardo Vargas has written ten books on project management, published in Portuguese and English, which have sold over 200,000 copies throughout the world. In 2005 he received the PMI Distinguished Award for his contribution to the development of project management and the PMI Professional Development Product of the Year award for the PMDome® workshop, considered the best project management training solution in the world. He is a project management professor for various MBA courses, and actively participates on editorial boards for specialized journals in Brazil and the United States. Vargas is a recognized reviewer of the PMBOK Guide, the most important reference in the world for project management, and also chaired the official translation of PMBOK into Portuguese. He is a chemical engineer and holds a master’s degree in Industrial Engineering from UFMG (Federal University of Minas Gerais). Ricardo Vargas also holds a Master Certificate in Project Management from George Washington University and is certified both as a Project Management Professional (PMP) by PMI and as IPMA-B by the International Project Management Association. He attended the Program on Negotiation for Executives at Harvard Law School. Over an eleven year timeframe, which began in 1995, Ricardo, in conjunction with two partners, established one of the most solid Brazilian businesses in the area of technology, project management and outsourcing, which had a staff of 4,000 collaborators and an annual income of 50 million dollars in 2006, when Ricardo Vargas sold his share of the company to dedicate himself on a fulltime basis to the internationalization of his project management activities. He is a member of the Association for Advancement of Cost Engineering (AACE), the American Management Association (AMA), the International Project Management Association (IPMA), the Institute for Global Ethics and the Professional Risk Management International Association (PRMIA). 2 © BY MACROSOLUTIONS SA. TODOS OS DIREITOS RESERVADOS
  • 3. Measuring Earned Value (BCWP) The way used to plan the project impacts directly on how its earned value (BCWP) is to be measured: • Milestones with weighted values; • Fixed formula by task; • Percente complete estimates; • Equivalent completed units; • Apportioned relationships to other discrete work packages © BY RICARDO VIANA VARGAS. TODOS OS DIREITOS RESERVADOS
  • 4. Milestones with Weighted Values The work package is converted into two or more milestones, and each milestone is considered to be a partial delivery. The total sum of these milestones is the cost of the work package. P a c o te Jan Fe v M ar T otal P a c o te 1 200 100 25 75 © BY RICARDO VIANA VARGAS. TODOS OS DIREITOS RESERVADOS
  • 5. Fixed Formula by Task The work package is split into two parts that together make up 100% (25/75, 50/50 and 75/25) P a c o te Jan Fe v M ar T otal P a c o te 1 200 50 150 © BY RICARDO VIANA VARGAS. TODOS OS DIREITOS RESERVADOS
  • 6. Percent complete estimates Attributes to each work package a percent complete estimate (between 0 and 100%) P a c o te Jan Fe v M ar T otal 6 6 ,7 6 6 ,7 6 6 ,7 P a c o te 1 200 © BY RICARDO VIANA VARGAS. TODOS OS DIREITOS RESERVADOS
  • 7. Equivalent completed units Earned value is calculated based on each full unit of work completed, and also for a fractional equivalent of a full unit. P a co te Ja n Fev Mar Total 50m² 12,5 m ² 12,5 m ² 25,0 m ² P a co te 1 4 ,0 /m ² 2 0 0 ,0 50,0 50,0 100,0 © BY RICARDO VIANA VARGAS. TODOS OS DIREITOS RESERVADOS
  • 8. Apportioned relationships to other discrete work packages Work packages that have similar performance are considered as measurement base to other work packages. P a c o te Ja n Fev Mar Total 2 0 0 ,0 50,0 50,0 100,0 Pac ote de Ref Pac ote A n alis 3 0 0 ,0 75,0 75,0 150,0 © BY RICARDO VIANA VARGAS. TODOS OS DIREITOS RESERVADOS
  • 9. Conclusions Most used methods: percent complete estimates and equivalent completed units • Percent complete estimates is popular due to being easy to use, despite its subjectivity • Equivalent completed units is widely used in projects that have repeating activities that can be accounted using unit costs. One method that is gaining momentum uses a fixed formula for each CAP. That’s because it is more precise than percent complete estimates and also because it delimits two distinct execution points, i.e., its start and its end. © BY RICARDO VIANA VARGAS. TODOS OS DIREITOS RESERVADOS
  • 10. Visit www.ricardo-vargas.com to access other presentations, podcasts, videos and technical content about project , risk and portfolio management. © BY MACROSOLUTIONS SA