RF Optimization Activity
B24G Project
07-Feb-2024
Summary:
1. 4G Rollout Summary -Circle wise
2. RF Optimization major activities
3. List of 158 basic Parameters which needs to be defined in LTE Nodes
4. Basic Testing
5. Site basic health Check ups
6. Testing of CSFB, SRVCC, PSHO, FR-LTE in Punjab & Haryana
7. 2G/3G to LTE cell reselection and FRLTE need to define in 3G RNC/Sites and 2G BSC/Sites
8. Major RF KPIs
9. Major RF KPIs formula & Action Plan for Improvement
Summary of Circles where rollout started & Circle Dashboard
RF DASHBOARD_PUNJAB CIRCLE_ 2/5/2024
OA
Site
Coun
t
RFI SURVEY
STATUS
Installation
Done Status
COMISSIONING
STATUS
INTEGRATION
STATUS
JSON
STATUS
Neighbor
Defination
Status
Total Alarm Free
Sites(JSON
Done)[S=D+P]
Basic Testing
Done [D =D1+D2]
Basic
Testing
Pending [P]
Basic Testing
Result Received
Status
Basic
Testing
Pass [D1]
Basic
Testing Fail
[D2]
Basic RF Testing
report received
Commercially
On-Air Sites
AMRITSAR 239 239 113 107 104 101 96 98 93 5 93 91 2 93 92
Chandigarh UT 33 32 1 1 1 2 1 2 2 0 0 0 2 0 1
CHD-PB 84 77 15 8 4 3 3 3 2 1 2 2 0 2 1
CHD-PKL 31 31 11 11 11 11 9 11 11 0 10 11 0 10 9
Ferozepur 346 321 174 170 170 166 154 156 146 10 137 128 19 137 138
Jalandhar 378 350 186 153 126 125 98 104 91 13 80 76 16 80 76
Ludhiana 247 183 123 124 123 123 122 123 122 1 122 121 1 122 122
Pathankot 141 140 78 76 69 70 66 63 63 0 61 60 3 61 62
Patiala 523 432 220 209 207 207 196 198 190 8 186 181 9 186 188
Ropar 63 62 48 40 37 36 33 32 28 4 27 25 3 27 29
Bathinda 116 113 93 92 84 83 72 74 53 21 53 52 1 53 50
Chandigarh 223 219 145 125 116 117 104 110 104 6 96 96 8 96 98
Sangrur 91 91 71 71 69 69 68 67 63 4 62 59 5 62 62
HOSHIARPUR 150 126 105 89 95 92 51 63 0 63 0 0 0 0 0
Total 2665 2416 1383 1276 1216 1205 1073 1104 968 136 929 902 69 929 928
CAT-B_RF DASHBOARD_HARYAYA CIRCLE_(05/02/2024)g
OA
Site
Count
RFI
SURVEY
STATUS
Installatio
n Done
Status
COMISSIONIN
G STATUS
INTEGRATIO
N STATUS
JSON
STATUS
Neighbor
s 4G-4G
Neighbors
4G-3G
Neighbor
s 4G-2G
Common
Sites (JSON
Done+All NBR
Done) (A)
Basic Testing
Done(B=B1+B2
)
Basic Testing
Pass (B1)
Basic Testing
Fail (B2)
Basic RF Testing
report received
Alrams/Iss
ue Sites (C)
Ready for
Basic Testing
D=(A-B-C)
On
Air
AMBALA 232 230 101 90 71 71 72 71 71 59 47 45 2 42 0 12 42
FARIDABAD 46 45 16 16 13 13 13 13 13 13 12 12 11 0 1 11
GURGAON 57 52 27 27 27 27 27 27 27 27 26 26 22 0 1 22
HISAR 334 330 141 142 132 129 130 129 129 126 76 70 5 59 0 50 54
KARNAL 264 258 131 130 125 126 124 121 121 123 115 113 2 104 0 8 97
REWARI 182 180 82 80 66 62 59 56 56 47 36 35 1 26 0 11 29
ROHTAK 261 258 100 92 83 77 75 74 74 70 60 57 3 51 0 10 53
SONIPAT 119 117 48 48 38 36 36 36 36 32 29 29 22 0 3 17
Grand Total 1495 1470 646 625 555 541 536 527 527 497 401 387 13 337 0 96 325
CAT-A_RF DASHBOARD_HARYAYA CIRCLE_(05/02/2024)
OA
Site
Count
RFI SURVEY
STATUS
Installation
Done Status
COMISSIONING
STATUS
INTEGRATION
STATUS
JSON
STATUS
Neighbors
4G-4G
Neighbors
4G-3G
Neighbors
4G-2G
Common Sites
(JSON
Done+4G/4G
Done) (A)
Basic Testing
Done(B=B1+B2)
Basic Testing
Pass (B1)
Basic Testing Fail
(B2)
Basic RF Testing
report received
Alrams/Issue
Sites (C)
Ready for
Basic Testing
D=(A-B-C)
On
Air
AMBALA 17 15 10 6 3 4 2 2 2 2 1 1 1 1
FARIDABAD 5 5
GURGAON 4 4 4 1
HISAR 25 19 5 5 1 1 1 1 1
KARNAL 50 49 18 18 15 15 11 13 13 7 0
REWARI 2 2
ROHTAK 13 13 3 3
SONIPAT 10 10 2
Summary of Circles where rollout started & Circle Dashboard
Summary of Circles started:
1. Punjab: Rollout started majorly, Total Site Count: 2665, Installation done: 1383, JSON Run: 1104, BT pass: 968, On Air: 928
2. Haryana: Rollout also started majorly: Total Site Count: 1495, Installation done: 646, JSON Run: 541, BT pass: 401, On Air: 325
3. Up West: Currently Agra, Bareilly & Meerut rollout started only. Total Site Count: 660, Installation done: 465, JSON Run: 108, BT pass:
82, On Air: 73
4. Uttarakhand: Currently in Dehradun, Haridwar & Nainital Rollout started only, Total Site Count: 357, Installation done: 267, JSON Run:
117, BT pass: 10, On Air: 0, No Site on air in this circle currently.
RF DASHBOARD_U.P WEST CIRCLE_(05/02/2024)
OA
Site
Count
RFI
SURVEY
STATUS
Installatio
n Done
Status
COMISSIONING
STATUS
INTEGRATION
STATUS
JSON
STATUS
Neighbor
s 4G-4G
Neighbors
4G-3G
Neighbor
s 4G-2G
Common
Sites (JSON
Done+4G/4G
Done) (A)
Basic Testing
Done(B=B1+B2
)
Basic Testing
Pass (B1)
Basic Testing
Fail (B2)
Basic RF Testing
report received
Alarms/Iss
ue Sites (C)
Ready for
Basic Testing
D=(A-B-C)
On
Air
Agra 221 198 184 101 91 42 39 39 39 32 29 3 32 1 7 32
Bareilly 199 175 116 91 81 28 27 27 27 24 19 5 24 3 18
Meerut 240 206 165 127 113 38 29 29 29 26 21 5 26 1 3 23
Grand Total 660 579 465 319 285 108 95 95 95 0 82 69 13 82 2 13 73
RF DASHBOARD_Uttarakhand CIRCLE_(04/02/2024)
OA
Site
Count
RFI
SURVEY
STATUS
Installatio
n Done
Status
COMISSIONING
STATUS
INTEGRATIO
N STATUS
JSON
STAT
US
Neighbor
s 4G-4G
Neighbors
4G-3G
Neighbor
s 4G-2G
Common Sites
(JSON
Done+4G/4G
Done) (A)
Basic Testing
Done(B=B1+B2
)
Basic Testing
Pass (B1)
Basic Testing
Fail (B2)
Basic RF Testing
report received
Alrams/Iss
ue Sites (C)
Ready for
Basic Testing
D=(A-B-C)
On
Air
Dehradun 131 120 93 58 29 29 23 23 23 23 6 6 0 17
Haridwar 61 61 53 45 37 37 30 30 30 30 30
Nainital 165 163 121 77 51 51 44 44 44 44 4 4 0 40
Grand Total 357 344 267 180 117 117 97 97 97 97 10 10 0 0 0 87 0
RF Optimization Major activities:
1. Plan basic testing, Route identification, DT allocation, RNO Engineer allocation for next day
2. Coordination with Drive tester & conduct end to end basic testing activity, Issue rectification during basic
testing(Latching Issue, CSFB Issue, Less Throughput Issue, Cell reserve/unreserve)
3. Compilation of whole day work & share RF dashboard by each Circle lead end of the day
4. SRVCC, CSFB, PSHO & FR-LTE testing(Coordination with Drive tester, CSFB Priority Change, B2- Threshold change,
After activity revert of changes)
5. 4G-4G/ 4G-3G/ 4G-2G Neighbor addition coordination with SON Team & Publish dashboard for Neighbor Update
6. TAC change activity end to end coordination & completion
7. During Basic testing if latching issue found site health checkup, VSWR check, configuration check, site soft reset as
per requirement
8. 2G/3G to LTE cell reselection and FRLTE definition in 3G RNC/Sites and 2G BSC/Sites, take up with BSNL team & end
to end follow up for Implementation
9. Cluster Drive in Major Cities where basic testing has been completed, Identification of poor patch, site physical/
parametric change, redrive after cluster optimization
10. RET Serial Number Collection, Site where RET Serial Number not received RET Scan, RET configuration in site & RET
change
List of 158 basic Parameters which needs to be defined in LTE Nodes:
Parameter/Detail
Site Details
Site ID
4G Cell Name (SiteName&Local Cell ID)
Local Cell Id
4G Cell ID (eNBID&Local CellID)
Technology
PLMN
eCGI
TAL
DL Start Freq(MHz)
DL Stop Freq(MHz)
UL Start Freq(MHz)
UL Stop Freq(MHz)
DL EARFCN
UL EARFCN
Tx Power (Watt) Per Port
AMSL (m)
Antenna Height
Building Height
Tower Height
Tower Type (RTT, RTP, Wall Mount, GBT, GBM, Monopole, COW etc)
M. Tilt
E. Tilt
Media
City
SSA
Circle
District
State
eNodeB Config
Site Address
eNB Id
Site Name
Longitude
Latitude
MME Association
NTP Server
Commissioning Info
Duplex Mode
eNodeB Name
eNodeB Management IP & Subnet
Management GW IP
IP Address & Subnet
eNodeB VLAN
Managment VLAN
Interface Gateway
EMS Server IP Address
Clock Source
Parameter/Detail
Sector Config
Assosiated MME IP
Cell Name
Cell Coverage
Antenna Height (meters)
Antenna Orientation (degree)
Antenna Gain (dB)
Antenna Make
Beam Width (degree)
Antenna Mech Tilt
RRH Model Number
Freq Band
EARFCN DL
EARFCN UL
Channel Bandwidth (MHz)
Antenna Type
MIMO Mode
RET
Tx Power in (dbm)
PCI
TDD Mode
Special SubFrame Configuration
PRACH RSI
PUSCH RS GA(0-29)
PUSCH RS CS(0-7)
Sector Advance Configuration
TAC
Zero Correlation Zone Configuration
Delta PUCCH Shift
NRBCQI
Eutran Idle Mode Config
Frequency Offset
Q Hysteresis
T Evaluation
Q Rx Level Min SIB1
Q Rx Level Min SIB3
S Intra Search
S Non Intra Search
Idle Mode Intra Freq Cell Reselection Priority
P Max
Threshold Serving Low
Allowed Meas Bandwidth Intra
S Intra Search Pr9
List of 158 basic Parameters which needs to be defined in LTE Nodes:
Parameter/Detail
EUTRAN Measurement Config
S Intra Search Qr9
Filter Coefficient RSRP
A1 Threshold RSRP
A1 Hysteresis
A1 Time To Trigger
A2 Threshold RSRP
A2 Hysteresis
A2 Time To Trigger
A3 Offset
A3 Hysteresis
A3 Time To Trigger
A4 Threshold RSRP
A4 Hysteresis
A4 Time To Trigger
A5 Threshold 1 RSRP
A5 Threshold 2 RSRP
A5 Hysteresis
A5 Time To Trigger
Max Report Cells
EUTRA Report Interval
EUTRA Report Amount
EUTRAN Carrier Config
S Measure
Index
EUTRA Carrier ARFCN
Allowed Meas Bandwidth Inter
Presence Antenna Port1 Inter
Neighbor Cell Config Inter
Q Offset Freq
Q Rx Level Min SIB5
P Max
T Reselection EUTRA
T Reselection EUTRA SF Medium
T Reselection EUTRA SF High
Threshold X High
Threshold X Low
Cell Reselection Priority
Threshold X High QR9
Threshold X Low QR9
UTRAN Measurement Config
Enable
T Reselection UTRA
B2 Threshold2 UTRA RSCP
B2 Hyesteresis UTRAN
B2 Timer To Trigger UTRAN
Max Report Cells
IRAT Report Interval
IRAT Report Amount
Parameter/Detail
UTRAN FDD Carrier Config
B2 Threshold1 Serving Cell RSRP
Index
UTRA Carrier ARFCN
Q Rx Level Min.
Q Qual Min.
Cell Reselection Priority
Threshold X High
Threshold X Low
P Max UTRA
Q Offset
Threshold X High QR9
Threshold X Low QR9
GERAN Measurement Config
Enable
T Reselection GERAN
B2 Threshold2 GERAN
B2 Hyesteresis GERAN
B2 Timer To Trigger GERAN
GERAN Carrier Config
B2 Threshold1 Serving Cell RSRP
Index
Q Rx Level Min
Cell Reselection Priority
Threshold X High
Threshold X Low
Band Indicator
BCCH ARFCN
NCC Permitted
P Max
Q Offset
Basic Testing Currently basic testing is being conducted for integrated sites, sample format for basic testing as below:
Test Scenarios/Site ID T4PB01AMP09AMI022 T4PB01AMP09AMI022 T4PB01AMP09AMI022
Test Date 11/8/2023 11/8/2023 11/8/2023
Sector 0 1 2
Azimuth 10 120 250
Antenna Uptilt Status (OK/Not OK) OK OK OK
PCI 231 232 233
Building Height 13 13 13
Tower height 12 12 12
Antenna Height 25 25 25
VoLTE MO (OK/Not OK) OK OK OK
VoLTE MT (OK/Not OK) OK OK OK
CSFB MO (OK/Not OK) OK OK OK
CSFB MT (OK/Not OK) OK OK OK
SMS MO- LTE Mode (OK/Not OK) OK OK OK
SMS MT- LTE Mode (OK/Not OK) OK OK OK
SMS MO- VoLTE Mode (OK/Not OK) OK OK OK
SMS MO- VoLTE Mode (OK/Not OK) OK OK OK
3G-4G Reselection (OK/Not OK) Not ok Not ok Not ok
2G-4G Reselection (OK/Not OK) Not ok Not ok Not ok
LTE Attach (OK/Not OK) ok ok ok
Data Throughput (DL)- Mbps 20 21 20
Data Throughput (UL)- Mbps 4 4 5
4G-3G PSHO (OK/Not OK) Not ok Not ok Not ok
4G-2G PSHO (OK/Not OK) Not ok Not ok Not ok
SRVCC (OK/Not OK) Not ok Not ok Not ok
VOLTE INTRA(HO)
VOLTE INTER(HO)
Remark (If any) CSFB CALL IN 3G CSFB CALL IN 3G CSFB CALL IN 3G
Site basic health Check ups:
1. Site Status: 2. Connected Users: 3. Inventory details
For below site all 3 sectors are Up,S1 also Up No of Connected Users visible for below site Site inventory details
4. VSWR: 5. Alarm:
Testing of CSFB, SRVCC, PSHO, FR-LTE in Punjab & Haryana
We have done CSFB, SRVCC, PSHO & FR-LTE check in multiple locations in Punjab & Haryana, below is the testing status
for all BSCs & RNCs in Punjab & Haryana
Punjab:
2G BSC 2G Vendor BSC Version
4G-2G SRVCC
Status(OK/NOK
)
4G-2G CSFB
Status(OK/NOK
)
2G-4G FRLTE
Status(OK/NOK
)
3G RNC
ID
3G Vendor
4G-3G SRVCC
Status(OK/NOK
)
4G-3G CSFB
Status(OK/NOK
)
3G-4G FRLTE
Status(OK/NOK
)
3G-4G PSHO
Status(OK/NOK
)
4G-3G PSHO
Status(OK/NOK
)
Tentative
date
BSCKTP3 Ericsson EVOC8230 - OK OK 101 Ericsson - OK OK - - 15-Feb-24
BSC2PKT Ericsson R07B - OK OK 103 Ericsson OK OK OK OK OK 15-Feb-24
BSC6KTP Ericsson B30B07 - OK OK 102 Ericsson - OK OK - - 15-Feb-24
BSCAMR1 Ericsson R07B - OK OK 310 ZTE - OK OK - - 15-Feb-24
BSCAMR4 Ericsson R07B - OK OK 311 ZTE - OK OK - - 15-Feb-24
BSCBHA9 Ericsson R07B OK OK OK 312 ZTE - OK OK - - 15-Feb-24
BSCJAL3 Ericsson R07B - OK OK 313 ZTE OK OK OK OK OK 15-Feb-24
BSCKTP3 Ericsson EVOC8230 - OK OK 3801 ZTE - OK OK - - 15-Feb-24
BSCKTP4 Ericsson B30A07 - OK OK 3802 ZTE - OK OK - - 15-Feb-24
BSCPKT2 Ericsson R07B - OK OK 3803 ZTE - OK OK - - 15-Feb-24
BSCPTL1 Ericsson R07B - OK OK 3804 ZTE - OK OK - - 15-Feb-24
EBSCJAL Ericsson G17Q4 - OK OK 3806 ZTE - OK OK - - 15-Feb-24
EVBKTP1 Ericsson G17Q4 - OK OK 3807 ZTE - OK OK - - 15-Feb-24
PB_BSC_2801_ZTE_Bathinda1 ZTE V6.50.350d - OK OK - - - - - - - 15-Feb-24
PB_BSC_225_ZTE_Chandigarh 2 ZTE V6.30.350d OK OK OK - - - - - - - 15-Feb-24
PB_BSC_224_ZTE_Chandigarh 1 ZTE V6.30.350d - OK OK - - - - - - - 15-Feb-24
PB_BSC_2805_ZTE_Patiala2 ZTE V6.50.350d - OK OK - - - - - - - 15-Feb-24
PB_BSC_231_ZTE_Hoshiarpur2 ZTE V6.30.350d - OK OK - - - - - - - 15-Feb-24
PB_BSC_230_ZTE_Hoshiarpur1 ZTE V6.30.350d - - - - - - - - - - 15-Feb-24
PB_BSC_2807_ZTE_Sangrur1 ZTE V6.50.350d - OK OK - - - - - - - 15-Feb-24
PB_BSC_2806_ZTE_Ropar1 ZTE V6.50.350d - OK OK - - - - - - - 15-Feb-24
PB_BSC_2804_ZTE_Patiala1 ZTE V6.50.350d - OK OK - - - - - - - 15-Feb-24
PB_BSC_228_ZTE_Jalandhar BSC 1 ZTE V6.30.350d - OK OK - - - - - - - 15-Feb-24
PB_BSC_2803_ZTE_Ludhiana3 ZTE V6.50.350d - OK OK - - - - - - - 15-Feb-24
PB_BSC_229_ZTE_Jalandhar BSC 2 ZTE V6.30.350d - OK OK - - - - - - - 15-Feb-24
PB_BSC_2802_ZTE_Jalandhar3 ZTE V6.50.350d - OK OK - - - - - - - 15-Feb-24
PB_BSC_227_ZTE_Ludhiana BSC 2 ZTE V6.30.350d - OK OK - - - - - - - 15-Feb-24
PB_BSC_226_ZTE_Ludhiana BSC 1 ZTE V6.30.350d - OK OK - - - - - - - 15-Feb-24
Haryana:
Haryana
2G BSC Name
2G
Vendor
4G-2G SRVCC
Status(OK/N
OK)
4G-2G CSFB
Status(OK/NO
K)
2G-4G FRLTE
Status(OK/NO
K)
RNC NAME RNC ID 3G Vendor
4G-3G SRVCC
Status(OK/NOK
)
4G-3G CSFB
Status(OK/NO
K)
3G-4G FRLTE
Status(OK/NOK
)
3G-4G PSHO
Status(OK/NO
K)
4G-3G PSHO
Status(OK/NO
K)
HR_BSC_212_ZTE_Faridabad(21
2)
ZTE Ok Ok Ok HR_RNC_301_ZTE_Rohtak1 301 ZTE Ok Ok Ok Ok
PNPBSC
ERICSS
ON
NA NA NA HR_RNC_302_ZTE_Gurgaon1 302 ZTE Ok Ok Ok Ok
SIRBSC2
ERICSS
ON
NA NA NA HR_RNC_303_ZTE_AMBALA1 303 ZTE Ok Ok Ok Ok
HISBSC1
ERICSS
ON
NA NA NA
HR_RNC_304_ZTE_Yamunan
agar1
304 ZTE Ok Ok Ok Ok
HR BSC AMBALA 2 ZTE Ok Ok Ok HR_RNC_305_ZTE_REWARI 305 ZTE Ok Ok Ok Ok
HR BSC YAMUNANAGAR 214 ZTE Ok Ok Ok
HR_RNC_306_ZTE_NARNAUL
1
306 ZTE Ok Ok Ok Ok
HR_BSC_211_ZTE_Gurgaon1(21
1)
ZTE Ok Ok Ok HR_RNC_3816_ZTE_Rohtak2 3816 ZTE Ok Ok Ok Ok
HR BSC JIND ZTE As per GM Sir, No need to check HR_RNC_3817_ZTE_Sonipat1 3817 ZTE Ok Ok Ok Ok
BSC1HS1
ERICSS
ON
NA Ok
HR_RNC_3818_ZTE_Faridaba
d1
3818 ZTE Ok Ok Ok Ok
ZTE_BSC_213_AMBALA1(213) ZTE Ok Ok Ok HR_RNC_3819_ZTE_Karnal1 3819 ZTE Ok Ok Ok Ok
BSCKRL1(G17)
ERICSS
ON
Ok Ok Ok HR_RNC_3820_ZTE_Hisar1 3820 ZTE Ok Ok Ok Ok
HR BSC KARNAL ZTE Ok Ok Ok RNCKRN01 310 ERICSSON Ok Ok Ok Ok
HR_BSC_215_ZTE_REWARI1(21
5)
ZTE Ok Ok Ok RNCSRS102 307 ERICSSON Ok Ok Ok Ok
BHSN2 NOKIA NA NA NA
BHSN1 NOKIA NA NA NA
BKRN2 NOKIA NA NA NA
HR_BSC_207_ZTE_Rohtak1(207
)
ZTE Ok Ok Ok
HR_BSC_208_ZTE_Bhiwani(208) ZTE Ok Ok Ok
HR_BSC_210_ZTE_Sonipat(210) ZTE Ok Ok Ok
HR BSC REWARI 2 ZTE Ok Ok Ok
Testing of CSFB, SRVCC, PSHO, FR-LTE in Punjab & Haryana
2G/3G to LTE cell reselection and FRLTE need to define in 3G RNC/Sites and 2G BSC/Sites
Below Parameter changes has been Implemented in 2G BSCs & 3G RNCs for 2G/3G to LTE Cell Reselection & FR-LTE:
2G Feature Name(Ericsson BSC) Feature ID
GSM-LTE Cell Reselection FAJ 123 155
FAST Return to LTE after call release FAJ 121 1873
LTE to GSM NACC Support FAJ 121 1872
3G Feature Name(Ericsson RNC) Feature ID
LTE cell re-selection FAJ 121 1474
CS voice fallback from LTE FAJ 121 1610 R1
Release with Redirect to LTE FAJ 121 2174
SrvccPsCsFromLte CXC4030142
PshoFromLte CXC4030107
Ericsson Feature:
E-UTRAN to UTRAN SRVCC:
Parameter Value
RncPsHoL2UtraSw ON
RncSrvccSw ON
sRVCCEmgCalSwch ON
psSigForImsInd Supported
ZTE-3G to 4G:
2G Parameter Name(Ericsson) Proposed Value
EARFCN need to add 515
COVERAGEE GOOD
RATPRIO 6
HPRIOTHR 6
LPRIOTHR 6
QRXLEVMINE 8
MINCHBW 1
FASTRETLTE Active
Ericsson-2G to 4G:
3G Parameter Name(Ericsson) Proposed Value
EutranFreqRelation 515
releaseRedirectEutraTriggers.csFallbackCsRelease 1
releaseRedirectEutraTriggers.csFallbackDchToFach 0
releaseRedirectEutraTriggers.dchToFach 1
releaseRedirectEutraTriggers.fachToUra 1
releaseRedirectEutraTriggers.fastDormancy 1
releaseRedirectEutraTriggers.normalRelease 1
EutranFreqRelation.cellReselectionPriority 6
EutranFreqRelation.qRxLevMin -124
EutranFreqRelation.threshHigh 12
EutranFreqRelation.redirectionOrder 1
Ericsson-3G to 4G:
2G Parameter Name(ZTE)_BTS Proposed Value
GERAN RAT Priority 100
GERAN Target system of connected UE 100
Maximum intra Frequency Measurement
Bandwidth 5M(25RB)[2]
GERAN-Frequency Number 1
FastReturn to LTE
Channel Release with E-Utran Neighbor cell When CSFB and
SRVCC[4]
Cell re-selection Switch based on Priority Support[1]
GERAN Neighbor relation with LTE
2G Parameter Name(ZTE)_BSC Proposed Value
FastReturn to LTE 1
ZTE-2G to 4G:
Major RF KPIs
Below are the Major RF KPIs which we work on daily basis:
 RRC Connection Success Rate(All) (%)
 RRC Congestion
 RRC Drop Rate(%)
 ERAB Setup Success Rate (%)
 VOLTE ERAB Setup Success Rate
 DROP Call Rate (%)
 ERAB Drop Rate - PS (%)
 ERAB Drop Rate-VoLTE (%)
 Data Volume DL(MB)
 Data Volume UL(MB)
 Data Volume - Total (GB)
 Average Per user throughput (DL) Mbps
 Average Per user throughput (UL) Mbps
 VOLTE Traffic (Erlang)
 E-UTRAN Cell availability (%)
 Intra Frequency HO Out Success Rate(%)
 VOLTE Intra Freq HO out Success Rate
 PS handover success rate(LTE intra system) (%)
 Inter RAT HO out Success Rate (GERAN) (%)
 Inter RAT HO out Success Rate (UTRAN) (%)
 CSFB Preparation success rate
Major RF KPIs formula & Action Plan for Improvement
 RRC Connection Success Rate(All) (%):
Major Checks:
• Operational Issue check – Outage, Alarm, High VSWR, Configuration issue(Sec-0 should have one RRH, Sec-1,2 should have one RRH)
• If Traffic is very high & site is overshooting, we recommend down tilt in cell
• If site hangs, RRC SR becomes zero or very less suddenly site restart is recommended
 ERAB Setup Success Rate (%):
Similar actions are being taken for Improving Erab setup success rate(down tilt, restart, Outage/alarm rectification)
 Average Per user throughput (DL) Mbps:
Major Checks:
• Operational Issue check – Outage, Alarm, High VSWR, Configuration issue
• If connected user is very high & cell traffic is very high we down tilt the site to dominate the coverage & improves user throughput
• Sometimes high packet loss causes poor DL Throughput, Need to improve packet loss to improve DL user throughput
 Intra Frequency HO Out Success Rate(%):
 Major Checks:
• Neighbor Audit required for Improving Intra Freq HOSR, Wrong TAC, PLMN, PCI, Cell ID mapping in neighbor cause poor intra freq hosr
• Neighbor refresh(Neighbor deletion & recreation) required to improve intra freq hosr
KPI Formulas
RRC Connection Success Rate(All) (%)
(RRC.ConnEstabSucc.Emergency+ RRC.ConnEstabSucc.HighPriorityAccess + RRC.ConnEstabSucc.MtAccess +
RRC.ConnEstabSucc.MoSignalling + RRC.ConnEstabSucc.MoData)/(RRC.ConnEstabAtt.Emergency + RRC.ConnEstabAtt.HighPriorityAccess+
RRC.ConnEstabAtt.MtAccess+RRC.ConnEstabAtt.MoSignalling+RRC.ConnEstabAtt.MoData)*100
KPI Formulas
Average Per user throughput (DL) Mbps Avg.PerUser.CellThp.DL
KPI Formulas
Intra Frequency HO Out Success Rate(%) ((HO.IntraFreqOutSucc/HO.IntraFreqOutAtt)*100)
Major RF KPIs formula & Action Plan for Improvement
 Inter RAT HO out Success Rate (GERAN) (%):
• For Improving SRVCC to GERAN – 4G to 2G Neighbor audit is required, If any 2G neighbor is having wrong Cell ID, BCCH, BSIC, LAC definition SRVCC will be
degraded, Need to correct the definition.
 Inter RAT HO out Success Rate (UTRAN) (%):
• For Improving SRVCC to UTRAN – 4G to 3G Neighbor audit is required, If any 3G neighbor is having wrong Cell ID, PSC, LAC definition SRVCC will be
degraded, Need to correct the definition.
 Other few Major KPIs formula:
KPI Formulas
Inter RAT HO out Success Rate (GERAN) (%) ((HO.SrvccGeranSucc/HO.SrvccGeranAtt )*100)
KPI Formulas
Inter RAT HO out Success Rate (UTRAN) (%) ((HO.SrvccUtranSucc /HO.SrvccUtranAtt)*100)
KPI Formulas
RRC Drop Rate (%) ((RRC.ConnectionDrop.Num/RRC.ConnTotal)* 100)
Data Volume - Total (GB) (PdcpDLBytesConsumed+PdcpULBytesConsumed)/(1024*1024*1024)
PS handover success rate(LTE intra system) (%)
(((HO.IntraFreqOutSucc.QCI6+HO.IntraFreqOutSucc.QCI7+HO.IntraFreqOutSucc.QCI8+HO.IntraFreqOutSucc.QCI9) +
(HO.InterFreqMeasGapOutSucc.QCI6 + HO.InterFreqMeasGapOutSucc.QCI7
+HO.InterFreqMeasGapOutSucc.QCI8+HO.InterFreqMeasGapOutSucc.QCI9))
/
((HO.IntraFreqOutAtt.QCI6+HO.IntraFreqOutAtt.QCI7+HO.IntraFreqOutAtt.QCI8+HO.IntraFreqOutAtt.QCI9 +
HO.InterFreqMeasGapOutAtt.QCI6+HO.InterFreqMeasGapOutAtt.QCI7+HO.InterFreqMeasGapOutAtt.QCI8+HO.InterFreqMeasGapOut
Att.QCI9 ))
*100)
CSFB Preparation success rate ((HO.CSFallback.GeranSucc+HO.CSFallback.UtranSucc)/(HO.CSFallback.EstabInitCount+HO.CSFallback.UECNTXModCount))*100
KPI Dashboard
PB Combined Sites Stats 24-Jan-24 25-Jan-24 26-Jan-24 27-Jan-24 28-Jan-24 29-Jan-24
Total Sites Reported in CNOPS 983 983 985 1059 1056 1149
Total Sites Not Reported in CNOPS 300 300 298 224 227 134
Total Cells Reported 2946 2943 2951 3186 3178 3450
Total Payload (GB) 17942 17706 19089 19158 19386 20427
Data DL(GB) 16618 16360 17653 17691 17939 18875
Data UL(GB) 1324 1346 1436 1467 1447 1552
VOLTE Traffic (Erlang) 2620 2683 2290 2826 2396 3288
Drop call Rate (%) 1.79 1.77 1.71 1.75 1.78 1.82
RRC Drop Rate (%) 6.60 7.94 9.15 6.86 7.74 8.00
ERAB Drop Rate - PS (%) 3.18 3.16 3.09 3.16 3.24 3.18
ERAB Drop Rate-VoLTE (%) 1.21 1.15 1.15 1.22 1.05 1.26
% N/W availability 99.63 99.68 99.79 99.74 99.71 99.60
Outage Minute 15735 13645 9009 11775 13317 19744
RRC Connection Success Rate(All) (%) 30.10 37.69 45.12 47.03 48.30 47.66
RRC Congestion (%) 1.75 2.38 0.75 1.10 1.83 2.61
ERAB Setup Success Rate (%) 95.89 95.82 95.68 94.95 94.69 94.95
ERAB Setup Success Rate-VoLTE (%) 97.68 97.33 96.92 97.04 97.42 96.80
ERAB Congestion (%) 0.12 0.08 0.07 0.89 1.53 0.84
Packet Drop rate (DL) 0.09 0.09 0.10 0.11 0.18 0.21
Packet Drop rate (DL)-VOLTE 0.02 0.02 0.02 0.02 0.08 0.03
Packet Drop rate (DL)-PS 0.10 0.10 0.10 0.12 0.18 0.21
Intra Frequency HO Out Success Rate (%) 79.90 79.36 84.11 82.46 79.02 75.06
Intra Frequency HO Out Success Rate-VoLTE (%) 86.88 82.16 83.64 88.94 84.31 80.39
PS handover success rate(LTE intra system) (%) 79.88 76.23 77.38 81.32 77.45 75.02
CSFB Preparation success rate 97.92 98.18 97.78 97.71 97.87 97.75
Site count with zero Payload 109 135 73 91 95 133
Cell count with zero Payload 446 529 381 437 462 599
% of Cells Drop Call Rate > 2.5% 19.86 18.93 21.72 22.38 20.93 20.87
% of Cells RRC Drop Rate > 2.5% 81.16 78.15 83.67 81.04 80.59 78.72
% of Cells ERAB Drop Rate - PS > 2.5% 53.33 52.26 52.83 51.48 52.61 52.00
% of Cells ERAB Drop Rate-VoLTE > 2.5% 13.92 12.91 14.13 13.65 13.56 15.65
% of Cells % N/W availability > 95% 82.32 78.05 89.43 87.32 87.95 86.00
% of Cells RRC Connection Success Rate(All) > 95% 46.03 38.70 24.91 41.81 45.28 47.28
% of Cells RRC Congestion >1% 2.31 2.24 1.63 1.26 1.35 1.62
Copyright © 2020 Tata Consultancy Services Limited
Thank you

More Related Content

Similar to RF Optimization Slide deck.pptx

3G Drive Test Procedure_ By Md Joynal Abaden@ MYM
3G Drive Test Procedure_ By Md Joynal Abaden@ MYM3G Drive Test Procedure_ By Md Joynal Abaden@ MYM
3G Drive Test Procedure_ By Md Joynal Abaden@ MYMMd Joynal Abaden
 
3G drive test procedure (SSV) by Md Joynal Abaden
3G drive test procedure (SSV)  by Md Joynal Abaden3G drive test procedure (SSV)  by Md Joynal Abaden
3G drive test procedure (SSV) by Md Joynal AbadenMd Joynal Abaden
 
3G Drive test procedure by Md joynal Abaden
3G Drive test procedure  by Md joynal Abaden3G Drive test procedure  by Md joynal Abaden
3G Drive test procedure by Md joynal AbadenMd Joynal Abaden
 
SCFT-Training_v8.2-1
SCFT-Training_v8.2-1SCFT-Training_v8.2-1
SCFT-Training_v8.2-1mahesh savita
 
Anguruwathota [wb klt-2106]-umts2100 swap site ssv report_v2.0
Anguruwathota [wb klt-2106]-umts2100 swap site ssv report_v2.0Anguruwathota [wb klt-2106]-umts2100 swap site ssv report_v2.0
Anguruwathota [wb klt-2106]-umts2100 swap site ssv report_v2.0Yasas Anuradha
 
Advanced: 5G NR RRC Inactive State
Advanced: 5G NR RRC Inactive StateAdvanced: 5G NR RRC Inactive State
Advanced: 5G NR RRC Inactive State3G4G
 
AZQ Android 2G/3G/4G Test Tool Presentation 2014
AZQ Android 2G/3G/4G Test Tool Presentation 2014AZQ Android 2G/3G/4G Test Tool Presentation 2014
AZQ Android 2G/3G/4G Test Tool Presentation 2014Don Plooksawasdi
 
Examination of Coordination Requests
Examination of Coordination RequestsExamination of Coordination Requests
Examination of Coordination Requestshfng
 
Azenqos portfolio generic 27112014
Azenqos portfolio generic 27112014Azenqos portfolio generic 27112014
Azenqos portfolio generic 27112014Don Plooksawasdi
 
SON Server Web KPI Portal 4G DT Analysis Cases Module.pptx
SON Server Web KPI Portal  4G DT Analysis Cases Module.pptxSON Server Web KPI Portal  4G DT Analysis Cases Module.pptx
SON Server Web KPI Portal 4G DT Analysis Cases Module.pptxssuser2b76bb
 
Wcdma dt analysis using TEMS Investigation
Wcdma dt analysis using TEMS InvestigationWcdma dt analysis using TEMS Investigation
Wcdma dt analysis using TEMS InvestigationMichael Ofili
 
Call processing and handover.eng
Call processing and handover.engCall processing and handover.eng
Call processing and handover.engNeelabh Krishna
 
Chap 4. call processing and handover.eng
Chap 4. call processing and handover.engChap 4. call processing and handover.eng
Chap 4. call processing and handover.engsivakumar D
 
LTE Call Processing and Handover
LTE Call Processing and HandoverLTE Call Processing and Handover
LTE Call Processing and HandoverSitha Sok
 
Oral Report Rev2
Oral Report Rev2Oral Report Rev2
Oral Report Rev2guest845037
 
UBR C5x Configuration_12th Feb 2020.pptx
UBR C5x Configuration_12th Feb 2020.pptxUBR C5x Configuration_12th Feb 2020.pptx
UBR C5x Configuration_12th Feb 2020.pptxMujtabaBhat6
 

Similar to RF Optimization Slide deck.pptx (20)

3G Drive Test Procedure_ By Md Joynal Abaden@ MYM
3G Drive Test Procedure_ By Md Joynal Abaden@ MYM3G Drive Test Procedure_ By Md Joynal Abaden@ MYM
3G Drive Test Procedure_ By Md Joynal Abaden@ MYM
 
3G drive test procedure (SSV) by Md Joynal Abaden
3G drive test procedure (SSV)  by Md Joynal Abaden3G drive test procedure (SSV)  by Md Joynal Abaden
3G drive test procedure (SSV) by Md Joynal Abaden
 
3G Drive test procedure by Md joynal Abaden
3G Drive test procedure  by Md joynal Abaden3G Drive test procedure  by Md joynal Abaden
3G Drive test procedure by Md joynal Abaden
 
SCFT-Training_v8.2-1
SCFT-Training_v8.2-1SCFT-Training_v8.2-1
SCFT-Training_v8.2-1
 
Anguruwathota [wb klt-2106]-umts2100 swap site ssv report_v2.0
Anguruwathota [wb klt-2106]-umts2100 swap site ssv report_v2.0Anguruwathota [wb klt-2106]-umts2100 swap site ssv report_v2.0
Anguruwathota [wb klt-2106]-umts2100 swap site ssv report_v2.0
 
Advanced: 5G NR RRC Inactive State
Advanced: 5G NR RRC Inactive StateAdvanced: 5G NR RRC Inactive State
Advanced: 5G NR RRC Inactive State
 
AZQ Android 2G/3G/4G Test Tool Presentation 2014
AZQ Android 2G/3G/4G Test Tool Presentation 2014AZQ Android 2G/3G/4G Test Tool Presentation 2014
AZQ Android 2G/3G/4G Test Tool Presentation 2014
 
Examination of Coordination Requests
Examination of Coordination RequestsExamination of Coordination Requests
Examination of Coordination Requests
 
Azenqos portfolio generic 27112014
Azenqos portfolio generic 27112014Azenqos portfolio generic 27112014
Azenqos portfolio generic 27112014
 
SON Server Web KPI Portal 4G DT Analysis Cases Module.pptx
SON Server Web KPI Portal  4G DT Analysis Cases Module.pptxSON Server Web KPI Portal  4G DT Analysis Cases Module.pptx
SON Server Web KPI Portal 4G DT Analysis Cases Module.pptx
 
Adeel Ahmed- CV
Adeel Ahmed- CVAdeel Ahmed- CV
Adeel Ahmed- CV
 
Adeel Ahmed- CV
Adeel Ahmed- CVAdeel Ahmed- CV
Adeel Ahmed- CV
 
Wcdma dt analysis using TEMS Investigation
Wcdma dt analysis using TEMS InvestigationWcdma dt analysis using TEMS Investigation
Wcdma dt analysis using TEMS Investigation
 
Call processing and handover.eng
Call processing and handover.engCall processing and handover.eng
Call processing and handover.eng
 
Chap 4. call processing and handover.eng
Chap 4. call processing and handover.engChap 4. call processing and handover.eng
Chap 4. call processing and handover.eng
 
LTE Call Processing and Handover
LTE Call Processing and HandoverLTE Call Processing and Handover
LTE Call Processing and Handover
 
Initial tuning umts (2)
Initial tuning  umts (2)Initial tuning  umts (2)
Initial tuning umts (2)
 
Oral Report Rev2
Oral Report Rev2Oral Report Rev2
Oral Report Rev2
 
UBR C5x Configuration_12th Feb 2020.pptx
UBR C5x Configuration_12th Feb 2020.pptxUBR C5x Configuration_12th Feb 2020.pptx
UBR C5x Configuration_12th Feb 2020.pptx
 
Drive Test
Drive TestDrive Test
Drive Test
 

Recently uploaded

Data Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt RobisonData Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt RobisonAnna Loughnan Colquhoun
 
Slack Application Development 101 Slides
Slack Application Development 101 SlidesSlack Application Development 101 Slides
Slack Application Development 101 Slidespraypatel2
 
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...Igalia
 
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...Drew Madelung
 
Enhancing Worker Digital Experience: A Hands-on Workshop for Partners
Enhancing Worker Digital Experience: A Hands-on Workshop for PartnersEnhancing Worker Digital Experience: A Hands-on Workshop for Partners
Enhancing Worker Digital Experience: A Hands-on Workshop for PartnersThousandEyes
 
Presentation on how to chat with PDF using ChatGPT code interpreter
Presentation on how to chat with PDF using ChatGPT code interpreterPresentation on how to chat with PDF using ChatGPT code interpreter
Presentation on how to chat with PDF using ChatGPT code interpreternaman860154
 
GenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day PresentationGenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day PresentationMichael W. Hawkins
 
Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365
Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365
Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 3652toLead Limited
 
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
04-2024-HHUG-Sales-and-Marketing-Alignment.pptxHampshireHUG
 
How to convert PDF to text with Nanonets
How to convert PDF to text with NanonetsHow to convert PDF to text with Nanonets
How to convert PDF to text with Nanonetsnaman860154
 
CNv6 Instructor Chapter 6 Quality of Service
CNv6 Instructor Chapter 6 Quality of ServiceCNv6 Instructor Chapter 6 Quality of Service
CNv6 Instructor Chapter 6 Quality of Servicegiselly40
 
#StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
#StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024#StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
#StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024BookNet Canada
 
SQL Database Design For Developers at php[tek] 2024
SQL Database Design For Developers at php[tek] 2024SQL Database Design For Developers at php[tek] 2024
SQL Database Design For Developers at php[tek] 2024Scott Keck-Warren
 
A Call to Action for Generative AI in 2024
A Call to Action for Generative AI in 2024A Call to Action for Generative AI in 2024
A Call to Action for Generative AI in 2024Results
 
08448380779 Call Girls In Greater Kailash - I Women Seeking Men
08448380779 Call Girls In Greater Kailash - I Women Seeking Men08448380779 Call Girls In Greater Kailash - I Women Seeking Men
08448380779 Call Girls In Greater Kailash - I Women Seeking MenDelhi Call girls
 
Handwritten Text Recognition for manuscripts and early printed texts
Handwritten Text Recognition for manuscripts and early printed textsHandwritten Text Recognition for manuscripts and early printed texts
Handwritten Text Recognition for manuscripts and early printed textsMaria Levchenko
 
[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdf[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdfhans926745
 
Google AI Hackathon: LLM based Evaluator for RAG
Google AI Hackathon: LLM based Evaluator for RAGGoogle AI Hackathon: LLM based Evaluator for RAG
Google AI Hackathon: LLM based Evaluator for RAGSujit Pal
 
08448380779 Call Girls In Friends Colony Women Seeking Men
08448380779 Call Girls In Friends Colony Women Seeking Men08448380779 Call Girls In Friends Colony Women Seeking Men
08448380779 Call Girls In Friends Colony Women Seeking MenDelhi Call girls
 
🐬 The future of MySQL is Postgres 🐘
🐬  The future of MySQL is Postgres   🐘🐬  The future of MySQL is Postgres   🐘
🐬 The future of MySQL is Postgres 🐘RTylerCroy
 

Recently uploaded (20)

Data Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt RobisonData Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt Robison
 
Slack Application Development 101 Slides
Slack Application Development 101 SlidesSlack Application Development 101 Slides
Slack Application Development 101 Slides
 
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...
 
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
 
Enhancing Worker Digital Experience: A Hands-on Workshop for Partners
Enhancing Worker Digital Experience: A Hands-on Workshop for PartnersEnhancing Worker Digital Experience: A Hands-on Workshop for Partners
Enhancing Worker Digital Experience: A Hands-on Workshop for Partners
 
Presentation on how to chat with PDF using ChatGPT code interpreter
Presentation on how to chat with PDF using ChatGPT code interpreterPresentation on how to chat with PDF using ChatGPT code interpreter
Presentation on how to chat with PDF using ChatGPT code interpreter
 
GenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day PresentationGenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day Presentation
 
Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365
Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365
Tech-Forward - Achieving Business Readiness For Copilot in Microsoft 365
 
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
04-2024-HHUG-Sales-and-Marketing-Alignment.pptx
 
How to convert PDF to text with Nanonets
How to convert PDF to text with NanonetsHow to convert PDF to text with Nanonets
How to convert PDF to text with Nanonets
 
CNv6 Instructor Chapter 6 Quality of Service
CNv6 Instructor Chapter 6 Quality of ServiceCNv6 Instructor Chapter 6 Quality of Service
CNv6 Instructor Chapter 6 Quality of Service
 
#StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
#StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024#StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
#StandardsGoals for 2024: What’s new for BISAC - Tech Forum 2024
 
SQL Database Design For Developers at php[tek] 2024
SQL Database Design For Developers at php[tek] 2024SQL Database Design For Developers at php[tek] 2024
SQL Database Design For Developers at php[tek] 2024
 
A Call to Action for Generative AI in 2024
A Call to Action for Generative AI in 2024A Call to Action for Generative AI in 2024
A Call to Action for Generative AI in 2024
 
08448380779 Call Girls In Greater Kailash - I Women Seeking Men
08448380779 Call Girls In Greater Kailash - I Women Seeking Men08448380779 Call Girls In Greater Kailash - I Women Seeking Men
08448380779 Call Girls In Greater Kailash - I Women Seeking Men
 
Handwritten Text Recognition for manuscripts and early printed texts
Handwritten Text Recognition for manuscripts and early printed textsHandwritten Text Recognition for manuscripts and early printed texts
Handwritten Text Recognition for manuscripts and early printed texts
 
[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdf[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdf
 
Google AI Hackathon: LLM based Evaluator for RAG
Google AI Hackathon: LLM based Evaluator for RAGGoogle AI Hackathon: LLM based Evaluator for RAG
Google AI Hackathon: LLM based Evaluator for RAG
 
08448380779 Call Girls In Friends Colony Women Seeking Men
08448380779 Call Girls In Friends Colony Women Seeking Men08448380779 Call Girls In Friends Colony Women Seeking Men
08448380779 Call Girls In Friends Colony Women Seeking Men
 
🐬 The future of MySQL is Postgres 🐘
🐬  The future of MySQL is Postgres   🐘🐬  The future of MySQL is Postgres   🐘
🐬 The future of MySQL is Postgres 🐘
 

RF Optimization Slide deck.pptx

  • 1. Copyright © 2020 Tata Consultancy Services Limited RF Optimization Activity B24G Project 07-Feb-2024
  • 2. Summary: 1. 4G Rollout Summary -Circle wise 2. RF Optimization major activities 3. List of 158 basic Parameters which needs to be defined in LTE Nodes 4. Basic Testing 5. Site basic health Check ups 6. Testing of CSFB, SRVCC, PSHO, FR-LTE in Punjab & Haryana 7. 2G/3G to LTE cell reselection and FRLTE need to define in 3G RNC/Sites and 2G BSC/Sites 8. Major RF KPIs 9. Major RF KPIs formula & Action Plan for Improvement
  • 3. Summary of Circles where rollout started & Circle Dashboard RF DASHBOARD_PUNJAB CIRCLE_ 2/5/2024 OA Site Coun t RFI SURVEY STATUS Installation Done Status COMISSIONING STATUS INTEGRATION STATUS JSON STATUS Neighbor Defination Status Total Alarm Free Sites(JSON Done)[S=D+P] Basic Testing Done [D =D1+D2] Basic Testing Pending [P] Basic Testing Result Received Status Basic Testing Pass [D1] Basic Testing Fail [D2] Basic RF Testing report received Commercially On-Air Sites AMRITSAR 239 239 113 107 104 101 96 98 93 5 93 91 2 93 92 Chandigarh UT 33 32 1 1 1 2 1 2 2 0 0 0 2 0 1 CHD-PB 84 77 15 8 4 3 3 3 2 1 2 2 0 2 1 CHD-PKL 31 31 11 11 11 11 9 11 11 0 10 11 0 10 9 Ferozepur 346 321 174 170 170 166 154 156 146 10 137 128 19 137 138 Jalandhar 378 350 186 153 126 125 98 104 91 13 80 76 16 80 76 Ludhiana 247 183 123 124 123 123 122 123 122 1 122 121 1 122 122 Pathankot 141 140 78 76 69 70 66 63 63 0 61 60 3 61 62 Patiala 523 432 220 209 207 207 196 198 190 8 186 181 9 186 188 Ropar 63 62 48 40 37 36 33 32 28 4 27 25 3 27 29 Bathinda 116 113 93 92 84 83 72 74 53 21 53 52 1 53 50 Chandigarh 223 219 145 125 116 117 104 110 104 6 96 96 8 96 98 Sangrur 91 91 71 71 69 69 68 67 63 4 62 59 5 62 62 HOSHIARPUR 150 126 105 89 95 92 51 63 0 63 0 0 0 0 0 Total 2665 2416 1383 1276 1216 1205 1073 1104 968 136 929 902 69 929 928 CAT-B_RF DASHBOARD_HARYAYA CIRCLE_(05/02/2024)g OA Site Count RFI SURVEY STATUS Installatio n Done Status COMISSIONIN G STATUS INTEGRATIO N STATUS JSON STATUS Neighbor s 4G-4G Neighbors 4G-3G Neighbor s 4G-2G Common Sites (JSON Done+All NBR Done) (A) Basic Testing Done(B=B1+B2 ) Basic Testing Pass (B1) Basic Testing Fail (B2) Basic RF Testing report received Alrams/Iss ue Sites (C) Ready for Basic Testing D=(A-B-C) On Air AMBALA 232 230 101 90 71 71 72 71 71 59 47 45 2 42 0 12 42 FARIDABAD 46 45 16 16 13 13 13 13 13 13 12 12 11 0 1 11 GURGAON 57 52 27 27 27 27 27 27 27 27 26 26 22 0 1 22 HISAR 334 330 141 142 132 129 130 129 129 126 76 70 5 59 0 50 54 KARNAL 264 258 131 130 125 126 124 121 121 123 115 113 2 104 0 8 97 REWARI 182 180 82 80 66 62 59 56 56 47 36 35 1 26 0 11 29 ROHTAK 261 258 100 92 83 77 75 74 74 70 60 57 3 51 0 10 53 SONIPAT 119 117 48 48 38 36 36 36 36 32 29 29 22 0 3 17 Grand Total 1495 1470 646 625 555 541 536 527 527 497 401 387 13 337 0 96 325 CAT-A_RF DASHBOARD_HARYAYA CIRCLE_(05/02/2024) OA Site Count RFI SURVEY STATUS Installation Done Status COMISSIONING STATUS INTEGRATION STATUS JSON STATUS Neighbors 4G-4G Neighbors 4G-3G Neighbors 4G-2G Common Sites (JSON Done+4G/4G Done) (A) Basic Testing Done(B=B1+B2) Basic Testing Pass (B1) Basic Testing Fail (B2) Basic RF Testing report received Alrams/Issue Sites (C) Ready for Basic Testing D=(A-B-C) On Air AMBALA 17 15 10 6 3 4 2 2 2 2 1 1 1 1 FARIDABAD 5 5 GURGAON 4 4 4 1 HISAR 25 19 5 5 1 1 1 1 1 KARNAL 50 49 18 18 15 15 11 13 13 7 0 REWARI 2 2 ROHTAK 13 13 3 3 SONIPAT 10 10 2
  • 4. Summary of Circles where rollout started & Circle Dashboard Summary of Circles started: 1. Punjab: Rollout started majorly, Total Site Count: 2665, Installation done: 1383, JSON Run: 1104, BT pass: 968, On Air: 928 2. Haryana: Rollout also started majorly: Total Site Count: 1495, Installation done: 646, JSON Run: 541, BT pass: 401, On Air: 325 3. Up West: Currently Agra, Bareilly & Meerut rollout started only. Total Site Count: 660, Installation done: 465, JSON Run: 108, BT pass: 82, On Air: 73 4. Uttarakhand: Currently in Dehradun, Haridwar & Nainital Rollout started only, Total Site Count: 357, Installation done: 267, JSON Run: 117, BT pass: 10, On Air: 0, No Site on air in this circle currently. RF DASHBOARD_U.P WEST CIRCLE_(05/02/2024) OA Site Count RFI SURVEY STATUS Installatio n Done Status COMISSIONING STATUS INTEGRATION STATUS JSON STATUS Neighbor s 4G-4G Neighbors 4G-3G Neighbor s 4G-2G Common Sites (JSON Done+4G/4G Done) (A) Basic Testing Done(B=B1+B2 ) Basic Testing Pass (B1) Basic Testing Fail (B2) Basic RF Testing report received Alarms/Iss ue Sites (C) Ready for Basic Testing D=(A-B-C) On Air Agra 221 198 184 101 91 42 39 39 39 32 29 3 32 1 7 32 Bareilly 199 175 116 91 81 28 27 27 27 24 19 5 24 3 18 Meerut 240 206 165 127 113 38 29 29 29 26 21 5 26 1 3 23 Grand Total 660 579 465 319 285 108 95 95 95 0 82 69 13 82 2 13 73 RF DASHBOARD_Uttarakhand CIRCLE_(04/02/2024) OA Site Count RFI SURVEY STATUS Installatio n Done Status COMISSIONING STATUS INTEGRATIO N STATUS JSON STAT US Neighbor s 4G-4G Neighbors 4G-3G Neighbor s 4G-2G Common Sites (JSON Done+4G/4G Done) (A) Basic Testing Done(B=B1+B2 ) Basic Testing Pass (B1) Basic Testing Fail (B2) Basic RF Testing report received Alrams/Iss ue Sites (C) Ready for Basic Testing D=(A-B-C) On Air Dehradun 131 120 93 58 29 29 23 23 23 23 6 6 0 17 Haridwar 61 61 53 45 37 37 30 30 30 30 30 Nainital 165 163 121 77 51 51 44 44 44 44 4 4 0 40 Grand Total 357 344 267 180 117 117 97 97 97 97 10 10 0 0 0 87 0
  • 5. RF Optimization Major activities: 1. Plan basic testing, Route identification, DT allocation, RNO Engineer allocation for next day 2. Coordination with Drive tester & conduct end to end basic testing activity, Issue rectification during basic testing(Latching Issue, CSFB Issue, Less Throughput Issue, Cell reserve/unreserve) 3. Compilation of whole day work & share RF dashboard by each Circle lead end of the day 4. SRVCC, CSFB, PSHO & FR-LTE testing(Coordination with Drive tester, CSFB Priority Change, B2- Threshold change, After activity revert of changes) 5. 4G-4G/ 4G-3G/ 4G-2G Neighbor addition coordination with SON Team & Publish dashboard for Neighbor Update 6. TAC change activity end to end coordination & completion 7. During Basic testing if latching issue found site health checkup, VSWR check, configuration check, site soft reset as per requirement 8. 2G/3G to LTE cell reselection and FRLTE definition in 3G RNC/Sites and 2G BSC/Sites, take up with BSNL team & end to end follow up for Implementation 9. Cluster Drive in Major Cities where basic testing has been completed, Identification of poor patch, site physical/ parametric change, redrive after cluster optimization 10. RET Serial Number Collection, Site where RET Serial Number not received RET Scan, RET configuration in site & RET change
  • 6. List of 158 basic Parameters which needs to be defined in LTE Nodes: Parameter/Detail Site Details Site ID 4G Cell Name (SiteName&Local Cell ID) Local Cell Id 4G Cell ID (eNBID&Local CellID) Technology PLMN eCGI TAL DL Start Freq(MHz) DL Stop Freq(MHz) UL Start Freq(MHz) UL Stop Freq(MHz) DL EARFCN UL EARFCN Tx Power (Watt) Per Port AMSL (m) Antenna Height Building Height Tower Height Tower Type (RTT, RTP, Wall Mount, GBT, GBM, Monopole, COW etc) M. Tilt E. Tilt Media City SSA Circle District State eNodeB Config Site Address eNB Id Site Name Longitude Latitude MME Association NTP Server Commissioning Info Duplex Mode eNodeB Name eNodeB Management IP & Subnet Management GW IP IP Address & Subnet eNodeB VLAN Managment VLAN Interface Gateway EMS Server IP Address Clock Source Parameter/Detail Sector Config Assosiated MME IP Cell Name Cell Coverage Antenna Height (meters) Antenna Orientation (degree) Antenna Gain (dB) Antenna Make Beam Width (degree) Antenna Mech Tilt RRH Model Number Freq Band EARFCN DL EARFCN UL Channel Bandwidth (MHz) Antenna Type MIMO Mode RET Tx Power in (dbm) PCI TDD Mode Special SubFrame Configuration PRACH RSI PUSCH RS GA(0-29) PUSCH RS CS(0-7) Sector Advance Configuration TAC Zero Correlation Zone Configuration Delta PUCCH Shift NRBCQI Eutran Idle Mode Config Frequency Offset Q Hysteresis T Evaluation Q Rx Level Min SIB1 Q Rx Level Min SIB3 S Intra Search S Non Intra Search Idle Mode Intra Freq Cell Reselection Priority P Max Threshold Serving Low Allowed Meas Bandwidth Intra S Intra Search Pr9
  • 7. List of 158 basic Parameters which needs to be defined in LTE Nodes: Parameter/Detail EUTRAN Measurement Config S Intra Search Qr9 Filter Coefficient RSRP A1 Threshold RSRP A1 Hysteresis A1 Time To Trigger A2 Threshold RSRP A2 Hysteresis A2 Time To Trigger A3 Offset A3 Hysteresis A3 Time To Trigger A4 Threshold RSRP A4 Hysteresis A4 Time To Trigger A5 Threshold 1 RSRP A5 Threshold 2 RSRP A5 Hysteresis A5 Time To Trigger Max Report Cells EUTRA Report Interval EUTRA Report Amount EUTRAN Carrier Config S Measure Index EUTRA Carrier ARFCN Allowed Meas Bandwidth Inter Presence Antenna Port1 Inter Neighbor Cell Config Inter Q Offset Freq Q Rx Level Min SIB5 P Max T Reselection EUTRA T Reselection EUTRA SF Medium T Reselection EUTRA SF High Threshold X High Threshold X Low Cell Reselection Priority Threshold X High QR9 Threshold X Low QR9 UTRAN Measurement Config Enable T Reselection UTRA B2 Threshold2 UTRA RSCP B2 Hyesteresis UTRAN B2 Timer To Trigger UTRAN Max Report Cells IRAT Report Interval IRAT Report Amount Parameter/Detail UTRAN FDD Carrier Config B2 Threshold1 Serving Cell RSRP Index UTRA Carrier ARFCN Q Rx Level Min. Q Qual Min. Cell Reselection Priority Threshold X High Threshold X Low P Max UTRA Q Offset Threshold X High QR9 Threshold X Low QR9 GERAN Measurement Config Enable T Reselection GERAN B2 Threshold2 GERAN B2 Hyesteresis GERAN B2 Timer To Trigger GERAN GERAN Carrier Config B2 Threshold1 Serving Cell RSRP Index Q Rx Level Min Cell Reselection Priority Threshold X High Threshold X Low Band Indicator BCCH ARFCN NCC Permitted P Max Q Offset
  • 8. Basic Testing Currently basic testing is being conducted for integrated sites, sample format for basic testing as below: Test Scenarios/Site ID T4PB01AMP09AMI022 T4PB01AMP09AMI022 T4PB01AMP09AMI022 Test Date 11/8/2023 11/8/2023 11/8/2023 Sector 0 1 2 Azimuth 10 120 250 Antenna Uptilt Status (OK/Not OK) OK OK OK PCI 231 232 233 Building Height 13 13 13 Tower height 12 12 12 Antenna Height 25 25 25 VoLTE MO (OK/Not OK) OK OK OK VoLTE MT (OK/Not OK) OK OK OK CSFB MO (OK/Not OK) OK OK OK CSFB MT (OK/Not OK) OK OK OK SMS MO- LTE Mode (OK/Not OK) OK OK OK SMS MT- LTE Mode (OK/Not OK) OK OK OK SMS MO- VoLTE Mode (OK/Not OK) OK OK OK SMS MO- VoLTE Mode (OK/Not OK) OK OK OK 3G-4G Reselection (OK/Not OK) Not ok Not ok Not ok 2G-4G Reselection (OK/Not OK) Not ok Not ok Not ok LTE Attach (OK/Not OK) ok ok ok Data Throughput (DL)- Mbps 20 21 20 Data Throughput (UL)- Mbps 4 4 5 4G-3G PSHO (OK/Not OK) Not ok Not ok Not ok 4G-2G PSHO (OK/Not OK) Not ok Not ok Not ok SRVCC (OK/Not OK) Not ok Not ok Not ok VOLTE INTRA(HO) VOLTE INTER(HO) Remark (If any) CSFB CALL IN 3G CSFB CALL IN 3G CSFB CALL IN 3G
  • 9. Site basic health Check ups: 1. Site Status: 2. Connected Users: 3. Inventory details For below site all 3 sectors are Up,S1 also Up No of Connected Users visible for below site Site inventory details 4. VSWR: 5. Alarm:
  • 10. Testing of CSFB, SRVCC, PSHO, FR-LTE in Punjab & Haryana We have done CSFB, SRVCC, PSHO & FR-LTE check in multiple locations in Punjab & Haryana, below is the testing status for all BSCs & RNCs in Punjab & Haryana Punjab: 2G BSC 2G Vendor BSC Version 4G-2G SRVCC Status(OK/NOK ) 4G-2G CSFB Status(OK/NOK ) 2G-4G FRLTE Status(OK/NOK ) 3G RNC ID 3G Vendor 4G-3G SRVCC Status(OK/NOK ) 4G-3G CSFB Status(OK/NOK ) 3G-4G FRLTE Status(OK/NOK ) 3G-4G PSHO Status(OK/NOK ) 4G-3G PSHO Status(OK/NOK ) Tentative date BSCKTP3 Ericsson EVOC8230 - OK OK 101 Ericsson - OK OK - - 15-Feb-24 BSC2PKT Ericsson R07B - OK OK 103 Ericsson OK OK OK OK OK 15-Feb-24 BSC6KTP Ericsson B30B07 - OK OK 102 Ericsson - OK OK - - 15-Feb-24 BSCAMR1 Ericsson R07B - OK OK 310 ZTE - OK OK - - 15-Feb-24 BSCAMR4 Ericsson R07B - OK OK 311 ZTE - OK OK - - 15-Feb-24 BSCBHA9 Ericsson R07B OK OK OK 312 ZTE - OK OK - - 15-Feb-24 BSCJAL3 Ericsson R07B - OK OK 313 ZTE OK OK OK OK OK 15-Feb-24 BSCKTP3 Ericsson EVOC8230 - OK OK 3801 ZTE - OK OK - - 15-Feb-24 BSCKTP4 Ericsson B30A07 - OK OK 3802 ZTE - OK OK - - 15-Feb-24 BSCPKT2 Ericsson R07B - OK OK 3803 ZTE - OK OK - - 15-Feb-24 BSCPTL1 Ericsson R07B - OK OK 3804 ZTE - OK OK - - 15-Feb-24 EBSCJAL Ericsson G17Q4 - OK OK 3806 ZTE - OK OK - - 15-Feb-24 EVBKTP1 Ericsson G17Q4 - OK OK 3807 ZTE - OK OK - - 15-Feb-24 PB_BSC_2801_ZTE_Bathinda1 ZTE V6.50.350d - OK OK - - - - - - - 15-Feb-24 PB_BSC_225_ZTE_Chandigarh 2 ZTE V6.30.350d OK OK OK - - - - - - - 15-Feb-24 PB_BSC_224_ZTE_Chandigarh 1 ZTE V6.30.350d - OK OK - - - - - - - 15-Feb-24 PB_BSC_2805_ZTE_Patiala2 ZTE V6.50.350d - OK OK - - - - - - - 15-Feb-24 PB_BSC_231_ZTE_Hoshiarpur2 ZTE V6.30.350d - OK OK - - - - - - - 15-Feb-24 PB_BSC_230_ZTE_Hoshiarpur1 ZTE V6.30.350d - - - - - - - - - - 15-Feb-24 PB_BSC_2807_ZTE_Sangrur1 ZTE V6.50.350d - OK OK - - - - - - - 15-Feb-24 PB_BSC_2806_ZTE_Ropar1 ZTE V6.50.350d - OK OK - - - - - - - 15-Feb-24 PB_BSC_2804_ZTE_Patiala1 ZTE V6.50.350d - OK OK - - - - - - - 15-Feb-24 PB_BSC_228_ZTE_Jalandhar BSC 1 ZTE V6.30.350d - OK OK - - - - - - - 15-Feb-24 PB_BSC_2803_ZTE_Ludhiana3 ZTE V6.50.350d - OK OK - - - - - - - 15-Feb-24 PB_BSC_229_ZTE_Jalandhar BSC 2 ZTE V6.30.350d - OK OK - - - - - - - 15-Feb-24 PB_BSC_2802_ZTE_Jalandhar3 ZTE V6.50.350d - OK OK - - - - - - - 15-Feb-24 PB_BSC_227_ZTE_Ludhiana BSC 2 ZTE V6.30.350d - OK OK - - - - - - - 15-Feb-24 PB_BSC_226_ZTE_Ludhiana BSC 1 ZTE V6.30.350d - OK OK - - - - - - - 15-Feb-24
  • 11. Haryana: Haryana 2G BSC Name 2G Vendor 4G-2G SRVCC Status(OK/N OK) 4G-2G CSFB Status(OK/NO K) 2G-4G FRLTE Status(OK/NO K) RNC NAME RNC ID 3G Vendor 4G-3G SRVCC Status(OK/NOK ) 4G-3G CSFB Status(OK/NO K) 3G-4G FRLTE Status(OK/NOK ) 3G-4G PSHO Status(OK/NO K) 4G-3G PSHO Status(OK/NO K) HR_BSC_212_ZTE_Faridabad(21 2) ZTE Ok Ok Ok HR_RNC_301_ZTE_Rohtak1 301 ZTE Ok Ok Ok Ok PNPBSC ERICSS ON NA NA NA HR_RNC_302_ZTE_Gurgaon1 302 ZTE Ok Ok Ok Ok SIRBSC2 ERICSS ON NA NA NA HR_RNC_303_ZTE_AMBALA1 303 ZTE Ok Ok Ok Ok HISBSC1 ERICSS ON NA NA NA HR_RNC_304_ZTE_Yamunan agar1 304 ZTE Ok Ok Ok Ok HR BSC AMBALA 2 ZTE Ok Ok Ok HR_RNC_305_ZTE_REWARI 305 ZTE Ok Ok Ok Ok HR BSC YAMUNANAGAR 214 ZTE Ok Ok Ok HR_RNC_306_ZTE_NARNAUL 1 306 ZTE Ok Ok Ok Ok HR_BSC_211_ZTE_Gurgaon1(21 1) ZTE Ok Ok Ok HR_RNC_3816_ZTE_Rohtak2 3816 ZTE Ok Ok Ok Ok HR BSC JIND ZTE As per GM Sir, No need to check HR_RNC_3817_ZTE_Sonipat1 3817 ZTE Ok Ok Ok Ok BSC1HS1 ERICSS ON NA Ok HR_RNC_3818_ZTE_Faridaba d1 3818 ZTE Ok Ok Ok Ok ZTE_BSC_213_AMBALA1(213) ZTE Ok Ok Ok HR_RNC_3819_ZTE_Karnal1 3819 ZTE Ok Ok Ok Ok BSCKRL1(G17) ERICSS ON Ok Ok Ok HR_RNC_3820_ZTE_Hisar1 3820 ZTE Ok Ok Ok Ok HR BSC KARNAL ZTE Ok Ok Ok RNCKRN01 310 ERICSSON Ok Ok Ok Ok HR_BSC_215_ZTE_REWARI1(21 5) ZTE Ok Ok Ok RNCSRS102 307 ERICSSON Ok Ok Ok Ok BHSN2 NOKIA NA NA NA BHSN1 NOKIA NA NA NA BKRN2 NOKIA NA NA NA HR_BSC_207_ZTE_Rohtak1(207 ) ZTE Ok Ok Ok HR_BSC_208_ZTE_Bhiwani(208) ZTE Ok Ok Ok HR_BSC_210_ZTE_Sonipat(210) ZTE Ok Ok Ok HR BSC REWARI 2 ZTE Ok Ok Ok Testing of CSFB, SRVCC, PSHO, FR-LTE in Punjab & Haryana
  • 12. 2G/3G to LTE cell reselection and FRLTE need to define in 3G RNC/Sites and 2G BSC/Sites Below Parameter changes has been Implemented in 2G BSCs & 3G RNCs for 2G/3G to LTE Cell Reselection & FR-LTE: 2G Feature Name(Ericsson BSC) Feature ID GSM-LTE Cell Reselection FAJ 123 155 FAST Return to LTE after call release FAJ 121 1873 LTE to GSM NACC Support FAJ 121 1872 3G Feature Name(Ericsson RNC) Feature ID LTE cell re-selection FAJ 121 1474 CS voice fallback from LTE FAJ 121 1610 R1 Release with Redirect to LTE FAJ 121 2174 SrvccPsCsFromLte CXC4030142 PshoFromLte CXC4030107 Ericsson Feature: E-UTRAN to UTRAN SRVCC: Parameter Value RncPsHoL2UtraSw ON RncSrvccSw ON sRVCCEmgCalSwch ON psSigForImsInd Supported ZTE-3G to 4G: 2G Parameter Name(Ericsson) Proposed Value EARFCN need to add 515 COVERAGEE GOOD RATPRIO 6 HPRIOTHR 6 LPRIOTHR 6 QRXLEVMINE 8 MINCHBW 1 FASTRETLTE Active Ericsson-2G to 4G: 3G Parameter Name(Ericsson) Proposed Value EutranFreqRelation 515 releaseRedirectEutraTriggers.csFallbackCsRelease 1 releaseRedirectEutraTriggers.csFallbackDchToFach 0 releaseRedirectEutraTriggers.dchToFach 1 releaseRedirectEutraTriggers.fachToUra 1 releaseRedirectEutraTriggers.fastDormancy 1 releaseRedirectEutraTriggers.normalRelease 1 EutranFreqRelation.cellReselectionPriority 6 EutranFreqRelation.qRxLevMin -124 EutranFreqRelation.threshHigh 12 EutranFreqRelation.redirectionOrder 1 Ericsson-3G to 4G: 2G Parameter Name(ZTE)_BTS Proposed Value GERAN RAT Priority 100 GERAN Target system of connected UE 100 Maximum intra Frequency Measurement Bandwidth 5M(25RB)[2] GERAN-Frequency Number 1 FastReturn to LTE Channel Release with E-Utran Neighbor cell When CSFB and SRVCC[4] Cell re-selection Switch based on Priority Support[1] GERAN Neighbor relation with LTE 2G Parameter Name(ZTE)_BSC Proposed Value FastReturn to LTE 1 ZTE-2G to 4G:
  • 13. Major RF KPIs Below are the Major RF KPIs which we work on daily basis:  RRC Connection Success Rate(All) (%)  RRC Congestion  RRC Drop Rate(%)  ERAB Setup Success Rate (%)  VOLTE ERAB Setup Success Rate  DROP Call Rate (%)  ERAB Drop Rate - PS (%)  ERAB Drop Rate-VoLTE (%)  Data Volume DL(MB)  Data Volume UL(MB)  Data Volume - Total (GB)  Average Per user throughput (DL) Mbps  Average Per user throughput (UL) Mbps  VOLTE Traffic (Erlang)  E-UTRAN Cell availability (%)  Intra Frequency HO Out Success Rate(%)  VOLTE Intra Freq HO out Success Rate  PS handover success rate(LTE intra system) (%)  Inter RAT HO out Success Rate (GERAN) (%)  Inter RAT HO out Success Rate (UTRAN) (%)  CSFB Preparation success rate
  • 14. Major RF KPIs formula & Action Plan for Improvement  RRC Connection Success Rate(All) (%): Major Checks: • Operational Issue check – Outage, Alarm, High VSWR, Configuration issue(Sec-0 should have one RRH, Sec-1,2 should have one RRH) • If Traffic is very high & site is overshooting, we recommend down tilt in cell • If site hangs, RRC SR becomes zero or very less suddenly site restart is recommended  ERAB Setup Success Rate (%): Similar actions are being taken for Improving Erab setup success rate(down tilt, restart, Outage/alarm rectification)  Average Per user throughput (DL) Mbps: Major Checks: • Operational Issue check – Outage, Alarm, High VSWR, Configuration issue • If connected user is very high & cell traffic is very high we down tilt the site to dominate the coverage & improves user throughput • Sometimes high packet loss causes poor DL Throughput, Need to improve packet loss to improve DL user throughput  Intra Frequency HO Out Success Rate(%):  Major Checks: • Neighbor Audit required for Improving Intra Freq HOSR, Wrong TAC, PLMN, PCI, Cell ID mapping in neighbor cause poor intra freq hosr • Neighbor refresh(Neighbor deletion & recreation) required to improve intra freq hosr KPI Formulas RRC Connection Success Rate(All) (%) (RRC.ConnEstabSucc.Emergency+ RRC.ConnEstabSucc.HighPriorityAccess + RRC.ConnEstabSucc.MtAccess + RRC.ConnEstabSucc.MoSignalling + RRC.ConnEstabSucc.MoData)/(RRC.ConnEstabAtt.Emergency + RRC.ConnEstabAtt.HighPriorityAccess+ RRC.ConnEstabAtt.MtAccess+RRC.ConnEstabAtt.MoSignalling+RRC.ConnEstabAtt.MoData)*100 KPI Formulas Average Per user throughput (DL) Mbps Avg.PerUser.CellThp.DL KPI Formulas Intra Frequency HO Out Success Rate(%) ((HO.IntraFreqOutSucc/HO.IntraFreqOutAtt)*100)
  • 15. Major RF KPIs formula & Action Plan for Improvement  Inter RAT HO out Success Rate (GERAN) (%): • For Improving SRVCC to GERAN – 4G to 2G Neighbor audit is required, If any 2G neighbor is having wrong Cell ID, BCCH, BSIC, LAC definition SRVCC will be degraded, Need to correct the definition.  Inter RAT HO out Success Rate (UTRAN) (%): • For Improving SRVCC to UTRAN – 4G to 3G Neighbor audit is required, If any 3G neighbor is having wrong Cell ID, PSC, LAC definition SRVCC will be degraded, Need to correct the definition.  Other few Major KPIs formula: KPI Formulas Inter RAT HO out Success Rate (GERAN) (%) ((HO.SrvccGeranSucc/HO.SrvccGeranAtt )*100) KPI Formulas Inter RAT HO out Success Rate (UTRAN) (%) ((HO.SrvccUtranSucc /HO.SrvccUtranAtt)*100) KPI Formulas RRC Drop Rate (%) ((RRC.ConnectionDrop.Num/RRC.ConnTotal)* 100) Data Volume - Total (GB) (PdcpDLBytesConsumed+PdcpULBytesConsumed)/(1024*1024*1024) PS handover success rate(LTE intra system) (%) (((HO.IntraFreqOutSucc.QCI6+HO.IntraFreqOutSucc.QCI7+HO.IntraFreqOutSucc.QCI8+HO.IntraFreqOutSucc.QCI9) + (HO.InterFreqMeasGapOutSucc.QCI6 + HO.InterFreqMeasGapOutSucc.QCI7 +HO.InterFreqMeasGapOutSucc.QCI8+HO.InterFreqMeasGapOutSucc.QCI9)) / ((HO.IntraFreqOutAtt.QCI6+HO.IntraFreqOutAtt.QCI7+HO.IntraFreqOutAtt.QCI8+HO.IntraFreqOutAtt.QCI9 + HO.InterFreqMeasGapOutAtt.QCI6+HO.InterFreqMeasGapOutAtt.QCI7+HO.InterFreqMeasGapOutAtt.QCI8+HO.InterFreqMeasGapOut Att.QCI9 )) *100) CSFB Preparation success rate ((HO.CSFallback.GeranSucc+HO.CSFallback.UtranSucc)/(HO.CSFallback.EstabInitCount+HO.CSFallback.UECNTXModCount))*100
  • 16. KPI Dashboard PB Combined Sites Stats 24-Jan-24 25-Jan-24 26-Jan-24 27-Jan-24 28-Jan-24 29-Jan-24 Total Sites Reported in CNOPS 983 983 985 1059 1056 1149 Total Sites Not Reported in CNOPS 300 300 298 224 227 134 Total Cells Reported 2946 2943 2951 3186 3178 3450 Total Payload (GB) 17942 17706 19089 19158 19386 20427 Data DL(GB) 16618 16360 17653 17691 17939 18875 Data UL(GB) 1324 1346 1436 1467 1447 1552 VOLTE Traffic (Erlang) 2620 2683 2290 2826 2396 3288 Drop call Rate (%) 1.79 1.77 1.71 1.75 1.78 1.82 RRC Drop Rate (%) 6.60 7.94 9.15 6.86 7.74 8.00 ERAB Drop Rate - PS (%) 3.18 3.16 3.09 3.16 3.24 3.18 ERAB Drop Rate-VoLTE (%) 1.21 1.15 1.15 1.22 1.05 1.26 % N/W availability 99.63 99.68 99.79 99.74 99.71 99.60 Outage Minute 15735 13645 9009 11775 13317 19744 RRC Connection Success Rate(All) (%) 30.10 37.69 45.12 47.03 48.30 47.66 RRC Congestion (%) 1.75 2.38 0.75 1.10 1.83 2.61 ERAB Setup Success Rate (%) 95.89 95.82 95.68 94.95 94.69 94.95 ERAB Setup Success Rate-VoLTE (%) 97.68 97.33 96.92 97.04 97.42 96.80 ERAB Congestion (%) 0.12 0.08 0.07 0.89 1.53 0.84 Packet Drop rate (DL) 0.09 0.09 0.10 0.11 0.18 0.21 Packet Drop rate (DL)-VOLTE 0.02 0.02 0.02 0.02 0.08 0.03 Packet Drop rate (DL)-PS 0.10 0.10 0.10 0.12 0.18 0.21 Intra Frequency HO Out Success Rate (%) 79.90 79.36 84.11 82.46 79.02 75.06 Intra Frequency HO Out Success Rate-VoLTE (%) 86.88 82.16 83.64 88.94 84.31 80.39 PS handover success rate(LTE intra system) (%) 79.88 76.23 77.38 81.32 77.45 75.02 CSFB Preparation success rate 97.92 98.18 97.78 97.71 97.87 97.75 Site count with zero Payload 109 135 73 91 95 133 Cell count with zero Payload 446 529 381 437 462 599 % of Cells Drop Call Rate > 2.5% 19.86 18.93 21.72 22.38 20.93 20.87 % of Cells RRC Drop Rate > 2.5% 81.16 78.15 83.67 81.04 80.59 78.72 % of Cells ERAB Drop Rate - PS > 2.5% 53.33 52.26 52.83 51.48 52.61 52.00 % of Cells ERAB Drop Rate-VoLTE > 2.5% 13.92 12.91 14.13 13.65 13.56 15.65 % of Cells % N/W availability > 95% 82.32 78.05 89.43 87.32 87.95 86.00 % of Cells RRC Connection Success Rate(All) > 95% 46.03 38.70 24.91 41.81 45.28 47.28 % of Cells RRC Congestion >1% 2.31 2.24 1.63 1.26 1.35 1.62
  • 17. Copyright © 2020 Tata Consultancy Services Limited Thank you