SlideShare a Scribd company logo
Sushant Nitin Lele
sushant.lele@okstate.edu +1 512-806-4009
(Visa Status – H1b)
Profile of Qualification:
 Experience in cost analysis of Electrical, Mechanical components and PCB assemblies, performing gap analysis and
driving fact based cost negotiations to close cost-gaps
 Proficient in identifying and implementing process improvements as well as managing overall operations in a global
automobile manufacturing assembly line
 Aptitude in using optimization and simulation tools while exercising concepts of Supply Chain Operations, Inventory
Management and Operational Planning to provide solutions to supply chain problems
 Basics of Supply Chain Management and MasterPlanning of Resources certified by APICS
Education:
MS in Industrial Engineering (Supply Chain Management) Oklahoma State University GPA – 3.7 May 2015
Bachelor of Engineering (Production Engineering) University of Pune, India GPA – 3.5 May 2011
Experience:
Dell Technologies November 2015 - Present
 Responsible for acquiring an insight of the cost structure of a broad supply base for Dell’s specified Server products
 Cost modeling for all Electrical, Mechanical components and PCB assemblies across Dell's enterprise solutions portfolio
 Engage with global commodity managers during RFQ and RTS stage in order to perform gap analysis and drive fact based
cost negotiations to close cost-gaps
 Update the EE components database. Also, analyze what-if aspects of Electrical components provide in the EE BOM to
find better alternatives
Mahindra and Mahindra Ltd, Assistant Manager December 2012 – June 2013
 Responsible for procurement of components required for end to end process improvement projects on shop floors e.g.
electrical commodity parts, hydraulic or pneumatic components by considering industry standard quality and financial
parameters such as ISO 9001:2000
 Worked with production, quality, logistics and finance departments to ensure department requirements are met
 Led production team to meet operational plans on Trim line – final buyoff stage,producing 500 automobiles a day
 Responsible for all FMEA and other in-house root cause analysis investigations in regards to equipment failures, quality
checks and safety to implement remedial actions and eliminate critical defects on manufacturing assembly line. Single
contact and responsibility for ECM, QA, Engineering changes and their impact on part costing
Mahindra and Mahindra Ltd, Engineer - Process Improvement and Project Management July 2011 – July 2012
 Gained insight of automotive manufacturing operations by working closely with numerous cross functional teams
 Member of a core team addressing issues in logistics and redesigning space utilization in trailers for car bodies resulting in
substantialcost reduction
 Designed an in-house work measurement systembased upon which led changes in the material and human movement to
yield gains in operational and logistic efficiency in Bolero assembly shop
Summit Engineers & Consultants Pvt. Ltd, Engineering Intern May 2010 – May 2011
 Performed cost estimation of tube end sizing machine considering machining cost, hydraulic unit cost, tooling cost and
overheads.Designed and fabricated a special purpose tube end sizing machine
Academic Projects:
 Designed a supply chain network to address complex inefficiencies by using supply chain strategy,design,modelling and
costing approaches while achieving a 12% i.e. $64 million reduction in transportation cost by using ‘Llamasoft Supply
Chain Guru’ to determine optimal location of distribution centers across US
 Managed a 3 Tier Supply Chain, built financial model for making a strategic decision to expand supply chain network in a
virtual supply chain network simulator to execute operational planning by optimizing inventory level, batch size and
infrastructure so as to achieve a profit of approximately $22 million over a period of 2 years
 Developed a relational database application using MS Access and SQL to consolidate orders placed by the customers and
provide a daily production schedule
Certifications:
 Six Sigma Green Belt certified from Institute of Industrial Engineers.
 APICS CPIM – BSCM and MPR certified

More Related Content

What's hot

Modernizationdigitalcloud as a multiplier
Modernizationdigitalcloud as a  multiplier Modernizationdigitalcloud as a  multiplier
Modernizationdigitalcloud as a multiplier
Joshua Fox
 
ALESSIA NEWTON HARRELL RESUME_2015
ALESSIA NEWTON HARRELL RESUME_2015ALESSIA NEWTON HARRELL RESUME_2015
ALESSIA NEWTON HARRELL RESUME_2015
Alessia Newton Harrell
 
Meezan PE
Meezan PEMeezan PE
Meezan PE
Meezan Batcha
 
Resume - Rizal AM
Resume - Rizal AMResume - Rizal AM
Resume - Rizal AM
Rizal A M
 
CV - Electrical Estimation Engineer
CV - Electrical Estimation EngineerCV - Electrical Estimation Engineer
CV - Electrical Estimation Engineer
Akbar Sadiq
 
Kraft,Cheryl 416_resume.pdf
Kraft,Cheryl 416_resume.pdf Kraft,Cheryl 416_resume.pdf
Kraft,Cheryl 416_resume.pdf
Cheryl Kraft
 
Jalen Tate Summer Intern Presentation
Jalen Tate Summer Intern PresentationJalen Tate Summer Intern Presentation
Jalen Tate Summer Intern Presentation
Jalen Tate
 
Venkat_ Resume
Venkat_ ResumeVenkat_ Resume
Venkat_ Resume
Venkatesan Govindharajan
 
Resume - Hasitha Ketanwila
Resume - Hasitha KetanwilaResume - Hasitha Ketanwila
Resume - Hasitha Ketanwila
Hasitha Geeshan Ketanwila
 
Sanchit - Resume
Sanchit - ResumeSanchit - Resume
Sanchit - Resume
Sanchit S Bhadoria
 
se_resume
se_resumese_resume
Kummer resume
Kummer resumeKummer resume
Kummer resume
JordanKummer1
 
Md aashique ali
Md aashique aliMd aashique ali
Md aashique ali
Md Aashique Ali
 
Resume-Mujib.
Resume-Mujib.Resume-Mujib.
Resume-Mujib.
Mujibur Rahman
 
RLPResume
RLPResumeRLPResume
RLPResume
Russ Papparotto
 
Mahesh k. mokire resume nov 7th, 2019
Mahesh k. mokire resume  nov 7th, 2019Mahesh k. mokire resume  nov 7th, 2019
Mahesh k. mokire resume nov 7th, 2019
Mahesh Mokire
 
Wesley Yan Resume
Wesley Yan ResumeWesley Yan Resume
Wesley Yan Resume
Wesley Yan
 
BASEEM
BASEEMBASEEM
BASEEM
Baseem k
 
nabi
nabinabi
Daniel Levandowski Resume
Daniel Levandowski Resume Daniel Levandowski Resume
Daniel Levandowski Resume
Dan Levandowski
 

What's hot (20)

Modernizationdigitalcloud as a multiplier
Modernizationdigitalcloud as a  multiplier Modernizationdigitalcloud as a  multiplier
Modernizationdigitalcloud as a multiplier
 
ALESSIA NEWTON HARRELL RESUME_2015
ALESSIA NEWTON HARRELL RESUME_2015ALESSIA NEWTON HARRELL RESUME_2015
ALESSIA NEWTON HARRELL RESUME_2015
 
Meezan PE
Meezan PEMeezan PE
Meezan PE
 
Resume - Rizal AM
Resume - Rizal AMResume - Rizal AM
Resume - Rizal AM
 
CV - Electrical Estimation Engineer
CV - Electrical Estimation EngineerCV - Electrical Estimation Engineer
CV - Electrical Estimation Engineer
 
Kraft,Cheryl 416_resume.pdf
Kraft,Cheryl 416_resume.pdf Kraft,Cheryl 416_resume.pdf
Kraft,Cheryl 416_resume.pdf
 
Jalen Tate Summer Intern Presentation
Jalen Tate Summer Intern PresentationJalen Tate Summer Intern Presentation
Jalen Tate Summer Intern Presentation
 
Venkat_ Resume
Venkat_ ResumeVenkat_ Resume
Venkat_ Resume
 
Resume - Hasitha Ketanwila
Resume - Hasitha KetanwilaResume - Hasitha Ketanwila
Resume - Hasitha Ketanwila
 
Sanchit - Resume
Sanchit - ResumeSanchit - Resume
Sanchit - Resume
 
se_resume
se_resumese_resume
se_resume
 
Kummer resume
Kummer resumeKummer resume
Kummer resume
 
Md aashique ali
Md aashique aliMd aashique ali
Md aashique ali
 
Resume-Mujib.
Resume-Mujib.Resume-Mujib.
Resume-Mujib.
 
RLPResume
RLPResumeRLPResume
RLPResume
 
Mahesh k. mokire resume nov 7th, 2019
Mahesh k. mokire resume  nov 7th, 2019Mahesh k. mokire resume  nov 7th, 2019
Mahesh k. mokire resume nov 7th, 2019
 
Wesley Yan Resume
Wesley Yan ResumeWesley Yan Resume
Wesley Yan Resume
 
BASEEM
BASEEMBASEEM
BASEEM
 
nabi
nabinabi
nabi
 
Daniel Levandowski Resume
Daniel Levandowski Resume Daniel Levandowski Resume
Daniel Levandowski Resume
 

Similar to Resume_Sushant.Lele

Denise Calow Resume 11_09_2015
Denise Calow Resume 11_09_2015Denise Calow Resume 11_09_2015
Denise Calow Resume 11_09_2015
Denise Calow
 
Seanresume3-15.docx-2
Seanresume3-15.docx-2Seanresume3-15.docx-2
Seanresume3-15.docx-2
Sean Hedden
 
Sai Krishna_Gilla
Sai Krishna_GillaSai Krishna_Gilla
Sai Krishna_Gilla
Sai Krishna
 
'Applying System Science and System Thinking Techniques to BIM Management'
'Applying System Science and System Thinking Techniques to BIM Management' 'Applying System Science and System Thinking Techniques to BIM Management'
'Applying System Science and System Thinking Techniques to BIM Management'
Alan Martin Redmond, PhD
 
Lekia P Ross resume
Lekia P Ross resumeLekia P Ross resume
Lekia P Ross resume
Lekia Ross
 
Sternberger CTO eArchitect CV
Sternberger CTO eArchitect CVSternberger CTO eArchitect CV
Sternberger CTO eArchitect CV
Mark Sternberger, cEA, cBPM, PMP
 
Resume
ResumeResume
Wpf resume-formal-eng-current-design-5
Wpf resume-formal-eng-current-design-5Wpf resume-formal-eng-current-design-5
Wpf resume-formal-eng-current-design-5
WarrenFaeth
 
Kate Resume-7Page
Kate Resume-7PageKate Resume-7Page
Kate Resume-7Page
Katherine Kuo
 
Muralidhar
MuralidharMuralidhar
Muralidhar
Muralidhar J K
 
Byron Pang (LinkedIn- Oct 2014)
Byron Pang (LinkedIn- Oct 2014)Byron Pang (LinkedIn- Oct 2014)
Byron Pang (LinkedIn- Oct 2014)
Byron Pang
 
Wpf Resume Formal Eng Current Design 5
Wpf Resume Formal Eng Current Design 5Wpf Resume Formal Eng Current Design 5
Wpf Resume Formal Eng Current Design 5
WarrenFaeth
 
Resume
ResumeResume
Resume of bruce bennett 2018 - baseline - stripped
Resume of bruce bennett   2018 - baseline - strippedResume of bruce bennett   2018 - baseline - stripped
Resume of bruce bennett 2018 - baseline - stripped
BruceBennett43
 
Resume of bruce bennett
Resume of bruce bennettResume of bruce bennett
Resume of bruce bennett
BruceBennett43
 
resume_Ravi Kumar_
resume_Ravi Kumar_resume_Ravi Kumar_
resume_Ravi Kumar_
Ravi Kumar Jagarlapudi
 
Priyanka Shrivastava - Career Snapshot
Priyanka Shrivastava - Career SnapshotPriyanka Shrivastava - Career Snapshot
Priyanka Shrivastava - Career Snapshot
priyanka shrivastava
 
Suchendran H - P
Suchendran H - PSuchendran H - P
Suchendran H - P
Suchendran H
 
Brendan_Salmond_Resume_2015_V4
Brendan_Salmond_Resume_2015_V4Brendan_Salmond_Resume_2015_V4
Brendan_Salmond_Resume_2015_V4
Brendan Salmond
 
Engineering & Project Management
Engineering & Project ManagementEngineering & Project Management
Engineering & Project Management
James Gilmore
 

Similar to Resume_Sushant.Lele (20)

Denise Calow Resume 11_09_2015
Denise Calow Resume 11_09_2015Denise Calow Resume 11_09_2015
Denise Calow Resume 11_09_2015
 
Seanresume3-15.docx-2
Seanresume3-15.docx-2Seanresume3-15.docx-2
Seanresume3-15.docx-2
 
Sai Krishna_Gilla
Sai Krishna_GillaSai Krishna_Gilla
Sai Krishna_Gilla
 
'Applying System Science and System Thinking Techniques to BIM Management'
'Applying System Science and System Thinking Techniques to BIM Management' 'Applying System Science and System Thinking Techniques to BIM Management'
'Applying System Science and System Thinking Techniques to BIM Management'
 
Lekia P Ross resume
Lekia P Ross resumeLekia P Ross resume
Lekia P Ross resume
 
Sternberger CTO eArchitect CV
Sternberger CTO eArchitect CVSternberger CTO eArchitect CV
Sternberger CTO eArchitect CV
 
Resume
ResumeResume
Resume
 
Wpf resume-formal-eng-current-design-5
Wpf resume-formal-eng-current-design-5Wpf resume-formal-eng-current-design-5
Wpf resume-formal-eng-current-design-5
 
Kate Resume-7Page
Kate Resume-7PageKate Resume-7Page
Kate Resume-7Page
 
Muralidhar
MuralidharMuralidhar
Muralidhar
 
Byron Pang (LinkedIn- Oct 2014)
Byron Pang (LinkedIn- Oct 2014)Byron Pang (LinkedIn- Oct 2014)
Byron Pang (LinkedIn- Oct 2014)
 
Wpf Resume Formal Eng Current Design 5
Wpf Resume Formal Eng Current Design 5Wpf Resume Formal Eng Current Design 5
Wpf Resume Formal Eng Current Design 5
 
Resume
ResumeResume
Resume
 
Resume of bruce bennett 2018 - baseline - stripped
Resume of bruce bennett   2018 - baseline - strippedResume of bruce bennett   2018 - baseline - stripped
Resume of bruce bennett 2018 - baseline - stripped
 
Resume of bruce bennett
Resume of bruce bennettResume of bruce bennett
Resume of bruce bennett
 
resume_Ravi Kumar_
resume_Ravi Kumar_resume_Ravi Kumar_
resume_Ravi Kumar_
 
Priyanka Shrivastava - Career Snapshot
Priyanka Shrivastava - Career SnapshotPriyanka Shrivastava - Career Snapshot
Priyanka Shrivastava - Career Snapshot
 
Suchendran H - P
Suchendran H - PSuchendran H - P
Suchendran H - P
 
Brendan_Salmond_Resume_2015_V4
Brendan_Salmond_Resume_2015_V4Brendan_Salmond_Resume_2015_V4
Brendan_Salmond_Resume_2015_V4
 
Engineering & Project Management
Engineering & Project ManagementEngineering & Project Management
Engineering & Project Management
 

Resume_Sushant.Lele

  • 1. Sushant Nitin Lele sushant.lele@okstate.edu +1 512-806-4009 (Visa Status – H1b) Profile of Qualification:  Experience in cost analysis of Electrical, Mechanical components and PCB assemblies, performing gap analysis and driving fact based cost negotiations to close cost-gaps  Proficient in identifying and implementing process improvements as well as managing overall operations in a global automobile manufacturing assembly line  Aptitude in using optimization and simulation tools while exercising concepts of Supply Chain Operations, Inventory Management and Operational Planning to provide solutions to supply chain problems  Basics of Supply Chain Management and MasterPlanning of Resources certified by APICS Education: MS in Industrial Engineering (Supply Chain Management) Oklahoma State University GPA – 3.7 May 2015 Bachelor of Engineering (Production Engineering) University of Pune, India GPA – 3.5 May 2011 Experience: Dell Technologies November 2015 - Present  Responsible for acquiring an insight of the cost structure of a broad supply base for Dell’s specified Server products  Cost modeling for all Electrical, Mechanical components and PCB assemblies across Dell's enterprise solutions portfolio  Engage with global commodity managers during RFQ and RTS stage in order to perform gap analysis and drive fact based cost negotiations to close cost-gaps  Update the EE components database. Also, analyze what-if aspects of Electrical components provide in the EE BOM to find better alternatives Mahindra and Mahindra Ltd, Assistant Manager December 2012 – June 2013  Responsible for procurement of components required for end to end process improvement projects on shop floors e.g. electrical commodity parts, hydraulic or pneumatic components by considering industry standard quality and financial parameters such as ISO 9001:2000  Worked with production, quality, logistics and finance departments to ensure department requirements are met  Led production team to meet operational plans on Trim line – final buyoff stage,producing 500 automobiles a day  Responsible for all FMEA and other in-house root cause analysis investigations in regards to equipment failures, quality checks and safety to implement remedial actions and eliminate critical defects on manufacturing assembly line. Single contact and responsibility for ECM, QA, Engineering changes and their impact on part costing Mahindra and Mahindra Ltd, Engineer - Process Improvement and Project Management July 2011 – July 2012  Gained insight of automotive manufacturing operations by working closely with numerous cross functional teams  Member of a core team addressing issues in logistics and redesigning space utilization in trailers for car bodies resulting in substantialcost reduction  Designed an in-house work measurement systembased upon which led changes in the material and human movement to yield gains in operational and logistic efficiency in Bolero assembly shop Summit Engineers & Consultants Pvt. Ltd, Engineering Intern May 2010 – May 2011  Performed cost estimation of tube end sizing machine considering machining cost, hydraulic unit cost, tooling cost and overheads.Designed and fabricated a special purpose tube end sizing machine Academic Projects:  Designed a supply chain network to address complex inefficiencies by using supply chain strategy,design,modelling and costing approaches while achieving a 12% i.e. $64 million reduction in transportation cost by using ‘Llamasoft Supply Chain Guru’ to determine optimal location of distribution centers across US  Managed a 3 Tier Supply Chain, built financial model for making a strategic decision to expand supply chain network in a virtual supply chain network simulator to execute operational planning by optimizing inventory level, batch size and infrastructure so as to achieve a profit of approximately $22 million over a period of 2 years  Developed a relational database application using MS Access and SQL to consolidate orders placed by the customers and provide a daily production schedule Certifications:  Six Sigma Green Belt certified from Institute of Industrial Engineers.  APICS CPIM – BSCM and MPR certified