Name: NITIN GUPTA 
Mobile No: +91-9810038093 
Email: engineernitin1980@gmail.com 
Current Location: Gurgaon, India 
Preferred Location: Jammu (J&K), India 
Objective 
To develop a common domain of expertise across sectors such as real estate, 
Infrastructure, retail, logistics etc by working in fields such as Strategic planning & 
Project control, Business development, Contracts, Project management, Risk 
management, Marketing and finance, Liaisoning etc which cut across these sectors. 
Professional Qualifications 
Post Graduate Diploma in Advanced Construction Management from NICMAR 
(National Institute of Construction Management and Research) Pune, 
Maharashtra, India: Passed out in Jan 2006 
Bachelor of Civil Engineering from University of Pune, Maharashtra, India 
(K K Wagh Engineering College, Nasik): Passed out with a First Class in June 2003 
Area of Specialization 
Hands on experience in various NHAI projects in different capacities i.e. Site 
Planning, Co-ordination, Procurement & Contracts mgmt., Liasioning with Govt. & 
Private players 
To create, manage and maintain warm and positive relationships with people who 
are policy makers, decision-makers and at levels in Govt./Ministries/Governing 
bodies, consultants, architects, contractors, quantity surveyors, project-owners, 
banks for enduring and enlarging our business in short, medium and long term 
perspectives, achieve targets for sustained growth of the company for better returns 
to all the stake holders. 
Project planning /Project Mgmt. for Large scale projects in Highways including BOT 
Projects on EPC mode, Airports, High rise buildings, Metros, Steel & power plant. 
President & CEO’s office: Preparing annual business plans, Strategic planning, 
Corporate planning, Budgeting & Cash flow mgmt., PPT for Board meetings etc. 
Total all round Work Experience 
More than 9 years of experience with two of the best construction companies in India 
to work with. a) Punjlloyd Limited & b) Jindal Steel & Power Limited.
Computer Proficiency 
MS-project, PRIMAVERA, ERP, Oracle, Financial Modeling to work out the IRR of 
the Project, SAP. 
References 
Available on request 
Major Project Executed: 
S.No Name of Project 
Organization 
Worked with 
Value of Project Profile 
A High Rise Buildings, Group Housing, Commercial Complex & Hospitals 
1 
Cons. of Two Residential 
towers of 21 Storey each 
for HIRCO , Mumbai 
PunjLloyd Ltd.- 
Gurgaon (HO) 
2410 Millions 
Manager-Project 
Controller 
2 
Cons. of Integrated 
Residential & Retail 
Complex ,Capital Heights , 
for Tata Realty, Nagpur 
PunjLloyd Ltd.- 
Gurgaon (HO) 
1952 Millions 
Manager-Project 
Co-ordination & 
Monitoring 
3 
Delhi Police Housing 
Project, Dheerpur, 
New Delhi. 
PunjLloyd Ltd.- 
Gurgaon (HO) 
8250 Millions 
Manager-Project 
Co-ordination & 
Monitoring 
4 
Cons. of 3 Hospitals for 
West Bengal Medical 
services Corporation Ltd. 
PunjLloyd Ltd.- 
Gurgaon (HO) 
2750 Millions 
Manager-Project 
Co-ordination & 
Monitoring 
5 AIIMS-College- Raipur 
PunjLloyd Ltd.- 
Gurgaon (HO) 
1150 Millions 
Dy. Manager-Site 
Co-ordination & 
Monitoring 
6 
Rajiv Gandhi Institute of 
petroleum Technology at 
Ray Bareli 
PunjLloyd Ltd.- 
Gurgaon (HO) 
1890 Millions 
Dy. Manager-Site 
Co-ordination & 
Monitoring 
7 
Cons. of Medanta Hospital 
,Gurgaon 
PunjLloyd Ltd.- 
Gurgaon (HO) 
1650 Millions 
Sr. Engineer – 
Project Planning & 
Monitoring 
B Airports 
8 
Cons. of New Airport at 
Pakyong , Sikkim 
PunjLloyd Ltd.- 
Gurgaon (HO) 
2640 Millions 
Dy. Manager – 
Project Planning, 
Procurement & 
Monitoring 
C Metro Stations 
9 
Elevated Metro Stations – 
3 Packages constitute of 8 
Metro Stations , Bangalore 
PunjLloyd Ltd.- 
Gurgaon (HO) 
3080 Millions 
Dy. Manager – 
Project Planning, 
Site Co-ordination & 
Monitoring
D Railways 
10 
Railway Siding works for 
TPP (2X 500) MW Anpara, 
UP 
PunjLloyd Ltd.- 
Gurgaon (HO) 
1140 Millions 
Manager-Project 
Controller including 
finalization of Sub-contractor 
for Back 
to Back work 
E Roads- NH Projects 
11 
Widening & Strengthening 
of Existing National 
Highway to 4 Lane from 
Lanka to Daboka in the 
state of Assam(NH-54) 
PunjLloyd Ltd.- 
Project Site , 
Nagaon, Assam 
1980 Millions 
Sr. Planning 
Engineer – 
Site Planning & 
Monitoring 
12 
Widening & Strengthening 
of Existing National 
Highway to 4 Lane from 
Km 983.00 to 961.00 in 
the state of Assam(NH-31) 
PunjLloyd Ltd.- 
Gurgaon (HO) 
1310 Millions 
Dy. Manager-Site 
Co-ordination & 
Monitoring 
13 
Widening & Strengthening 
of Existing National 
Highway to 4 Lane from 
Km 1013.00 to 983.00 in 
the state of Assam(NH-31) 
PunjLloyd Ltd.- 
Gurgaon (HO) 
1870 Millions 
Dy. Manager-Site 
Co-ordination & 
Monitoring 
14 
Widening & Strengthening 
of Existing National 
Highway to 4 Lane from 
Km 1093.00 to 1065.00 in 
the state of Assam(NH-31) 
PunjLloyd Ltd.- 
Gurgaon (HO) 
1928 Millions 
Dy. Manager-Site 
Co-ordination & 
Monitoring 
15 
Widening & Strengthening 
of Existing National 
Highway to 4 Lane from 
Km 1121.00 to 1093.00 in 
the state of Assam(NH-31) 
PunjLloyd Ltd.- 
Gurgaon (HO) 
1736 Millions 
Dy. Manager-Site 
Co-ordination & 
Monitoring 
16 
Widening & Strengthening 
of Existing National 
Highway to 4 Lane from 
Km 306.00 to 275.00 in 
the state of Assam(NH-31) 
PunjLloyd Ltd.- 
Gurgaon (HO) 
1158 Millions 
Dy. Manager-Site 
Co-ordination & 
Monitoring 
F Steel & Power Plant 
17 
Const. of Various units of 
6.5 MTPA Steel plant i.e. 
Sinter Plant, Coke Oven, 
Bar & Rod Mill, Billet 
Caster etc. in the State of 
Orissa (Angul) 
Jindal Steel & 
Power Limited , 
Gurgaon (HO) 
20000 Millions 
AGM - Project 
Controller, 
Finalization of sub-contractors 
& Site 
Visits.
Work History 
July 2013 till date: Presently working with Jindal Steel & 
Power Limited in the Office of President 
Const. –EPC as Asst. General Manager 
(Project Controller) 
Functional Area: 
 To check & give inputs on Project estimate of various units of Steel, Hydro & 
Thermal power plants which are in the preliminary stage of construction at 
various locations across pan India & abroad. 
 Spearheading Special Initiatives: Integration of a new SBU into JSPL family, 
Employee Engagement Initiatives. 
 Planned and facilitated various internal Senior Management Forums, budget 
and strategy plan exercise, review meetings etc and catalyzed implementation 
of decisions taken in letter and spirit. 
 To finalize Sub-contractors for Large value works which requires huge labour. 
This is a very tedious job as there is huge shortage of labour in Orissa (Angul) 
region. 
 Liaisoning with Client/Govt. agencies for Labour licenses, Environmental 
clearance, clearing of RA Bills on time for maintaining positive cashflow. 
Oct 2010 to June 2013: With PunjLloyd Limited as Manager 
(Head of MIS) & Executive Asst. to 
President & CEO (B&I) 
Functional Area: 
 Responsible for preparation of Business Plan for the entire Vertical and 
review it on Monthly/Quarterly/6 months/Yearly basis. 
 Interaction with various clients for future/upcoming projects.Liasioning with 
Govt. agencies/ministries. 
 Preparing various presentations for CEO's office for Board level meetings 
clearly showing the Profitability, Cash flows, Turnover for the entire vertical. 
 SWOT analysis followed by Strategy Formulation. 
 To ensure that the Project Budget for each ongoing project should be 
prepared on yearly basis and review of the same will be done on 
monthly/quarterly/6months/Yearly basis. 
Aug 2008– Sep2010: With PunjLloyd Limited as Dy. Manager 
(Corporate Planning, Co-ordination & 
Monitoring) for B&I Vertical with Projects 
worth CV 1700 Crs.
Functional Area: 
 Complete Project Management including Budgeting, Mobilization of all 
resources, their scheduling, Work Planning and implementation to complete 
the Project within scheduled time and cost parameters. 
 Use of Control Charts, Close monitoring for Project Completion within Target 
Time Completion as well Limited Budget Allocated. 
 Preparation of various Project Management Reports such as Profitability 
Statement, Material Reconciliation report, Fixed Monthly Expenses, HSD 
consumption reports etc. 
 Look Ahead/Catch-up Program, Standardization of Reporting Format, 
Training & Post –implementation support. 
 Preparation of Construction Schedule along with Manpower & Machinery 
forecast for Tendering. 
Feb 2007 – Mar 2008: With PunjLloyd Limited as Sr. Engineer 
(Project Planning, Co-ordination & 
Tendering) for 6 NH Road Packages in the 
state of Assam. 
Functional Area: 
 Preparation of work Programme using Project Planning & Scheduling tools, 
computation & preparation of S-Curve, Financial Progress Curve, Time- 
Distance Chart, Paver movement chart, Monthwise requirement of major 
materials, Plant & Equipment requirement & deployment schedule, physical 
progress monitoring formats for road works and structural works. Training 
and Post-implementation Support. 
 Contractual correspondence with consultant / client 
 Preparation of Tenders including Cost Estimates, site visits and their 
submission. Preparation of Construction Schedule along with Manpower & 
Machinery forecast for Tendering. 
 Liaison and coordination with various Depts. 
Feb 2006 – Jan 2007: With PunjLloyd Limited as Mgmt. Trainee 
(Site Planning Engineer) for NH Road 
Project in Assam 
Functional Area: 
 Preparation & submission of Daily Progress Report, Weekly Progress Report, 
Fortnightly Progress Report & Monthly Progress Report to consultant and 
head office. 
 Checking & certification of sub-contractor / vendor / supplier bills 
 Preparation of Design levels, layer charts for various roadwork activities. 
Comparison of Productivity against Standards.
 Preparation & follow-up of Work Orders for various works allocated to sub-contractors, 
System PO & System indent for purchase of major materials and 
other misc items. 
Apr 2005 – June 2005: With HCC as a Summer Trainee at Project 
site – Baramulla (Tunneling Project) 
(J&K) 
Functional Area: 
 Worked as Management Trainee in H.C.C Ltd. observed various activities of 
tunneling, bridges & open works. H.C.C was using a new technology of NATM 
(New Austrian Tunneling Method) for tunneling works in soft soil .In spite of I-Sections 
they were using Lattice Girder for the support system which was 
used only in DMRC (Delhi Metro Rail Project) before this which is a new 
technique. 
July 2003 – June 2004: With Deepak Builders Pvt. Ltd. as Project 
Engineer for a small Hospital Project in 
Jammu (J&K) 
Functional Area: 
 Effective and optimum use of available resources. 
 Maintain quality as per IS standards, checking of reinforcement according to 
drawings and various safety precautions to be taken at site. 
 Prepare the inspection checklist and to raise the Request for Inspection (RFI) 
and to attend them. 
Salary Details: 
Present CTC: 15.50 Lacs (CTC Statement FY14-15 available on request) 
Expected Salary: Negotiable 
NITIN GUPTA

Resume_Nitin Gupta

  • 1.
    Name: NITIN GUPTA Mobile No: +91-9810038093 Email: engineernitin1980@gmail.com Current Location: Gurgaon, India Preferred Location: Jammu (J&K), India Objective To develop a common domain of expertise across sectors such as real estate, Infrastructure, retail, logistics etc by working in fields such as Strategic planning & Project control, Business development, Contracts, Project management, Risk management, Marketing and finance, Liaisoning etc which cut across these sectors. Professional Qualifications Post Graduate Diploma in Advanced Construction Management from NICMAR (National Institute of Construction Management and Research) Pune, Maharashtra, India: Passed out in Jan 2006 Bachelor of Civil Engineering from University of Pune, Maharashtra, India (K K Wagh Engineering College, Nasik): Passed out with a First Class in June 2003 Area of Specialization Hands on experience in various NHAI projects in different capacities i.e. Site Planning, Co-ordination, Procurement & Contracts mgmt., Liasioning with Govt. & Private players To create, manage and maintain warm and positive relationships with people who are policy makers, decision-makers and at levels in Govt./Ministries/Governing bodies, consultants, architects, contractors, quantity surveyors, project-owners, banks for enduring and enlarging our business in short, medium and long term perspectives, achieve targets for sustained growth of the company for better returns to all the stake holders. Project planning /Project Mgmt. for Large scale projects in Highways including BOT Projects on EPC mode, Airports, High rise buildings, Metros, Steel & power plant. President & CEO’s office: Preparing annual business plans, Strategic planning, Corporate planning, Budgeting & Cash flow mgmt., PPT for Board meetings etc. Total all round Work Experience More than 9 years of experience with two of the best construction companies in India to work with. a) Punjlloyd Limited & b) Jindal Steel & Power Limited.
  • 2.
    Computer Proficiency MS-project,PRIMAVERA, ERP, Oracle, Financial Modeling to work out the IRR of the Project, SAP. References Available on request Major Project Executed: S.No Name of Project Organization Worked with Value of Project Profile A High Rise Buildings, Group Housing, Commercial Complex & Hospitals 1 Cons. of Two Residential towers of 21 Storey each for HIRCO , Mumbai PunjLloyd Ltd.- Gurgaon (HO) 2410 Millions Manager-Project Controller 2 Cons. of Integrated Residential & Retail Complex ,Capital Heights , for Tata Realty, Nagpur PunjLloyd Ltd.- Gurgaon (HO) 1952 Millions Manager-Project Co-ordination & Monitoring 3 Delhi Police Housing Project, Dheerpur, New Delhi. PunjLloyd Ltd.- Gurgaon (HO) 8250 Millions Manager-Project Co-ordination & Monitoring 4 Cons. of 3 Hospitals for West Bengal Medical services Corporation Ltd. PunjLloyd Ltd.- Gurgaon (HO) 2750 Millions Manager-Project Co-ordination & Monitoring 5 AIIMS-College- Raipur PunjLloyd Ltd.- Gurgaon (HO) 1150 Millions Dy. Manager-Site Co-ordination & Monitoring 6 Rajiv Gandhi Institute of petroleum Technology at Ray Bareli PunjLloyd Ltd.- Gurgaon (HO) 1890 Millions Dy. Manager-Site Co-ordination & Monitoring 7 Cons. of Medanta Hospital ,Gurgaon PunjLloyd Ltd.- Gurgaon (HO) 1650 Millions Sr. Engineer – Project Planning & Monitoring B Airports 8 Cons. of New Airport at Pakyong , Sikkim PunjLloyd Ltd.- Gurgaon (HO) 2640 Millions Dy. Manager – Project Planning, Procurement & Monitoring C Metro Stations 9 Elevated Metro Stations – 3 Packages constitute of 8 Metro Stations , Bangalore PunjLloyd Ltd.- Gurgaon (HO) 3080 Millions Dy. Manager – Project Planning, Site Co-ordination & Monitoring
  • 3.
    D Railways 10 Railway Siding works for TPP (2X 500) MW Anpara, UP PunjLloyd Ltd.- Gurgaon (HO) 1140 Millions Manager-Project Controller including finalization of Sub-contractor for Back to Back work E Roads- NH Projects 11 Widening & Strengthening of Existing National Highway to 4 Lane from Lanka to Daboka in the state of Assam(NH-54) PunjLloyd Ltd.- Project Site , Nagaon, Assam 1980 Millions Sr. Planning Engineer – Site Planning & Monitoring 12 Widening & Strengthening of Existing National Highway to 4 Lane from Km 983.00 to 961.00 in the state of Assam(NH-31) PunjLloyd Ltd.- Gurgaon (HO) 1310 Millions Dy. Manager-Site Co-ordination & Monitoring 13 Widening & Strengthening of Existing National Highway to 4 Lane from Km 1013.00 to 983.00 in the state of Assam(NH-31) PunjLloyd Ltd.- Gurgaon (HO) 1870 Millions Dy. Manager-Site Co-ordination & Monitoring 14 Widening & Strengthening of Existing National Highway to 4 Lane from Km 1093.00 to 1065.00 in the state of Assam(NH-31) PunjLloyd Ltd.- Gurgaon (HO) 1928 Millions Dy. Manager-Site Co-ordination & Monitoring 15 Widening & Strengthening of Existing National Highway to 4 Lane from Km 1121.00 to 1093.00 in the state of Assam(NH-31) PunjLloyd Ltd.- Gurgaon (HO) 1736 Millions Dy. Manager-Site Co-ordination & Monitoring 16 Widening & Strengthening of Existing National Highway to 4 Lane from Km 306.00 to 275.00 in the state of Assam(NH-31) PunjLloyd Ltd.- Gurgaon (HO) 1158 Millions Dy. Manager-Site Co-ordination & Monitoring F Steel & Power Plant 17 Const. of Various units of 6.5 MTPA Steel plant i.e. Sinter Plant, Coke Oven, Bar & Rod Mill, Billet Caster etc. in the State of Orissa (Angul) Jindal Steel & Power Limited , Gurgaon (HO) 20000 Millions AGM - Project Controller, Finalization of sub-contractors & Site Visits.
  • 4.
    Work History July2013 till date: Presently working with Jindal Steel & Power Limited in the Office of President Const. –EPC as Asst. General Manager (Project Controller) Functional Area:  To check & give inputs on Project estimate of various units of Steel, Hydro & Thermal power plants which are in the preliminary stage of construction at various locations across pan India & abroad.  Spearheading Special Initiatives: Integration of a new SBU into JSPL family, Employee Engagement Initiatives.  Planned and facilitated various internal Senior Management Forums, budget and strategy plan exercise, review meetings etc and catalyzed implementation of decisions taken in letter and spirit.  To finalize Sub-contractors for Large value works which requires huge labour. This is a very tedious job as there is huge shortage of labour in Orissa (Angul) region.  Liaisoning with Client/Govt. agencies for Labour licenses, Environmental clearance, clearing of RA Bills on time for maintaining positive cashflow. Oct 2010 to June 2013: With PunjLloyd Limited as Manager (Head of MIS) & Executive Asst. to President & CEO (B&I) Functional Area:  Responsible for preparation of Business Plan for the entire Vertical and review it on Monthly/Quarterly/6 months/Yearly basis.  Interaction with various clients for future/upcoming projects.Liasioning with Govt. agencies/ministries.  Preparing various presentations for CEO's office for Board level meetings clearly showing the Profitability, Cash flows, Turnover for the entire vertical.  SWOT analysis followed by Strategy Formulation.  To ensure that the Project Budget for each ongoing project should be prepared on yearly basis and review of the same will be done on monthly/quarterly/6months/Yearly basis. Aug 2008– Sep2010: With PunjLloyd Limited as Dy. Manager (Corporate Planning, Co-ordination & Monitoring) for B&I Vertical with Projects worth CV 1700 Crs.
  • 5.
    Functional Area: Complete Project Management including Budgeting, Mobilization of all resources, their scheduling, Work Planning and implementation to complete the Project within scheduled time and cost parameters.  Use of Control Charts, Close monitoring for Project Completion within Target Time Completion as well Limited Budget Allocated.  Preparation of various Project Management Reports such as Profitability Statement, Material Reconciliation report, Fixed Monthly Expenses, HSD consumption reports etc.  Look Ahead/Catch-up Program, Standardization of Reporting Format, Training & Post –implementation support.  Preparation of Construction Schedule along with Manpower & Machinery forecast for Tendering. Feb 2007 – Mar 2008: With PunjLloyd Limited as Sr. Engineer (Project Planning, Co-ordination & Tendering) for 6 NH Road Packages in the state of Assam. Functional Area:  Preparation of work Programme using Project Planning & Scheduling tools, computation & preparation of S-Curve, Financial Progress Curve, Time- Distance Chart, Paver movement chart, Monthwise requirement of major materials, Plant & Equipment requirement & deployment schedule, physical progress monitoring formats for road works and structural works. Training and Post-implementation Support.  Contractual correspondence with consultant / client  Preparation of Tenders including Cost Estimates, site visits and their submission. Preparation of Construction Schedule along with Manpower & Machinery forecast for Tendering.  Liaison and coordination with various Depts. Feb 2006 – Jan 2007: With PunjLloyd Limited as Mgmt. Trainee (Site Planning Engineer) for NH Road Project in Assam Functional Area:  Preparation & submission of Daily Progress Report, Weekly Progress Report, Fortnightly Progress Report & Monthly Progress Report to consultant and head office.  Checking & certification of sub-contractor / vendor / supplier bills  Preparation of Design levels, layer charts for various roadwork activities. Comparison of Productivity against Standards.
  • 6.
     Preparation &follow-up of Work Orders for various works allocated to sub-contractors, System PO & System indent for purchase of major materials and other misc items. Apr 2005 – June 2005: With HCC as a Summer Trainee at Project site – Baramulla (Tunneling Project) (J&K) Functional Area:  Worked as Management Trainee in H.C.C Ltd. observed various activities of tunneling, bridges & open works. H.C.C was using a new technology of NATM (New Austrian Tunneling Method) for tunneling works in soft soil .In spite of I-Sections they were using Lattice Girder for the support system which was used only in DMRC (Delhi Metro Rail Project) before this which is a new technique. July 2003 – June 2004: With Deepak Builders Pvt. Ltd. as Project Engineer for a small Hospital Project in Jammu (J&K) Functional Area:  Effective and optimum use of available resources.  Maintain quality as per IS standards, checking of reinforcement according to drawings and various safety precautions to be taken at site.  Prepare the inspection checklist and to raise the Request for Inspection (RFI) and to attend them. Salary Details: Present CTC: 15.50 Lacs (CTC Statement FY14-15 available on request) Expected Salary: Negotiable NITIN GUPTA