Wagman completed the construction of the I-95 HOV/HOT Lanes Post and Panel
Wall in Springfield, VA. This wall was designed and installed to provide slope
stabilization between a residential neighborhood and the I-95/I-395 interchange.
Wagman installed 155 global stability drilled shafts for the wall and slope
stabilization. Wagman utilized our Lo-Drill to drill and place 24” and 36” diameter
drilled shafts for H-Piles. Drilled shaft depths ranged from 35 linear feet to 45
linear feet. Steel H-piles were placed and aligned in each shaft prior to pouring
concrete. Wagman provided the design and engineering for permanent tiebacks
on the wall. Wagman’s equipment and expertise in design and construction of
anchored earth structures were essential to complete this project.
Project		 I-95 HOV/HOT Lanes
Location		 Springfield, VA
Project Type	 Pile and Post Wall
Duration		 August 2013 - 		
		 November 2013
Construction Costs $272,000
Owner		 VDOT
I-95HOV/HOTLanes
PostandPanelWall
KEY CHALLENGES & PROJECT DETAILS
•	A total of 41 tiebacks were installed with design loads varying from 50 kips to 102 kips.
•	Tiebacks were encapsulated in corrugated tubes filled with grout to protect against corrosion.

More Related Content

What's hot (7)

resumelarry
resumelarryresumelarry
resumelarry
 
Ashley cv most recent2016 7
Ashley cv most recent2016 7Ashley cv most recent2016 7
Ashley cv most recent2016 7
 
ALEX KALAJ resume
ALEX KALAJ resumeALEX KALAJ resume
ALEX KALAJ resume
 
Presentation
PresentationPresentation
Presentation
 
Basheer C.V.1
Basheer C.V.1Basheer C.V.1
Basheer C.V.1
 
Commercial roofing services in plano, texas
Commercial roofing services in plano, texasCommercial roofing services in plano, texas
Commercial roofing services in plano, texas
 
Resume- Boyd Wilson
Resume- Boyd WilsonResume- Boyd Wilson
Resume- Boyd Wilson
 

I-95 HOV HOT Lanes

  • 1. wagman.com Wagman completed the construction of the I-95 HOV/HOT Lanes Post and Panel Wall in Springfield, VA. This wall was designed and installed to provide slope stabilization between a residential neighborhood and the I-95/I-395 interchange. Wagman installed 155 global stability drilled shafts for the wall and slope stabilization. Wagman utilized our Lo-Drill to drill and place 24” and 36” diameter drilled shafts for H-Piles. Drilled shaft depths ranged from 35 linear feet to 45 linear feet. Steel H-piles were placed and aligned in each shaft prior to pouring concrete. Wagman provided the design and engineering for permanent tiebacks on the wall. Wagman’s equipment and expertise in design and construction of anchored earth structures were essential to complete this project. Project I-95 HOV/HOT Lanes Location Springfield, VA Project Type Pile and Post Wall Duration August 2013 - November 2013 Construction Costs $272,000 Owner VDOT I-95HOV/HOTLanes PostandPanelWall KEY CHALLENGES & PROJECT DETAILS • A total of 41 tiebacks were installed with design loads varying from 50 kips to 102 kips. • Tiebacks were encapsulated in corrugated tubes filled with grout to protect against corrosion.