Robert Stine has over 7 years of experience as an industrial engineer working for automotive suppliers. He has a Bachelor of Science in Engineering from the University of Michigan Dearborn. His experience includes using simulation software like Process Simulate and AutoCAD to analyze assembly processes and optimize plant layouts. He has also performed ergonomic studies and created work instructions. His technical skills include software like NX9, Teamcenter, Excel, and Visio. He is proficient in lean principles and has applied them in projects like improving patient flow at a hospital clinic.
Robert Stine's Resume for Industrial Engineer Position
1. Robert Stine
38660 Joy Rd • Livonia, MI 48150
CELL: 734-474-4190
Robertstine11@yahoo.com
Academic Background
University of Michigan Dearborn Dearborn, MI
Bachelor of Science in Engineering, Major: Industrial and Systems Engineering. GPA: 3.17
Graduation Date: December, 2011.
Professional Experience
Valiant International- Ford Motor Co. Supplier Troy, MI
Position Title: Industrial Engineer- Processing March 2014 - Present
• Used MODAPTS and Man-Motion studies to find standard work time of assembly workers.
• Kept weld sheets, process illustrations, and system layouts up to date; made necessary changes if needed.
• Identified optimum layout of plant using AutoCad as primary software. Worked also with simulation
engineers to modify layout.
• Performed Ergo studies on newly designed tooling. Determined if tooling allowed for standard working
conditions for the operator. Used FIDES as primary software for ergo studies.
Troy Design and Manufacturing - Ford Motor Co. Subsidiary Redford, MI
Position Title: Industrial Engineer Oct. 2011 – Dec. 2013
• Supported Virtual Build for Ford Motor Company by creating motion studies of assembly processes using
Process Simulate. Found parts that required design changes due to collisions during final assembly build.
Recommended proper size tooling based on simulation findings.
• Worked with Ford Paint Engineers to improve lower bodyside stone pecking test simulations for Ford
Motor Company. Analyzed simulation data both historical and current to draw conclusions; used
Microsoft office tools to present findings to customer. Outcome: Improvement to test simulations in area
of precision and accuracy.
• Revised and created work instructions and work flows using Visio.
• Tested new upgrade for Teamcenter software working with Siemens and Ford employees.
• Supported M1 prototype build for Ford Motor Company. Revised plant floor work instructions;
implemented rework procedures. Tracked issues and solutions in program database. Worked in cross-
functional team environment.
• Completed studies related to dimensional variation analysis (DVA), giving recommendations to
customers related to simulated dimensional tolerances.
Technical Skills
• Software applied professionally: Powerpoint, Excel, Word, Robcad, Teamcenter,
Process Simulate, VisMockup, Sharepoint, AIMS, Outlook, AutoCad, NX9(UG), FIDES 9.0, Lotus
Notes, and Visio.
• Other notable software through academics: IDEAS, SQL, ARENA, LINGO, C++, Unix, HTML,
Matlab, and Oracle.
Class Projects
Page 1 of 2
2. Capstone Senior Design Project West Bloomfield, MI
West Bloomfield Hospital – Urology Clinic, Externship April 2011 – Aug. 2011
• Worked with a Senior Management Engineer and two other classmates to improve processes and
patient flow within the Urology Clinic.
• Investigated patient backlogs and bottlenecks in the clinic.
• Techniques used but not limited to include observations/interviews, times studies, and using
ARENA software to simulate patient flow in clinic.
• Applied lean principles to eliminate waste in the system.
• Gave recommendations to optimize resources and increase patient flow.
Work Related Experience
DADCO – Manufacturer of Nitrogen Gas Springs Plymouth, MI
Position Title: Production/ Quality Control Specialist Aug. 2007 – Sept. 2011
• Ensured products were to ISO standard using various quality assurance devices such as calibers, pressure
gauges, and other height and length instrumentation.
• Tested new machines by collecting average cycle time and downtimes.
• Worked as department leader. Ensured correct building and quality processes were followed among team
members and parts were completed in a timely fashion.
• Operated plastic injection molding machinery to make seals for nitrogen gas springs. Also operated CNC
milling machines for forming steal cylinders.
Page 2 of 2