SlideShare a Scribd company logo
1 of 5
SwapnilR Rane
Email : swapnilrane.2008@gmail.com
Contact no: +91 9920292407
Address : B/203, Cherry Blossom, Vasant Park, Kalyan, 421301
Summary
8 yrs 10 months of functional experience in Supply chain management with extensive
experience in Supply chain planning and Demand planning.
 Supply chain planning
 Demand, forecast & Capacity planning, stock replenishment.
 Production planning, Scheduling, Inventory management
 Wide experience in Regulatory, non Regulatory Pharmaceutical Markets.
8 yrs 10 months SAP experience: Proficient in SAP R3, SAP R2, Planvisage tool, MS
office.
Experience
in Supply Chain Planning July’12 till date (3 Yrs )
Organization : Wockhardt Ltd.
Location : BKC, Mumbai, India
Designation : Sr. Supply chain planning Executive
Role:
o Responsible to derive & schedule production plan In SAP for India Plants based on
orders and forecast received for UK regulatory market. To achieve production
targets and control inventories at plant level.
o To finalize production plan for UK supplies (from India) based
on the orders received, to priorities the production at SKU level
as per the number of day’s inventories available (safety Stock)
o To schedule production plan as per the priorities and available
assets. To check the capacity constraint, material issues etc. To
Identify expected bottlenecks and to take appropriate actions.
o Feed procurement team with MRP run in SAP to fulfill
requirements for the production/forecast plan and to optimize
inventory at plant level.
o To prepare material availability Index (MAI) for the next month
production plan. To coordinate with purchase for material
availability & highlight delay in the supplies.
o Maintain RMPM inventory at appropriate level. To schedule
deliveries bulky materials (API) on weekly basis in order to prevent
storage capacity constraints at warehouse.
o To perform ABC analysis as per the budgeted requirements. To
review and set the reorder points/safety stocks in SAP and
effectively maintain system performance parameter to optimize
results.
o Management of slow / non moving/ near expiry stocks of materials
by monthly movement analysis and arrange action in consultation
with purchase managers and other stake holders.
o To track and timely implement the changes in Artworks as per the
MHRA norms. To minimize the destruction of old materials by
effective implementation of new Artwork.
o Track production performance: To check planned Vs Actual status,
to arrange conference call between UK team and respective
stakeholders for queries, issues, new developments, thus ensuring
smooth process and achieving targets in given time span.
o Provide inputs to update SAP material masters of newly created
codes across all India plants. To maintain certain SAP parameters
related to MRP run, like material master fields, BOMs, recipes,
production versions, open orders/STO’s.
KRAs:
o Percentage OTIF above 85% with minimum SKU variance.
o MAI above 95 % for every month.
o 100 % accuracy in implementation of MHRA driven artwork changes.
o 100 % priority compliance.
Experience
in Supply Chain Planning Apr’11 to July’12 (1 Yrs 3 months)
Organization : Arch Pharmalabs Private Ltd.
Location : Marol Naka, Mumbai (India).
Designation : Asst. Manager supply chain planning. (API)
Role:
o Responsible for Capacity planning of monthly plans of API manufacturing, to
identify bottleneck assets, to review & correct process timelines for each SKU in
SAP, MRP run and inventory management. 
o Successfully completed the project Planvisage on Capacity & API
production planning driven by IBM & Planvisage Software Solution.
Project was tag-lined as ‘Effective utilization of the primary and
secondary resources & to define process timelines/production
cycles of all SKU’s for the optimum production output.’
To complete various activities as per the Gantt chart. Activities
includes updation & correction of Master Data in SAP, evaluate and
correct of process time in Recipes, correction in lead times of
materials and to set appropriate reorder points & safety stock, to
understand & learn the functioning of planvisage tool. To verify
smooth functioning of planvisage software on quality server and to
go live on production server. (Project Timeline: 6 months)
o To attend S&OP meeting as supply chain planner, review demands
and forecast plans received from sales team. To feed the same in
planvisage tool to check feasibility of completion of plans,
identifying the bottlenecks and correcting the plans if required.
o To conduct MRP run, generate procurements, interplant stock
transfers as per the requirements and to co-ordinate with
purchase for timely deliveries of materials.
o To track the production performance. To coordinate with
production team to resolve supply chain related issues.
Highlight production delays to sales team.
o To perform stock reconciliation on regular basis. Non
moving/slow moving & discontinued SKUs to check for the
destruction with sales and purchase.
KRAs:
o Effective utilization of planvisage to finalize the plans and to
overcome capacity constraints.
o To deliver the production plans as per agreed timelines.
Experience
in Supply Chain Planning Mar’09 to Apr’11 (2 Yrs 1 months)
Organization : Glenmark Pharmaceuticals Ltd.
Location : Andheri, Mumbai (India).
Designation : Executive supply chain planning.
Role:
o Responsible for replenishment and Contract manufacturing (Third Party) planning
for Glenmark Pharmaceuticals Ltd.
o To firm agreed supply plans for TPs to meet marketing
requirements.
o On time in Full (OTIF) deliveries of SKU’s to avoid sales loss.
o To ensure smooth product transfer at third parties
o Cost negotiation with TP’s and venders.
o Hiring new third parties for export products
o To process MRP run for the plans received.
o To minimize the stock variance at LL locations
Experience
in Supply Chain Planning Sept’06 to Mar’09 (2 yrs 3 months)
Organization : Asian Paints Ltd.
Location : Bhandup, Mumbai ( India)
Designation : Production Planning Officer
Role:
o Responsible for Production planning for Decorative Business Unit. Manpower
planning using manpower model. Capacity planning based on cycle time of batches,
availability of time and plan released. Asset utilization and tracking manpower
efficiency. Achieve daily production targets with effective planning. Packing
material scheduling, coordinating with vendors and PM purchase for the same.
Controlling losses of raw materials and finished products during production and
thereby taking necessary steps to reduce factory level losses. 



Experience
in SAP (For all Organizations) Sept’06 to till date (9 yrs)
SAP experience
o Total 9 year overall experience in SAP R3/R2 versions.
o Through understanding of Material Masters.
o Knowledge of all MRP related transactions.
o Understanding of process cycle, recipes, BOMs.
o Transactions related to inventory management. (stock
reconciliation)
o Creation of purchase orders, STOs, material GRNs, Excise
entries
o Knowledge of Capacity Calculation Module : planvisage
Merits/ Awards
Achievements:
 Established effective planning & scheduling process for UK supplies
from INDIA plants and reduced monthly MRP runs to single MRP run
per month.

 Recognized for Successful completion of the project planvisage on
API production and capacity planning at Arch Pharmalabs.

 Received Asian Paints recognition awards for excellent understanding
and learning capabilities of production planning process and to
achieve highest production in the history of bhandup plant. 
Educational
Qualifications
P.G.D.B.A. (Supply chain management)
 Successfully completed, 1 year post graduation diploma in supply chain management
form Welingkar Institute. (distant learning)
F.Y.B.Sc. : Chemistry-Physics-Zoology (65%) – Mumbai University
S.Y.B.Sc. : Chemistry-Zoology (70%) – Mumbai University
T.Y.B.Sc. : Chemistry- First class (70%) – Mumbai University
 MS Office: Completed 3 years certificate course on the M.S. Office, V.B. 6.0 & ‘C’
Programming from N.E.S. Ratnam College with ‘A’ grade.
Academic Achievements:
 Ranked first in 7th standard scholarship examination in Ratnagiri District Rural
Division.
 Awards in Science projects exhibition, Poem writing competition, singing competition.
Personal
Information
Date of Birth : 22nd
September 1985
Gender : Male
Marital Status : Married
Languages Known : English, Hindi, Marathi

More Related Content

What's hot (20)

CV_Milind Deshmukh_84
CV_Milind Deshmukh_84CV_Milind Deshmukh_84
CV_Milind Deshmukh_84
 
Devinder Resume SCM FINAL
Devinder Resume SCM FINAL Devinder Resume SCM FINAL
Devinder Resume SCM FINAL
 
Resume_of_Debashish_Pan_updated_Aug_15 (1)
Resume_of_Debashish_Pan_updated_Aug_15 (1)Resume_of_Debashish_Pan_updated_Aug_15 (1)
Resume_of_Debashish_Pan_updated_Aug_15 (1)
 
Resume
ResumeResume
Resume
 
Gopal new doc
Gopal   new docGopal   new doc
Gopal new doc
 
Christopher J Legiec Resume 051016
Christopher J Legiec Resume 051016Christopher J Legiec Resume 051016
Christopher J Legiec Resume 051016
 
Alam-MC 1
Alam-MC 1Alam-MC 1
Alam-MC 1
 
Azhar Farook - Epyllion
Azhar Farook - EpyllionAzhar Farook - Epyllion
Azhar Farook - Epyllion
 
Resume Divyesh B Patel
Resume Divyesh B PatelResume Divyesh B Patel
Resume Divyesh B Patel
 
Resume Divyesh B. Patel
Resume Divyesh B. PatelResume Divyesh B. Patel
Resume Divyesh B. Patel
 
CV RAJESH LONKAR
CV RAJESH LONKARCV RAJESH LONKAR
CV RAJESH LONKAR
 
Abdul resume cv
Abdul resume cvAbdul resume cv
Abdul resume cv
 
Ed Houghtby Resume
Ed Houghtby ResumeEd Houghtby Resume
Ed Houghtby Resume
 
Magaly vazquez new
Magaly vazquez newMagaly vazquez new
Magaly vazquez new
 
latest resume
latest resumelatest resume
latest resume
 
SANJEEV RESUME
SANJEEV RESUMESANJEEV RESUME
SANJEEV RESUME
 
Resume viji
Resume  vijiResume  viji
Resume viji
 
CV-AK Padhi
CV-AK PadhiCV-AK Padhi
CV-AK Padhi
 
Hari resume_new
Hari resume_newHari resume_new
Hari resume_new
 
Stephen Moss_08.29.2016 RESUME
Stephen Moss_08.29.2016 RESUMEStephen Moss_08.29.2016 RESUME
Stephen Moss_08.29.2016 RESUME
 

Viewers also liked

Viewers also liked (8)

Apostoles poster
Apostoles posterApostoles poster
Apostoles poster
 
Sara
SaraSara
Sara
 
MT Outdoors 1
MT Outdoors 1MT Outdoors 1
MT Outdoors 1
 
Vesna Dolonc WTA player_sponsorship
Vesna Dolonc WTA player_sponsorshipVesna Dolonc WTA player_sponsorship
Vesna Dolonc WTA player_sponsorship
 
Crit complemtentarios[1]
Crit complemtentarios[1]Crit complemtentarios[1]
Crit complemtentarios[1]
 
Love is Love
Love is LoveLove is Love
Love is Love
 
La robótica
La robóticaLa robótica
La robótica
 
Acid-Base, Fluids and Electrolytes
Acid-Base, Fluids and ElectrolytesAcid-Base, Fluids and Electrolytes
Acid-Base, Fluids and Electrolytes
 

Similar to Resume Swapnil 2015 (20)

CV Stephen Beer 04-06-17
CV   Stephen Beer 04-06-17CV   Stephen Beer 04-06-17
CV Stephen Beer 04-06-17
 
Group_Manager_Demand_Planning
Group_Manager_Demand_PlanningGroup_Manager_Demand_Planning
Group_Manager_Demand_Planning
 
Ajit_02
Ajit_02Ajit_02
Ajit_02
 
Resume-Global SCM
Resume-Global  SCMResume-Global  SCM
Resume-Global SCM
 
RPRAKASH Nov Gen
RPRAKASH Nov GenRPRAKASH Nov Gen
RPRAKASH Nov Gen
 
CV - SBeer 26-08-16
CV - SBeer 26-08-16CV - SBeer 26-08-16
CV - SBeer 26-08-16
 
Group_Manager_Demand_Planning
Group_Manager_Demand_PlanningGroup_Manager_Demand_Planning
Group_Manager_Demand_Planning
 
Manoj_Resume
Manoj_ResumeManoj_Resume
Manoj_Resume
 
Resume Shriniwas Raichurkar
Resume Shriniwas RaichurkarResume Shriniwas Raichurkar
Resume Shriniwas Raichurkar
 
Keith resume
Keith resumeKeith resume
Keith resume
 
MKS LATEST
MKS LATESTMKS LATEST
MKS LATEST
 
GaithryDevi_Resume
GaithryDevi_ResumeGaithryDevi_Resume
GaithryDevi_Resume
 
Resume 786
Resume 786Resume 786
Resume 786
 
CURRICULUM VITAE SARAVANAN_SCM
CURRICULUM VITAE SARAVANAN_SCMCURRICULUM VITAE SARAVANAN_SCM
CURRICULUM VITAE SARAVANAN_SCM
 
Resume of Subhash Chandra Panda
Resume of Subhash Chandra PandaResume of Subhash Chandra Panda
Resume of Subhash Chandra Panda
 
Cv
CvCv
Cv
 
N-RESUME
N-RESUMEN-RESUME
N-RESUME
 
Sai PP-QM
Sai PP-QMSai PP-QM
Sai PP-QM
 
My Resume
My ResumeMy Resume
My Resume
 
VISHWAS N
VISHWAS NVISHWAS N
VISHWAS N
 

Resume Swapnil 2015

  • 1. SwapnilR Rane Email : swapnilrane.2008@gmail.com Contact no: +91 9920292407 Address : B/203, Cherry Blossom, Vasant Park, Kalyan, 421301 Summary 8 yrs 10 months of functional experience in Supply chain management with extensive experience in Supply chain planning and Demand planning.  Supply chain planning  Demand, forecast & Capacity planning, stock replenishment.  Production planning, Scheduling, Inventory management  Wide experience in Regulatory, non Regulatory Pharmaceutical Markets. 8 yrs 10 months SAP experience: Proficient in SAP R3, SAP R2, Planvisage tool, MS office. Experience in Supply Chain Planning July’12 till date (3 Yrs ) Organization : Wockhardt Ltd. Location : BKC, Mumbai, India Designation : Sr. Supply chain planning Executive Role: o Responsible to derive & schedule production plan In SAP for India Plants based on orders and forecast received for UK regulatory market. To achieve production targets and control inventories at plant level. o To finalize production plan for UK supplies (from India) based on the orders received, to priorities the production at SKU level as per the number of day’s inventories available (safety Stock) o To schedule production plan as per the priorities and available assets. To check the capacity constraint, material issues etc. To Identify expected bottlenecks and to take appropriate actions. o Feed procurement team with MRP run in SAP to fulfill requirements for the production/forecast plan and to optimize inventory at plant level. o To prepare material availability Index (MAI) for the next month production plan. To coordinate with purchase for material availability & highlight delay in the supplies. o Maintain RMPM inventory at appropriate level. To schedule deliveries bulky materials (API) on weekly basis in order to prevent storage capacity constraints at warehouse. o To perform ABC analysis as per the budgeted requirements. To review and set the reorder points/safety stocks in SAP and effectively maintain system performance parameter to optimize results.
  • 2. o Management of slow / non moving/ near expiry stocks of materials by monthly movement analysis and arrange action in consultation with purchase managers and other stake holders. o To track and timely implement the changes in Artworks as per the MHRA norms. To minimize the destruction of old materials by effective implementation of new Artwork. o Track production performance: To check planned Vs Actual status, to arrange conference call between UK team and respective stakeholders for queries, issues, new developments, thus ensuring smooth process and achieving targets in given time span. o Provide inputs to update SAP material masters of newly created codes across all India plants. To maintain certain SAP parameters related to MRP run, like material master fields, BOMs, recipes, production versions, open orders/STO’s. KRAs: o Percentage OTIF above 85% with minimum SKU variance. o MAI above 95 % for every month. o 100 % accuracy in implementation of MHRA driven artwork changes. o 100 % priority compliance. Experience in Supply Chain Planning Apr’11 to July’12 (1 Yrs 3 months) Organization : Arch Pharmalabs Private Ltd. Location : Marol Naka, Mumbai (India). Designation : Asst. Manager supply chain planning. (API) Role: o Responsible for Capacity planning of monthly plans of API manufacturing, to identify bottleneck assets, to review & correct process timelines for each SKU in SAP, MRP run and inventory management.  o Successfully completed the project Planvisage on Capacity & API production planning driven by IBM & Planvisage Software Solution. Project was tag-lined as ‘Effective utilization of the primary and secondary resources & to define process timelines/production cycles of all SKU’s for the optimum production output.’ To complete various activities as per the Gantt chart. Activities includes updation & correction of Master Data in SAP, evaluate and correct of process time in Recipes, correction in lead times of materials and to set appropriate reorder points & safety stock, to understand & learn the functioning of planvisage tool. To verify smooth functioning of planvisage software on quality server and to go live on production server. (Project Timeline: 6 months)
  • 3. o To attend S&OP meeting as supply chain planner, review demands and forecast plans received from sales team. To feed the same in planvisage tool to check feasibility of completion of plans, identifying the bottlenecks and correcting the plans if required. o To conduct MRP run, generate procurements, interplant stock transfers as per the requirements and to co-ordinate with purchase for timely deliveries of materials. o To track the production performance. To coordinate with production team to resolve supply chain related issues. Highlight production delays to sales team. o To perform stock reconciliation on regular basis. Non moving/slow moving & discontinued SKUs to check for the destruction with sales and purchase. KRAs: o Effective utilization of planvisage to finalize the plans and to overcome capacity constraints. o To deliver the production plans as per agreed timelines. Experience in Supply Chain Planning Mar’09 to Apr’11 (2 Yrs 1 months) Organization : Glenmark Pharmaceuticals Ltd. Location : Andheri, Mumbai (India). Designation : Executive supply chain planning. Role: o Responsible for replenishment and Contract manufacturing (Third Party) planning for Glenmark Pharmaceuticals Ltd. o To firm agreed supply plans for TPs to meet marketing requirements. o On time in Full (OTIF) deliveries of SKU’s to avoid sales loss. o To ensure smooth product transfer at third parties o Cost negotiation with TP’s and venders. o Hiring new third parties for export products o To process MRP run for the plans received. o To minimize the stock variance at LL locations
  • 4. Experience in Supply Chain Planning Sept’06 to Mar’09 (2 yrs 3 months) Organization : Asian Paints Ltd. Location : Bhandup, Mumbai ( India) Designation : Production Planning Officer Role: o Responsible for Production planning for Decorative Business Unit. Manpower planning using manpower model. Capacity planning based on cycle time of batches, availability of time and plan released. Asset utilization and tracking manpower efficiency. Achieve daily production targets with effective planning. Packing material scheduling, coordinating with vendors and PM purchase for the same. Controlling losses of raw materials and finished products during production and thereby taking necessary steps to reduce factory level losses.     Experience in SAP (For all Organizations) Sept’06 to till date (9 yrs) SAP experience o Total 9 year overall experience in SAP R3/R2 versions. o Through understanding of Material Masters. o Knowledge of all MRP related transactions. o Understanding of process cycle, recipes, BOMs. o Transactions related to inventory management. (stock reconciliation) o Creation of purchase orders, STOs, material GRNs, Excise entries o Knowledge of Capacity Calculation Module : planvisage Merits/ Awards Achievements:  Established effective planning & scheduling process for UK supplies from INDIA plants and reduced monthly MRP runs to single MRP run per month.   Recognized for Successful completion of the project planvisage on API production and capacity planning at Arch Pharmalabs.   Received Asian Paints recognition awards for excellent understanding and learning capabilities of production planning process and to achieve highest production in the history of bhandup plant. 
  • 5. Educational Qualifications P.G.D.B.A. (Supply chain management)  Successfully completed, 1 year post graduation diploma in supply chain management form Welingkar Institute. (distant learning) F.Y.B.Sc. : Chemistry-Physics-Zoology (65%) – Mumbai University S.Y.B.Sc. : Chemistry-Zoology (70%) – Mumbai University T.Y.B.Sc. : Chemistry- First class (70%) – Mumbai University  MS Office: Completed 3 years certificate course on the M.S. Office, V.B. 6.0 & ‘C’ Programming from N.E.S. Ratnam College with ‘A’ grade. Academic Achievements:  Ranked first in 7th standard scholarship examination in Ratnagiri District Rural Division.  Awards in Science projects exhibition, Poem writing competition, singing competition. Personal Information Date of Birth : 22nd September 1985 Gender : Male Marital Status : Married Languages Known : English, Hindi, Marathi