SlideShare a Scribd company logo
1 of 3
ASWINI KUMAR PADHI
Contact: 9938206789
E-Mail: aswinipadhi@gmail.com
~ Seeking senior level assignments in ~
PRODUCTION PLANNING CONTROL & DISPATCH
Preferably in the Steel industry in Orissa, West Bengal, Chhattisgarh, Jharkhand & Bihar
An efficient planner, proficient in running successful method-oriented production operations & taking initiatives for
business excellence through process improvement
PROFILE SUMMARY
A competent professional with over 14 years of experience in:
Production Planning & Control Inventory Management MIS Reporting
Sales Co-ordination Customer supply management SAP (PP) Implementation
 Expertise in handling the entire production planning & Inventory management with key focus on top line & bottom
line profitability by ensuring optimal utilization of resources
 Adept in managing production activities involving resource planning, in-process inspection and co-ordination with
internal / external departments for timely delivery of finished products
 Acquired exposure in utilizing SAP PP Module for performing material planning activities
 Proficiency in appraising the prevalent production systems/ processes, identifying loopholes if any and undertaking
result-oriented measures for alleviating them and documenting the same
 An effective communicator with excellent relationship management skills and strong analytical, problem solving &
organizational abilities
CORE COMPETENCIES
 Formulating day-to-day strategies, budgets, production schedules for the manufacturing processes along with
resource allocation and machine loading for optimum output
 Minimizing performance bottlenecks for high productivity with maximization of men, material & machine
 Assessing and rendering recommendations on overall equipment effectiveness (OEE)
 Developing integrated management system and managing Quality Systems for meeting the standard requirements of
the pre-defined guidelines
 Taking stringent quality measures including preparation / maintenance of necessary documents to ensure compliance
with standards & customer requirements
 Implementing & monitoring technological changes to enhance efficiency
 Effectuating modifications in equipment, process flow, working practices, consumables, etc. for controlling & reducing
conversion cost per unit produced
ORGANISATIONAL EXPERIENCE
Jan’2015 – till date
Electrosteel Steels Limited, Integrated Steel Plant (2.50 MTPA), Bokaro Steel City, Jharkhand
Senior Manager – Production Planning Control and Sales Co-ordination
Key Result Areas: (Jan’2015)
 Production planning of SMS, Caster, Bar Mill & Wire rod mill.
 Customer order compliance & delay analysis.
 Dispatch plan finalization with Logistics daily/ monthly basis.
 Interaction with MKTG, QA, Operation & Logistics team for optimum level of Inventory in bar mill & steel yard for
dispatch.
 Dilution of old aging stocks and minimizes generation of non-conforming materials.
 Arrangement & getting clearance for Third Party Inspection of materials for dispatch.
 Responsible for attaining daily & monthly target dispatch.
 Responsible for preparation of Dispatch plan thru rake & road transport for achieving target dispatch.
 Generation of MIS reports.
Sep’2006 – Dec’2014
Jindal Stainless Limited, Stainless Steel Plant (1.60 MTPA), Jajpur, Odisha
Manager – Production Planning & Control Dept./ Customer Supply Management
Key Result Areas: (Sept’2006- Dec’2014)
 Facilitated production planning, scheduling & inventory control in the HSM & CRM Section
 Adherence to the Quality Management System / IMS
 Liaised with the QA & Dispatch Teams for ensuring timely delivery of materials
 Deftly taken actions for down grade materials for necessary salvage as per quality recommendation
 Up-keeping optimum level of inventory at FG & WIP Stages
 Released plan for finishing lines to meet daily prod target
 Prepared of various Stock reports and MIS & co-ordination with different departments
 Ensuredstock feeding& productionpunchinginSAPas peractual lineproduction
 Chalking out the monthly dispatch, weekly & daily plans
 Working in coordination with plant for daily dispatch of raw materials
 Maintaining and promoting customer order compliance
 Ensuring selling of steels as per management target set month wise
 Responsible for optimum level of Inventory in yard and in transit to serve customers in time
 Accountable for performing aging analysis and diversion of material FIFO basis
 Preparation of daily Sales & performance analysis, sales tracking and MIS
 Ensuring proper response to each enquiry for conversion to Orders.
Highlights
 Deftly Achieved:
o 98% customer order compliance
o 100% plant capacity utilization.
o 99% conversion of enquires to sales orders
o 95% diversion of old aging material as per quality/ management decision
o 100% movement of non moving material >30days aging
Jan’06 – Aug’06
Indian Steel Corporation Limited, Gandhidham, Gujarat
Senior Engineer - Production Planning & Control Dept.
Key Result Areas
 Ensured optimum inventory control of raw material, WIP & finished materials
 Efficiently promulgated and executed effective plans for 4 HI Cold Rolled Mill, Continuous Galvanizing Line & finish
line to meet daily production targets
 Kept a track of the movement of the materials from factories and warehouses
 Liaised with the Production, Marketing, Raw Material and QC Departments to ensure on-time delivery
Highlights
 Responsible for 100% analysis of old aging material and taken decision for diversion
 Shown 98% error free inventory control
 Achieved 98% consumption of WIP material into production as per FIFO also increased 40% plant capacity
 Successfully saved 30% energy by proper consumption planning
Dec’03 – Dec’05
Bhushan Steel & Strips Limited, Raigad, Maharashtra.
Engineer - Production Planning & Control Dept.
Key Result Areas
 Maintained the daily production details in the ERP System
 Introduced & executed plans for 6 HI Mill, Galvanizing line, Color Coating line, CRS, CTL, Profiling & Finish Lines to
meet daily production targets
 Handled activities related to Customer order compliance
Highlights
 Shown 100% planned production as per planning & schedule and achieved 98% yield in finish line
 Successfully achieved 80% production target also enhanced 10% productivity every month by controlling process
parameters
 Depicted 60% increase in plant after commissioning stage to ramp up production
 Expertise in tracking 100% inventory through internal data analysis
PREVIOUS EXPERIENCE
Apr’02 – Dec’03
GKW Limited (POWMEX Steel Division),Titlagarh, Odisha
GET - Production Planning & Control Dept.
EDUCATION
2001 BE - Mechanical 74.65%(First)
North Orissa University, Keonjhar, Orissa
1996 Diploma (Mech.) 66.50%(First)
NCTE &VT, Rourkela, Orissa
IT SKILLS
 MS Office, SAP (R/3) and ERP System
PERSONAL DETAILS
Date of Birth: 3rdMay, 1978
Address: Plot no-213, Co-operative Colony, Bokaro Steel City, Bokaro, Jharkhand- 827001
Languages Known: English, Hindi and Oriya
Present CTC: 12.79 Lacs per annum
Expected: Negotiable
***

More Related Content

What's hot

What's hot (19)

James Haden
James HadenJames Haden
James Haden
 
John C Trimble 4
John C Trimble 4John C Trimble 4
John C Trimble 4
 
shivbachan kushwaha Resume
shivbachan kushwaha Resumeshivbachan kushwaha Resume
shivbachan kushwaha Resume
 
HPoole_Resume-10-2015
HPoole_Resume-10-2015HPoole_Resume-10-2015
HPoole_Resume-10-2015
 
Chestley Resume
Chestley ResumeChestley Resume
Chestley Resume
 
RESUME N0USHAD - PRODUCTION CONTROLLER SEPT 2016
RESUME N0USHAD - PRODUCTION CONTROLLER SEPT 2016RESUME N0USHAD - PRODUCTION CONTROLLER SEPT 2016
RESUME N0USHAD - PRODUCTION CONTROLLER SEPT 2016
 
Dennis Bertoni Resume Review (1)
Dennis Bertoni Resume Review (1)Dennis Bertoni Resume Review (1)
Dennis Bertoni Resume Review (1)
 
Resume Giridhar
Resume GiridharResume Giridhar
Resume Giridhar
 
Donna M Chick 2016
Donna M Chick 2016 Donna M Chick 2016
Donna M Chick 2016
 
ROXANNE LEAH SMITH-2015
ROXANNE LEAH SMITH-2015ROXANNE LEAH SMITH-2015
ROXANNE LEAH SMITH-2015
 
Kanwaljit.doc
Kanwaljit.docKanwaljit.doc
Kanwaljit.doc
 
John C Trimble 3
John C Trimble 3John C Trimble 3
John C Trimble 3
 
Charinthorn_Resume file_
Charinthorn_Resume file_Charinthorn_Resume file_
Charinthorn_Resume file_
 
Marc Dexter Par_Latest CV
Marc Dexter Par_Latest CVMarc Dexter Par_Latest CV
Marc Dexter Par_Latest CV
 
Resume_Arup Barman Roy
Resume_Arup Barman RoyResume_Arup Barman Roy
Resume_Arup Barman Roy
 
Elizabeth Rubio - CV-2
Elizabeth Rubio - CV-2Elizabeth Rubio - CV-2
Elizabeth Rubio - CV-2
 
Jacqueline Lebron Figuera Resume
Jacqueline Lebron Figuera ResumeJacqueline Lebron Figuera Resume
Jacqueline Lebron Figuera Resume
 
HeenanResume2016 R1
HeenanResume2016 R1HeenanResume2016 R1
HeenanResume2016 R1
 
PRADIPTA BHATTACHARYA_resume(L)
PRADIPTA BHATTACHARYA_resume(L)PRADIPTA BHATTACHARYA_resume(L)
PRADIPTA BHATTACHARYA_resume(L)
 

Similar to CV-AK Padhi (20)

KukadeCv_1_-1_-_Copy_-_Copy
KukadeCv_1_-1_-_Copy_-_CopyKukadeCv_1_-1_-_Copy_-_Copy
KukadeCv_1_-1_-_Copy_-_Copy
 
PP_Amit Tandan new
PP_Amit Tandan newPP_Amit Tandan new
PP_Amit Tandan new
 
PP_Amit Tandan new
PP_Amit Tandan newPP_Amit Tandan new
PP_Amit Tandan new
 
vikas goel
vikas goelvikas goel
vikas goel
 
vikas goel
vikas goelvikas goel
vikas goel
 
RKS
RKSRKS
RKS
 
1.CV_SUDHAKAR PATHAK STORE Manager - Copy
1.CV_SUDHAKAR PATHAK STORE Manager - Copy1.CV_SUDHAKAR PATHAK STORE Manager - Copy
1.CV_SUDHAKAR PATHAK STORE Manager - Copy
 
sanjay resume
sanjay resumesanjay resume
sanjay resume
 
Resume -TARAK
Resume -TARAKResume -TARAK
Resume -TARAK
 
sandy resume planning.doc
sandy resume planning.docsandy resume planning.doc
sandy resume planning.doc
 
updated resume
updated resumeupdated resume
updated resume
 
Resume - Harish Patel R2
Resume - Harish Patel R2Resume - Harish Patel R2
Resume - Harish Patel R2
 
Resume Uma 2015
Resume Uma 2015Resume Uma 2015
Resume Uma 2015
 
Resume new Yogesh
Resume new YogeshResume new Yogesh
Resume new Yogesh
 
resume_nivedita_planning
resume_nivedita_planningresume_nivedita_planning
resume_nivedita_planning
 
CV_AVINASH B. WADASKAR-2016-08-23
CV_AVINASH B. WADASKAR-2016-08-23CV_AVINASH B. WADASKAR-2016-08-23
CV_AVINASH B. WADASKAR-2016-08-23
 
Praveen.Karabuja.PPIC
Praveen.Karabuja.PPICPraveen.Karabuja.PPIC
Praveen.Karabuja.PPIC
 
Yajuvendra Bamrara CV
Yajuvendra Bamrara CVYajuvendra Bamrara CV
Yajuvendra Bamrara CV
 
12
1212
12
 
12
1212
12
 

CV-AK Padhi

  • 1. ASWINI KUMAR PADHI Contact: 9938206789 E-Mail: aswinipadhi@gmail.com ~ Seeking senior level assignments in ~ PRODUCTION PLANNING CONTROL & DISPATCH Preferably in the Steel industry in Orissa, West Bengal, Chhattisgarh, Jharkhand & Bihar An efficient planner, proficient in running successful method-oriented production operations & taking initiatives for business excellence through process improvement PROFILE SUMMARY A competent professional with over 14 years of experience in: Production Planning & Control Inventory Management MIS Reporting Sales Co-ordination Customer supply management SAP (PP) Implementation  Expertise in handling the entire production planning & Inventory management with key focus on top line & bottom line profitability by ensuring optimal utilization of resources  Adept in managing production activities involving resource planning, in-process inspection and co-ordination with internal / external departments for timely delivery of finished products  Acquired exposure in utilizing SAP PP Module for performing material planning activities  Proficiency in appraising the prevalent production systems/ processes, identifying loopholes if any and undertaking result-oriented measures for alleviating them and documenting the same  An effective communicator with excellent relationship management skills and strong analytical, problem solving & organizational abilities CORE COMPETENCIES  Formulating day-to-day strategies, budgets, production schedules for the manufacturing processes along with resource allocation and machine loading for optimum output  Minimizing performance bottlenecks for high productivity with maximization of men, material & machine  Assessing and rendering recommendations on overall equipment effectiveness (OEE)  Developing integrated management system and managing Quality Systems for meeting the standard requirements of the pre-defined guidelines  Taking stringent quality measures including preparation / maintenance of necessary documents to ensure compliance with standards & customer requirements  Implementing & monitoring technological changes to enhance efficiency  Effectuating modifications in equipment, process flow, working practices, consumables, etc. for controlling & reducing conversion cost per unit produced ORGANISATIONAL EXPERIENCE Jan’2015 – till date Electrosteel Steels Limited, Integrated Steel Plant (2.50 MTPA), Bokaro Steel City, Jharkhand Senior Manager – Production Planning Control and Sales Co-ordination Key Result Areas: (Jan’2015)  Production planning of SMS, Caster, Bar Mill & Wire rod mill.  Customer order compliance & delay analysis.  Dispatch plan finalization with Logistics daily/ monthly basis.  Interaction with MKTG, QA, Operation & Logistics team for optimum level of Inventory in bar mill & steel yard for dispatch.  Dilution of old aging stocks and minimizes generation of non-conforming materials.  Arrangement & getting clearance for Third Party Inspection of materials for dispatch.  Responsible for attaining daily & monthly target dispatch.  Responsible for preparation of Dispatch plan thru rake & road transport for achieving target dispatch.  Generation of MIS reports.
  • 2. Sep’2006 – Dec’2014 Jindal Stainless Limited, Stainless Steel Plant (1.60 MTPA), Jajpur, Odisha Manager – Production Planning & Control Dept./ Customer Supply Management Key Result Areas: (Sept’2006- Dec’2014)  Facilitated production planning, scheduling & inventory control in the HSM & CRM Section  Adherence to the Quality Management System / IMS  Liaised with the QA & Dispatch Teams for ensuring timely delivery of materials  Deftly taken actions for down grade materials for necessary salvage as per quality recommendation  Up-keeping optimum level of inventory at FG & WIP Stages  Released plan for finishing lines to meet daily prod target  Prepared of various Stock reports and MIS & co-ordination with different departments  Ensuredstock feeding& productionpunchinginSAPas peractual lineproduction  Chalking out the monthly dispatch, weekly & daily plans  Working in coordination with plant for daily dispatch of raw materials  Maintaining and promoting customer order compliance  Ensuring selling of steels as per management target set month wise  Responsible for optimum level of Inventory in yard and in transit to serve customers in time  Accountable for performing aging analysis and diversion of material FIFO basis  Preparation of daily Sales & performance analysis, sales tracking and MIS  Ensuring proper response to each enquiry for conversion to Orders. Highlights  Deftly Achieved: o 98% customer order compliance o 100% plant capacity utilization. o 99% conversion of enquires to sales orders o 95% diversion of old aging material as per quality/ management decision o 100% movement of non moving material >30days aging Jan’06 – Aug’06 Indian Steel Corporation Limited, Gandhidham, Gujarat Senior Engineer - Production Planning & Control Dept. Key Result Areas  Ensured optimum inventory control of raw material, WIP & finished materials  Efficiently promulgated and executed effective plans for 4 HI Cold Rolled Mill, Continuous Galvanizing Line & finish line to meet daily production targets  Kept a track of the movement of the materials from factories and warehouses  Liaised with the Production, Marketing, Raw Material and QC Departments to ensure on-time delivery Highlights  Responsible for 100% analysis of old aging material and taken decision for diversion  Shown 98% error free inventory control  Achieved 98% consumption of WIP material into production as per FIFO also increased 40% plant capacity  Successfully saved 30% energy by proper consumption planning
  • 3. Dec’03 – Dec’05 Bhushan Steel & Strips Limited, Raigad, Maharashtra. Engineer - Production Planning & Control Dept. Key Result Areas  Maintained the daily production details in the ERP System  Introduced & executed plans for 6 HI Mill, Galvanizing line, Color Coating line, CRS, CTL, Profiling & Finish Lines to meet daily production targets  Handled activities related to Customer order compliance Highlights  Shown 100% planned production as per planning & schedule and achieved 98% yield in finish line  Successfully achieved 80% production target also enhanced 10% productivity every month by controlling process parameters  Depicted 60% increase in plant after commissioning stage to ramp up production  Expertise in tracking 100% inventory through internal data analysis PREVIOUS EXPERIENCE Apr’02 – Dec’03 GKW Limited (POWMEX Steel Division),Titlagarh, Odisha GET - Production Planning & Control Dept. EDUCATION 2001 BE - Mechanical 74.65%(First) North Orissa University, Keonjhar, Orissa 1996 Diploma (Mech.) 66.50%(First) NCTE &VT, Rourkela, Orissa IT SKILLS  MS Office, SAP (R/3) and ERP System PERSONAL DETAILS Date of Birth: 3rdMay, 1978 Address: Plot no-213, Co-operative Colony, Bokaro Steel City, Bokaro, Jharkhand- 827001 Languages Known: English, Hindi and Oriya Present CTC: 12.79 Lacs per annum Expected: Negotiable ***