SlideShare a Scribd company logo
Renjith N K
Mobile: +91 9087158127
: renjithnk1984@gmail.com SKILL : SAP-PM/ SAP-EAM
Overall Summary
 Overall 8+ years of experience.
 2.9 years in SAP PM/EAM Module & 6+ years in Domain.
 Travelled to Germany during Extension of Implementation of DB-Germany to France.
 Currently working in Hexaware Technologies Ltd, Chennai.
SAP Skills
 SAP PM / SAP EAM (Plant Maintenance/Enterprise Asset Management).
Education
 B.Tech: (Electrical and Electronics Engineering) With First Class from College of Engineering,
Munnar (CUSAT University).
Work Experience
HEXAWARE TECHNOLOGIES LTD
1
Roles and Responsibilities:
 Creation of Test documents and management.
 Testing of functionality with system upgrades.
 Data handling in SAP Solution Manager.
2
Project Type : Implementation Project
Client Richland Logistics, Singapore
Role SAP PM Functional Consultant
Duration Oct 2014 to Sep 2015
Environment SAP ECC 6.0,
Designation Software Engineer
Page 1 of 3
Project Type : Support Project
Client DB Systel, Germany
Role SAP PM Functional Consultant
Duration July 2013 to Till Date
Environment SAP ECC 6.0 ,
Designation Software Engineer
Roles and Responsibilities:
 Understanding the business requirements for configuration.
 Compile Business Blue Print.
 Construction of a technical hierarchical structure.
 Master Data definition for PM Processes.
 Creation and management of Master data for PM Module as per the requirements.
 Preventative/Predictive Maintenance.
 Corrective Maintenance.
 Breakdown/Emergency Maintenance.
 Functional Locations.
 Serial Number Management using serial number profile.
 Maintenance Orders.
 Work Centers.
 Functional Location.
 Equipment.
 Measuring Points.
 Task Lists.
 Permits.
 Warranty.
 Partner functions.
 Identify Reporting Requirements.
 Assist and conduct 1st round of Testing.
 Assist and conduct final Testing on QA.
 PM User trainings.
 Compilation of PM documentation for business processes.
 Creation of Test documents and management.
 Ensuring that the PM Team adheres to the Project governance.
 Provision of PM support on Post Implementation.
 Compilation of PM User profiles.
Additional Responsibilities:
 Trainings on SAP PM for Team members.
 Involved in Recruitment process for SAP PM resourse.
 Certified in Logistics Training and German Language
Domain Experiences:
DP WORLD COCHIN, INTERNATIONAL CONTAINER TRANSHIPMENT TERMINAL, Vallarpadam Kochi,
Project Type : CONTAINER TRANSHIPMENT TERMINAL (1million TEUs)
Role Senior Officer, Engineering,
Duration Mar 2010 – July 2013
 Planning and execution of Preventive, Corrective and Breakdown maintenance of all PLC
controlled electrical equipments in the terminal.
 Member of core team for implementation of plant maintenance ERP (Mainpac) in the terminal
during 2010-2011.
 Generated breakdown analysis reports to identify recurrent problems and develop corrective
and preventive action plans.
Page 2 of 3
 Enforce strict compliance of all HSE policies and rules and conduct inspections to identify
unsafe conditions and working practices and initiate necessary remedial measures.
 Member of hazard and risk management team and work permit management system in the
terminal to maintain smooth operations meeting the company’s OSH standards.
UTILITY POWERTECH LTD, Dabhol-Ratnagiri,
Project Type : Combined Cycle Power Plant (2100MW)
Role Electical Engineer, Engineering,
Duration Oct 2008 – Feb 2010
Site Ratnagiri Gas and Power Pvt Ltd.
 Was part of the O&M team at Ratnagiri Gas and Power Pvt Ltd.
 Carried out Installation, testing commissioning and maintenance of various electrical
equipment in the Power blocks, Substations and Switchyard.
SINGH ENTERPRISES, Dabhol Ratnagiri
Project Type : Combined Cycle Power Plant (2100MW)
Role Electical Engineer, Engineering,
Duration June 2007 – Oct 2008
Site Ratnagiri Gas and Power Pvt Ltd.
 Management and Planning of manpower.
 Management of documents on all type of maintenance and report generation.
 Ensure completion of all planned preventive maintenance jobs on schedule to deliver
targeted reliability of the electrical equipment in the terminals and electrical substations.
Personal Details
D.O.B : 14th
SEP 1984.
Marital status : Married
Passport No : G5886713
Languages known : English, Malayalam, Tamil and Hindi.
I hereby certify that the information provided above is correct to the best of my knowledge and
belief.
[Renjith N K]
Page 3 of 3

More Related Content

What's hot (20)

Suchendran H - P
Suchendran H - PSuchendran H - P
Suchendran H - P
 
Résumé_Tarun Pant gen aug16
Résumé_Tarun Pant gen aug16Résumé_Tarun Pant gen aug16
Résumé_Tarun Pant gen aug16
 
Resume
ResumeResume
Resume
 
CustomerCopy(3)
CustomerCopy(3)CustomerCopy(3)
CustomerCopy(3)
 
Ashutosh Gupta
Ashutosh GuptaAshutosh Gupta
Ashutosh Gupta
 
Haitham Seleem
Haitham SeleemHaitham Seleem
Haitham Seleem
 
Resume __Sanjay Gulati
Resume __Sanjay GulatiResume __Sanjay Gulati
Resume __Sanjay Gulati
 
ERP
ERPERP
ERP
 
RABINDRA KUMAR PANDEY-PUNE
RABINDRA KUMAR PANDEY-PUNERABINDRA KUMAR PANDEY-PUNE
RABINDRA KUMAR PANDEY-PUNE
 
Deepak_Thakur 31.05.2016
Deepak_Thakur 31.05.2016Deepak_Thakur 31.05.2016
Deepak_Thakur 31.05.2016
 
Vinay_Chandwalker[1]_25032015
Vinay_Chandwalker[1]_25032015Vinay_Chandwalker[1]_25032015
Vinay_Chandwalker[1]_25032015
 
Resume - Vipin Parkash
Resume - Vipin ParkashResume - Vipin Parkash
Resume - Vipin Parkash
 
Resume ( Sachin Kumar)
Resume ( Sachin Kumar)Resume ( Sachin Kumar)
Resume ( Sachin Kumar)
 
Ram resume
Ram resumeRam resume
Ram resume
 
Chethan Yadav_SAP MM
Chethan Yadav_SAP MMChethan Yadav_SAP MM
Chethan Yadav_SAP MM
 
Sanjay KHOSLA - Synopsis
Sanjay KHOSLA - SynopsisSanjay KHOSLA - Synopsis
Sanjay KHOSLA - Synopsis
 
Cv Anand
Cv AnandCv Anand
Cv Anand
 
Resume 12yrs Exp
Resume 12yrs ExpResume 12yrs Exp
Resume 12yrs Exp
 
Shilpa Resume
Shilpa ResumeShilpa Resume
Shilpa Resume
 
kapilumak
kapilumakkapilumak
kapilumak
 

Similar to Resume renjith sap _pm

pravin_pate_CV_SAP plant maintenance - Copy
pravin_pate_CV_SAP plant maintenance - Copypravin_pate_CV_SAP plant maintenance - Copy
pravin_pate_CV_SAP plant maintenance - Copypravin pate
 
Cv murugesan alagar
Cv murugesan alagarCv murugesan alagar
Cv murugesan alagar
Murugesan Alagar
 
2.9 years_Infosys_Resume-1
2.9 years_Infosys_Resume-12.9 years_Infosys_Resume-1
2.9 years_Infosys_Resume-1Prem Suvarna
 
Resume2
Resume2Resume2
Anthoni anil, pmp(r)
Anthoni anil, pmp(r)Anthoni anil, pmp(r)
Anthoni anil, pmp(r)
Anil Anthony, PMP
 

Similar to Resume renjith sap _pm (20)

Satheeshkumar_CV_engg
Satheeshkumar_CV_enggSatheeshkumar_CV_engg
Satheeshkumar_CV_engg
 
Nitin_Technical
Nitin_TechnicalNitin_Technical
Nitin_Technical
 
ANKUR_GHOSH
ANKUR_GHOSHANKUR_GHOSH
ANKUR_GHOSH
 
Chia Shin Fatt CV
Chia Shin Fatt CVChia Shin Fatt CV
Chia Shin Fatt CV
 
Gaurav_Resume
Gaurav_ResumeGaurav_Resume
Gaurav_Resume
 
Guruprasad_Testing_TM_7.5yrs
Guruprasad_Testing_TM_7.5yrsGuruprasad_Testing_TM_7.5yrs
Guruprasad_Testing_TM_7.5yrs
 
Curriculum Vitae new-1
Curriculum Vitae new-1Curriculum Vitae new-1
Curriculum Vitae new-1
 
Resume Thangadurai S
Resume Thangadurai SResume Thangadurai S
Resume Thangadurai S
 
pravin_pate_CV_SAP plant maintenance - Copy
pravin_pate_CV_SAP plant maintenance - Copypravin_pate_CV_SAP plant maintenance - Copy
pravin_pate_CV_SAP plant maintenance - Copy
 
Shivani_CV
Shivani_CVShivani_CV
Shivani_CV
 
Shree_Resume
Shree_ResumeShree_Resume
Shree_Resume
 
Resume_Sunil kumar Singh
Resume_Sunil kumar SinghResume_Sunil kumar Singh
Resume_Sunil kumar Singh
 
B Kiremire Resume R0.4
B Kiremire Resume R0.4B Kiremire Resume R0.4
B Kiremire Resume R0.4
 
mpita20_CV_Amec
mpita20_CV_Amecmpita20_CV_Amec
mpita20_CV_Amec
 
Cv murugesan alagar
Cv murugesan alagarCv murugesan alagar
Cv murugesan alagar
 
Debanshu_CV
Debanshu_CVDebanshu_CV
Debanshu_CV
 
2.9 years_Infosys_Resume-1
2.9 years_Infosys_Resume-12.9 years_Infosys_Resume-1
2.9 years_Infosys_Resume-1
 
Resume2
Resume2Resume2
Resume2
 
Anthoni anil, pmp(r)
Anthoni anil, pmp(r)Anthoni anil, pmp(r)
Anthoni anil, pmp(r)
 
Sivanpandi
SivanpandiSivanpandi
Sivanpandi
 

Recently uploaded

Governing Equations for Fundamental Aerodynamics_Anderson2010.pdf
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdfGoverning Equations for Fundamental Aerodynamics_Anderson2010.pdf
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdf
WENKENLI1
 
HYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generationHYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generation
Robbie Edward Sayers
 
space technology lecture notes on satellite
space technology lecture notes on satellitespace technology lecture notes on satellite
space technology lecture notes on satellite
ongomchris
 
Immunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary AttacksImmunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary Attacks
gerogepatton
 
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
zwunae
 
ethical hacking in wireless-hacking1.ppt
ethical hacking in wireless-hacking1.pptethical hacking in wireless-hacking1.ppt
ethical hacking in wireless-hacking1.ppt
Jayaprasanna4
 
Cosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdfCosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdf
Kamal Acharya
 
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
H.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdfH.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdf
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
MLILAB
 
Student information management system project report ii.pdf
Student information management system project report ii.pdfStudent information management system project report ii.pdf
Student information management system project report ii.pdf
Kamal Acharya
 
The Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdfThe Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdf
Pipe Restoration Solutions
 
Planning Of Procurement o different goods and services
Planning Of Procurement o different goods and servicesPlanning Of Procurement o different goods and services
Planning Of Procurement o different goods and services
JoytuBarua2
 
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
ydteq
 
road safety engineering r s e unit 3.pdf
road safety engineering  r s e unit 3.pdfroad safety engineering  r s e unit 3.pdf
road safety engineering r s e unit 3.pdf
VENKATESHvenky89705
 
English lab ppt no titlespecENG PPTt.pdf
English lab ppt no titlespecENG PPTt.pdfEnglish lab ppt no titlespecENG PPTt.pdf
English lab ppt no titlespecENG PPTt.pdf
BrazilAccount1
 
ML for identifying fraud using open blockchain data.pptx
ML for identifying fraud using open blockchain data.pptxML for identifying fraud using open blockchain data.pptx
ML for identifying fraud using open blockchain data.pptx
Vijay Dialani, PhD
 
MCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdfMCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdf
Osamah Alsalih
 
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
Amil Baba Dawood bangali
 
Railway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdfRailway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdf
TeeVichai
 
block diagram and signal flow graph representation
block diagram and signal flow graph representationblock diagram and signal flow graph representation
block diagram and signal flow graph representation
Divya Somashekar
 
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
thanhdowork
 

Recently uploaded (20)

Governing Equations for Fundamental Aerodynamics_Anderson2010.pdf
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdfGoverning Equations for Fundamental Aerodynamics_Anderson2010.pdf
Governing Equations for Fundamental Aerodynamics_Anderson2010.pdf
 
HYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generationHYDROPOWER - Hydroelectric power generation
HYDROPOWER - Hydroelectric power generation
 
space technology lecture notes on satellite
space technology lecture notes on satellitespace technology lecture notes on satellite
space technology lecture notes on satellite
 
Immunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary AttacksImmunizing Image Classifiers Against Localized Adversary Attacks
Immunizing Image Classifiers Against Localized Adversary Attacks
 
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
一比一原版(IIT毕业证)伊利诺伊理工大学毕业证成绩单专业办理
 
ethical hacking in wireless-hacking1.ppt
ethical hacking in wireless-hacking1.pptethical hacking in wireless-hacking1.ppt
ethical hacking in wireless-hacking1.ppt
 
Cosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdfCosmetic shop management system project report.pdf
Cosmetic shop management system project report.pdf
 
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
H.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdfH.Seo,  ICLR 2024, MLILAB,  KAIST AI.pdf
H.Seo, ICLR 2024, MLILAB, KAIST AI.pdf
 
Student information management system project report ii.pdf
Student information management system project report ii.pdfStudent information management system project report ii.pdf
Student information management system project report ii.pdf
 
The Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdfThe Benefits and Techniques of Trenchless Pipe Repair.pdf
The Benefits and Techniques of Trenchless Pipe Repair.pdf
 
Planning Of Procurement o different goods and services
Planning Of Procurement o different goods and servicesPlanning Of Procurement o different goods and services
Planning Of Procurement o different goods and services
 
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
一比一原版(UofT毕业证)多伦多大学毕业证成绩单如何办理
 
road safety engineering r s e unit 3.pdf
road safety engineering  r s e unit 3.pdfroad safety engineering  r s e unit 3.pdf
road safety engineering r s e unit 3.pdf
 
English lab ppt no titlespecENG PPTt.pdf
English lab ppt no titlespecENG PPTt.pdfEnglish lab ppt no titlespecENG PPTt.pdf
English lab ppt no titlespecENG PPTt.pdf
 
ML for identifying fraud using open blockchain data.pptx
ML for identifying fraud using open blockchain data.pptxML for identifying fraud using open blockchain data.pptx
ML for identifying fraud using open blockchain data.pptx
 
MCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdfMCQ Soil mechanics questions (Soil shear strength).pdf
MCQ Soil mechanics questions (Soil shear strength).pdf
 
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
NO1 Uk best vashikaran specialist in delhi vashikaran baba near me online vas...
 
Railway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdfRailway Signalling Principles Edition 3.pdf
Railway Signalling Principles Edition 3.pdf
 
block diagram and signal flow graph representation
block diagram and signal flow graph representationblock diagram and signal flow graph representation
block diagram and signal flow graph representation
 
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
RAT: Retrieval Augmented Thoughts Elicit Context-Aware Reasoning in Long-Hori...
 

Resume renjith sap _pm

  • 1. Renjith N K Mobile: +91 9087158127 : renjithnk1984@gmail.com SKILL : SAP-PM/ SAP-EAM Overall Summary  Overall 8+ years of experience.  2.9 years in SAP PM/EAM Module & 6+ years in Domain.  Travelled to Germany during Extension of Implementation of DB-Germany to France.  Currently working in Hexaware Technologies Ltd, Chennai. SAP Skills  SAP PM / SAP EAM (Plant Maintenance/Enterprise Asset Management). Education  B.Tech: (Electrical and Electronics Engineering) With First Class from College of Engineering, Munnar (CUSAT University). Work Experience HEXAWARE TECHNOLOGIES LTD 1 Roles and Responsibilities:  Creation of Test documents and management.  Testing of functionality with system upgrades.  Data handling in SAP Solution Manager. 2 Project Type : Implementation Project Client Richland Logistics, Singapore Role SAP PM Functional Consultant Duration Oct 2014 to Sep 2015 Environment SAP ECC 6.0, Designation Software Engineer Page 1 of 3 Project Type : Support Project Client DB Systel, Germany Role SAP PM Functional Consultant Duration July 2013 to Till Date Environment SAP ECC 6.0 , Designation Software Engineer
  • 2. Roles and Responsibilities:  Understanding the business requirements for configuration.  Compile Business Blue Print.  Construction of a technical hierarchical structure.  Master Data definition for PM Processes.  Creation and management of Master data for PM Module as per the requirements.  Preventative/Predictive Maintenance.  Corrective Maintenance.  Breakdown/Emergency Maintenance.  Functional Locations.  Serial Number Management using serial number profile.  Maintenance Orders.  Work Centers.  Functional Location.  Equipment.  Measuring Points.  Task Lists.  Permits.  Warranty.  Partner functions.  Identify Reporting Requirements.  Assist and conduct 1st round of Testing.  Assist and conduct final Testing on QA.  PM User trainings.  Compilation of PM documentation for business processes.  Creation of Test documents and management.  Ensuring that the PM Team adheres to the Project governance.  Provision of PM support on Post Implementation.  Compilation of PM User profiles. Additional Responsibilities:  Trainings on SAP PM for Team members.  Involved in Recruitment process for SAP PM resourse.  Certified in Logistics Training and German Language Domain Experiences: DP WORLD COCHIN, INTERNATIONAL CONTAINER TRANSHIPMENT TERMINAL, Vallarpadam Kochi, Project Type : CONTAINER TRANSHIPMENT TERMINAL (1million TEUs) Role Senior Officer, Engineering, Duration Mar 2010 – July 2013  Planning and execution of Preventive, Corrective and Breakdown maintenance of all PLC controlled electrical equipments in the terminal.  Member of core team for implementation of plant maintenance ERP (Mainpac) in the terminal during 2010-2011.  Generated breakdown analysis reports to identify recurrent problems and develop corrective and preventive action plans. Page 2 of 3
  • 3.  Enforce strict compliance of all HSE policies and rules and conduct inspections to identify unsafe conditions and working practices and initiate necessary remedial measures.  Member of hazard and risk management team and work permit management system in the terminal to maintain smooth operations meeting the company’s OSH standards. UTILITY POWERTECH LTD, Dabhol-Ratnagiri, Project Type : Combined Cycle Power Plant (2100MW) Role Electical Engineer, Engineering, Duration Oct 2008 – Feb 2010 Site Ratnagiri Gas and Power Pvt Ltd.  Was part of the O&M team at Ratnagiri Gas and Power Pvt Ltd.  Carried out Installation, testing commissioning and maintenance of various electrical equipment in the Power blocks, Substations and Switchyard. SINGH ENTERPRISES, Dabhol Ratnagiri Project Type : Combined Cycle Power Plant (2100MW) Role Electical Engineer, Engineering, Duration June 2007 – Oct 2008 Site Ratnagiri Gas and Power Pvt Ltd.  Management and Planning of manpower.  Management of documents on all type of maintenance and report generation.  Ensure completion of all planned preventive maintenance jobs on schedule to deliver targeted reliability of the electrical equipment in the terminals and electrical substations. Personal Details D.O.B : 14th SEP 1984. Marital status : Married Passport No : G5886713 Languages known : English, Malayalam, Tamil and Hindi. I hereby certify that the information provided above is correct to the best of my knowledge and belief. [Renjith N K] Page 3 of 3