I have an excellent footstep in multiple project implementations in power sector by turnkey or EPC
contractor. Infrastructure development is the key of economic upliftment of any nation, without
which a country can’t reach to the goal of prosperity. Again use of trained/experienced human
resources for execution & supervision of development projects is the key of successful
implementation of any project i.e infrastructure development. Now I am working in power
transmission utility as an Executive Engineer (Manager) in the project implementation division. I have
a gorgeous milestone in the role playing of multiple project which had completed. Our project
implementation team had completed a multiple project which amount was US$ 103.50 million where
we had constructed 107 km four ckt 132 kV transmission line (TL), extended of capacity of 5 nos
existing 230/132 kV substations (SS) (each 225 MVA), 4 nos new 132/33 kV AIS SS (each 150 MVA),
extended a 132/33 kV SS (300 MVA) & constructed a new 132/33 kV GIS SS (84 MVA). I have also an
experience on ERS system. Now our project team has started a new multiple project which name is
Matarbari-Madunaghat-Meghnaghat 400 kV Transmission Line (MMM 400 kV TL) Project. The
estimated cost of this project is US$ 731.23 million where have 314 km double ckt 400 kV TL, a
400/230/132 kV AIS, a 400/230 kV GIS, a 230/132 kV GIS & recruitment of consultant for this project. I
have handle several turnkey contractors like Siemens, ABB, KEC, CCC, Hyosung, Lg-Sejon, CCC-ETERN
& other subcontractors. I am a mid level key person of my organization. I can apply my knowledge in
practical field whatsoever has achieved from my completed project.
I have also an excellent experience record in power station operation & maintenance in electrical and
mechanical in both sides and Power plant management skills.
Carrier Summary
Total Job Length: Around 15 years
 Job-2:
Name of Organization: Power Grid Company of Bangladesh (PGCB) Ltd. www.pgcb.org.bd.
Job Length: 10 years + 11 months.
It is my second job which is Government own power transmission utility. I had joined in this
organization in project implementation division on 16/03/2005 as an Assistant Engineer
(Assistant Manager). In the mid time, I had been promoted as a Sub-Divisional Engineer
2/5
(Deputy Manager) in the same division. Again I have been promoted as an Executive Engineer
(Manager) in the same division.
My Responsibility in PGCB:
 To coordinate feasibility study, IEE, EIA, RAP.
 To coordinate to prepare Development Project Proposal (DPP).
 To take clearance from the sponsoring ministry for substation land acquisition.
 To take initial process for substation land from DC Office.
 To take NoC from DC office, forest department, River authority, R&H, railway for TL etc.
 To take clearance from DoE.
 To send DPP including all necessary papers to planning ministry through power ministry.
 To taking approval of DPP from ECNEC of planning ministry.
 To prepare bid document (one envelope two stage method) for turnkey contractor (EPC).
 To prepare of bid document (EOI & RFP) for consultant & floating the tender notice.
 To evaluate of bid documents, notification award, contract negotiation, contract signing.
 To take necessary activity for design & drawing approval.
 To make bar chart/Schedule for completing the project in contractual time frame.
 To make tentative disbursement schedule for the FY.
 To ensure the quality of civil works of SS/TL related foundation works, building & road.
 To ensure the quality of erection/installation electrical equipment, structure & tower.
 To ensure the quality of stringing of TL conductor, OPGW, sky wire.
 To ensure the quality of control, power cable termination.
 To ensure the quality of 132 kV XLPE power cable termination & jointing.
 To make all kinds of reports such as monthly, quarterly, half yearly & yearly.
 To attend in the progress meeting held in HOPE, Power Ministry & ERD.
 To attend in the progress meeting with development partner like WB, ADB, JICA etc.
 To certify of Progress Invoice & delegate financial rules.
 To mitigate RoW problems for TL.
 To perform pre-commissioning test, finally commissioning test & run the system.
 To complete punch list/any defects during the defect liability period.
 To handover the substation & transmission line to the O&M division.
 To take necessary process for issuing CC(TOC) & OAC(FAC)
 To prepare all kinds of correspondence, note sheet for any kind of approval.
 To make minutes of meeting.
 To keeping all kinds of necessary documents in respective files.
 To make PCR of the project.
 Job-1:
Name of Organization: Summit Power Company Ltd. (SPCL). www.summitpower.org.
Job Length: 3 years + 8 months.
After graduating of my B.Sc. in Electrical & Electronic Engineering, at first I joined in Summit
Power Company Ltd on 01/07/2001 as a Shift Engineer i.e. Shift In-Charge of Power Plant
under O&M division. Its previous name was United Summit Power Company Ltd. It was 11
MW power generating station. There were 4 nos CATERPILLAR Gas Engine where 3 nos set
3/5
model was G3616 of each production capacity was 3871 kW & rest one set model was G3516
which production capacity was 1040 kW. There was 11/33 kV, 35 MVA power Transformer in
switch yard. I left SPCL on 28/02/2005.
My Responsibility in SPCL:
 Responsible for the safe & economic “Operation and Management” of the plant as a shift engineer
(In-charge of the shift designated shift).
 Before starting the shift operation, checked all machineries of the power plant.
 To check log book, shift diary what was happed during the previous shift and what type of
corrective measures were taken.
 During my shift, any trouble came, such as engine, radiator, transformer, breaker, LT switchgear,
that time initiated corrective measures & have to solve the trouble.
 Monitoring Spare parts, inventory control.
 Normally power plant was run in grid mode with the grid system parameters, if grid system failed,
then according to our power station capacity, one by one generator were started according local
utility requirements, that time generator was run by island mode according to local utility load
demand. If power plant frequency was lower that time informed local utility to cut their few load.
When frequency was very high that time informed local utility to increased their load. It was very
much difficult job to maintain system frequency because of less power (not larger power produce),
always monitor the system parameters. When grid was ready, then all generator breakers were
opened. Grid voltage & frequency were imported by 11kV switchgear through power transformer
and one by one generator were synchronized with imported 11 kV, national grid frequency.
 Maintained shift dairy.
Educational Achievement:
Sl.
No.
Name of the Certificate
Or Exam Title
Name of Board or University
Passing
year
Division
or Class
Result
or CGPA
1. B.Sc in Electrical &
Electronic Engineering
Dhaka University of Engineering &
Technology (DUET), www:duet.ac.bd
Former Name was Bangladesh
Institute of Technology (BIT), Dhaka
2001
First
Class
3.31
out
of 4
2. Diploma in Electrical
Engineering
Comilla Polytechnic Institute under
BTEB, www:bteb.gov.bd
1994
First
Division
72.90%
3. SSC in Science Group Govt. Laboratory High School under
Comilla, www.comillaboard.gov.bd
1991
First
Division
65.90%
Training Summary:
Sl.No. Name of the Course Training Institute Country Duration Year
1. Environmental Impact
Assessment (EIA)
Power Cell Power Division,
MoPEMR
Bangladesh 3 Days 2015
2. Project Management Bangladesh Institute of
Management
Bangladesh 1 Week 2015
3. Public Procurement & Reform
Project
IMED, Ministry of Planning
Bangladesh 2 Weeks 2014
4. Design of Tower & Foundation M/s. KEC Ltd., India Bangladesh 2 Weeks 2013
5. Project Management Skills for
Projects Engineers
National Academy for
Planning and Development
Bangladesh 2 Weeks 2012
6. Group Training Course in
Electrical System Engineering
Tohoko Electric Power
Company
Japan 5 Weeks 2009
4/5
7. Short Training on Substation
Design and Construction
M/s. Nippon KOEI, Japan Bangladesh 1 Week 2007
8. Project Training Course M/s. ABB India, Ltd. Bangladesh 2 Days 2005
9. CATERPILLAR “G3600LB Gas
Engines
M/s. CATERPILLAR ASIA
PACIFIC, Singapore
Bangladesh 1 Week 2003
10. Introduction to ISO
9001:2000” & “Internal Quality
Auditing
M/s. Quality Links
International, Pakistan Bangladesh 2 Weeks 2002
Language Proficiency:
Name of Language Speaking Reading Writing Listening
English Excellent Excellent Excellent Excellent
Bengali Excellent Excellent Excellent Excellent
Hindi Little bit - - Understand
Computer Skills:
Operating System: Win 98/200, Win XP, Windows 2007
Programming Languages: C/C++, FORTRAN (12 years ago)
Hardware Application Software: Assembling, Trouble Shooting of PC and all
all types of Software installation.
Application of Software: MS Office Application, Auto CAD, Visual Basic, Power Point, Internet Browsing,
online Assessment, MS Project, Adobe Illustrator, Adobe Photo-shop, Paint.
Extra Activities:
Play cricket, football, bally ball, table tennis & badminton; traveling, cultural activities, leasing song etc.
Engineering Membership:
Membership No. 20244
Name of the Institution: Institute Engineers Bangladesh
Driving License:
I can drive & applying for license
Personal Information:
Name : Mohammad Jashim Uddin Present Address:
Father’s Name : Md. Abdul Latif House – 35, Road – 7, Block – C,
Banasree, Rampura, Dhaka-1219,
Bangladesh
Mother’s Name : Feroza Begum
Date of Birth : 1st October 1976
Blood Group : O+
Gender : Male Permanent Address:
Passport No. : BA 0561845 Village : Elahabad, Post
Office:Elahabad Bazar, Upazila
:Debidwar, District: Comilla,
Bangladesh
Marital Status : Married
Religion : Islam
Nationality : Bangladeshi by Birth
5/5
Reference:
1. Name of Referred Person : Engr. Md. Yeakub Elahi Chowdhury
Designation : Project Director & Superintending Engineer
Name of the Project : Dhaka-Chittagong Main Power Grid Strengthening (Matarbari-Madunaghat-
Meghnaghat 400 kV T/L Line) Project
Name of the Organization: PGCB
Mobile No. : +880-1711-644858
e-mail: Yec120@yahoo.com
Address: NLDC Bhaban (9th Floor), PGCB, Aftab Nagar, Badda, Dhaka-1212, Bangladesh
Relation : Professional
2. Name of Referred Person: Engr. Mrinal Kanti Paul
Designation: Project Director & Superintending Engineer
Name of the Project: Barisal-Bhola-Burhanuddin 230 kV Transmission Line Project
Name of the Organization: PGCB
Mobile No. : +880-1711-430526
e-mail : paul.pgcb@yahoo.com
Address : NLDC Bhaban (8th Floor), PGCB, Aftabnagar, Rampura, Dhaka-1219, Bangladesh
Relation: Professional
3. Name of Referred Person : Engr. Md. Mozammel Hossain
Designation: Deputy Managing Director, Summit Power Ltd.
: Managing Director, Summit Purbancol Power Com. Ltd’
Mobile No.: +880-1755-550065
e-mail: mozammel@summitpower.org
Address: Summit Centre, 18 Kawran Bazar C/A, Dhaka-1215, Bangladesh
Relation: Professional
(Mohammad Jashim Uddin)

Resume mju 03.10.2016

  • 1.
    1/5 RESUME OF MOHAMMADJASHIM UDDIN Mailing Address: Mohammad Jashim Uddin House # 35(5th Floor), Road # 7, Block # C Banasree, Rampura, Dhaka-1219 Cell Phone: +88-01711-430529, +88-01755-203411 e-mail: jashim94201@gmail.com, jashim.pgcb@yahoo.com xen1-mmm400kvtlp@pgcb.org.bd Message: I have an excellent footstep in multiple project implementations in power sector by turnkey or EPC contractor. Infrastructure development is the key of economic upliftment of any nation, without which a country can’t reach to the goal of prosperity. Again use of trained/experienced human resources for execution & supervision of development projects is the key of successful implementation of any project i.e infrastructure development. Now I am working in power transmission utility as an Executive Engineer (Manager) in the project implementation division. I have a gorgeous milestone in the role playing of multiple project which had completed. Our project implementation team had completed a multiple project which amount was US$ 103.50 million where we had constructed 107 km four ckt 132 kV transmission line (TL), extended of capacity of 5 nos existing 230/132 kV substations (SS) (each 225 MVA), 4 nos new 132/33 kV AIS SS (each 150 MVA), extended a 132/33 kV SS (300 MVA) & constructed a new 132/33 kV GIS SS (84 MVA). I have also an experience on ERS system. Now our project team has started a new multiple project which name is Matarbari-Madunaghat-Meghnaghat 400 kV Transmission Line (MMM 400 kV TL) Project. The estimated cost of this project is US$ 731.23 million where have 314 km double ckt 400 kV TL, a 400/230/132 kV AIS, a 400/230 kV GIS, a 230/132 kV GIS & recruitment of consultant for this project. I have handle several turnkey contractors like Siemens, ABB, KEC, CCC, Hyosung, Lg-Sejon, CCC-ETERN & other subcontractors. I am a mid level key person of my organization. I can apply my knowledge in practical field whatsoever has achieved from my completed project. I have also an excellent experience record in power station operation & maintenance in electrical and mechanical in both sides and Power plant management skills. Carrier Summary Total Job Length: Around 15 years  Job-2: Name of Organization: Power Grid Company of Bangladesh (PGCB) Ltd. www.pgcb.org.bd. Job Length: 10 years + 11 months. It is my second job which is Government own power transmission utility. I had joined in this organization in project implementation division on 16/03/2005 as an Assistant Engineer (Assistant Manager). In the mid time, I had been promoted as a Sub-Divisional Engineer
  • 2.
    2/5 (Deputy Manager) inthe same division. Again I have been promoted as an Executive Engineer (Manager) in the same division. My Responsibility in PGCB:  To coordinate feasibility study, IEE, EIA, RAP.  To coordinate to prepare Development Project Proposal (DPP).  To take clearance from the sponsoring ministry for substation land acquisition.  To take initial process for substation land from DC Office.  To take NoC from DC office, forest department, River authority, R&H, railway for TL etc.  To take clearance from DoE.  To send DPP including all necessary papers to planning ministry through power ministry.  To taking approval of DPP from ECNEC of planning ministry.  To prepare bid document (one envelope two stage method) for turnkey contractor (EPC).  To prepare of bid document (EOI & RFP) for consultant & floating the tender notice.  To evaluate of bid documents, notification award, contract negotiation, contract signing.  To take necessary activity for design & drawing approval.  To make bar chart/Schedule for completing the project in contractual time frame.  To make tentative disbursement schedule for the FY.  To ensure the quality of civil works of SS/TL related foundation works, building & road.  To ensure the quality of erection/installation electrical equipment, structure & tower.  To ensure the quality of stringing of TL conductor, OPGW, sky wire.  To ensure the quality of control, power cable termination.  To ensure the quality of 132 kV XLPE power cable termination & jointing.  To make all kinds of reports such as monthly, quarterly, half yearly & yearly.  To attend in the progress meeting held in HOPE, Power Ministry & ERD.  To attend in the progress meeting with development partner like WB, ADB, JICA etc.  To certify of Progress Invoice & delegate financial rules.  To mitigate RoW problems for TL.  To perform pre-commissioning test, finally commissioning test & run the system.  To complete punch list/any defects during the defect liability period.  To handover the substation & transmission line to the O&M division.  To take necessary process for issuing CC(TOC) & OAC(FAC)  To prepare all kinds of correspondence, note sheet for any kind of approval.  To make minutes of meeting.  To keeping all kinds of necessary documents in respective files.  To make PCR of the project.  Job-1: Name of Organization: Summit Power Company Ltd. (SPCL). www.summitpower.org. Job Length: 3 years + 8 months. After graduating of my B.Sc. in Electrical & Electronic Engineering, at first I joined in Summit Power Company Ltd on 01/07/2001 as a Shift Engineer i.e. Shift In-Charge of Power Plant under O&M division. Its previous name was United Summit Power Company Ltd. It was 11 MW power generating station. There were 4 nos CATERPILLAR Gas Engine where 3 nos set
  • 3.
    3/5 model was G3616of each production capacity was 3871 kW & rest one set model was G3516 which production capacity was 1040 kW. There was 11/33 kV, 35 MVA power Transformer in switch yard. I left SPCL on 28/02/2005. My Responsibility in SPCL:  Responsible for the safe & economic “Operation and Management” of the plant as a shift engineer (In-charge of the shift designated shift).  Before starting the shift operation, checked all machineries of the power plant.  To check log book, shift diary what was happed during the previous shift and what type of corrective measures were taken.  During my shift, any trouble came, such as engine, radiator, transformer, breaker, LT switchgear, that time initiated corrective measures & have to solve the trouble.  Monitoring Spare parts, inventory control.  Normally power plant was run in grid mode with the grid system parameters, if grid system failed, then according to our power station capacity, one by one generator were started according local utility requirements, that time generator was run by island mode according to local utility load demand. If power plant frequency was lower that time informed local utility to cut their few load. When frequency was very high that time informed local utility to increased their load. It was very much difficult job to maintain system frequency because of less power (not larger power produce), always monitor the system parameters. When grid was ready, then all generator breakers were opened. Grid voltage & frequency were imported by 11kV switchgear through power transformer and one by one generator were synchronized with imported 11 kV, national grid frequency.  Maintained shift dairy. Educational Achievement: Sl. No. Name of the Certificate Or Exam Title Name of Board or University Passing year Division or Class Result or CGPA 1. B.Sc in Electrical & Electronic Engineering Dhaka University of Engineering & Technology (DUET), www:duet.ac.bd Former Name was Bangladesh Institute of Technology (BIT), Dhaka 2001 First Class 3.31 out of 4 2. Diploma in Electrical Engineering Comilla Polytechnic Institute under BTEB, www:bteb.gov.bd 1994 First Division 72.90% 3. SSC in Science Group Govt. Laboratory High School under Comilla, www.comillaboard.gov.bd 1991 First Division 65.90% Training Summary: Sl.No. Name of the Course Training Institute Country Duration Year 1. Environmental Impact Assessment (EIA) Power Cell Power Division, MoPEMR Bangladesh 3 Days 2015 2. Project Management Bangladesh Institute of Management Bangladesh 1 Week 2015 3. Public Procurement & Reform Project IMED, Ministry of Planning Bangladesh 2 Weeks 2014 4. Design of Tower & Foundation M/s. KEC Ltd., India Bangladesh 2 Weeks 2013 5. Project Management Skills for Projects Engineers National Academy for Planning and Development Bangladesh 2 Weeks 2012 6. Group Training Course in Electrical System Engineering Tohoko Electric Power Company Japan 5 Weeks 2009
  • 4.
    4/5 7. Short Trainingon Substation Design and Construction M/s. Nippon KOEI, Japan Bangladesh 1 Week 2007 8. Project Training Course M/s. ABB India, Ltd. Bangladesh 2 Days 2005 9. CATERPILLAR “G3600LB Gas Engines M/s. CATERPILLAR ASIA PACIFIC, Singapore Bangladesh 1 Week 2003 10. Introduction to ISO 9001:2000” & “Internal Quality Auditing M/s. Quality Links International, Pakistan Bangladesh 2 Weeks 2002 Language Proficiency: Name of Language Speaking Reading Writing Listening English Excellent Excellent Excellent Excellent Bengali Excellent Excellent Excellent Excellent Hindi Little bit - - Understand Computer Skills: Operating System: Win 98/200, Win XP, Windows 2007 Programming Languages: C/C++, FORTRAN (12 years ago) Hardware Application Software: Assembling, Trouble Shooting of PC and all all types of Software installation. Application of Software: MS Office Application, Auto CAD, Visual Basic, Power Point, Internet Browsing, online Assessment, MS Project, Adobe Illustrator, Adobe Photo-shop, Paint. Extra Activities: Play cricket, football, bally ball, table tennis & badminton; traveling, cultural activities, leasing song etc. Engineering Membership: Membership No. 20244 Name of the Institution: Institute Engineers Bangladesh Driving License: I can drive & applying for license Personal Information: Name : Mohammad Jashim Uddin Present Address: Father’s Name : Md. Abdul Latif House – 35, Road – 7, Block – C, Banasree, Rampura, Dhaka-1219, Bangladesh Mother’s Name : Feroza Begum Date of Birth : 1st October 1976 Blood Group : O+ Gender : Male Permanent Address: Passport No. : BA 0561845 Village : Elahabad, Post Office:Elahabad Bazar, Upazila :Debidwar, District: Comilla, Bangladesh Marital Status : Married Religion : Islam Nationality : Bangladeshi by Birth
  • 5.
    5/5 Reference: 1. Name ofReferred Person : Engr. Md. Yeakub Elahi Chowdhury Designation : Project Director & Superintending Engineer Name of the Project : Dhaka-Chittagong Main Power Grid Strengthening (Matarbari-Madunaghat- Meghnaghat 400 kV T/L Line) Project Name of the Organization: PGCB Mobile No. : +880-1711-644858 e-mail: Yec120@yahoo.com Address: NLDC Bhaban (9th Floor), PGCB, Aftab Nagar, Badda, Dhaka-1212, Bangladesh Relation : Professional 2. Name of Referred Person: Engr. Mrinal Kanti Paul Designation: Project Director & Superintending Engineer Name of the Project: Barisal-Bhola-Burhanuddin 230 kV Transmission Line Project Name of the Organization: PGCB Mobile No. : +880-1711-430526 e-mail : paul.pgcb@yahoo.com Address : NLDC Bhaban (8th Floor), PGCB, Aftabnagar, Rampura, Dhaka-1219, Bangladesh Relation: Professional 3. Name of Referred Person : Engr. Md. Mozammel Hossain Designation: Deputy Managing Director, Summit Power Ltd. : Managing Director, Summit Purbancol Power Com. Ltd’ Mobile No.: +880-1755-550065 e-mail: mozammel@summitpower.org Address: Summit Centre, 18 Kawran Bazar C/A, Dhaka-1215, Bangladesh Relation: Professional (Mohammad Jashim Uddin)