1. Page 1
ALKET DUKA
Arnold Rd, Northolt UB5 5TB
Telephone: 07976278034 work 07920243647
Email: Alket@hotmail.co.uk
Professional Profile
I am a highly motivated Site manager, I take particular pride in ensuring that my sites are well presented an
extremely well organised. Supervising and managing all site based operatives, overseeing all aspects of their
work, to include; carrying out safety inductions; tool box talks; controlling quality of work; ensuring all works are
carried out within the Risk assessment and methodology requirements of the individual tasks and the required
housekeeping of the general site are maintained. I have a proven track record of making money for my employer.
Career Summary
Joseph Gallagher Limited
Position: Site Manger
From 2011 To Date
Current Project
Fulham reach Project Blocks G&F1 (phase 3)
Role and Responsibilities
Assisting the PM by being his “eyes and ears” on site. Supervising various
trades, daily record keeping and recording / site diary, resolving day to day
issues, raising RFI’s where relevant.
Promote and maintain project safety awareness at all levels and support the
development of a strong project safety culture.
Ensure that Project HS&E Plans Procedures and Management Systems for
executing the work are in accordance with legislative requirements and JGL & SGCL
procedures
Inform SGCL in addition to HSE of any incident, death, reportable injury, ill health or
dangerous occurrence as defined within the RIDDOR Regulations.
Carry out investigations of accidents and incidents in accordance with Company and
contract procedures.
Monitor that the programme of HS&E audits and inspections are carried out on site
and that closure of inspection findings, non-conformances and corrective actions are
being effectively managed.
Provide for weekly meetings with HS&E as the first item on the agenda.
Prepare and submit Method Statements and Risk Assessments.
Promote and maintain project safety awareness at all levels and support the
development of a strong project safety culture.
Monitor the work is being carried out in accordance with the Project Plans, Method
Statements Risk Assessments, COSHH Assessments and the CDM Construction
Health and Safety Plan
Ensure that Project Accident Records, Safety Statistics and Monthly Safety Report
are issued to the Joseph Gallagher Ltd Construction Director.
Environmental Management
Implement the Drugs and Alcohol Policy.
Ensure that all persons employed are competent for the tasks and have successfully
completed the required training.
Notify the Joseph Gallagher Ltd Construction Director of any issues, which may
adversely affect completion of the installation work with respect to HS&E design
issues.
Site Safety Inspections
SCOPE OF WORK:
Piling Matt, Piles, Deep Drainage, Earthwork support, Formwork,
Contiguous piles, Bulk excavation, Tower Crane, logistics.
2. Page 2
Joseph Gallagher Limited
St George South London
LTD The Tower R634
Demolition and Removal of
Temporary Car Park
Ramps
Joseph Gallagher Limited
Battersea Reach St George
Joseph Gallagher Limited
Beafort Park St George
Joseph Gallagher Limited
St George London ltd
KEW BRIDGE
Joseph Gallagher Limited
Queensland Road
KIER
SCOPE OF WORK:
Erect hoarding to enclose car park ramps in basement and at surface
Confirm isolation and termination of services to car park temporary ramps –
liaise with St George South London;
Soft strip car park ramps and parking office;
Strip soft Landscaping and set a side;
Demolish temporary car park ramps, parking office and redundant planter
walls;
Removal all demolition, rubbish and soft strip material arising.
Cast Infill slabs
Form Up-stands
SCOPE OF WORK:
-rising walls
-concrete pour
-form work
-cctv survey
-drainage
SCOPE OF WORK:
-Bulk excavation
- removal of concrete obstruction
-probing
-Make ready for piling mat to installed
SCOPE OF WORK:
-Bulk Excavation
-drainage
-aqua cell (drainage)
-power floating
-remove existing ramp and relocate residential ramp
-lift shafts
-podium slab
-finish frame work block B and C,A,D and handed over SGSL
Site manager 2011-2012
SCOPE OF WORK:
-Foot path construction and landscaping
-Utility installation;
-water pipe
-BT ducts
-street lights
3. Page 3
Joseph Gallagher Limited
St George London ltd
Battersea Reach
Ground work supervisor
Joseph Gallagher Limited
Mansell
Royal Marsden hospital
Ground work supervisor
Mann Construction
Ltd
Kings cross station
Form work supervisor
Mann Construction
Ltd
R.A.F. NORTHOLT
Ground work supervisor
Education and Qualifications
Professional Training
Personal Details
References are available on request
During the period: 2010
-Block F and G substructure construction
Installing drainage / attenuation / hydro-brakes / covers
Supervising the Temporary works associated with deep drainage and
pile caps
Supervising a groundworks gang of 20men
During the period: 2009
Deep Stormwater and Foulwater drainage
Over pumping live foul drainage from Hospital to allow works to extend
the drainage system.
During the period:2008-2009
Risers on back of station
During the period: 2003-2008
Drainage
Ground works
-High School: College in albania (1998)
RD8000 Certificate
Asbestos Awareness certificate
Confined Spaces awarness
Fire Marshall (Expires 2015)
LUCAS Card
First Aid 3 day
Site supervisor safety training (SSSTS)
Abrasive wheels certificate
Site manager safety training (SMSTS)
Fit test operator training course
CPCS forward tipping dumper-wheeled
Safe use of harness
Tower crane rescue training
Languages: English (Fluent), Albanian (Mother Tongue)
Driving Licence: Full/Clean