This resume is for Navneet Kumar Pandey, with over 4 years of experience as a NOC Engineer and RAN Engineer working with companies like Vodafone, Samsung, Nokia, and Alethe Consulting. He has expertise in telecom technologies including 2G, 3G, LTE and experience with installation, integration, commissioning, operations and troubleshooting of various telecom equipment. His roles have included NOC operations, KPI monitoring, network optimization and ensuring high network availability.
Minimization of Starting Energy Loss of Three Phase Induction Motors Based on...IJPEDS-IAES
The purpose of this paper is to minimize energy losses consumed by three
phase induction motors during starting with wide range of load torque from
no load to full load. This will limit the temperature rise and allows for more
numbers of starting during a definite time. Starting energy losses
minimization is achieved by controlling the rate of increasing voltage
and frequency to start induction motor under certain load torque within a
definite starting time. Optimal voltage and frequency are obtained by particle
swarm optimization (PSO) tool according to load torque. Then, outputs of the
PSO are used to design a neuro-fuzzy controller to control the output voltage
and frequency of the inverter during starting for each load torque. The
starting characteristics using proposed method are compared to that of direct
on line and V/F methods. A complete model of the system is developed using
SIMULINK/MATLAB.
Minimization of Starting Energy Loss of Three Phase Induction Motors Based on...IJPEDS-IAES
The purpose of this paper is to minimize energy losses consumed by three
phase induction motors during starting with wide range of load torque from
no load to full load. This will limit the temperature rise and allows for more
numbers of starting during a definite time. Starting energy losses
minimization is achieved by controlling the rate of increasing voltage
and frequency to start induction motor under certain load torque within a
definite starting time. Optimal voltage and frequency are obtained by particle
swarm optimization (PSO) tool according to load torque. Then, outputs of the
PSO are used to design a neuro-fuzzy controller to control the output voltage
and frequency of the inverter during starting for each load torque. The
starting characteristics using proposed method are compared to that of direct
on line and V/F methods. A complete model of the system is developed using
SIMULINK/MATLAB.
Este texto de electrónica estudia tres grandes áreas: dispositivos discretos, circuitos integrados lineales y circuitos integrados digitales. La obra permitirá a los estudiantes no solo analizar sistemas electrónicos sino además diseñarlos. El texto está actualizado según todos los avances tecnológicos y las hojas de datos proceden de referencias actuales. Se incorporan en muchas secciones simulaciones de computadora empleando PSPICE y se incluyen amplias discusiones sobre modelos computerizados.
VLAN, VTP, DTP, Ether channel Cheat Sheet With examples.pptxINFitunes
Cisco has implemented a proprietary, point-to-point protocol called Dynamic Trunking protocol (DTP) that negotiates a common trunking mode between two switches. DTP is used on Cisco IOS switches to negotiate if the interface should become an access port or trunk port.EtherChannel is a port link aggregation technology or port-channel architecture used primarily on Cisco switches. It allows grouping of several physical Ethernet links to create one logical Ethernet link for the purpose of providing fault-tolerance and high-speed links between switches, routers and servers.
Wireless network (cellular network architecture and http.)Abdullah Moin
Cellular architecture is constituted of the following − A network of cells each with a base station. A packet-switched network for communication between the base stations and mobile switching centres. The public switched telephone networks to connect subscribers to the wider telephony network.
In all cellular systems, land area is divided into a number of cells each with its radio service. In AMPS the area is large which in digital services, the area is much smaller. Conventionally cells are hexagonal in shape. Each cell uses a frequency range that is not used by its adjacent cells. However, frequencies may be reused in non-adjacent cells.
Power System Analysis was a core subject for Electrical & Electronics Engineering, Based On Anna University Syllabus. The Whole Subject was there in this document.
Share with it ur friends & Follow me for more updates.!
Este texto de electrónica estudia tres grandes áreas: dispositivos discretos, circuitos integrados lineales y circuitos integrados digitales. La obra permitirá a los estudiantes no solo analizar sistemas electrónicos sino además diseñarlos. El texto está actualizado según todos los avances tecnológicos y las hojas de datos proceden de referencias actuales. Se incorporan en muchas secciones simulaciones de computadora empleando PSPICE y se incluyen amplias discusiones sobre modelos computerizados.
VLAN, VTP, DTP, Ether channel Cheat Sheet With examples.pptxINFitunes
Cisco has implemented a proprietary, point-to-point protocol called Dynamic Trunking protocol (DTP) that negotiates a common trunking mode between two switches. DTP is used on Cisco IOS switches to negotiate if the interface should become an access port or trunk port.EtherChannel is a port link aggregation technology or port-channel architecture used primarily on Cisco switches. It allows grouping of several physical Ethernet links to create one logical Ethernet link for the purpose of providing fault-tolerance and high-speed links between switches, routers and servers.
Wireless network (cellular network architecture and http.)Abdullah Moin
Cellular architecture is constituted of the following − A network of cells each with a base station. A packet-switched network for communication between the base stations and mobile switching centres. The public switched telephone networks to connect subscribers to the wider telephony network.
In all cellular systems, land area is divided into a number of cells each with its radio service. In AMPS the area is large which in digital services, the area is much smaller. Conventionally cells are hexagonal in shape. Each cell uses a frequency range that is not used by its adjacent cells. However, frequencies may be reused in non-adjacent cells.
Power System Analysis was a core subject for Electrical & Electronics Engineering, Based On Anna University Syllabus. The Whole Subject was there in this document.
Share with it ur friends & Follow me for more updates.!
Resume - Taranjeet Singh - 3.5 years - Java/J2EE/GWTtaranjs
This is OLD PROFILE.
For latest one, visit : http://www.linkedin.com/in/taranjs
and connect with me using my email : taranjs at gmail dot com
B.Tech. (Electronics and Communication) from Guru Gobind Singh Indraprastha University.
● Proficiency in grasping new technical concepts quickly and utilizing the same in a productive manner.
● A proactive learner with a flair for adopting emerging trends & addressing industry requirements to achieve
organizational objectives & profitability norms.
● An exceptional performer with distinction of being commended for exemplary performance in academics as well as
extra-curricular activities.
● Total experience: 3 year and 5 months
Working as a “Solpar Manager “on Samsung/Reliance 4G Project.
Responsibility:
Solpar Team management and checking on daily basis.
Tool and device management at circle.
Provides DPR to management team support and assistance in scheduling, documentation, communication, reporting and transaction processing.
Supports the planning and implementation work from beginning to end.
Monitors and reports project progress, problems and solutions as necessary in a timely manner to stakeholder(s)
Facilitates, tracks, and documents project plan, timelines, tasks, deliverables and resource requirements
Handles ordering and delivery coordination for hardware, software and services globally.
Proactively conforms to shifting priorities, resources, changes, demands and timelines through analytical and problem-solving capabilities to achieve project outputs.
1. RESUME
Employee Name : Navneet Kumar Pandey
Date of Birth : 23-Aug-1990
Address : S/O- Awadh Narayan Pandey,Village-Dular patty
Post-ParsaKothi,P.S-Sanichari,Via-Bettiah
Dist-West champaran,Bihar-845453,India
Mobile No. : 8652503686,7033807895
Email ID : navneetkumarpandey1990@gmail.com
Summary: B.Tech. (EEE) with 4.3 yrs of experience in Telecom 2G/3G/LTE
(Nokia/Ericsson/Samsung) - I & C (LSMR) RAN Engineer and NOC Operation, Fault
Management ,KPI Monitoring & Troubleshooting, SES( Saving energy system), eSON.
Academic Record
Name of School /
College
Board /
University
From To
Degree Exam.
Full Time /
Part Time /
Distance
Learning
MM YYYY MM
YYY
Y
Dr. MGR
Educational &
Research institute
Dr. MGR
University
Aug 2008 April 2012 B.Tech.(EEE) Full Time
Mrs. KMPM Inter
College
Jharkhand
Board
May 2006 April 2008 HSC Full time
ShikshaNiketan
High School
Jharkhand
Board
March 2005 March 2006 SSC Full time
Summary of Work Experience: (Start with current employer)
Employer’s Name
Period
From To Total Experience
(Duration in Month)
Designation
MM YYYY MM YYYY
Vodafone India (On role
of Avion system)
Apr 2016 Till Date NOC Engineer
Samsung Electronics
India(On Contract of
Linkquest Telecom)
Feb 2015 Apr 2016 15
LTE I & C, Sr.
RAN Engineer
Nokia Networks ltd.(On
role of Vedang cellular
Services)
Aug 2014 Feb 2015 7
Project
Engineer
Alethe consulting Pvt.ltd Sep 2012 Jul 2014 23
Project
Engineer(Co-
ordinator)
2. Company Confidential Professional Profile Page 2 of 4 age 2 of 4
Name of Employer : Vodafone India
Dates of Employment : Apr 2016 to Till Date
Job Title : NOC Operation, KPI Monitoring & Troubleshooting on
SES system. eSON
Project Description:
Role: NOC engineer
Responsibilities:
Vodafone SNOC-Operations.
Working on Saving energy system ( Saving Trx Power).
KPI monitoring & troubleshooting to maintain proper KPI.
Monitoring & Maintain TCH Block, TCH Drop, TCH faulty, SD Block, RACH,
Data-Call Block, TRx saving.
Monitoring Network Alerts & Clearing Alerts.
Network evolution & Network optimization.
Ensure highest availability of Network & Services by resolving faults/ handling
incidents effectively.
Using Saving energy system, ON/OFF TRx according to Traffic uses.
Making daily Network & SES performance Report.
Name of Employer : Samsung Electronics India
Dates of Employment : Feb 2015 to Apr 2016
Job Title : LTE, I & C (LSMR) Sr. RAN Engineer at National NOC
Reliance Jio NNOC- Operations in Mumbai.
Project Description:
Role: LTE, I & C (LSMR) Sr. RAN Engineer
Responsibilities:
Reliance Jio NNOC-Operations.
LTE (2300 & 850) Integration & commissioning from LSMR .
Troubleshooting, eNodeB Support from LSMR, Fault management .
Solving Problem Like Throughput issue, Network availability Problem, Alarms,
Parameter set-up.
Growing sites from LSMR end after installation done.
Perform ATP11B after integration of site,& send report to Reliance.
Perform EMF (Electromagnetic Field Test) & SCFT (Single cell Function Test) by
sending field engineer to site and supporting them from LSMR.
Perform CLOT after SCFT by sending field engineer to site and supporting them
from LSMR.
Network Alarm Monitoring & Troubleshooting.
Rehoming site from one LSMR To Another.
Fault Testing Of network issues and raise Fault Tickets (FT) & Trouble Tickets
(TT) and processing them towards resolution with the help of Cisco Networks.
Ensure highest availability of Network & Services by resolving faults/ handling
incidents effectively.
Utilization of network equipment login tools for Integration &
Commissioning,ATP11B, FT & TT raising, Fault Resolution, monitoring &
analyzing alarms, fiber cut finding, troubleshooting.
3. Company Confidential Professional Profile Page 3 of 4 age 3 of 4
Technical liaison with other departments and partners involved in the delivery of
service to improve performance and resolve service downtime and network
problems.
Prepare & Send daily progress report of circle to the Project Manager.
Technologies
NNOC operations
Siteforge, K Touch, s4 mini, Citrix, Secure CRT, LSMR, HP Service manager
Name of Employer : Nokia Networks India ltd.
Dates of Employment : Aug 2014 to Feb 2015
Job Title : U 900 Project , LTE(4G Airtel) I & C Project.
Project Description:
Role: Project Engineer
Responsibilities:
Integration & commissioning of U 900 BTS Node B.
Integration & commissioning of 4G LTE BTS eNode B.
Integration & commissioning of MR BTS.
Integration & commissioning of IP-10 & IP-20.
Media Provisioning for LTE(FDD/TDD).
Swapping of Ultra BTS to MR BTS.
Synchronisation between Flexi and 3G BTS & IP 10 & 3G.
Expansion of 3G BTS
Trouble shooting and Rectification of BTS Fault (VSWR, Diversity etc).
Working on U900 <E(FDD/TDD) project in Mumbai location.
Working on Triplexer/diplexer technology on GSM using 1st time in
the world.
Network alarm monitoring & troubleshooting.
Coordination with vendor teams for Installation of BTS and Commissioning,
Configuration and integration with the help of GNOC team.
Punch points rectification.
Perform Acceptance Test Process (ATP) by monitoring and inspecting site
and Telecom installation work progress and verifying that the
implementation is done according to Customer specifications, Quality
standards &guidelines, Health & Safety standards which help to improvethe
Quality Index (QI) of each BTS site.
Name of Employer : Alethe consulting Pvt.ltd
Dates of Employment :Sep 2012 to Jul 2014
Job Title : Co-ordination with Client and Team for all project
4. Company Confidential Professional Profile Page 4 of 4 age 4 of 4
Project Description
Role: Project Engineer (Co-ordinator)
Responsibilities
Installation, Commissioning and Troubleshooting of Nokia Flexi BTS.
Commissioning and O&M of Ericsson RBS 2964/V2,2954/V2.
Installation, Commissioning of TN_2P, 6P, 20P.
Trouble Shooting and Rectification of BTS Fault (VSWR, Diversity etc)
BTS and TRX ID to OD swapping for TTSL in Haryana, Punjab, M.P,U.P.
Installation, Commissioning and integration of SDH & PDH link for
Vodafone.
Worked on RJIL &Bharti infra 4G Project for TSP.
Worked on RJIL Data center for Dimension data.
Worked on various Power equipments like (Emersion and Delta power
plant), isolated transformer (IT) and Stabilizers etc.
Co-ordination with Client and Planning for Project execution.
Material procurement and Vender Handling.
Quality testing.
RF,EMI,RFI Survey.
Software & Tool Skills:
Nokia Flexi, U900 BTS Manager, Nokia LTE RL 35 & 45,U900 RL-40
Samsung eNodeB- Siteforge, Citrix, K-Touch,s4 mini ,LSMR, Secure CRT, HP Service
manager
APPLICATION:- AUTO CAD 2012, MS Word, MS Excel, MS Power point
Language :- C,C++
Training Courses
2G/3G BTS Product Installation, Commissioning & Integration training
PDH/SDH Product Installation & Commissioning training
Nokia U900,LTE Installation & Commissioning Training.
Samsung LTE product installation & Commissioning, troubleshooting Training.
Health & safety Training.
Robotic 1 year course in IIT Madras.
__________ ____________ __________________________
DATE PLACE SIGNATURE OF EMPLOYEE