RESULT

channel                quantity                               Normal
                                    time taken   flow rate
 slope    test no     collected v                            depth yₒ   B(m)      A(m²)    P (m)     R(m)     V(m/s)     √(RSₒ)       n
                                       t(s)      Q (m³/s)
 (Sₒ)                     (m³)                                 (m)
            1           0.005           33.59    0.0001489    0.0450    0.0765   0.00344   0.1665   0.02068   0.04324   0.006431     0.0779
1/500       2           0.005           18.56    0.0002694    0.0920    0.0765   0.00704   0.2605   0.02702   0.03828   0.007351     0.1052
            3           0.005           18.47    0.0002707    0.1400    0.0765   0.01071   0.3565   0.03004   0.02528   0.007751     0.1710
            1           0.005           80.26    0.0000623    0.0140    0.0765   0.00107   0.1045   0.01025   0.05817   -0.004527   -0.0363
-0.002      2           0.005           17.89    0.0002795    0.0830    0.0765   0.00635   0.2425   0.02618   0.04402   -0.007237   -0.0896
            3           0.005           16.47    0.0003036    0.1500    0.0765   0.01148   0.3765   0.03048   0.02646   -0.007807   -0.1649




             n(avg)       v(avg)(m/s)     R(avg)(m)



           0.118030        0.035598        0.007178



           -0.096933       0.042880       -0.006524
Graph V against √RSₒ
                                            0.0700


                                            0.0600


                                            0.0500


                                            0.0400
V (m/s)




                                            0.0300                                                      1/500
                                                                                                        -1/500
                                            0.0200


                                            0.0100


                                            0.0000
-0.0100   -0.0080   -0.0060   -0.0040   -0.0020   0.0000   0.0020   0.0040   0.0060   0.0080   0.0100
                                                  √(RSₒ)

result lab

  • 1.
    RESULT channel quantity Normal time taken flow rate slope test no collected v depth yₒ B(m) A(m²) P (m) R(m) V(m/s) √(RSₒ) n t(s) Q (m³/s) (Sₒ) (m³) (m) 1 0.005 33.59 0.0001489 0.0450 0.0765 0.00344 0.1665 0.02068 0.04324 0.006431 0.0779 1/500 2 0.005 18.56 0.0002694 0.0920 0.0765 0.00704 0.2605 0.02702 0.03828 0.007351 0.1052 3 0.005 18.47 0.0002707 0.1400 0.0765 0.01071 0.3565 0.03004 0.02528 0.007751 0.1710 1 0.005 80.26 0.0000623 0.0140 0.0765 0.00107 0.1045 0.01025 0.05817 -0.004527 -0.0363 -0.002 2 0.005 17.89 0.0002795 0.0830 0.0765 0.00635 0.2425 0.02618 0.04402 -0.007237 -0.0896 3 0.005 16.47 0.0003036 0.1500 0.0765 0.01148 0.3765 0.03048 0.02646 -0.007807 -0.1649 n(avg) v(avg)(m/s) R(avg)(m) 0.118030 0.035598 0.007178 -0.096933 0.042880 -0.006524
  • 2.
    Graph V against√RSₒ 0.0700 0.0600 0.0500 0.0400 V (m/s) 0.0300 1/500 -1/500 0.0200 0.0100 0.0000 -0.0100 -0.0080 -0.0060 -0.0040 -0.0020 0.0000 0.0020 0.0040 0.0060 0.0080 0.0100 √(RSₒ)