The document provides a weekly report and review for the week of September 2022 for PT. Baramulti Sukses Sarana Tbk and PT. Antang Gunung Meratus. It includes information on manpower numbers by site and department, new hires and exits, daily worker numbers, attendance ratios, medical claims processing, daily worker recap and payments, improvement initiatives, open recruitment positions, and more HR and operations metrics.
The document discusses maintenance of roads and flexible pavements. It describes the requirements of a good pavement including sufficient thickness to distribute wheel loads, structural strength, adequate friction, a smooth surface, and long design life. It then discusses the necessity of road maintenance to prevent accidents, maintain components in good working condition, and increase road life. Various types of defects in flexible pavements are described such as cracks, rutting, shoving, and potholes. Causes and treatments of these defects are provided. Maintenance techniques for flexible pavements like patching potholes, ruts, and conducting surface treatments are outlined.
Traffic Forecasting (Transportation Engineering)Hossam Shafiq I
This document provides an overview of a traffic forecasting course (CEE320) taught in winter 2006. It discusses the need for traffic forecasting to plan transportation infrastructure and services. It covers topics like traveler decisions, trip generation, and mode choice modeling. Trip generation involves predicting the number and timing of trips, while considering factors like life stage, technology, and land use. Mode choice modeling uses techniques like logit models to predict transportation mode. The document provides examples of models for recreational trip generation and sitcom character preference to illustrate these traffic forecasting techniques.
This document is a summer training report on the construction of cement concrete pavement for a rural municipality works department. It discusses the key materials used in concrete pavement construction including cement, sand, aggregate and their proportions. It also outlines the procedures to construct the pavement from site preparation, mixing and transporting concrete, placement, compaction and curing. The report aims to improve practices for more effective concrete pavement projects.
Identification of Groundwater Potential Zones in Vaippar Basin, Tamil Nadu, I...SagarChougule11
Groundwater is prominent part of the earth’s fresh water as well as main source of drinking water and survival source for many lives on earth. Groundwater potential zone identification can be done using advanced as well as recently developed geospatial technology such as Remote Sensing and GIS. GIS technology is useful for capturing, storing, and analyzing spatial data with the help of computer programming techniques. Here in identification of groundwater potential zone using of spatial elements which are related for infiltration of water into ground. For the groundwater potential zone analysis using of spatial layers like geology, geomorphology, rainfall, lineament, land use/land cover, drainage density, soil texture, soil depth etc.
This document provides information about failures in flexible pavements. It discusses the major types of failures such as fatigue cracking, rutting, and thermal cracking. It then describes different types of failures that can occur in the subgrade, subbase, and base course layers. Finally, it defines and describes common flexible pavement distresses including various types of cracking, deformation, deterioration, and problems associated with seal coats. The distresses and failures are defined in detail.
This document describes an internship report on the construction of a cement concrete road by Deepak Athwal at the Public Works Department in Mainpuri, Uttar Pradesh, India from June 26 to July 24, 2014. It provides details on the materials, design, and process used to construct an 800 meter long, 7 meter wide cement concrete road with a cost of 4.5 crore rupees. Key steps in the construction included preparation of the subgrade and base, formwork, mixing and placing concrete, compaction, curing, and allowing the road to be opened for traffic. Standard tests were performed on the concrete including slump, compression, and cube tests to ensure quality.
GPS is a satellite-based navigation system that provides location data worldwide. It uses a constellation of satellites that orbit the Earth every 11 hours and 58 minutes, providing 24-hour 3D coverage. GPS is used for navigation, land surveying, tracking vehicles and individuals, and guiding missiles. GIS is a computer-based technology that stores, retrieves, maps, and analyzes geographic data for applications like transportation planning, environmental impact assessments, resource management, and disaster response. GIS integrates different data layers to allow analysis and visualization of spatial patterns, trends, and relationships.
Visual assessment of pavement conditionSulav Sigdel
This document discusses common defects in pavements and their causes and solutions. It identifies the four primary reasons for premature pavement failure as defects in design, construction, materials, and maintenance. Through a case study of a road in Kathmandu, Nepal, the most common problems are identified as alligator and longitudinal cracking due to lack of drainage and improper construction. Solutions proposed include crack sealing, resurfacing, rejuvenation, and ensuring proper design, construction, maintenance, and consideration of traffic patterns.
The document discusses maintenance of roads and flexible pavements. It describes the requirements of a good pavement including sufficient thickness to distribute wheel loads, structural strength, adequate friction, a smooth surface, and long design life. It then discusses the necessity of road maintenance to prevent accidents, maintain components in good working condition, and increase road life. Various types of defects in flexible pavements are described such as cracks, rutting, shoving, and potholes. Causes and treatments of these defects are provided. Maintenance techniques for flexible pavements like patching potholes, ruts, and conducting surface treatments are outlined.
Traffic Forecasting (Transportation Engineering)Hossam Shafiq I
This document provides an overview of a traffic forecasting course (CEE320) taught in winter 2006. It discusses the need for traffic forecasting to plan transportation infrastructure and services. It covers topics like traveler decisions, trip generation, and mode choice modeling. Trip generation involves predicting the number and timing of trips, while considering factors like life stage, technology, and land use. Mode choice modeling uses techniques like logit models to predict transportation mode. The document provides examples of models for recreational trip generation and sitcom character preference to illustrate these traffic forecasting techniques.
This document is a summer training report on the construction of cement concrete pavement for a rural municipality works department. It discusses the key materials used in concrete pavement construction including cement, sand, aggregate and their proportions. It also outlines the procedures to construct the pavement from site preparation, mixing and transporting concrete, placement, compaction and curing. The report aims to improve practices for more effective concrete pavement projects.
Identification of Groundwater Potential Zones in Vaippar Basin, Tamil Nadu, I...SagarChougule11
Groundwater is prominent part of the earth’s fresh water as well as main source of drinking water and survival source for many lives on earth. Groundwater potential zone identification can be done using advanced as well as recently developed geospatial technology such as Remote Sensing and GIS. GIS technology is useful for capturing, storing, and analyzing spatial data with the help of computer programming techniques. Here in identification of groundwater potential zone using of spatial elements which are related for infiltration of water into ground. For the groundwater potential zone analysis using of spatial layers like geology, geomorphology, rainfall, lineament, land use/land cover, drainage density, soil texture, soil depth etc.
This document provides information about failures in flexible pavements. It discusses the major types of failures such as fatigue cracking, rutting, and thermal cracking. It then describes different types of failures that can occur in the subgrade, subbase, and base course layers. Finally, it defines and describes common flexible pavement distresses including various types of cracking, deformation, deterioration, and problems associated with seal coats. The distresses and failures are defined in detail.
This document describes an internship report on the construction of a cement concrete road by Deepak Athwal at the Public Works Department in Mainpuri, Uttar Pradesh, India from June 26 to July 24, 2014. It provides details on the materials, design, and process used to construct an 800 meter long, 7 meter wide cement concrete road with a cost of 4.5 crore rupees. Key steps in the construction included preparation of the subgrade and base, formwork, mixing and placing concrete, compaction, curing, and allowing the road to be opened for traffic. Standard tests were performed on the concrete including slump, compression, and cube tests to ensure quality.
GPS is a satellite-based navigation system that provides location data worldwide. It uses a constellation of satellites that orbit the Earth every 11 hours and 58 minutes, providing 24-hour 3D coverage. GPS is used for navigation, land surveying, tracking vehicles and individuals, and guiding missiles. GIS is a computer-based technology that stores, retrieves, maps, and analyzes geographic data for applications like transportation planning, environmental impact assessments, resource management, and disaster response. GIS integrates different data layers to allow analysis and visualization of spatial patterns, trends, and relationships.
Visual assessment of pavement conditionSulav Sigdel
This document discusses common defects in pavements and their causes and solutions. It identifies the four primary reasons for premature pavement failure as defects in design, construction, materials, and maintenance. Through a case study of a road in Kathmandu, Nepal, the most common problems are identified as alligator and longitudinal cracking due to lack of drainage and improper construction. Solutions proposed include crack sealing, resurfacing, rejuvenation, and ensuring proper design, construction, maintenance, and consideration of traffic patterns.
This document provides an overview of cement road construction in three parts:
1. It introduces the Public Works Department in India and their role in developing infrastructure like roads, bridges, and buildings.
2. It describes the basic materials used in cement road construction including cement, sand, and aggregate. Different types of cement are also outlined.
3. The process of cement road construction is explained in 12 steps from site preparation to allowing traffic, covering tasks like forming, placing concrete, compaction, curing, and finishing.
The document summarizes the process of developing and piloting water safety plans (WSPs) in Bangladesh. Model WSPs were developed for various rural water supply technologies through expert workshops. These plans and accompanying community monitoring tools were then piloted by several organizations, including NGOs and DPHE. The results of the pilots showed improvements in water quality and sanitation. Communities responded positively and saw benefits. Based on the success, WSPs are being scaled up nationally in Bangladesh to improve water safety.
The document discusses various types of distresses that can occur in flexible and rigid pavement structures. It describes the primary causes of distresses such as fatigue cracking, thermal cracking, rutting, frost heave, block cracking, and more that affect flexible pavements. For rigid pavements, key distresses covered include diagonal cracking, longitudinal cracking, wrapping cracking, faulting, spalling, pumping, scaling, and reflection cracking. The distresses are caused by factors like traffic loads, temperature variations, moisture, and material properties. Understanding these distresses helps with pavement maintenance and rehabilitation.
The document discusses highway and transportation planning. It covers:
- The need for transportation planning to optimize mobility and utilize limited resources.
- Different types of planning including short, medium, and long term. Long term planning requires more funding and impacts the environment.
- The systems approach to complex long term planning which involves analysis, engineering, and scientific decision making.
- Evaluating economic and environmental viability of alternatives through factors like benefits, costs, impacts.
- Challenges of transportation planning such as funding, coordination, and environmental concerns.
- Road network classification including national highways, feeder roads, urban and district roads.
- Strategic road network and local road network planning in Nepal.
Global positioning system_Surveying, Civil EngineeringA Makwana
(GPS) technology is a great boon to anyone who has the need to navigate either great or small distances.
The Global Positioning System (GPS) is a burgeoning technology, which provides unequalled accuracy and flexibility of positioning for navigation, surveying and GIS data capture.
Railway secondary part of the transportation . Railway use of maximum materials transport of one place to other place. Particular time of number of trains are move of particular junction so these part are used of points and crossing.
Best helpful of these ppt of railway track and design purposes.
This document discusses the execution of monolithic concrete pavements. It covers several types of monolithic pavements including plain concrete, reinforced concrete, and steel fibre concrete. It provides details on preparing the subgrade, mixing and transporting concrete, and placing concrete through both fixed-form and slipform methods. Key aspects addressed include properly setting up forms and sensor lines, ensuring continuous concrete supply, and the importance of quality control during execution.
The document discusses drone surveys and applications in civil engineering. It provides an overview of how drone surveys can be used for mapping, surveying, construction monitoring, inspections, and other applications. Drones allow data to be collected from the sky efficiently and safely. High-resolution orthomosaic maps and 3D models can be created through drone photography and post-processing software. This provides accurate spatial data that saves time and costs compared to traditional surveying methods.
The document outlines the steps involved in highway route location, which includes reconnaissance, preliminary, and final location surveys. The reconnaissance survey evaluates feasibility of corridor routes based on topography, traffic, land use, environment, and economics. The preliminary survey determines horizontal and vertical alignments and evaluates routes for cost, environment, safety, and cost-benefit. The final survey fixes the center line and collects additional data like cross-sections and elevations for working drawings. The overall process aims to find a location that minimizes costs while considering traffic needs and impacts.
The document discusses GPS surveying and related topics. It covers the shape of the Earth, different types of surveying including plane, geodetic and GPS surveying. It describes the components of a GPS system including antennas, receivers, controllers and satellites. It discusses positioning methods like single point, relative positioning. It also covers GPS coordinates, height systems, signals, codes and different types of receivers. GPS software and measurement techniques are also summarized along with ongoing modernization of GPS.
The document summarizes a traffic volume study conducted by a student group. They collected traffic data over 20 minutes using direct manual counting methods at an intersection in Dhaka. A total of 1132 passenger car units per hour passed through during the study period, indicating a level of service of D. Based on expansion factors, they estimated an average daily traffic of 18,658 vehicles and annual average daily traffic of 32,764 vehicles. The study had some limitations but provided useful findings on vehicle composition and directional flow. Recommendations included adopting automatic counting methods and improving transportation infrastructure.
chapter19. Terrestrial and Close-Range Photogrammetry.pdfssuser3f7a17
This document discusses terrestrial and close-range photogrammetry. It describes how terrestrial photogrammetry involves photographs taken from cameras on the earth's surface, which can be handheld, mounted on tripods, or suspended. Close-range photogrammetry refers to terrestrial photos taken from up to around 300 meters. Various applications of terrestrial photogrammetry are discussed, including topographic mapping, traffic accident reconstruction, and measuring objects that are otherwise inaccessible. Analytical self-calibration methods are also summarized, which allow camera calibration parameters to be solved for directly during photogrammetric processing.
The document discusses highway geometric design and its key elements. It aims to maximize safety, comfort and efficiency while minimizing costs and environmental impacts. Geometric design considers the road's alignment, cross-section, sight distances and intersections. Elements include the carriageway, shoulders, formation width, right of way, side slopes, berms and side drains. Camber and super elevation help drain water and counteract centrifugal forces on curves. Sight distance requirements like stopping sight distance ensure drivers can see far enough to stop safely.
This document provides an overview of a total station, including its key components and functions. A total station is an electronic surveying instrument that combines an electronic distance meter and theodolite to measure horizontal and vertical angles and distances. It allows simultaneous measurement of all surveying parameters needed for construction layout and topographic surveys. The total station's main components include an electronic distance measurement system, angle measurement circles, telescope, microprocessor, keyboard, and display. Accessories such as prisms, data collectors, and software enable various surveying tasks.
This document provides information on different types of roads and pavements. It discusses various road construction methods such as water bound macadam, tar bitumen roads, asphalt roads and cement concrete roads. It also covers soil stabilization techniques. For pavements, it describes different materials used like murram, brick, stone and drainage elements like crowns, shoulders, slopes, sub drains, culverts, ditches and gutters. Overall, the document presents an overview of road and pavement construction methods as well as drainage systems.
1. River training works include guide banks, marginal banks, spurs, and pitched islands that are constructed upstream of barrages and weirs. This is to ensure the river flows through the structure and to protect upstream lands and property from submergence.
2. Marginal banks are embankments on both sides of the river that maintain the river channel and prevent submergence of upstream areas. Spurs are fortified embankments built transverse to the banks that control the river's course and protect banks from erosion. Pitched islands artificially redistribute the river's force and sediment to attract and hold the channel.
Report HRGA Meeting Report Ops Mei 2022 W2.pptxNazarFahrizal1
This document provides a summary of weekly HR operations and metrics for PT. Baramulti Sukses Sarana Tbk and PT. Antang Gunung Meratus for the week of May 2022. It includes information on:
- Employee numbers by department and location totaling 563 employees.
- 4 new joiners and 4 employee exits.
- Attendance ratios by department ranging from 78-100%.
- Planned and actual trainings conducted.
- 28 open recruitment processes and candidate status.
The document provides a high-level overview of employee headcounts, movements, attendance, training activities, and recruitment progress for the reporting period.
Revised Rajasthan DSM Penalty for June 2018 (uploaded on 1st May 2019)Das A. K.
This document is a revised statement of deviation settlement charges for generators in Rajasthan for the month of June 2018. It lists the intra-state and inter-state deviation charges for 36 pooling stations belonging to ReConnect Energy, Manikaran Analytics and Statkraft. The total deviation charges have been revised from Rs. 199.50 crore to Rs. 387.31 crore. Constituents that have to pay charges according to this statement must make payments within 7 days to avoid interest on late payments.
This document provides an overview of cement road construction in three parts:
1. It introduces the Public Works Department in India and their role in developing infrastructure like roads, bridges, and buildings.
2. It describes the basic materials used in cement road construction including cement, sand, and aggregate. Different types of cement are also outlined.
3. The process of cement road construction is explained in 12 steps from site preparation to allowing traffic, covering tasks like forming, placing concrete, compaction, curing, and finishing.
The document summarizes the process of developing and piloting water safety plans (WSPs) in Bangladesh. Model WSPs were developed for various rural water supply technologies through expert workshops. These plans and accompanying community monitoring tools were then piloted by several organizations, including NGOs and DPHE. The results of the pilots showed improvements in water quality and sanitation. Communities responded positively and saw benefits. Based on the success, WSPs are being scaled up nationally in Bangladesh to improve water safety.
The document discusses various types of distresses that can occur in flexible and rigid pavement structures. It describes the primary causes of distresses such as fatigue cracking, thermal cracking, rutting, frost heave, block cracking, and more that affect flexible pavements. For rigid pavements, key distresses covered include diagonal cracking, longitudinal cracking, wrapping cracking, faulting, spalling, pumping, scaling, and reflection cracking. The distresses are caused by factors like traffic loads, temperature variations, moisture, and material properties. Understanding these distresses helps with pavement maintenance and rehabilitation.
The document discusses highway and transportation planning. It covers:
- The need for transportation planning to optimize mobility and utilize limited resources.
- Different types of planning including short, medium, and long term. Long term planning requires more funding and impacts the environment.
- The systems approach to complex long term planning which involves analysis, engineering, and scientific decision making.
- Evaluating economic and environmental viability of alternatives through factors like benefits, costs, impacts.
- Challenges of transportation planning such as funding, coordination, and environmental concerns.
- Road network classification including national highways, feeder roads, urban and district roads.
- Strategic road network and local road network planning in Nepal.
Global positioning system_Surveying, Civil EngineeringA Makwana
(GPS) technology is a great boon to anyone who has the need to navigate either great or small distances.
The Global Positioning System (GPS) is a burgeoning technology, which provides unequalled accuracy and flexibility of positioning for navigation, surveying and GIS data capture.
Railway secondary part of the transportation . Railway use of maximum materials transport of one place to other place. Particular time of number of trains are move of particular junction so these part are used of points and crossing.
Best helpful of these ppt of railway track and design purposes.
This document discusses the execution of monolithic concrete pavements. It covers several types of monolithic pavements including plain concrete, reinforced concrete, and steel fibre concrete. It provides details on preparing the subgrade, mixing and transporting concrete, and placing concrete through both fixed-form and slipform methods. Key aspects addressed include properly setting up forms and sensor lines, ensuring continuous concrete supply, and the importance of quality control during execution.
The document discusses drone surveys and applications in civil engineering. It provides an overview of how drone surveys can be used for mapping, surveying, construction monitoring, inspections, and other applications. Drones allow data to be collected from the sky efficiently and safely. High-resolution orthomosaic maps and 3D models can be created through drone photography and post-processing software. This provides accurate spatial data that saves time and costs compared to traditional surveying methods.
The document outlines the steps involved in highway route location, which includes reconnaissance, preliminary, and final location surveys. The reconnaissance survey evaluates feasibility of corridor routes based on topography, traffic, land use, environment, and economics. The preliminary survey determines horizontal and vertical alignments and evaluates routes for cost, environment, safety, and cost-benefit. The final survey fixes the center line and collects additional data like cross-sections and elevations for working drawings. The overall process aims to find a location that minimizes costs while considering traffic needs and impacts.
The document discusses GPS surveying and related topics. It covers the shape of the Earth, different types of surveying including plane, geodetic and GPS surveying. It describes the components of a GPS system including antennas, receivers, controllers and satellites. It discusses positioning methods like single point, relative positioning. It also covers GPS coordinates, height systems, signals, codes and different types of receivers. GPS software and measurement techniques are also summarized along with ongoing modernization of GPS.
The document summarizes a traffic volume study conducted by a student group. They collected traffic data over 20 minutes using direct manual counting methods at an intersection in Dhaka. A total of 1132 passenger car units per hour passed through during the study period, indicating a level of service of D. Based on expansion factors, they estimated an average daily traffic of 18,658 vehicles and annual average daily traffic of 32,764 vehicles. The study had some limitations but provided useful findings on vehicle composition and directional flow. Recommendations included adopting automatic counting methods and improving transportation infrastructure.
chapter19. Terrestrial and Close-Range Photogrammetry.pdfssuser3f7a17
This document discusses terrestrial and close-range photogrammetry. It describes how terrestrial photogrammetry involves photographs taken from cameras on the earth's surface, which can be handheld, mounted on tripods, or suspended. Close-range photogrammetry refers to terrestrial photos taken from up to around 300 meters. Various applications of terrestrial photogrammetry are discussed, including topographic mapping, traffic accident reconstruction, and measuring objects that are otherwise inaccessible. Analytical self-calibration methods are also summarized, which allow camera calibration parameters to be solved for directly during photogrammetric processing.
The document discusses highway geometric design and its key elements. It aims to maximize safety, comfort and efficiency while minimizing costs and environmental impacts. Geometric design considers the road's alignment, cross-section, sight distances and intersections. Elements include the carriageway, shoulders, formation width, right of way, side slopes, berms and side drains. Camber and super elevation help drain water and counteract centrifugal forces on curves. Sight distance requirements like stopping sight distance ensure drivers can see far enough to stop safely.
This document provides an overview of a total station, including its key components and functions. A total station is an electronic surveying instrument that combines an electronic distance meter and theodolite to measure horizontal and vertical angles and distances. It allows simultaneous measurement of all surveying parameters needed for construction layout and topographic surveys. The total station's main components include an electronic distance measurement system, angle measurement circles, telescope, microprocessor, keyboard, and display. Accessories such as prisms, data collectors, and software enable various surveying tasks.
This document provides information on different types of roads and pavements. It discusses various road construction methods such as water bound macadam, tar bitumen roads, asphalt roads and cement concrete roads. It also covers soil stabilization techniques. For pavements, it describes different materials used like murram, brick, stone and drainage elements like crowns, shoulders, slopes, sub drains, culverts, ditches and gutters. Overall, the document presents an overview of road and pavement construction methods as well as drainage systems.
1. River training works include guide banks, marginal banks, spurs, and pitched islands that are constructed upstream of barrages and weirs. This is to ensure the river flows through the structure and to protect upstream lands and property from submergence.
2. Marginal banks are embankments on both sides of the river that maintain the river channel and prevent submergence of upstream areas. Spurs are fortified embankments built transverse to the banks that control the river's course and protect banks from erosion. Pitched islands artificially redistribute the river's force and sediment to attract and hold the channel.
Report HRGA Meeting Report Ops Mei 2022 W2.pptxNazarFahrizal1
This document provides a summary of weekly HR operations and metrics for PT. Baramulti Sukses Sarana Tbk and PT. Antang Gunung Meratus for the week of May 2022. It includes information on:
- Employee numbers by department and location totaling 563 employees.
- 4 new joiners and 4 employee exits.
- Attendance ratios by department ranging from 78-100%.
- Planned and actual trainings conducted.
- 28 open recruitment processes and candidate status.
The document provides a high-level overview of employee headcounts, movements, attendance, training activities, and recruitment progress for the reporting period.
Revised Rajasthan DSM Penalty for June 2018 (uploaded on 1st May 2019)Das A. K.
This document is a revised statement of deviation settlement charges for generators in Rajasthan for the month of June 2018. It lists the intra-state and inter-state deviation charges for 36 pooling stations belonging to ReConnect Energy, Manikaran Analytics and Statkraft. The total deviation charges have been revised from Rs. 199.50 crore to Rs. 387.31 crore. Constituents that have to pay charges according to this statement must make payments within 7 days to avoid interest on late payments.
Revised Rajasthan DSM Penalty for September 2018 (uploaded on 1st May 2019)Das A. K.
This document is a Deviation Settlement Account statement for the month of September 2018 issued by Rajasthan Rajya Vidyut Prasaran Nigam Limited to three renewable energy companies - StatKraft Markets Pvt. Ltd, Manikaran Analytics Limited, and RE Connect Energy Solution Pvt. Ltd. It contains details of intra-state and inter-state deviation charges for various pooling stations. Constituents that owe deviation settlement charges must pay by May 10, 2019 or interest will be applied.
The document outlines plans for reconstructing roads and bridges damaged by the 2004 tsunami in Aceh, Indonesia. It discusses three priority construction projects divided into task orders, including repairing the Banda Aceh to Calang road, the Calang to Meulaboh road, and creating a Meulaboh bypass. It also addresses acquiring the necessary land and coordinating with local governments and communities.
Revised Rajasthan DSM Penalty for July 2018 (uploaded on 1st May 2019) Das A. K.
This document is a revision 1 statement of deviation settlement charges for renewable energy generators in Rajasthan for the month of July 2018. It provides adjusted totals of intra-state and inter-state deviation charges for three companies - Reconnect, Manikaran, and Statkraft - based on revisions to their scheduled generation. Constituents owing charges must pay into a designated account by May 10th or incur interest charges.
Similar to Report HRGA Meeting Report Sep 2022 W3.pptx (6)
KALYAN CHART SATTA MATKA DPBOSS KALYAN MATKA RESULTS KALYAN MATKA MATKA RESULT KALYAN MATKA TIPS SATTA MATKA MATKA COM MATKA PANA JODI TODAY BATTA SATKA MATKA PATTI JODI NUMBER MATKA RESULTS MATKA CHART MATKA JODI SATTA COM INDIA SATTA MATKA MATKA TIPS MATKA WAPKA ALL MATKA RESULT LIVE ONLINE MATKA RESULT KALYAN MATKA RESULT DPBOSS MATKA 143 MAIN MATKA KALYAN MATKA RESULTS KALYAN CHART
Prescriptive analytics BA4206 Anna University PPTFreelance
Business analysis - Prescriptive analytics Introduction to Prescriptive analytics
Prescriptive Modeling
Non Linear Optimization
Demonstrating Business Performance Improvement
Cover Story - China's Investment Leader - Dr. Alyce SUmsthrill
In World Expo 2010 Shanghai – the most visited Expo in the World History
https://www.britannica.com/event/Expo-Shanghai-2010
China’s official organizer of the Expo, CCPIT (China Council for the Promotion of International Trade https://en.ccpit.org/) has chosen Dr. Alyce Su as the Cover Person with Cover Story, in the Expo’s official magazine distributed throughout the Expo, showcasing China’s New Generation of Leaders to the World.
Discover the Beauty and Functionality of The Expert Remodeling Serviceobriengroupinc04
Unlock your kitchen's true potential with expert remodeling services from O'Brien Group Inc. Transform your space into a functional, modern, and luxurious haven with their experienced professionals. From layout reconfiguration to high-end upgrades, they deliver stunning results tailored to your style and needs. Visit obriengroupinc.com to elevate your kitchen's beauty and functionality today.
DPBOSS NET SPBOSS SATTA MATKA RESULT KALYAN MATKA GUESSING FREE KALYAN FIX JO...essorprof62
DPBOSS NET SPBOSS SATTA MATKA RESULT KALYAN MATKA GUESSING FREE KALYAN FIX JODI ANK LEAK FIX GAME BY DP BOSS MATKA SATTA NUMBER TODAY LUCKY NUMBER FREE TIPS ...
High-Quality IPTV Monthly Subscription for $15advik4387
Experience high-quality entertainment with our IPTV monthly subscription for just $15. Access a vast array of live TV channels, movies, and on-demand shows with crystal-clear streaming. Our reliable service ensures smooth, uninterrupted viewing at an unbeatable price. Perfect for those seeking premium content without breaking the bank. Start streaming today!
https://rb.gy/f409dk
Ellen Burstyn: From Detroit Dreamer to Hollywood Legend | CIO Women MagazineCIOWomenMagazine
In this article, we will dive into the extraordinary life of Ellen Burstyn, where the curtains rise on a story that's far more attractive than any script.
Tired of chasing down expiring contracts and drowning in paperwork? Mastering contract management can significantly enhance your business efficiency and productivity. This guide unveils expert secrets to streamline your contract management process. Learn how to save time, minimize risk, and achieve effortless contract management.
SATTA MATKA DPBOSS KALYAN MATKA RESULTS KALYAN CHART KALYAN MATKA MATKA RESULT KALYAN MATKA TIPS SATTA MATKA MATKA COM MATKA PANA JODI TODAY BATTA SATKA MATKA PATTI JODI NUMBER MATKA RESULTS MATKA CHART MATKA JODI SATTA COM INDIA SATTA MATKA MATKA TIPS MATKA WAPKA ALL MATKA RESULT LIVE ONLINE MATKA RESULT KALYAN MATKA RESULT DPBOSS MATKA 143 MAIN MATKA KALYAN MATKA RESULTS KALYAN CHART
SATTA MATKA DPBOSS KALYAN MATKA RESULTS KALYAN CHART KALYAN MATKA MATKA RESULT KALYAN MATKA TIPS SATTA MATKA MATKA COM MATKA PANA JODI TODAY BATTA SATKA MATKA PATTI JODI NUMBER MATKA RESULTS MATKA CHART MATKA JODI SATTA COM INDIA SATTA MATKA MATKA TIPS MATKA WAPKA ALL MATKA RESULT LIVE ONLINE MATKA RESULT KALYAN MATKA RESULT DPBOSS MATKA 143 MAIN MATKA KALYAN MATKA RESULTS KALYAN CHART INDIA MATKA KALYAN SATTA MATKA 420 INDIAN MATKA SATTA KING MATKA FIX JODI FIX FIX FIX SATTA NAMBAR MATKA INDIA SATTA BATTA
2. PT. BARAMULTI SUKSES SARANA TBK
PT. ANTANG GUNUNG MERATUS
Man Power Site
Departement Lok Buntar Ida Manggala Sungai Puting Grand Total
AGM-CPP & Hauling 32 55 1 88
AGM-Dredging & Canal 48 3 51
AGM-Engineering 5 32 1 38
AGM-External Affairs 42 5 47
AGM-Finance 5 1 6
AGM-HRGA 13 8 1 22
AGM-Infrastructure 14 10 1 25
AGM-Learning Institute 1 1
AGM-Lok Buntar Operation 57 2 59
AGM-Marketing & Quality Control 2 3 3 8
AGM-Operations 1 3 4
AGM-Plant & Maintenance 25 36 17 78
AGM-Project Explorasi 4 4
AGM-SHE 7 22 1 30
AGM-Supply Chain 28 12 11 51
AGM-Sungai Puting Operation 64 64
AGM-Terminal & Transhipment 3 3
TOTAL 282 194 103 579
3. PT. BARAMULTI SUKSES SARANA TBK
PT. ANTANG GUNUNG MERATUS
Turn Over Employee
A. Join Employee
Employee No. Employee Name Work Location Employee Position Join Date
0222210048 Nurul Aida Fitriani Ida Manggala AGM-Land Acquisition Staff 22-Aug-22
0222210051 Cahyo Utomo Putro Ida Manggala AGM-Jr Pit Geology 29-Aug-22
0222210049
Rachma Riskina
Renanda
Ida Manggala AGM-Land Acquisition Staff 31-Aug-22
0222210050 Gilang Adhi Prabowo Ida Manggala AGM-Safety Mining Staff 1-Sep-22
0222210052 Asmauddin Putra Lok Buntar AGM-Purchasing Supervisor 5-Sep-22
0222210053 Afdila Wahyuningsih Lok Buntar
AGM-Community Services
Administration
12-Sep-22
4. PT. BARAMULTI SUKSES SARANA TBK
PT. ANTANG GUNUNG MERATUS
Turn Over Employee
B. Exit Employee
Employee
No.
Employee Name Work Location Employee Position End Date Ket
0208160010 Tommy Mario Erwindo Ida Manggala AGM - GA Coordinator 27-Aug-22 Resign
0172220517 Muhammad Jaini Lok Buntar AGM-Captain Tug Boat 27-Aug-22 PHK
0172220523 Masyani Lok Buntar AGM-Captain Tug Boat 27-Aug-22 PHK
0172220527 Ahmad Muliani Lok Buntar AGM-Captain Tug Boat 27-Aug-22 PHK
0172220515 Samsuni Riady Lok Buntar AGM-Captain Tug Boat 29-Aug-22 Resign
0162210423 Rano Sabto Wibowo Ida Manggala AGM - RFID Supervisor 7-Sep-22 Resign
0172220521 M. Rahmadiansyah Lok Buntar AGM-Captain Tug Boat 10-Sep-22 PHK
0172220518 Taslim Lok Buntar AGM-Captain Tug Boat 10-Sep-22 PHK
0172220526 Muhammad Ramadani Lok Buntar
AGM-Assistant Captain
Tugboat
17-Sep-22 PHK
0172220525 Mahdinor Lok Buntar
AGM-Assistant Captain
Tugboat
17-Sep-22 PHK
0172220533 Riki Rahman Lok Buntar
AGM-Assistant Captain
Tugboat
17-Sep-22 PHK
0172220522 Maslianor Lok Buntar
AGM-Assistant Captain
Tugboat
17-Sep-22 PHK
0172220516 Rudi Lok Buntar AGM - Captain Tug Boat 17-Sep-22 PHK
0082810238 Emelka Lok Buntar AGM-Finance Staff 26-Sep-22 Resign
5. PT. BARAMULTI SUKSES SARANA TBK
PT. ANTANG GUNUNG MERATUS
Tenaga Harian Lepas
Department Ida manggala Lok Buntar Sungai Puting Grand Total
AGM-CPP & Hauling 15 15
AGM-Dredging & Canal 1 1
AGM-External Affairs 3 14 17
AGM-HRGA 10 5 16 31
AGM-Infrastructure 7 1 8
AGM-Lok Buntar Operation 3 3
AGM-Marketing 1 2 3 6
AGM-Plant & Maintenance 4 3 6 13
AGM-SHE 10 3 1 14
AGM-Sungai Puting
Operation
10 10
AGM-Supply Chain 4 4
Grand Total 50 36 36 122
6. PT. BARAMULTI SUKSES SARANA TBK
PT. ANTANG GUNUNG MERATUS
Attendance Ratio
Periode 1 – 19 September 2022
7. PT. BARAMULTI SUKSES SARANA TBK
PT. ANTANG GUNUNG MERATUS
Attendance Ratio
Periode 1 – 19 September 2022
8. PT. BARAMULTI SUKSES SARANA TBK
PT. ANTANG GUNUNG MERATUS
Medical Claim
PERIODE Jumlah Klaim Jumlah Rupiah APPROVAL SITE SENT HO APPROVAL HO SENT TO FINANCE
1 – 15 Maret 2022 54 25.517.234 17 Maret 2022 17 Maret 2022 21 Maret 2022 21 Maret 2022
16 – 31 Maret 2022 59 23.478.930 05-Apr-22 05-Apr-22 08-Apr-22 09-Apr-22
1 – 15 April 2022 37 24.172.068 18-Apr-22 18-Apr-22 22-Apr-22 22-Apr-22
16 – 30 April 2022 29 11.294.665 10 Mei 2022 10 Mei 2022 23 Mei 2022 23 Mei 2022
1 – 15 Mei 2022 39 16.230.009 18 Mei 2022 18 Mei 2022 27 Mei 2022 27 Mei 2022
16 – 31 Mei 2022 51 40.022.872 08 Juni 2022 13 Juni 2022 15 Juni 2022 15 Juni 2022
1 – 15 Juni 2022 40 20.801.852 17 Juni 2022 17 Juni 2022 28 Juni 2022 28 Juni 2022
16 – 30 Juni 2022 42 37.758.554 01 Juni 2022 01 Juni 2022 21 Juli 2022 21 Juli 2022
01 – 15 Juli 2022 46 27.452.625 20 Juli 2022 20 Juli 2022 05 Agt 2022 06 Agt 2022
16 – 31 Juli 2022 68 36.313.396 03 Agt 2022 03 Agt 2022 08 Agt 2022 08 Agt 2022
01 – 15 Agustus 2022 42 18.167.007 16 Agt 2022 16 Agt 2022 22 Agt 2022 22 Agt 2022
16 – 31 Agustus 2022 41 26.283.750 04 Sep 2022 04 Sep 2022 09 Sep 2022 09 Sep 2022
01 – 15 September 2022 82 34.795.927 16 Sep 2022 18 Sep 2022
Note : Medical LBCT Masih di HO menunggu persetujuan Pak Ace
9. PT. BARAMULTI SUKSES SARANA TBK
PT. ANTANG GUNUNG MERATUS
Rekap Tenaga Harian
PERIODE
Jumlah
THL
Jumlah Rupiah
Terima Rekap
Absen
Department
APPROVAL
SITE
SENT HO
APPROVAL
HO
SENT TO
FINANCE
SENT TO
BRI
BRI SENT TO
EMPLOYEE
21 Feb – 20 Mar
2022
116 Rp 269.936.488 22 Maret 22 24 Maret 22 25 Maret 22 31 Maret 22 31 Maret 22 31 Maret 22 01-Apr-22
21 Maret – 20
April 2022
116 Rp 321.689.000 21-Apr-22 22-Apr-22 22-Apr-22 26-Apr-22 26-Apr-22 27-Apr-22 27-Apr-22
21 April – 20 Mei
2022
120 Rp 294.967.300 23 Mei 22 25 Mei 2022 25 Mei 2022 31 Mei 2022
31 Mei 2022
(Sore)
02-Jun-22 02-Jun-22
21 Mei – 20 Juni
2022
121 Rp 351.321.400 21 Juni 2022 23 Juni 2022 23 Juni 2022 28 Juni 2022 29 Juni 2022 29 Juni 2022 29 Juni 2022
21 Jun – 20 Jul
2022
122 Rp 328.435.891 21 Juli 2022 23 Juli 2022 23 Juli 2022 27 Juli 2022 27 Juli 2022 28 Juli 2022 28 Juli 2022
21 Jul – 20 Ags
2022
122 Rp. 341.052.300 21 Ags 2022 22 Ags 2022 22 Ags 2022 30 Ags 2022 31 Ags 2022 31 Ags 2022 31 Ags 2022
12. PT. BARAMULTI SUKSES SARANA TBK
PT. ANTANG GUNUNG MERATUS
No Department Penambahan Baru Replacement Position Open Position Close
1. Engineering 3 1 1 3
2. SHE 6 0 2 4
3. HRGA 1 1 2 0
4. Infrastructure 2 1 2 1
5. Supply Chain 2 2 2 2
6. External Affairs 9 0 3 6
7. CPP Hauling 5 1 5 1
8. Plant & Maintenance 2 2 3 1
9. SPCT 4 0 1 3
10. IR & RM 2 0 1 1
11. Quality Control 0 1 1 0
12. LBCT 3 1 4 0
Total 39 10 27 22
Open Position July &
Agustus
13. PT. BARAMULTI SUKSES SARANA TBK
PT. ANTANG GUNUNG MERATUS
HO recruitment
No Position Department PIC MPP Level Date of PKB
SLA
as
per
today
Nama Kandidat
Sourchin
g
(Tgl
Iklan)
Interview
Psikotest
Interview
Final
MCU
Salary
Proposal
Offering
Letter
On
Boarding
Notes
1 CSR Supervisor
External Affair - CSR /
Comdev HO 1 Supervisor 14-Mar-22 133 Wa Ode 19-Apr-2022 26-Jun-22 26-Jun-22 04-Jul-22 X X X X NQ
Ana Nurlatifah 19-Apr-2022 26-Jun-22 26-Jun-22 04-Jul-22 X X X X NQ
Nur Azisya 19-Apr-2022 26-Jun-22 26-Jun-22 04-Jul-22 X X X X NQ
Faradila Nasri 19-Apr-2022 26-Jun-22 26-Jun-22 04-Jul-22 05-Jul-22 12-Jul-22 12-Jul-22 X Withdraw
Dian N 19-Apr-2022 26-Jun-22 26-Jun-22 04-Jul-22 X X X X NQ
2 Govrel Supervisor External Affair - Govrel HO 1 Supervisor 19-Apr-22 97 Indra 19-Apr-2022 X X X X X X X NQ
3 HRGA Spv HRGA HO 1 Supervisor 27-Mei-22 59 Dony 19-Apr-2022 09-Jul-22 X X X X X X NQ
Herman M 19-Apr-2022 09-Jul-22 X X X X X X NQ
4 Civil Mining Supervisor
Infrastruktur -
Transhipment HO 1 Supervisor 25-Mei-22 61 19-Apr-2022
5 Sr. Civil engineering
Infrastruktur -
Transhipment HO 1 Supervisor 25-Mei-22 61 Mufqi 19-Apr-2022 9 Aug 22 Interview HR
6
Internal Audit
Supervisor
Internal Audit & Risk
Management HO 1 Supervisor 11-Mar-22 136 Michael 19-Apr-2022 22-Jun-22 26-Jun-22 26-Jun-22
Interview Final Yonathan
Laurendy
Yazid 19-Apr-2022
Eka Prasetya 19-Apr-2022
Alfian Fani 19-Apr-2022
Yonathan
Laurendy 19-Apr-2022
Interview Final Yonathan
Laurendy
Febrian Luthfigar 19-Apr-2022 5 Juli 22 6-Jul-22
Nicholas 19-Apr-2022 20 Juli 22 21-Jul-22 Discuss salary expect
Process
14. PT. BARAMULTI SUKSES SARANA TBK
PT. ANTANG GUNUNG MERATUS
HO recruitment
No Position Department PIC MPP Level Date of PKB
SLA
as
per
today
Nama Kandidat
Sourchin
g
(Tgl
Iklan)
Intervie
w
Psikotest
Intervie
w
Final
MCU
Salary
Proposal
Offering
Letter
On
Boarding
Notes
7 Mine Plan Engineer
Mining Operation -
Engineering HO 1
Supervi
sor 20-Apr-22 96
Dori Apriman
Dhuha 19-Apr-2022
28-Jun-
22 X X X X NQ
M.Riza Fahlevi 19-Apr-2022
Mahmudin 19-Apr-2022
Adi Sulistya 19-Apr-2022
Galang
Budiansyah 19-Apr-2022
Cipta Fakar N 19-Apr-2022 9-Jul-22 15-Jul-22 26-Jul-22 Withdraw
Krisna Hanjar 19-Apr-2022 28-Jul-22 29-Jul-22 28 Juli 22 29 Jul 22 4 Aug 22 Psikotest, salary proposal
Bayu
Widiyartanto 19-Apr-2022 28-Jul-22 29-Jul-22 28 Juli 22 Not recommended
Yuli Yahya 19-Apr-2022 28-Jul-22 29-Jul-22 28 Juli 22 Not recommended
8 Supervisor Maintenance (IM)
Plant &
Maintenance HO 1
Supervi
sor
Approve site 17
Jun 22 19-Apr-2022
9
Safety Transhipment
Supervisor SHE - Transhipment HO 2
Supervi
sor 11-Nov-21 256 Sink 19-Apr-2022 09-Jul-22 X X X X X X NQ
Agus 19-Apr-2022 09-Jul-22 X X X X X X NQ
Donovan 19-Apr-2022 09-Jul-22 X X X X X X NQ
Surya 18-Jun-2022 20-Jul-22 20-Jul-22 Interview final
Gulfrid Baan 18-Jun-2022 20-Jul-22 20-Jul-22 Interview final
10 Purchasing Supervisor
Supply Chain -
Purchasing HO 1
Supervi
sor 21-Apr-22 95 M.Rian Munandar 19-Apr-2022 X X X X X X X Interview User
Ashadika 19-Apr-2022 X X X X X X X
Ali Sabaha
Kurniawan 19-Apr-2022 X X X X X X X
Sriyono 19-Apr-2022 22 Juli 22 X X X X X X
Afdian Eko
Wibowo 19-Apr-2022 22 Juli 22 X X X X X X WD
Dannis Akbar
Kurniawan 19-Apr-2022 22 Juli 22 X X X X X X
Asmauddin Putra 19-Apr-2022 30 Juli 22 1 Agu 22 30 Juli 22 6 Aug 22 2 Aug 22 8 Aug 22 Salary proposal
11
Warehouse & Logistic
Suptend Supply Chain HO 1
Supten
d PKB process Rahmadi Rizki 20-Jul-2022 21 Juli 2225 Juli 22 3 Agu 22 Interview SCM & CFO
Process
15. PT. BARAMULTI SUKSES SARANA TBK
PT. ANTANG GUNUNG MERATUS
HO recruitment
No Position Department PIC MPP Level Date of PKB
SLA
as
per
toda
y
Nama Kandidat
Sourching
(Tgl Iklan)
Interview Psikotest Interview Final MCU Salary Proposal Offering Letter On Boarding Notes
1 Surveyor Supervisor External Affair - LA HO 1
Supervi
sor
25-Nov-21 162
Rezki
Marahalim
19-Apr-22 19-Apr-22 21-Apr-22 03-Apr-22 06-Apr-22 06-Mei-22 Close
2
Land Acquisition
Supervisor
External Affair - LA HO 1
Supervi
sor
25-Nov-21 164 Heri Supriyanto 19-Apr-22 19-Apr-22 05-Apr-22 08-Apr-22 08-Mei-22 Close
3 FGDP Engineering Mining Operation HO 1 Officer 11-Okt-21 213Dzaky Ilham 19-Apr-22 19-Apr-22 09-Apr-22 12-Apr-22 12-Mei-22 Close
4
Warehouse & Logistic
Superintendent
Supply Chain -
Warehouse
HO 1
Superi
ntende
nt
09-Feb-22 105 Djoli Hendra S 19-Apr-22 19-Apr-22 21-Apr-22 22-Apr-22 24-Apr-22 22-Apr-22 25-Apr-22 25-Mei-22 Close
5
Purchasing
Superintendent
Supply Chain -
Purchasing
HO 1
Superi
ntende
nt
17-Feb-22 104 M Ismail 19-Apr-22 19-Apr-22 29-Apr-22 02-Mei-22 01-Jun-22 Close
6 IT Officer Supply Chain - HO HO 1 Officer 25-Mar-22 82 Aldi 19-Apr-22 19-Apr-22 21-Apr-22 22-Apr-22 24-Mei-22 13-Mei-22 16-Mei-22 15-Jun-22 Close
Close
16. PT. BARAMULTI SUKSES SARANA TBK
PT. ANTANG GUNUNG MERATUS
Engineering
Process
Close
No Position Department PIC MPP Level Date of PKB
SLA
as
per
today
Nama Kandidat
Sourching
(Tgl
Iklan)
Interview
Psikotest
Interview
Final
MCU
Salary
Proposal
Offering
Letter
On
Boarding
Notes
1 Surveyor
Mining Operation -
Engineering Site 1
Group
Leader PKB Process Taufik 18-Jun-2022 25-Jul-22 27-Jul-22 X X X X X NQ
Ardy Widi 18-Jun-2022 25-Jul-22 27-Jul-22 27-Jul-22 X X X X NQ
Jhontrado 18-Jun-2022 26-Jul-22 27-Jul-22 X X X X X NQ
Sulaiman Sinaga 18-Jun-2022 26-Jul-22 27-Jul-22 6-Agu-22 10-Agu-22 MCU
No Position Department PIC MPP Level Date of PKB
SLA
as
per
toda
y
Nama Kandidat
Sourching
(Tgl Iklan)
Interview Psikotest
Interview
Final
MCU
Salary
Proposal
Offering
Letter
On
Boarding
Notes
1
Data Processing
Officer
Mining Operation -
Engineering
Site 1 Officer 19-Apr-22 55 Hangger 01-Feb-22 19-Apr-22 21-Apr-22 22-Apr-22 24-Mei-22 11-Mei-22 14-Mei-22 13-Jun-22 Close
2 Jr. Geotech Engineer
Mining Operation -
Engineering
site 1 Officer 21-Feb-22 114 Zainul Ngatiq 00-Jan-00 19-Apr-22 21-Apr-22 22-Apr-22 24-Mei-22 13-Mei-22 16-Mei-22 15-Jun-22 Close
3 Jr. Pit Geology
Mining Operation -
Engineering
site 1 Officer 21-Sep-21 302 M Faiq 19-Apr-22 25-Apr-22 25-Apr-22 27-Mei-22 07-Jun-22 23-Jun-22 05-Jul-22 20-Jul-22 Close
4 Jr. Pit Geology
Mining Operation -
Engineering site 1 Officer 21-Sep-21 307 Cahyo 19-Apr-2022 25-Apr-22 25-Apr-22 27-Mei-22 07-Jun-22 23-Jun-22 21-Jul-22 29-Agu-22 CLose
17. PT. BARAMULTI SUKSES SARANA TBK
PT. ANTANG GUNUNG MERATUS
Road Maintenance
Process
Close
No Position Department PIC MPP Level Date of PKB
SLA
as
per
today
Nama Kandidat
Sourch
ing
(Tgl
Iklan)
Intervi
ew
Psikote
st
Intervi
ew
Final
MCU
Salary
Propos
al
Offerin
g
Letter
On
Boardi
ng
Notes
1 Motor Grader Operator Road Maintenance Site 1
Non
Staff 06-Des-21 231 Jarun 19-Apr-2022 28-Jun-22 06-Jul-22 06-Jul-22 07-Jul-22 X X X WD
Bustanul 19-Apr-2022 11-Jul-22 11-Jul-22 11-Jul-22 X X X X NQ User
Trisetiyo 19-Apr-2022 28-Jun-22 06-Jul-22 06-Jul-22 07-Jul-22 23-Jul-22 X X NQ MCU
No Position Department PIC MPP Level Date of PKB
SLA
as
per
toda
y
Nama Kandidat
Sourching
(Tgl Iklan)
Interview Psikotest Interview Final MCU Salary Proposal Offering Letter On Boarding Notes
1
Motor Grader
Operator Road Maintenance Site 1
Non
Staff 06-Des-21 231
Mukhtar
Faulana Hire Internal
18. PT. BARAMULTI SUKSES SARANA TBK
PT. ANTANG GUNUNG MERATUS
SHE
Process
Close
No Position Department PIC MPP Level Date of PKB
SLA
as
per
today
Nama Kandidat
Sourching
(Tgl
Iklan)
Interview
Psikotest
Interview
Final
MCU
Salary
Proposal
Offering
Letter
On
Boarding
Notes
1 Safety Group Leader SHE - Mining site 1
Group
Leader 10-Jun-22 45 Zamakh 19-Apr-2022 28-Jun-22 05-Jul-22 19-Jul-22 X X X X NQ
Tommy Mario 18-Jun-2022 28-Jun-22 05-Jul-22 X X X X X NQ
Tommy 18-Jun-2022 28-Jun-22 05-Jul-22 X X X X X NQ
TriJoko M 18-Jun-2022 28-Jun-22 X X X X X X NQ
Tomy Destyan 18-Jun-2022 28-Jun-22 05-Jul-22 19-Jul-22 X X X X NQ
Tomy Aprianto 18-Jun-2022 28-Jun-22 X X X X X X NQ
Asyrofi 18-Jun-2022 28-Jun-22 X X X X X X NQ
Rio Martha 18-Jun-2022 28-Jun-22 X X X X X X NQ
Indra Adam 18-Jun-2022 28-Jun-22 05-Jul-22 19-Jul-22 29-Jul-22 23-Jul-22 X X Withdraw
2 Safety Group Leader SHE - Transhipment site 1
Group
Leader 13-Jun-22 42
Agung Dwi
Rahmanto 18-Jun-2022 17-Jun-22 18-Jun-22 24-Jun-22 X X X X NQ
Rezali Haidir 18-Jun-2022 17-Jun-22 18-Jun-22 24-Jun-22 X X X X NQ
Rio Harianto 18-Jun-2022 17-Jun-22 18-Jun-22 21-Jul-22 X X X X NQ
Tesya Ananda
Siregar 18-Jun-2022 17-Jun-22 18-Jun-22 X X X X X NQ
Valentino
Sugiarto 18-Jun-2022 17-Jun-22 18-Jun-22 24-Jun-22 X X X X WD
Suharyono 18-Jun-2022 12-Jul-22 12-Jul-22 21-Jul-22 X X X X NQ
No Position Department PIC MPP Level Date of PKB SLA as per today Nama Kandidat
Sourching
(Tgl Iklan)
Interview Psikotest
Interview
Final
MCU
Salary
Proposal
Offering
Letter
On
Boarding
Note
s
1
Satefy Patrol Group
Leader
SHE - Mining site 1 Officer 23-Agu-21 296 R Prabowo 00-Jan-00 19-Apr-22 21-Apr-22 22-Apr-22 24-Mei-22 13-Mei-22 16-Mei-22 15-Jun-22 Close
2 Safety Group Leader SHE - Mining site 1
Group
Leader 10-Jun-22 45 Gilang Adhi P 18-Jun-2022 28-Jun-22 05-Jul-22 19-Jul-22 22-Jul-22 23-Jul-22 7 Agu 22 1 Sep 22 Close
3
Reclamation &
Revegetation Officer
SHE - Quality and
System
site 1
Group
Leader
11-Mar-22 57 Irwan Pasdar 19-Apr-22 19-Apr-22 21-Apr-22 22-Apr-22 24-Apr-22 26-Apr-22 30-Apr-22 07-Mei-22 Close
4
Monitoring Control
Officer
SHE - Quality and
System
site 1 Officer 09-Feb-22 95 Darintia 19-Apr-22 19-Apr-22 21-Apr-22 22-Apr-22 24-Apr-22 17-Apr-22 25-Apr-22 15-Mei-22 Close
5
Integrated Farming &
DAS
SHE - Quality and
System
Site 1
Group
Leader
25-Apr-22 98 Rennyta 30-Apr-22 18-Mei-22 18-Mei-22 19-Mei-22 03-Jun-22 17-Jun-22 05-Jul-22 01-Agu-22 Close
6
Planning
Development Officer
SHE - Quality and
System
Site 1 Officer 12-Mar-22 142 Raudlatul 19-Apr-22 18-Mei-22 18-Mei-22 19-Mei-22 21-Mei-22 17-Jun-22 05-Jul-22 01-Agu-22 Close
7
Document Control
Officer
SHE - Quality and
System Site 1 Officer 25-Apr-22 91
Emiliyana
Varida S 30-Apr-2022 18-Mei-22 18-Mei-22 19-Mei-22 30-Jun-22 02-Jul-22 12-Jul-22 01-Agu-22 Close
8 Safety Group Leader SHE - Transhipment site 2
Group
Leader 13-Jun-22 42
Catur Ravia
Chandra 18-Jun-2022 17-Jun-22 18-Jun-22 24-Jun-22 25-Jun-22 25-Jun-22 12-Jul-22 01-Agu-22 close
19. PT. BARAMULTI SUKSES SARANA TBK
PT. ANTANG GUNUNG MERATUS
HRGA
No Position Department PIC MPP Level Date of PKB
SLA
as
per
today
Nama Kandidat
Sourching
(Tgl
Iklan)
Interview
Psikotest
Interview
Final
MCU
Salary
Proposal
Offering
Letter
On
Boarding
Notes
1 HR Admin HRGA Site 1 Admin 25-Mei-22 61 Mega 18-Jun-2022 30-Jun-22 02-Jul-22 30-Jun-22 21-Jul-22 MCU, Waiing Decission super user
Nabila 18-Jun-2022 30-Jun-22 02-Jul-22 30-Jun-22 X X X X Hold
Ananda 18-Jun-2022 6-Jul-22 X X X X X X NQ
Process
Close
20. PT. BARAMULTI SUKSES SARANA TBK
PT. ANTANG GUNUNG MERATUS
Infrastructure
Process
Close
No Position Department PIC MPP Level Date of PKB
SLA
as
per
toda
y
Nama Kandidat
Sourching
(Tgl Iklan)
Interview Psikotest Interview Final MCU
Salary
Proposal
Offering
Letter
On
Boarding
Notes
1 Doco
Infrastruktur -
Transhipment
Site 1
Group
Leade
r
27-Feb-22 138 Zikri Adham 27-Feb-22 08-Apr-22 18-Mei-22 19-Mei-22 28-Mei-22 12-Jun-22 15-Jun-22 15-Jul-22 Close, internal hire
1 Field Engineer
Infrastruktur -
Transhipment
Site 1
Office
r
25-Mei-22 48
M Abdullah
Rofie
30-Mei-22 01-Jun-22 02-Jun-22 20-Apr-22 15-Jun-22 23-Jun-22 05-Jul-22 12-Jul-22 CLose
2
Civil Mining Group
Leader
Infrastruktur -
Transhipment Site 1
Group
Leade
r 25-Mei-22 61 Rasyid 18-Jun-2022 07-Apr-22 07-Apr-22 20-Apr-22 24-Jun-22 02-Jul-22 12-Jul-22 25-Agu-22 Close
No Position Department PIC MPP Level Date of PKB
SLA
as
per
today
Nama Kandidat
Sourch
ing
(Tgl
Iklan)
Intervi
ew
Psikote
st
Intervi
ew
Final
MCU
Salary
Propos
al
Offerin
g
Letter
On
Boardi
ng
Notes
1
Drafter & Document
Control Infrastruktur Site 1
Group
Leader
PKB On
Process Sourching
2
Civil Transhipment
Group Leader Infrastruktur Site 1
Group
Leader
PKB On
Process Sourching
21. PT. BARAMULTI SUKSES SARANA TBK
PT. ANTANG GUNUNG MERATUS
Supply Chain
Process
Close
No Position Department PIC MPP Level Date of PKB
SLA
as
per
today
Nama Kandidat
Sourch
ing
(Tgl
Iklan)
Intervi
ew
Psikote
st
Intervi
ew
Final
MCU
Salary
Propos
al
Offerin
g
Letter
On
Boardi
ng
Notes
1 IT Programmer Supply Chain - IT Site 1 Officer 19-Apr-22 97 Satrio 19-Apr-2022 18-Mei-22 18-Mei-22 19-Mei-22 25-Mei-22 23-Jun-22 X X
Satrio WD, Sourching
New Kandidat
DanuWinisuda 19-Apr-2022 21-Jul-22 X X X X X X NQ
Syaukani 19-Apr-2022 28 Jul 22 X X X X X X NQ
IGede 19-Apr-2022 28 Jul 22 29 Jul 22 X X X X X NQ
No Position Department PIC MPP Level Date of PKB
SLA
as
per
today
Nama
Kandidat
Sourching
(Tgl Iklan)
Interview Psikotest
Interview
Final
MCU
Salary
Proposal
Offering
Letter
On
Boarding
Notes
1 IT Officer Supply Chain - HO HO 1 Officer 25-Mar-22 82 Aldi 19-Apr-22 19-Apr-22 21-Apr-22 22-Apr-22 24-Mei-22 13-Mei-22 16-Mei-22 15-Jun-22 Close
2
Purchasing
Superintendent
Supply Chain -
Purchasing
HO 1 Superintendent 17-Feb-22 104 M Ismail 19-Apr-22 19-Apr-22 29-Apr-22 02-Mei-22 01-Jun-22 Close
3
Fuelman Supply Chain Site 1 Non Staff 11-Jul-22 14 Nur Sigit 19-Apr-2022 05-Jul-22 12-Jul-22 12-Jul-22 14-Jul-22 19-Jul-22 22-Jul-22 01-Agu-22 Close
4 IT Officer Supply Chain - IT Site 1 Officer 19-Apr-22 87 Miko 19-Apr-22 18-Mei-22 18-Mei-22 19-Mei-22 28-Mei-22 12-Jun-22 15-Jun-22 15-Jul-22 Close
5
Fuelman
Supply Chain -
Warehouse
Site 1
Non Staff 11-Jul-22 M.Haykal 19-Apr-2022 05-Jul-22 12-Jul-22 12-Jul-22 16-Jul-22 19-Jul-22 22-Jul-22 01-Agu-22 Close
22. PT. BARAMULTI SUKSES SARANA TBK
PT. ANTANG GUNUNG MERATUS
External Affair
No Position Department PIC MPP Level Date of PKB
SLA
as
per
today
Nama Kandidat
Sourching
(Tgl
Iklan)
Interview
Psikotest
Interview
Final
MCU
Salary
Proposal
Offering
Letter
On
Boarding
Notes
1 Comser Administrator External Affair - Comser Site 1 Officer 11-Jun-22 44 Oktaviani 18-Jun-2022 24-Jun-22 24-Jun-22 24-Jun-22 X X X X NQ
Khaliq Adady 18-Jun-2022 24-Jun-22 24-Jun-22 24-Jun-22 26-Jul-22 X X X Unfit
Afdila 18-Jun-2022 30-Jun-22 02-Jul-22 30-Jun-22 29-Jul-22 09-Agu-22 Salary Proposal
2 LA - Negosiator External Affair - LA Site 2 Officer 21-Jun-22 34 Haris 18-Jun-2022 29-Jun-22 30-Jun-22 29-Jun-22 05-Jul-22 23-Jul-22 7 Agu 22 Offering Letter
Oby Dinata 18-Jun-2022 29-Jun-22 30-Jun-22 29-Jun-22 X X X X Withdraw
Hady Susanto 18-Jun-2022 29-Jun-22 14-Jul-22 29-Jun-22 26-Jul-22 23-Jul-22 X X UNFIT
Process
Close
No Position Department PIC MPP Level Date of PKB
SLA as
per
today
Nama Kandidat
Sourching
(Tgl Iklan)
Interview Psikotest Interview Final MCU Salary Proposal Offering Letter On Boarding Notes
1 LA - Senior Admin External Affair - LA Site 1 Officer 10-Jun-22 32 Devi 30-Mei-22 30-Mei-22 30-Mei-22 12-Jun-22 21-Jun-22 23-Jun-22 05-Jul-22 12-Jul-22 Close
2 LLA Officer External Affair - LA Site 1 Officer 21-Jun-22 36 Takdir 30-Mei-22 30-Mei-22 30-Mei-22 12-Jun-22 21-Jun-22 23-Jun-22 05-Jul-22 27-Jul-22 Close
3 LA - Surveyor External Affair - LA Site 2 Officer 21-Jun-22 34 Dimyati 18-Jun-2022 21-Jun-22 21-Jun-22 21-Jun-22 27-Jun-22 02-Jul-22 21-Jul-22 08-Agu-22 Close
4 LA - Senior Admin External Affair - LA Site 2 Officer 10-Jun-22 45 Nurul Aida 30-Mei-22 30-Mei-22 12-Jul-22 12-Jul-22 14-Jul-22 23-Jul-22 7 Agu 22 22-Agus-22 CLose
23. PT. BARAMULTI SUKSES SARANA TBK
PT. ANTANG GUNUNG MERATUS
CPP Hauling
Process
Close
No Position Department PIC MPP Level Date of PKB
SLA
as
per
today
Nama Kandidat
Sourching
(Tgl
Iklan)
Interview
Psikotest
Interview
Final
MCU
Salary
Proposal
Offering
Letter
On
Boarding
Notes
1
Weight Bridge
Operator
Mining Operation -
CPP & Hauling Site 3
Non
Staff 05-Jul-22 20 Nor Ifansyah 19-Apr-2022 21-Jun-22 21-Jun-22 12-Jul-22 29-Jul-22 X X X NQ
Josswa 19-Apr-2022 21-Jun-22 21-Jun-22 12-Jul-22 29-Jul-22 X X X NQ
Isra 19-Apr-2022 21-Jun-22 21-Jun-22 12-Jul-22 29-Jul-22 X X X NQ
M. Fernanda 19-Apr-2022 21-Jun-22 21-Jun-22 12-Jul-22 29-Jul-22 09-Agu-22 Salary proposal
A. Syaiifullah 19-Apr-2022 21-Jun-22 21-Jun-22 12-Jul-22 29-Jul-22 09-Agu-22 Salary proposal
M. Rijani 19-Apr-2022 21-Jun-22 21-Jun-22 12-Jul-22 29-Jul-22 NQ
2 Driver Water Truck
Mining Operation -
CPP & Hauling Site 2
Non
Staff
Belum ada
PKB M. Khatami 19-Apr-2022 21-Jun-22 21-Jun-22 12-Jul-22 29-Jul-22 Review
Agus Melas 19-Apr-2022 21-Jun-22 21-Jun-22 12-Jul-22 29-Jul-22 Review
No Position Department PIC MPP Level Date of PKB
SLA as
per
today
Nama
Kandidat
Sourching
(Tgl Iklan)
Interview Psikotest Interview Final MCU Salary Proposal Offering Letter On Boarding Notes
1
Hauling Group Leader
(Blok IV)
Mining Operation -
CPP & Hauling
Site 1
Group
Leader
21-Apr-22 71 A Zainuddin 21-Apr-22 12-Mei-22 12-Mei-22 21-Mei-22
22-Mei-
22
29-Mei-22 01-Jun-22 01-Jul-22 Close
24. PT. BARAMULTI SUKSES SARANA TBK
PT. ANTANG GUNUNG MERATUS
Plant & Maintenance
Process
Close
No Position Department PIC MPP Level Date of PKB
SLA
as
per
today
Nama Kandidat
Sourching
(Tgl
Iklan)
Interview
Psikotest
Interview
Final
MCU
Salary
Proposal
Offering
Letter
On
Boarding
Notes
1
Senior Mechanic A2B
(IM) Plant & Maintenance Site 1 Non Staff 19-Apr-22 97 Teguh Santoso 18-Jun-2022 01-Jul-22 05-Jul-22 01-Jul-22 X X X X WD
Muhammad Rizka Arief 18-Jun-2022 19-Jul-22 19-Jul-22 19-Jul-22 20-Jul-22 X X X NQ
2 Mekanik A2B (SP) Plant & Maintenance Site 1 Non Staff
Approve site
28 jul 22 Wildan 18-Jun-2022
Fahrur Reza 18-Jun-2022
Wahyono 18-Jun-2022
3 PKB Fix Plan (LB Plant & Maintenance Site 1 Non Staff
Approve site
3 agu 22 Rian Hariyadi 18-Jun-2022
No Position Department PIC MPP Level Date of PKB
SLA as
per
today
Nama
Kandidat
Sourching
(Tgl Iklan)
Interview Psikotest Interview Final MCU
Salary
Proposal
Offering
Letter
On
Boarding
Notes
1
Senior Mechanic A2B
(IM) Plant & Maintenance Site 1 Non Staff 19-Apr-22 97 Lutfi Prayogo 18-Jun-2022 01-Jul-22 05-Jul-22 01-Jul-22 25-Jul-22 23-Jul-22 7 Agu 22 8 Agu 22 CLose
25. PT. BARAMULTI SUKSES SARANA TBK
PT. ANTANG GUNUNG MERATUS
SPCT
Process
Close
No Position Department PIC MPP Level Date of PKB
SLA
as
per
today
Nama Kandidat
Sourchin
g
(Tgl
Iklan)
Interview
Psikotest
Interview
Final
MCU
Salary
Proposal
Offering
Letter
On
Boarding
Notes
1 TCT Operation GL
Sungai Putting
Operation Site 1 Officer 19-Apr-22 97 Mawardi 18-Jun-2022 17-Jun-22 22-Jun-22 22-Jun-22 29-Jul-22 X X X NQ
No Position Department PIC MPP Level Date of PKB
SLA
as
per
toda
y
Nama Kandidat
Sourching
(Tgl Iklan)
Interview Psikotest
Interview
Final
MCU
Salary
Proposal
Offering
Letter
On
Boarding
Notes
1 Port Officer
Sungai Putting
Operation
Site 1 Officer 22-Apr-22 52 Eginius 19-Apr-22 19-Apr-22 21-Apr-22 22-Apr-22 24-Mei-22 11-Mei-22 14-Mei-22 13-Jun-22 Close
2 TCT Operation GL
Sungai Putting
Operation
Site 1 Officer 19-Apr-22 58 Hany Sadewa 19-Apr-22 19-Apr-22 21-Apr-22 22-Apr-22 24-Mei-22 14-Mei-22 17-Mei-22 16-Jun-22 Close
3 TCT Operation GL
Sungai Putting
Operation Site 1 Officer 19-Apr-22 97 Muhammad Arif 18-Jun-2022 17-Jun-22 22-Jun-22 22-Jun-22 25-Jun-22 02-Jul-22 12-Jul-22 01-Agu-22 close
26. PT. BARAMULTI SUKSES SARANA TBK
PT. ANTANG GUNUNG MERATUS
LBCT
Process
Close
No Position Department PIC MPP Level Date of PKB
SLA
as
per
today
Nama Kandidat
Sourching
(Tgl
Iklan)
Interview
Psikotest
Interview
Final
MCU
Salary
Proposal
Offering
Letter
On
Boarding
Notes
1 Excavator Operator
Transhipment - LB
Operation
Site 1
Non
Staff
Belum ada
PKB
Shahrul
Sourching
27. PT. BARAMULTI SUKSES SARANA TBK
PT. ANTANG GUNUNG MERATUS
QC
Process
Close
No Position Department PIC MPP Level Date of PKB
SLA
as
per
today
Nama Kandidat
Sourching
(Tgl
Iklan)
Interview
Psikotest
Interview
Final
MCU
Salary
Proposal
Offering
Letter
On
Boarding
Notes
1 QC Crew Quality Control Site 1
Non
Staff
PKB On
Process Irbani Sourching
28. PT. BARAMULTI SUKSES SARANA TBK
PT. ANTANG GUNUNG MERATUS
Posisi Close Agustus
No Position Department PIC MPP Level Date of PKB
SLA
as
per
toda
y
Nama Kandidat
Sourching
(Tgl Iklan)
Interview Psikotest
Interview
Final
MCU
Salary
Proposal
Offering
Letter
On Boarding Notes
1 LA - Surveyor External Affair - LA Site 1 Officer 21-Jun-22 34 Dimyati 18-Jun-2022 21-Jun-22 21-Jun-22 21-Jun-22 27-Jun-22 02-Jul-22 21-Jul-22 08-Agu-22 Close
2 LA - Senior Admin External Affair - LA Site 1 Officer 10-Jun-22 45 Nurul Aida 30-Mei-22 30-Mei-22 12-Jul-22 12-Jul-22 14-Jul-22 23-Jul-22 7 Agu 22 22-Agus-22 CLose
3 LLA Officer External Affair - LA Site 1 Officer 21-Jun-22 Fathur Rohman 18-Jun-2022 21-Jun-22 21-Jun-22 21-Jun-22 15-Jul-22 23-Jul-22 7 Agu 22 15-agu-22 Close
4 LLA Officer External Affair - LA Site 1 Officer 21-Jun-22 Rahma Ryzkina Renantha 30-Mei-22 19-Jul-22 19-Jul-22 19-Jul-22 21-Jul-22 23-Jul-22 7 Agu 22 22-Agus-22 Close
5 Civil Mining Group
Leader
Infrastruktur -
Transhipment Site 1
Group
Leader 25-Mei-22 61 Rasyid 18-Jun-2022 07-Apr-22 07-Apr-22 20-Apr-22 24-Jun-22 02-Jul-22 12-Jul-22 25-Agu-22 Close
6
Jr. Pit Geology
Mining Operation -
Engineering site 1 Officer 21-Sep-21 307 Cahyo 19-Apr-2022 25-Apr-22 25-Apr-22 27-Mei-22 07-Jun-22 23-Jun-22 21-Jul-22 29-Agu-22 CLose
7 Senior Mechanic A2B
(IM) Plant & Maintenance Site 1
Non
Staff 19-Apr-22 97 Lutfi Prayogo 18-Jun-2022 01-Jul-22 05-Jul-22 01-Jul-22 25-Jul-22 23-Jul-22 7 Agu 22 8 Agu 22 CLose
8
Safety Group Leader SHE - Mining site 1
Group
Leader 10-Jun-22 45 Gilang Adhi P 18-Jun-2022 28-Jun-22 05-Jul-22 19-Jul-22 22-Jul-22 23-Jul-22 7 Agu 22 1 Sep 22 Close
9
Integrated Farming &
DAS
SHE - Quality and
System
Site 1
Group
Leader
25-Apr-22 98 Rennyta 30-Apr-22 18-Mei-22 18-Mei-22 19-Mei-22 03-Jun-22 17-Jun-22 05-Jul-22 01-Agu-22 Close
10
Planning
Development Officer
SHE - Quality and
System
Site 1 Officer 12-Mar-22 142 Raudlatul 19-Apr-22 18-Mei-22 18-Mei-22 19-Mei-22 21-Mei-22 17-Jun-22 05-Jul-22 01-Agu-22 Close
11 Document Control
Officer
SHE - Quality and
System Site 1 Officer 25-Apr-22 91 Emiliyana Varida S 30-Apr-2022 18-Mei-22 18-Mei-22 19-Mei-22 30-Jun-22 02-Jul-22 12-Jul-22 01-Agu-22 Close
12
Safety Group Leader SHE - Transhipment site 1
Group
Leader 13-Jun-22 42 Catur Ravia Chandra 18-Jun-2022 17-Jun-22 18-Jun-22 24-Jun-22 25-Jun-22 25-Jun-22 12-Jul-22 01-Agu-22 close
13 SHE Group Leader SHE - Transhipment Site 1 Officer 13-Jun-22 Muhammad Mujahid 18-Jun-2022 12-Jul-22 12-Jul-22 21-Jul-22 22-Jul-22 23-Jul-22 6 agu 22 8 Agu 22 Close
14
TCT Operation GL
Sungai Putting
Operation Site 1 Officer 19-Apr-22 97 Muhammad Arif 18-Jun-2022 17-Jun-22 22-Jun-22 22-Jun-22 25-Jun-22 02-Jul-22 12-Jul-22 01-Agu-22 close
15
Fuelman Supply Chain Site 1
Non
Staff 11-Jul-22 14 Nur Sigit 19-Apr-2022 05-Jul-22 12-Jul-22 12-Jul-22 14-Jul-22 19-Jul-22 22-Jul-22 01-Agu-22 Close
16
Fuelman
Supply Chain -
Warehouse
Site 1 Non
Staff 11-Jul-22 M.Haykal 19-Apr-2022 05-Jul-22 12-Jul-22 12-Jul-22 16-Jul-22 19-Jul-22 22-Jul-22 01-Agu-22 Close
29. PT. BARAMULTI SUKSES SARANA TBK
PT. ANTANG GUNUNG MERATUS
Promosi Jabatan
No Nama Company Posisi Lama Posisi Baru Mulai Act. Selesai Act
Status
(selesai/lanjut
acting)
Jadwal Presentasi
1 Sulaiman A AGM Transhipment Safety Patrol (LB) SHE Group Leader 1 Maret 2021 31 Mei 2021 Lanjut Acting 6 bulan setelah presentase
2 Raihani AGM Lanjut Acting
3 Muhammad Majeni AGM Kepala Juru Masak GA Group Leader 1 Februari 2021 31 April 2021 Presentasi Agustus W3
4 Saeful Ruslan Hidayat AGM Weightbridge Operator Weightbridge Group Leader Presentasi Agustus W3
5 Sugeng Ariyanto AGM Tolgate Operator Tolgate Group Leader
6 Slamet Bolawi AGM AGM-Excavator Operator (LB) AGM-Excavator Operator (LB) 01 Juli 2021 31 Des 2021
7 Kustani Safran AGM AGM-SHE Jr Supervisor AGM-SHE Supervisor Lulus
8 Taufik AGM AGM-Safety Patrol (SP) AGM-Hauling Group Leader 1 Juli 2022 31 Des 2022
9 Abdul Mukhid AGM AGM-Fix Plan Mekanik (LB) AGM-Fix Plan Group Leader