• Early Renaissance.
1420 - 1500    • Filippo Brunelleschi, Leon Battista Alberti, Masaccio and others.



                • Renaissance mature (flowering of the Renaissance).
1500 - 1540
               • Leonardo da Vinci, Michelangelo Buonarroti, Raphael.




                                    • Late Renaissance.
16th Century   • Andrea Palladio, Dzhordzhone, Titian, Paolo Veronese Kaliari.
The influence of Leonardo
da Vinci, Copernicus,
Galileo, Paracelsus, and
other prominent scientists
left a clear track and
determine the multiple
paths of development in
     science and art.
He was renowned Italian
  architect, inventor, engineer,
   sculptor and painter of the
 Renaissance. He is said to be a
prototype of the Renaissance man
    and comprehensive genius.

                  Leonardo is famous for his
                  paintings, most famous of which are
                  "Last Supper" and "Mona Lisa".
He was an Italian Renaissance painter, sculptor, architect, poet,
     and engineer who exerted an unparalleled influence on the
development of Western art. Considered to be one of three titans of
    the Renaissance art with Leonardo da Vinci and Raphael.
He was an Italian painter and
      architect of the High
  Renaissance. Many of his
works are found in the Apostolic
 Palace of The Vatican, where
 the frescoed Raphael Rooms
    were the central, and the
  largest, work of his career.
 Renaissance literature begins with
  Dante, Petrarch continues with
  Giovanni Bokacho, Ludovico Ariosto,
  Torkuato Taso.
 Western literature is developing under
  the influence of Italian Renaissance
  and the scientific discoveries and reach
  apogee in the works of Lope de Vega,
  Miguel de Cervantes, William
  Shakespeare, Francois Rabelais.
Dante Alighieri was an
 Italian poet from the city of
  Florence. His most famous
work is "Divine Comedy" ("La
     Divina Commedia"),
culminating in the development
  of medieval literature and
fundamental to the development
       of modern Italy.
He was a Spanish novelist, poet,
             and playwright.




His great work, Don Quixote, considered the
  first modern novel is a classic of Western
literature, and is regarded amongst the best
         works of fiction ever written.
He was famous English playwright and poet,
   recognized in Western culture as the most
     important writer in English literature.
 Shakespeare is the few playwrights who excel
in writing both the tragedies and the comedies.
His ability to capture and transmit the deepest
    aspects of human nature entitle many to
 consider him the consummate talent, and the
      English Renaissance is often called
              "Shakespeare time”.
Bulgaria also has artists like as Leonardo
da Vinci. For example Zahari Zograf.
He is arguably the most famous Bulgarian
painter of the Bulgarian National Revival,
noted for his church mural paintings and icons
and often regarded as the founder of secular
art in Bulgaria due to the introduction of
everyday life elements in his work.



                                            The other is Vladimir Dimitrov —
                                            Maystora. He is considered one of the most
                                            talented 20th century Bulgarian painters
                                            and probably the most remarkable stylist in
                                            Bulgarian painting. His skills reach those
                                            of Leonardo da Vinci.
Profound change is made ​in the
   Renaissance and in theater, music and
    related arts. In construction focusing
primarily on public buildings, palaces, town
   houses and others. Typical orders are
      severing of wall panels, arcades,
 colonnades. During the Renaissance also
           develops and astrology.
In Bulgaria, the greatest impact on the renaissance feels in preserved
frescoes of the rock monastery near the village of Ivanovo, Ruse.
Founder of the monastery was a Bulgarian Tsar John Alexander.
Ivanovo rock churches are listed as World Heritage by UNESCO and is
one of the 9 such sites in Bulgaria. Popular tourist sites. The Boyana
Church is a medieval Bulgarian Orthodox church situated on the outskirts
of Sofia. The church owes its world fame mainly to its frescoes from
1259. They form a second layer over the paintings from earlier centuries
and represent one of the most complete and well-preserved monuments of
Eastern European mediaeval art. The church also was established in
Renaissance style.
•School of Mathematics "Dr. Petar
Beron" - Varna was established in
autumn 1883.
•It was built as planned by architect
Petko Momchilov in style "modern
renaissance".
• For decades, this is the most
beautiful school building in
Bulgaria.
All these personalities and their
works have a significant influence
      on the Renaissance.

Renesance mary 10b class new

  • 2.
    • Early Renaissance. 1420- 1500 • Filippo Brunelleschi, Leon Battista Alberti, Masaccio and others. • Renaissance mature (flowering of the Renaissance). 1500 - 1540 • Leonardo da Vinci, Michelangelo Buonarroti, Raphael. • Late Renaissance. 16th Century • Andrea Palladio, Dzhordzhone, Titian, Paolo Veronese Kaliari.
  • 3.
    The influence ofLeonardo da Vinci, Copernicus, Galileo, Paracelsus, and other prominent scientists left a clear track and determine the multiple paths of development in science and art.
  • 4.
    He was renownedItalian architect, inventor, engineer, sculptor and painter of the Renaissance. He is said to be a prototype of the Renaissance man and comprehensive genius. Leonardo is famous for his paintings, most famous of which are "Last Supper" and "Mona Lisa".
  • 5.
    He was anItalian Renaissance painter, sculptor, architect, poet, and engineer who exerted an unparalleled influence on the development of Western art. Considered to be one of three titans of the Renaissance art with Leonardo da Vinci and Raphael.
  • 6.
    He was anItalian painter and architect of the High Renaissance. Many of his works are found in the Apostolic Palace of The Vatican, where the frescoed Raphael Rooms were the central, and the largest, work of his career.
  • 7.
     Renaissance literaturebegins with Dante, Petrarch continues with Giovanni Bokacho, Ludovico Ariosto, Torkuato Taso.  Western literature is developing under the influence of Italian Renaissance and the scientific discoveries and reach apogee in the works of Lope de Vega, Miguel de Cervantes, William Shakespeare, Francois Rabelais.
  • 8.
    Dante Alighieri wasan Italian poet from the city of Florence. His most famous work is "Divine Comedy" ("La Divina Commedia"), culminating in the development of medieval literature and fundamental to the development of modern Italy.
  • 9.
    He was aSpanish novelist, poet, and playwright. His great work, Don Quixote, considered the first modern novel is a classic of Western literature, and is regarded amongst the best works of fiction ever written.
  • 10.
    He was famousEnglish playwright and poet, recognized in Western culture as the most important writer in English literature. Shakespeare is the few playwrights who excel in writing both the tragedies and the comedies. His ability to capture and transmit the deepest aspects of human nature entitle many to consider him the consummate talent, and the English Renaissance is often called "Shakespeare time”.
  • 11.
    Bulgaria also hasartists like as Leonardo da Vinci. For example Zahari Zograf. He is arguably the most famous Bulgarian painter of the Bulgarian National Revival, noted for his church mural paintings and icons and often regarded as the founder of secular art in Bulgaria due to the introduction of everyday life elements in his work. The other is Vladimir Dimitrov — Maystora. He is considered one of the most talented 20th century Bulgarian painters and probably the most remarkable stylist in Bulgarian painting. His skills reach those of Leonardo da Vinci.
  • 12.
    Profound change ismade ​in the Renaissance and in theater, music and related arts. In construction focusing primarily on public buildings, palaces, town houses and others. Typical orders are severing of wall panels, arcades, colonnades. During the Renaissance also develops and astrology.
  • 13.
    In Bulgaria, thegreatest impact on the renaissance feels in preserved frescoes of the rock monastery near the village of Ivanovo, Ruse. Founder of the monastery was a Bulgarian Tsar John Alexander. Ivanovo rock churches are listed as World Heritage by UNESCO and is one of the 9 such sites in Bulgaria. Popular tourist sites. The Boyana Church is a medieval Bulgarian Orthodox church situated on the outskirts of Sofia. The church owes its world fame mainly to its frescoes from 1259. They form a second layer over the paintings from earlier centuries and represent one of the most complete and well-preserved monuments of Eastern European mediaeval art. The church also was established in Renaissance style.
  • 15.
    •School of Mathematics"Dr. Petar Beron" - Varna was established in autumn 1883. •It was built as planned by architect Petko Momchilov in style "modern renaissance". • For decades, this is the most beautiful school building in Bulgaria.
  • 16.
    All these personalitiesand their works have a significant influence on the Renaissance.