shaped pieces dwgs
Swarco Hall i Tirol
Swarco Austria / EAS
Austria 2015 PiDs for the productions
PM6 auxiliaries Mondi Steti Czech rep 2015
different small projects basic and detail
+ authority projects
pipings for PM rebuild SMB Austria 2015
Sizer PM3 project including
rebuild of the PM ; lubrication ;
warm water system for sizer ;
warm water system for wet
end waste water station sizer ,
waste water system for colour
preparation , new broke
system , steam and
condensate rebuild , Infra red
system + air turn , new
building for fans infrared, new
heat recovery and pm
ventilation systems, new PM
pulpers , drives rebuild,
lubrication, steel pedestals for
drives , maintanence
monorails , splash pit under
the sizer
BB Niklasdorf Austria 2014-2015 exist state verification ,
basic engineering ,
detail engineering ,
inquiring , offer clarifying , offer
comparissions, order preparing ,
complete coordination , project leading ,
time scheduling ,shut down planing
,rebuild planing and coordination ,
mounting , piping supervisions, startup
planing
3rd press project PM7 Mondi SCP Ruzomberok 2015 order preparation support ,
comparission and clarifying of technical
solutions, commercial parts and
guarantees, project manager technical
support
PM18 rolls rebuild
Mondi Scp Ruzomberok
Slovakia 2014
project support ; suppliere checks , time
scheduling , technical solutions check
basic + detail for lubrication , compr air ;
update of exist docus acc to the rebuild ,
supervisions
PM3 rebuild preparation BB Niklasdorf Austria 2014
exist state verification and docu for exist
state
REFERENCE LIST 2012-2015
for older references please see the reference list - 2012 - 1991 ENG
Project Customer Year Action
pulp mill rebuild Mondi Bulgaria 2014 piping inquiry and offer check
rebuild PM5 BB Niklasdorf Austria 2014 invest preparation - main supplierer
order preparing
POLARNAYA natural gas
power plant - air
condensation; colling
condensing station for the
condens turbine
rebuild PM5
PM5 Rebuild auxiliaries
PM5 Rebuild auxiliaries Mondi Steti Czech rep. 2013
auxiliaries basic and detail engineering
Mondi Steti Czech rep. 2013
auxiliaries study , budget
Russian federation 2013
extended basic engineering and detail
engineering , subsuppliers
documenattion check , inquirying , time
scheduling , coordination
basic and detail engineering ;
manufacturing documentation
PM17 Sizer complete
auxiliaries for the new sizer ;
rebuild of workings station ,
ventilation , warm water
preparation , drives rebuild,
lubrication, steel pedestals for
drives , maintanence
monorails , splash pit under
the sizer , sizer pulper
Mondi SCP Ruzomberok
Slovakia
2014 exist state verification ,
basic engineering ,
detail engineering ,
inquiring , offer clarifying , offer
comparissions, order preparing ,
complete coordination , project leading ,
time scheduling ,shut down planing
,rebuild planing and coordination ,
mounting , piping supervisions, startup
planing
2013
study and budget for fersh water savings
BB Niklasdorf Austria 2014 study + budget for pM rebuild
splash walls for sizer Delfort group ; Dunafin
Hungary
2014
Dunafin paper mill Delfort gorup hungary
PM6 rebuild auxiliaries ; steam
and condensate system for
finishing , condesator and
condensate return pumping
station for finishing ;
condensate colecting and
condesator for flush steam ;
steam 12 Bar cooling station ,
water system - fresh water
supply , warm water
preparation sealing water
system , cooling water system ,
water chemical conditioning
and microfiltering , hall
ventilation system including
heating and filtering systems +
special distribution system ,
PM ventilation systems incl
heating and filtering, check of
layouts and proposals for
covering of problems ,
compressed air new station for
working air , instrumentation
Mondi Steti Czech rep 2014 exist state verification ,
basic engineering ,
detail engineering ,
inquiring , offer clarifying , offer
comparissions, order preparing ,
complete coordination , project leading ,
time scheduling ,shut down planing
,rebuild planing and coordination ,
mounting , piping supervisions, startup
planing
PM Rebuild paper mill Lenzing Austria 2013 study + budget
PM7 External Steam Mondi Steti 2012 / 2013 Study – Preproject + Budget
pulper, refiner, chests and loadplans, Supports,…
,..etc)
(new transportsystem, design, Layouts, Foundation
New Pulp Line Mondi Raubling 2012 / 2013 Detailengineering, Piping
loadplans, Supports,…
Layouts, Foundation and
Support, Piping design,
PM5 Shaker Mondi Steti 2013 Detail engineering + Project
pumps)
cleaners 1-4 stage + and loadplans, Supports,…
Cleaner Rebuild 2013 Detail engineering , Piping
(Installation of new design, Layouts, Foundation
Layout study
confidential Product finishing Mondi Steti CZ 2013 Study
Supports,…
confidential Storage for
products Mondi Steti CZ
Fan and loadplans,
Piping design,
pumps with a Man turbo CZ Layouts, Foundation
2013 Project for authorities - building permit
Dunaujvaros, H
PM9 Sizer protection wall Dunafin Delfort 2013 Study
PM5 heat recovery ; PM
ventilation ; Steam and
condensate system
Mondi Steti CZ and S
Project Prague Czech
republik 2013 Project for authorities - building permit
Detail Engineering,
PM5 Shoe Press Mondi Steti CZ 2013 Project for authorities - building permit
MAN Vaacum OPP Olsany 2013
Replacing vacuum Delfort group
Replacing vacuum
pumps with a Man turbo
Fan
Basic engineering2013
Delfort group
CZ
2013
CZ/SK
main distribution - main
pipeline d900
OPP Olsany
Slovnaft / Fans
Filter station ,
Watertreatment,.chemical
storage
Cooling Towers, pumping
station
extenden basic + Detailengineering;
permiting project for authorities; civil
engineering, coordination
Cooling center 5 for th
new energy centre
GLV Austria for Belisce
paper mill
MAN Vaacum
Slovenia
Slovenia
Slovenia
Sizer PM5 BB Vevce 2012 Preproject, budget
Exist state verification + CAD dwg
Hausmening Austria
PM5 sizer Mondi Neusiedler 2012 Preproject, budget
PS4 rebuild Mondi group Steti 2012 PM El exist state verification + CAD dwg
Czech republik
PS 4 CLUPAK
Pulp drying machine Mondi Syktivkar 2012
Czech republik
Mondi group Steti 2012
Russia dryier instalation
Austria
BB Vevce 2012
PS4 rebuild documentation Mondi group Steti 2012 Documentation sorting
for the 2nd hand dryier transfer
Verification of exist documentation
PS6 disc filter building Mondi group Steti 2012 Preproject + budget
management Czech republik + SAP preparing + management
Exist state verififcation for 2nd hand
Sizer PM5 BB Vevce 2013 / 2012 Study + budget
PM 3 Sizer BB Niklasdorf 2012 Preproject, budget
pulper, refiner, chests
New Pulp Line Mondi Raubling 2012 Basic Engineering
Beating line Hungary
(new transportsystem,
Sizer PM5 project including
rebuild of the PM ; lubrication ;
warm water system for sizer
;waste water station sizer ,
workings stations for colour ,
workingstation for starch ,
new broke system , steam and
condensate rebuild , Infra red
system + air turn , new
building for fans infrared, new
heat recovery and pm
ventilation systems, new PM
pulper ;drives rebuild,
lubrication, steel pedestals for
drives , maintanence
monorails , splash pit under
the sizer ,
,..etc)
sorting
piping
PM4 Dokumentation Mondi Steti 2012 project preparation
PM4 reconfiguration Delfort group Dunafin 2012 Basic Engineering
exist state verification ,
basic engineering ,
detail engineering ,
inquiring , offer clarifying , offer
comparissions, order preparing ,
complete coordination , project leading ,
time scheduling ,shut down planing
,rebuild planing and coordination ,
mounting , piping supervisions, startup
planing
monorails Czech republik
short fiber Hausmening Austria
PM6 new beating line for Mondi Neusiedler
PM6 Top Former Mondi group Steti 2012 Detail engineering
PM5 Pres rebuild Mondi Neusiedler 2012 Time scheduling for the rebuild
Czech republik
2012/2011 Detail engineering
lubrication+ ventilation +
steam and condensate
piping bridges
PM5 / PM7 new pulp Mondi Raubling 2012 detail engineering
pulping and beating line – Germany
and beating line Germany time scheduling; inquiries
PM5 / PM7 new pulp pulper Mondi Raubling 2012 Basic + detail engineering ;
civil engineering for condensate building
ventilation condensate building
268MW detail engineering
POLARNAYA new cooling
centre for new power plant
Management support
Basic engineering check
2012FANS
Czech republik
rebuild for energy saving Czech republik
PM6 Vacuum station – Mondi group Steti 2012 Basic , detailengineering
sizer rebuild Slovakia time scheduling ;
PS17 new sizer + rebuild Mondi SCP Ruzomberok 2012 Basicengineering
after drying section + drive Slovakia
PS17 working station for Mondi SCP Ruzomberok 2012 Basic, Detailengineering,
time scheduling ;
support for project management
+ collecting pit under sizer
waste paper pit, central
Detailengineering,
Hausmening Austria
for sizer + monorails and
platforms for the ADS drives

Referenc list 2012 -2015 excell pdf

  • 1.
    shaped pieces dwgs SwarcoHall i Tirol Swarco Austria / EAS Austria 2015 PiDs for the productions PM6 auxiliaries Mondi Steti Czech rep 2015 different small projects basic and detail + authority projects pipings for PM rebuild SMB Austria 2015 Sizer PM3 project including rebuild of the PM ; lubrication ; warm water system for sizer ; warm water system for wet end waste water station sizer , waste water system for colour preparation , new broke system , steam and condensate rebuild , Infra red system + air turn , new building for fans infrared, new heat recovery and pm ventilation systems, new PM pulpers , drives rebuild, lubrication, steel pedestals for drives , maintanence monorails , splash pit under the sizer BB Niklasdorf Austria 2014-2015 exist state verification , basic engineering , detail engineering , inquiring , offer clarifying , offer comparissions, order preparing , complete coordination , project leading , time scheduling ,shut down planing ,rebuild planing and coordination , mounting , piping supervisions, startup planing 3rd press project PM7 Mondi SCP Ruzomberok 2015 order preparation support , comparission and clarifying of technical solutions, commercial parts and guarantees, project manager technical support PM18 rolls rebuild Mondi Scp Ruzomberok Slovakia 2014 project support ; suppliere checks , time scheduling , technical solutions check basic + detail for lubrication , compr air ; update of exist docus acc to the rebuild , supervisions PM3 rebuild preparation BB Niklasdorf Austria 2014 exist state verification and docu for exist state REFERENCE LIST 2012-2015 for older references please see the reference list - 2012 - 1991 ENG Project Customer Year Action pulp mill rebuild Mondi Bulgaria 2014 piping inquiry and offer check
  • 2.
    rebuild PM5 BBNiklasdorf Austria 2014 invest preparation - main supplierer order preparing POLARNAYA natural gas power plant - air condensation; colling condensing station for the condens turbine rebuild PM5 PM5 Rebuild auxiliaries PM5 Rebuild auxiliaries Mondi Steti Czech rep. 2013 auxiliaries basic and detail engineering Mondi Steti Czech rep. 2013 auxiliaries study , budget Russian federation 2013 extended basic engineering and detail engineering , subsuppliers documenattion check , inquirying , time scheduling , coordination basic and detail engineering ; manufacturing documentation PM17 Sizer complete auxiliaries for the new sizer ; rebuild of workings station , ventilation , warm water preparation , drives rebuild, lubrication, steel pedestals for drives , maintanence monorails , splash pit under the sizer , sizer pulper Mondi SCP Ruzomberok Slovakia 2014 exist state verification , basic engineering , detail engineering , inquiring , offer clarifying , offer comparissions, order preparing , complete coordination , project leading , time scheduling ,shut down planing ,rebuild planing and coordination , mounting , piping supervisions, startup planing 2013 study and budget for fersh water savings BB Niklasdorf Austria 2014 study + budget for pM rebuild splash walls for sizer Delfort group ; Dunafin Hungary 2014 Dunafin paper mill Delfort gorup hungary PM6 rebuild auxiliaries ; steam and condensate system for finishing , condesator and condensate return pumping station for finishing ; condensate colecting and condesator for flush steam ; steam 12 Bar cooling station , water system - fresh water supply , warm water preparation sealing water system , cooling water system , water chemical conditioning and microfiltering , hall ventilation system including heating and filtering systems + special distribution system , PM ventilation systems incl heating and filtering, check of layouts and proposals for covering of problems , compressed air new station for working air , instrumentation Mondi Steti Czech rep 2014 exist state verification , basic engineering , detail engineering , inquiring , offer clarifying , offer comparissions, order preparing , complete coordination , project leading , time scheduling ,shut down planing ,rebuild planing and coordination , mounting , piping supervisions, startup planing
  • 3.
    PM Rebuild papermill Lenzing Austria 2013 study + budget PM7 External Steam Mondi Steti 2012 / 2013 Study – Preproject + Budget pulper, refiner, chests and loadplans, Supports,… ,..etc) (new transportsystem, design, Layouts, Foundation New Pulp Line Mondi Raubling 2012 / 2013 Detailengineering, Piping loadplans, Supports,… Layouts, Foundation and Support, Piping design, PM5 Shaker Mondi Steti 2013 Detail engineering + Project pumps) cleaners 1-4 stage + and loadplans, Supports,… Cleaner Rebuild 2013 Detail engineering , Piping (Installation of new design, Layouts, Foundation Layout study confidential Product finishing Mondi Steti CZ 2013 Study Supports,… confidential Storage for products Mondi Steti CZ Fan and loadplans, Piping design, pumps with a Man turbo CZ Layouts, Foundation 2013 Project for authorities - building permit Dunaujvaros, H PM9 Sizer protection wall Dunafin Delfort 2013 Study PM5 heat recovery ; PM ventilation ; Steam and condensate system Mondi Steti CZ and S Project Prague Czech republik 2013 Project for authorities - building permit Detail Engineering, PM5 Shoe Press Mondi Steti CZ 2013 Project for authorities - building permit MAN Vaacum OPP Olsany 2013 Replacing vacuum Delfort group Replacing vacuum pumps with a Man turbo Fan Basic engineering2013 Delfort group CZ 2013 CZ/SK main distribution - main pipeline d900 OPP Olsany Slovnaft / Fans Filter station , Watertreatment,.chemical storage Cooling Towers, pumping station extenden basic + Detailengineering; permiting project for authorities; civil engineering, coordination Cooling center 5 for th new energy centre GLV Austria for Belisce paper mill MAN Vaacum
  • 4.
    Slovenia Slovenia Slovenia Sizer PM5 BBVevce 2012 Preproject, budget Exist state verification + CAD dwg Hausmening Austria PM5 sizer Mondi Neusiedler 2012 Preproject, budget PS4 rebuild Mondi group Steti 2012 PM El exist state verification + CAD dwg Czech republik PS 4 CLUPAK Pulp drying machine Mondi Syktivkar 2012 Czech republik Mondi group Steti 2012 Russia dryier instalation Austria BB Vevce 2012 PS4 rebuild documentation Mondi group Steti 2012 Documentation sorting for the 2nd hand dryier transfer Verification of exist documentation PS6 disc filter building Mondi group Steti 2012 Preproject + budget management Czech republik + SAP preparing + management Exist state verififcation for 2nd hand Sizer PM5 BB Vevce 2013 / 2012 Study + budget PM 3 Sizer BB Niklasdorf 2012 Preproject, budget pulper, refiner, chests New Pulp Line Mondi Raubling 2012 Basic Engineering Beating line Hungary (new transportsystem, Sizer PM5 project including rebuild of the PM ; lubrication ; warm water system for sizer ;waste water station sizer , workings stations for colour , workingstation for starch , new broke system , steam and condensate rebuild , Infra red system + air turn , new building for fans infrared, new heat recovery and pm ventilation systems, new PM pulper ;drives rebuild, lubrication, steel pedestals for drives , maintanence monorails , splash pit under the sizer , ,..etc) sorting piping PM4 Dokumentation Mondi Steti 2012 project preparation PM4 reconfiguration Delfort group Dunafin 2012 Basic Engineering exist state verification , basic engineering , detail engineering , inquiring , offer clarifying , offer comparissions, order preparing , complete coordination , project leading , time scheduling ,shut down planing ,rebuild planing and coordination , mounting , piping supervisions, startup planing
  • 5.
    monorails Czech republik shortfiber Hausmening Austria PM6 new beating line for Mondi Neusiedler PM6 Top Former Mondi group Steti 2012 Detail engineering PM5 Pres rebuild Mondi Neusiedler 2012 Time scheduling for the rebuild Czech republik 2012/2011 Detail engineering lubrication+ ventilation + steam and condensate piping bridges PM5 / PM7 new pulp Mondi Raubling 2012 detail engineering pulping and beating line – Germany and beating line Germany time scheduling; inquiries PM5 / PM7 new pulp pulper Mondi Raubling 2012 Basic + detail engineering ; civil engineering for condensate building ventilation condensate building 268MW detail engineering POLARNAYA new cooling centre for new power plant Management support Basic engineering check 2012FANS Czech republik rebuild for energy saving Czech republik PM6 Vacuum station – Mondi group Steti 2012 Basic , detailengineering sizer rebuild Slovakia time scheduling ; PS17 new sizer + rebuild Mondi SCP Ruzomberok 2012 Basicengineering after drying section + drive Slovakia PS17 working station for Mondi SCP Ruzomberok 2012 Basic, Detailengineering, time scheduling ; support for project management + collecting pit under sizer waste paper pit, central Detailengineering, Hausmening Austria for sizer + monorails and platforms for the ADS drives