SlideShare a Scribd company logo
1 of 3
Download to read offline
1
George-Ciprian PETRESCU
Address: 123 Romana Street, Ploiesti, Prahova
Mobile: (+4)0722 459965 ROMANIA;
Email; ciprianpet79@yahoo.com
Skype: georgeciprianpetrescu
Date of Birth: June 2
nd
, 1979
- - P R O F E S S I O N AL E X P E R I E N C E - -
I.P.I.P S.A., Ploiesti
October 2015 – February 2016 Position – Engineer 2D, piping design engineer
Job description/ Responsibilities
 Achievement of isometric drawing according field surveys and P& I D’s;
 Attention to survey;
Caspian Proger, Aksai Kazakhstan Position – 3D design piping mechanical engineer
May-04-2015 – june-21-2015
Job description/ Responsibilities
 Achievement of 3d model with smartplant3d;
 Training and practice 3d model with smartplant3d in cloud;
 To verify project specifications according RoK codes (GOST) and EN codes, API norms, ANSI norms.
I.P.I.P S.A., Ploiesti
November 2014 – April 2015 Position – Engineer 2D/3D, piping design engineer
Job description/ Responsibilities
 Achievement of project documentation according to surveys and P& I D’s;
 Attention to survey in site;
 The graphics are done in AutoCAD, PDMS;
 I worked in authorizing projects pipeline (Petromidia -KazMunayGaz – HB Unit, RC Unit), I’m involved also in
“Interconnection of New Primary and Secondary Heaters in CDU No.2” project and Revamping Project Petrom-OMV
Unit Abramut.
 To prepare iso’s and material and supports list;
 To prepare MTO and Summary of piping materials;
 To prepare drawings, iso’s, plot plans, and P&ID’s if necessary “As Built” is.
Saipem S.p.A., San Donato Milanese
October 2014 Position – Piping engineer – P&ID Specialist
Job description/ Responsibilities
 Achievement of project documentation according to Line List and P& I D’s for Spiritwood Nitrogen Plant Project;
2
I.P.I.P S.A., Ploiesti
August 2010 – September 2014 Position – Engineer 2D, piping design engineer
Job description/ Responsibilities
 Achievement of project documentation according to surveys and P& I D’s;
 Attention to survey in site;
 The graphics are done in AutoCAD;
 In most of my work in the company in authorizing projects pipeline (Petrom -OMV – DAV2 Unit revamp Project,
FCC Unit Revamp Project
These projects were made with Foster Wheeler Italiana (FWI) in DAV Unit (atmospheric and vacuum distilleries
unit) and FCC Unit (catalytic cracking fraction unit).
 In collaboration with FWI were developed sketches for tie-in’s and repairs projects, after survey and after FWI
check sketches for a good solution.
 To prepare drawings, iso’s, plot plans, and P&ID’s if necessary “As Built” is.
October 2007 – July 2010 Position – Technical engineer 2D, piping design engineer
Job description/ Responsibilities
 Design of cooling water network and foam solution network for fire fighting system;
 As built cooling water systems and fire extinguishing project;
 Survey for “As Built”;
 Attention to survey in site;
 The graphics are done in AutoCAD;
 In most of my work in the company I was involved in authorizing projects pipeline (Petrom – Suplacu de Barcau,
Aprechim Pitesti, Brazi).
Petrotel-Lukoil S.A., Ploiesti
October 2006 – September 2007 Position – Technical engineer energy consumption accountability
Job description/ Responsibilities
 To collect information (quantity, pressure, temperature) a b o u t energy consumption (gas, steam,
condensate, electrical power);
 Daily, weekly, monthly activity report (by MS Excel);
 I made sketches for department with MS Visio;
 Very carefully to prepare reports.
Energomontaj S.A. Bucuresti, Brasov Branch
July 2003 – May 2005 Position –Technical engineer Site Engineer Coordinator
Job description/ Responsibilities
 Activity in that company is to setting and erecting equipments for power stations. My job was to coordinate and
check all activities in site, developed by Energomontaj S.A.
 As responsibilities in site must have maximum attention for HSE (health, safety and environmental);
 Setting layout sketch detail for erection;
 Over 6 km air duct installed in drug factory LekPharma (now, Sandoz) Tg-Mures, maintenance service for cement
kiln (Lafarge-Hoghiz, Brasov), setting and erection of air duct for thermal power-station Paroseni, Hunedoara;
 Steel structure (beam, supports, metal) for cement plant Holcim Turda;
 Daily, weekly and monthly activity report (by MS Excel and then MS Project).
3
- - E D U C AT I O N - -
Start 2006 – End 2010 Ploiesti Oil and Gas University, Ploiesti
Faculty of Mechanical engineering – Economic engineering in mechanical field
Start 1998 – End 2002 Bucharest Polytechnics University, Bucharest
Faculty of Power energy – 2nd
Technical College - Faculty of power system.
- - T R AI N I N G S - -
S.C. IPIP S.A and SIVECO S.A
Training : Introduction in PDS, PDMS, Microsoft Project.
- - S K I L L S - -
Foreign languages English - good level; Italian – medium level;
IT Skills Microsoft Office, Word, Visio, AutoCAD, PDMS, SmartPlant3d, Cosmos, SolidWorks,
Mathcad, Microsoft Project, Internet Explorer, Mozilla Firefox.
Driving License B Category, no records.

More Related Content

Similar to George_Petrescu_CVEN (20)

CV QUANPH - FEB 2019
CV QUANPH - FEB 2019CV QUANPH - FEB 2019
CV QUANPH - FEB 2019
 
WebCruiter
WebCruiterWebCruiter
WebCruiter
 
WebCruiter
WebCruiterWebCruiter
WebCruiter
 
HeikkiläCV201602
HeikkiläCV201602HeikkiläCV201602
HeikkiläCV201602
 
My CV
My CVMy CV
My CV
 
CV.FAHRUDIN ASMAN
CV.FAHRUDIN ASMANCV.FAHRUDIN ASMAN
CV.FAHRUDIN ASMAN
 
Scbj 11032017-cv
Scbj 11032017-cvScbj 11032017-cv
Scbj 11032017-cv
 
SMA CV2016-1
SMA CV2016-1SMA CV2016-1
SMA CV2016-1
 
Bhimasen Yadawad-3
Bhimasen Yadawad-3Bhimasen Yadawad-3
Bhimasen Yadawad-3
 
My cv
My cvMy cv
My cv
 
Bill ure cv 31 08-16
Bill ure cv 31 08-16Bill ure cv 31 08-16
Bill ure cv 31 08-16
 
My CV
My CVMy CV
My CV
 
Cv mišković ranko
Cv mišković rankoCv mišković ranko
Cv mišković ranko
 
Scbj 0706187-cv
Scbj 0706187-cvScbj 0706187-cv
Scbj 0706187-cv
 
GMcnicol CV
GMcnicol CVGMcnicol CV
GMcnicol CV
 
Scbj 070618-cv
Scbj 070618-cvScbj 070618-cv
Scbj 070618-cv
 
Resume_Jan 2017
Resume_Jan 2017Resume_Jan 2017
Resume_Jan 2017
 
EZBonavente CV_ Civil & Structural Engineer
EZBonavente CV_ Civil & Structural EngineerEZBonavente CV_ Civil & Structural Engineer
EZBonavente CV_ Civil & Structural Engineer
 
Maksimetc_Aleksandr
Maksimetc_AleksandrMaksimetc_Aleksandr
Maksimetc_Aleksandr
 
Ramy Mikhail updated
Ramy Mikhail updatedRamy Mikhail updated
Ramy Mikhail updated
 

George_Petrescu_CVEN

  • 1. 1 George-Ciprian PETRESCU Address: 123 Romana Street, Ploiesti, Prahova Mobile: (+4)0722 459965 ROMANIA; Email; ciprianpet79@yahoo.com Skype: georgeciprianpetrescu Date of Birth: June 2 nd , 1979 - - P R O F E S S I O N AL E X P E R I E N C E - - I.P.I.P S.A., Ploiesti October 2015 – February 2016 Position – Engineer 2D, piping design engineer Job description/ Responsibilities  Achievement of isometric drawing according field surveys and P& I D’s;  Attention to survey; Caspian Proger, Aksai Kazakhstan Position – 3D design piping mechanical engineer May-04-2015 – june-21-2015 Job description/ Responsibilities  Achievement of 3d model with smartplant3d;  Training and practice 3d model with smartplant3d in cloud;  To verify project specifications according RoK codes (GOST) and EN codes, API norms, ANSI norms. I.P.I.P S.A., Ploiesti November 2014 – April 2015 Position – Engineer 2D/3D, piping design engineer Job description/ Responsibilities  Achievement of project documentation according to surveys and P& I D’s;  Attention to survey in site;  The graphics are done in AutoCAD, PDMS;  I worked in authorizing projects pipeline (Petromidia -KazMunayGaz – HB Unit, RC Unit), I’m involved also in “Interconnection of New Primary and Secondary Heaters in CDU No.2” project and Revamping Project Petrom-OMV Unit Abramut.  To prepare iso’s and material and supports list;  To prepare MTO and Summary of piping materials;  To prepare drawings, iso’s, plot plans, and P&ID’s if necessary “As Built” is. Saipem S.p.A., San Donato Milanese October 2014 Position – Piping engineer – P&ID Specialist Job description/ Responsibilities  Achievement of project documentation according to Line List and P& I D’s for Spiritwood Nitrogen Plant Project;
  • 2. 2 I.P.I.P S.A., Ploiesti August 2010 – September 2014 Position – Engineer 2D, piping design engineer Job description/ Responsibilities  Achievement of project documentation according to surveys and P& I D’s;  Attention to survey in site;  The graphics are done in AutoCAD;  In most of my work in the company in authorizing projects pipeline (Petrom -OMV – DAV2 Unit revamp Project, FCC Unit Revamp Project These projects were made with Foster Wheeler Italiana (FWI) in DAV Unit (atmospheric and vacuum distilleries unit) and FCC Unit (catalytic cracking fraction unit).  In collaboration with FWI were developed sketches for tie-in’s and repairs projects, after survey and after FWI check sketches for a good solution.  To prepare drawings, iso’s, plot plans, and P&ID’s if necessary “As Built” is. October 2007 – July 2010 Position – Technical engineer 2D, piping design engineer Job description/ Responsibilities  Design of cooling water network and foam solution network for fire fighting system;  As built cooling water systems and fire extinguishing project;  Survey for “As Built”;  Attention to survey in site;  The graphics are done in AutoCAD;  In most of my work in the company I was involved in authorizing projects pipeline (Petrom – Suplacu de Barcau, Aprechim Pitesti, Brazi). Petrotel-Lukoil S.A., Ploiesti October 2006 – September 2007 Position – Technical engineer energy consumption accountability Job description/ Responsibilities  To collect information (quantity, pressure, temperature) a b o u t energy consumption (gas, steam, condensate, electrical power);  Daily, weekly, monthly activity report (by MS Excel);  I made sketches for department with MS Visio;  Very carefully to prepare reports. Energomontaj S.A. Bucuresti, Brasov Branch July 2003 – May 2005 Position –Technical engineer Site Engineer Coordinator Job description/ Responsibilities  Activity in that company is to setting and erecting equipments for power stations. My job was to coordinate and check all activities in site, developed by Energomontaj S.A.  As responsibilities in site must have maximum attention for HSE (health, safety and environmental);  Setting layout sketch detail for erection;  Over 6 km air duct installed in drug factory LekPharma (now, Sandoz) Tg-Mures, maintenance service for cement kiln (Lafarge-Hoghiz, Brasov), setting and erection of air duct for thermal power-station Paroseni, Hunedoara;  Steel structure (beam, supports, metal) for cement plant Holcim Turda;  Daily, weekly and monthly activity report (by MS Excel and then MS Project).
  • 3. 3 - - E D U C AT I O N - - Start 2006 – End 2010 Ploiesti Oil and Gas University, Ploiesti Faculty of Mechanical engineering – Economic engineering in mechanical field Start 1998 – End 2002 Bucharest Polytechnics University, Bucharest Faculty of Power energy – 2nd Technical College - Faculty of power system. - - T R AI N I N G S - - S.C. IPIP S.A and SIVECO S.A Training : Introduction in PDS, PDMS, Microsoft Project. - - S K I L L S - - Foreign languages English - good level; Italian – medium level; IT Skills Microsoft Office, Word, Visio, AutoCAD, PDMS, SmartPlant3d, Cosmos, SolidWorks, Mathcad, Microsoft Project, Internet Explorer, Mozilla Firefox. Driving License B Category, no records.