SlideShare a Scribd company logo
Rajasthan Solar PV Power Projects
- Project Conceptualization Services under
        Rajasthan Solar Policy 2011


              (Private and Confidential)

                     21 Feb 2011




                   Proposed By:-




   PAN EXERGY PRIVATE LIMITED



   Address: D-32, Sector 7, Noida, India. ZIP: 201301
     Tel: +91-120-4243211 Fax: +91-11-2271 9366
      Web: www.exergy.in Email: info@exergy.in
Aim of this Document
Rajasthan Solar Policy 2011 is going to be declared by RREC shortly. Perceiving a strong rush for
Project Registration at RREC, Exergy feels confident in guiding its future clients towards successful
project conceptualizationin the abode of Sun – Rajasthan.

Exergy has had an experience of handling more than 300 MW of project consultancies in Rajasthan
itself for some of the major clients like TATA Power, Gammon India, Reliance Power, NDPL,
Arvind Constructions to name a few. For a detailed profile of Exergy, please email us at:
info@exergy.in or view our website: www.exergy.in.

This document has been prepared by Pan Exergy Pvt Ltd (hereinafter together referred to as
“Exergy”) to provide a comprehensive proposal for MW-sized based Solar PV Power Project
Conceptualization Services in Rajasthan which includes:

   1. Regulatory Services:

           a. Solar Site Identification and Selection Services;

           b. Project Registration Services

   2. Technical Services

   3. Financial Services

The above proposal has been proposed for M/s IndoKorean Pvt Ltd (hereinafter together
referred to as “the Client”).
Scope of Activities

The whole scope of work for conceptualizing a 50MWp Solar PV Project in Rajasthan is divided
into following major activities:

              Scope of Work                                     Deliverables
   1. Solar Site Selection & Identification
                                                      a. Demonstrating 3 viable Govt. or
       a. Solar Land Bank Assessment                     private land of around 300 acres.

       b. Solar Resource Assessment Studies           b. Site Evaluation            &    Technical
                                                         Feasibility Services.
       c. Energy Yield Studies
                                                      c. Jamabandi Maps for the chosen
       d. Comparative Analysis of chosen sites
                                                         location.

                                                      d. Clearances on the land selected.

                                                      e. Identifying suitable land brokers,
                                                         patwaris for land acquisition pocess.

   2. Project Registration Services

       a. Assistance for filing application with      a. Project Registration at RREC.
          Govt. authorities.
                                                      b. Necessary follow ups with each govt.
       b. Preparation of Preliminary DPR for             offices involved.
          Govt. clearances.
                                                      c. Power Evacuation Clearance.
       c. Power Evacuation Scheme & Grid
          Interfacing Clearances.                     d. DPR Approval

       d. Project    Recommendation           &       e. Project Recommendation Certificate
          Clearance.                                     from RREC.

   3. Technology Services
      a. Preparation of final          Bankable
         Detailed Project Report.                     a. Bankable 50MW DPR.

       b. Technology selection advisory which         b. Technology       Selection        Strategy
          will include comparisons between               Report.
          various prevalent global & upcoming         c. BOQ        Finalization,       Shortlisting
technologies. The technology view                 technology vendors, contracts for
              shall   be     substantiated  with                civil, electrical & mechanical works.
              concomitant MNRE regulations.
                                                            d. Designing training modules for
       c. Detailed Engineering Consultancy as                  inhouse engineers for O&M, plant
          Owner’s Engineer.                                    handling etc.

       d. Training of Personnel in Solar Plant
          Operations, Maintenance, Principles.

   4. Financial Services

       a. Project Financial Analysis including
          Cash Flows, IRRs, P&L, DSCR etc.
                                                            a. Financial Analysis Reports.
       b. Sensitivity Analysis based on variable
          technology cost, solar radiation, debt            b. Debt Syndication Efforts.
          syndication etc.                                  c. Sensitivity Analysis Charts.
       c. Reverse bidding, providing required               d. Strong analysis for the rationale of
          market intelligence for effectively                  REC based Solar PV project. Some
          bidding in the process at RREC.                      of our REC (Renewable Energy
       d. Assisting the client in debt                         Certificate) clients are TATA Power,
          syndication based on the status of                   Abhijeet Industries etc.
          equity and other hygiene factors.

       e. Renewable Energy Certificate, REC
          based     project      assessment
          (recommended)



PS: The actual land acquisition will be undertaken by the client itself and Exergy shall
facilitate the process. Any incidental or liaisoning expenses shall be payable separately by
the client.

Exergy shall support the client during the acquisition process of the site. It will be part of initial
deliberations with the brokers and the govt. officials responsible. In case of the failure of
negotiations Exergy shall suggest another site in lieu of the previous one or another land broker as
the case may be. For this purpose Exergy shall conduct a maximum of 3 site visits with the client.
Consideration/ Project Cost & Timeline


Zero date
   o Placement of a clear and confirmed order/Mandate in favor of Pan Exergy Pvt. Ltd.
       alongwith the payment of the agreed advance amount.



Time Line

            Exergy shall propose three sites within 2 weeks from the Zero date.

            Exergy shall submit land selection-cum-feasibility report within 3 weeks from Zero date.

            The necessary project documents shall be submitted at Rajasthan Renewable Energy
             Corp within 3~4 week time from Zero Date.

            Tentative time schedule for RREC Recommendation shall be within 2-3 months
             provided all necessary data sought is provided in time.




Consideration

PS: This is a preliminary technical proposal and any budgetary cost shall be indicated in future
proposals.

Contact Us

Contact Person:         Rajat Sethi
                        Head, Solar Infrastructure Services, Pan Exergy Pvt Ltd
Website:                www.exergy.in
Email:                  Rajat@Exergy.in
Address:                D-32, Sector 7, Noida – 201301
Phone:                  +91-120-4243211; +91-9999676750; +91-9654436886.

More Related Content

Similar to Rajasthan-Solar-Policy 2011

Saibal Datta_CV15122015
Saibal Datta_CV15122015Saibal Datta_CV15122015
Saibal Datta_CV15122015Saibal Datta
 
Rahim a m
Rahim a mRahim a m
Rahim a m
Rahim A M
 
My new resume- Copy (1) (3) - Copy
My new resume- Copy (1) (3) - CopyMy new resume- Copy (1) (3) - Copy
My new resume- Copy (1) (3) - CopyRp Singh
 
Agneya Clientele
Agneya ClienteleAgneya Clientele
Resume (Sunil Kumar)
Resume (Sunil Kumar)Resume (Sunil Kumar)
Resume (Sunil Kumar)sunil kumar
 
Final Presentation for 1st GMs-PDs Conference 03.02.2023.pptx
Final Presentation for 1st GMs-PDs Conference 03.02.2023.pptxFinal Presentation for 1st GMs-PDs Conference 03.02.2023.pptx
Final Presentation for 1st GMs-PDs Conference 03.02.2023.pptx
hurain5
 
d premanatha reddy_original (2)
d premanatha reddy_original (2)d premanatha reddy_original (2)
d premanatha reddy_original (2)Reddy Premnath
 
GC Advisors - REC Offering
GC Advisors - REC OfferingGC Advisors - REC Offering
GC Advisors - REC OfferingGCAdvisors
 
CV_Mohammad Golam Sarowar _Civil Engineer
CV_Mohammad Golam Sarowar  _Civil EngineerCV_Mohammad Golam Sarowar  _Civil Engineer
CV_Mohammad Golam Sarowar _Civil EngineerMohammad Sarowar
 
Project & Infrastructure Financing- SPV for Solar Park
Project & Infrastructure Financing- SPV for Solar Park Project & Infrastructure Financing- SPV for Solar Park
Project & Infrastructure Financing- SPV for Solar Park
Akhilesh Upadhyay
 

Similar to Rajasthan-Solar-Policy 2011 (20)

Cv Ayan Ganguly
Cv Ayan GangulyCv Ayan Ganguly
Cv Ayan Ganguly
 
Saibal Datta_CV15122015
Saibal Datta_CV15122015Saibal Datta_CV15122015
Saibal Datta_CV15122015
 
NARESH 3+
NARESH 3+NARESH 3+
NARESH 3+
 
Rahim a m
Rahim a mRahim a m
Rahim a m
 
My new resume- Copy (1) (3) - Copy
My new resume- Copy (1) (3) - CopyMy new resume- Copy (1) (3) - Copy
My new resume- Copy (1) (3) - Copy
 
Resume-Mujib.
Resume-Mujib.Resume-Mujib.
Resume-Mujib.
 
Kona Rao -2015
Kona Rao  -2015Kona Rao  -2015
Kona Rao -2015
 
Aizaz Ahmad Qatar
Aizaz Ahmad QatarAizaz Ahmad Qatar
Aizaz Ahmad Qatar
 
Agneya Clientele
Agneya ClienteleAgneya Clientele
Agneya Clientele
 
Resume (Sunil Kumar)
Resume (Sunil Kumar)Resume (Sunil Kumar)
Resume (Sunil Kumar)
 
Final Presentation for 1st GMs-PDs Conference 03.02.2023.pptx
Final Presentation for 1st GMs-PDs Conference 03.02.2023.pptxFinal Presentation for 1st GMs-PDs Conference 03.02.2023.pptx
Final Presentation for 1st GMs-PDs Conference 03.02.2023.pptx
 
RAJPAL @cv
RAJPAL @cvRAJPAL @cv
RAJPAL @cv
 
CV Seismic
CV SeismicCV Seismic
CV Seismic
 
Curriculum Vitae
Curriculum VitaeCurriculum Vitae
Curriculum Vitae
 
d premanatha reddy_original (2)
d premanatha reddy_original (2)d premanatha reddy_original (2)
d premanatha reddy_original (2)
 
JAMES -CV -
JAMES -CV -JAMES -CV -
JAMES -CV -
 
GC Advisors - REC Offering
GC Advisors - REC OfferingGC Advisors - REC Offering
GC Advisors - REC Offering
 
CV_Mohammad Golam Sarowar _Civil Engineer
CV_Mohammad Golam Sarowar  _Civil EngineerCV_Mohammad Golam Sarowar  _Civil Engineer
CV_Mohammad Golam Sarowar _Civil Engineer
 
Project & Infrastructure Financing- SPV for Solar Park
Project & Infrastructure Financing- SPV for Solar Park Project & Infrastructure Financing- SPV for Solar Park
Project & Infrastructure Financing- SPV for Solar Park
 
MUBIN_CV
MUBIN_CVMUBIN_CV
MUBIN_CV
 

Recently uploaded

FIDO Alliance Osaka Seminar: Passkeys and the Road Ahead.pdf
FIDO Alliance Osaka Seminar: Passkeys and the Road Ahead.pdfFIDO Alliance Osaka Seminar: Passkeys and the Road Ahead.pdf
FIDO Alliance Osaka Seminar: Passkeys and the Road Ahead.pdf
FIDO Alliance
 
Transcript: Selling digital books in 2024: Insights from industry leaders - T...
Transcript: Selling digital books in 2024: Insights from industry leaders - T...Transcript: Selling digital books in 2024: Insights from industry leaders - T...
Transcript: Selling digital books in 2024: Insights from industry leaders - T...
BookNet Canada
 
State of ICS and IoT Cyber Threat Landscape Report 2024 preview
State of ICS and IoT Cyber Threat Landscape Report 2024 previewState of ICS and IoT Cyber Threat Landscape Report 2024 preview
State of ICS and IoT Cyber Threat Landscape Report 2024 preview
Prayukth K V
 
Secstrike : Reverse Engineering & Pwnable tools for CTF.pptx
Secstrike : Reverse Engineering & Pwnable tools for CTF.pptxSecstrike : Reverse Engineering & Pwnable tools for CTF.pptx
Secstrike : Reverse Engineering & Pwnable tools for CTF.pptx
nkrafacyberclub
 
RESUME BUILDER APPLICATION Project for students
RESUME BUILDER APPLICATION Project for studentsRESUME BUILDER APPLICATION Project for students
RESUME BUILDER APPLICATION Project for students
KAMESHS29
 
Monitoring Java Application Security with JDK Tools and JFR Events
Monitoring Java Application Security with JDK Tools and JFR EventsMonitoring Java Application Security with JDK Tools and JFR Events
Monitoring Java Application Security with JDK Tools and JFR Events
Ana-Maria Mihalceanu
 
Encryption in Microsoft 365 - ExpertsLive Netherlands 2024
Encryption in Microsoft 365 - ExpertsLive Netherlands 2024Encryption in Microsoft 365 - ExpertsLive Netherlands 2024
Encryption in Microsoft 365 - ExpertsLive Netherlands 2024
Albert Hoitingh
 
Alt. GDG Cloud Southlake #33: Boule & Rebala: Effective AppSec in SDLC using ...
Alt. GDG Cloud Southlake #33: Boule & Rebala: Effective AppSec in SDLC using ...Alt. GDG Cloud Southlake #33: Boule & Rebala: Effective AppSec in SDLC using ...
Alt. GDG Cloud Southlake #33: Boule & Rebala: Effective AppSec in SDLC using ...
James Anderson
 
Observability Concepts EVERY Developer Should Know -- DeveloperWeek Europe.pdf
Observability Concepts EVERY Developer Should Know -- DeveloperWeek Europe.pdfObservability Concepts EVERY Developer Should Know -- DeveloperWeek Europe.pdf
Observability Concepts EVERY Developer Should Know -- DeveloperWeek Europe.pdf
Paige Cruz
 
Enhancing Performance with Globus and the Science DMZ
Enhancing Performance with Globus and the Science DMZEnhancing Performance with Globus and the Science DMZ
Enhancing Performance with Globus and the Science DMZ
Globus
 
Removing Uninteresting Bytes in Software Fuzzing
Removing Uninteresting Bytes in Software FuzzingRemoving Uninteresting Bytes in Software Fuzzing
Removing Uninteresting Bytes in Software Fuzzing
Aftab Hussain
 
By Design, not by Accident - Agile Venture Bolzano 2024
By Design, not by Accident - Agile Venture Bolzano 2024By Design, not by Accident - Agile Venture Bolzano 2024
By Design, not by Accident - Agile Venture Bolzano 2024
Pierluigi Pugliese
 
Essentials of Automations: The Art of Triggers and Actions in FME
Essentials of Automations: The Art of Triggers and Actions in FMEEssentials of Automations: The Art of Triggers and Actions in FME
Essentials of Automations: The Art of Triggers and Actions in FME
Safe Software
 
Pushing the limits of ePRTC: 100ns holdover for 100 days
Pushing the limits of ePRTC: 100ns holdover for 100 daysPushing the limits of ePRTC: 100ns holdover for 100 days
Pushing the limits of ePRTC: 100ns holdover for 100 days
Adtran
 
A tale of scale & speed: How the US Navy is enabling software delivery from l...
A tale of scale & speed: How the US Navy is enabling software delivery from l...A tale of scale & speed: How the US Navy is enabling software delivery from l...
A tale of scale & speed: How the US Navy is enabling software delivery from l...
sonjaschweigert1
 
Leading Change strategies and insights for effective change management pdf 1.pdf
Leading Change strategies and insights for effective change management pdf 1.pdfLeading Change strategies and insights for effective change management pdf 1.pdf
Leading Change strategies and insights for effective change management pdf 1.pdf
OnBoard
 
GDG Cloud Southlake #33: Boule & Rebala: Effective AppSec in SDLC using Deplo...
GDG Cloud Southlake #33: Boule & Rebala: Effective AppSec in SDLC using Deplo...GDG Cloud Southlake #33: Boule & Rebala: Effective AppSec in SDLC using Deplo...
GDG Cloud Southlake #33: Boule & Rebala: Effective AppSec in SDLC using Deplo...
James Anderson
 
SAP Sapphire 2024 - ASUG301 building better apps with SAP Fiori.pdf
SAP Sapphire 2024 - ASUG301 building better apps with SAP Fiori.pdfSAP Sapphire 2024 - ASUG301 building better apps with SAP Fiori.pdf
SAP Sapphire 2024 - ASUG301 building better apps with SAP Fiori.pdf
Peter Spielvogel
 
The Metaverse and AI: how can decision-makers harness the Metaverse for their...
The Metaverse and AI: how can decision-makers harness the Metaverse for their...The Metaverse and AI: how can decision-makers harness the Metaverse for their...
The Metaverse and AI: how can decision-makers harness the Metaverse for their...
Jen Stirrup
 
Elevating Tactical DDD Patterns Through Object Calisthenics
Elevating Tactical DDD Patterns Through Object CalisthenicsElevating Tactical DDD Patterns Through Object Calisthenics
Elevating Tactical DDD Patterns Through Object Calisthenics
Dorra BARTAGUIZ
 

Recently uploaded (20)

FIDO Alliance Osaka Seminar: Passkeys and the Road Ahead.pdf
FIDO Alliance Osaka Seminar: Passkeys and the Road Ahead.pdfFIDO Alliance Osaka Seminar: Passkeys and the Road Ahead.pdf
FIDO Alliance Osaka Seminar: Passkeys and the Road Ahead.pdf
 
Transcript: Selling digital books in 2024: Insights from industry leaders - T...
Transcript: Selling digital books in 2024: Insights from industry leaders - T...Transcript: Selling digital books in 2024: Insights from industry leaders - T...
Transcript: Selling digital books in 2024: Insights from industry leaders - T...
 
State of ICS and IoT Cyber Threat Landscape Report 2024 preview
State of ICS and IoT Cyber Threat Landscape Report 2024 previewState of ICS and IoT Cyber Threat Landscape Report 2024 preview
State of ICS and IoT Cyber Threat Landscape Report 2024 preview
 
Secstrike : Reverse Engineering & Pwnable tools for CTF.pptx
Secstrike : Reverse Engineering & Pwnable tools for CTF.pptxSecstrike : Reverse Engineering & Pwnable tools for CTF.pptx
Secstrike : Reverse Engineering & Pwnable tools for CTF.pptx
 
RESUME BUILDER APPLICATION Project for students
RESUME BUILDER APPLICATION Project for studentsRESUME BUILDER APPLICATION Project for students
RESUME BUILDER APPLICATION Project for students
 
Monitoring Java Application Security with JDK Tools and JFR Events
Monitoring Java Application Security with JDK Tools and JFR EventsMonitoring Java Application Security with JDK Tools and JFR Events
Monitoring Java Application Security with JDK Tools and JFR Events
 
Encryption in Microsoft 365 - ExpertsLive Netherlands 2024
Encryption in Microsoft 365 - ExpertsLive Netherlands 2024Encryption in Microsoft 365 - ExpertsLive Netherlands 2024
Encryption in Microsoft 365 - ExpertsLive Netherlands 2024
 
Alt. GDG Cloud Southlake #33: Boule & Rebala: Effective AppSec in SDLC using ...
Alt. GDG Cloud Southlake #33: Boule & Rebala: Effective AppSec in SDLC using ...Alt. GDG Cloud Southlake #33: Boule & Rebala: Effective AppSec in SDLC using ...
Alt. GDG Cloud Southlake #33: Boule & Rebala: Effective AppSec in SDLC using ...
 
Observability Concepts EVERY Developer Should Know -- DeveloperWeek Europe.pdf
Observability Concepts EVERY Developer Should Know -- DeveloperWeek Europe.pdfObservability Concepts EVERY Developer Should Know -- DeveloperWeek Europe.pdf
Observability Concepts EVERY Developer Should Know -- DeveloperWeek Europe.pdf
 
Enhancing Performance with Globus and the Science DMZ
Enhancing Performance with Globus and the Science DMZEnhancing Performance with Globus and the Science DMZ
Enhancing Performance with Globus and the Science DMZ
 
Removing Uninteresting Bytes in Software Fuzzing
Removing Uninteresting Bytes in Software FuzzingRemoving Uninteresting Bytes in Software Fuzzing
Removing Uninteresting Bytes in Software Fuzzing
 
By Design, not by Accident - Agile Venture Bolzano 2024
By Design, not by Accident - Agile Venture Bolzano 2024By Design, not by Accident - Agile Venture Bolzano 2024
By Design, not by Accident - Agile Venture Bolzano 2024
 
Essentials of Automations: The Art of Triggers and Actions in FME
Essentials of Automations: The Art of Triggers and Actions in FMEEssentials of Automations: The Art of Triggers and Actions in FME
Essentials of Automations: The Art of Triggers and Actions in FME
 
Pushing the limits of ePRTC: 100ns holdover for 100 days
Pushing the limits of ePRTC: 100ns holdover for 100 daysPushing the limits of ePRTC: 100ns holdover for 100 days
Pushing the limits of ePRTC: 100ns holdover for 100 days
 
A tale of scale & speed: How the US Navy is enabling software delivery from l...
A tale of scale & speed: How the US Navy is enabling software delivery from l...A tale of scale & speed: How the US Navy is enabling software delivery from l...
A tale of scale & speed: How the US Navy is enabling software delivery from l...
 
Leading Change strategies and insights for effective change management pdf 1.pdf
Leading Change strategies and insights for effective change management pdf 1.pdfLeading Change strategies and insights for effective change management pdf 1.pdf
Leading Change strategies and insights for effective change management pdf 1.pdf
 
GDG Cloud Southlake #33: Boule & Rebala: Effective AppSec in SDLC using Deplo...
GDG Cloud Southlake #33: Boule & Rebala: Effective AppSec in SDLC using Deplo...GDG Cloud Southlake #33: Boule & Rebala: Effective AppSec in SDLC using Deplo...
GDG Cloud Southlake #33: Boule & Rebala: Effective AppSec in SDLC using Deplo...
 
SAP Sapphire 2024 - ASUG301 building better apps with SAP Fiori.pdf
SAP Sapphire 2024 - ASUG301 building better apps with SAP Fiori.pdfSAP Sapphire 2024 - ASUG301 building better apps with SAP Fiori.pdf
SAP Sapphire 2024 - ASUG301 building better apps with SAP Fiori.pdf
 
The Metaverse and AI: how can decision-makers harness the Metaverse for their...
The Metaverse and AI: how can decision-makers harness the Metaverse for their...The Metaverse and AI: how can decision-makers harness the Metaverse for their...
The Metaverse and AI: how can decision-makers harness the Metaverse for their...
 
Elevating Tactical DDD Patterns Through Object Calisthenics
Elevating Tactical DDD Patterns Through Object CalisthenicsElevating Tactical DDD Patterns Through Object Calisthenics
Elevating Tactical DDD Patterns Through Object Calisthenics
 

Rajasthan-Solar-Policy 2011

  • 1. Rajasthan Solar PV Power Projects - Project Conceptualization Services under Rajasthan Solar Policy 2011 (Private and Confidential) 21 Feb 2011 Proposed By:- PAN EXERGY PRIVATE LIMITED Address: D-32, Sector 7, Noida, India. ZIP: 201301 Tel: +91-120-4243211 Fax: +91-11-2271 9366 Web: www.exergy.in Email: info@exergy.in
  • 2. Aim of this Document Rajasthan Solar Policy 2011 is going to be declared by RREC shortly. Perceiving a strong rush for Project Registration at RREC, Exergy feels confident in guiding its future clients towards successful project conceptualizationin the abode of Sun – Rajasthan. Exergy has had an experience of handling more than 300 MW of project consultancies in Rajasthan itself for some of the major clients like TATA Power, Gammon India, Reliance Power, NDPL, Arvind Constructions to name a few. For a detailed profile of Exergy, please email us at: info@exergy.in or view our website: www.exergy.in. This document has been prepared by Pan Exergy Pvt Ltd (hereinafter together referred to as “Exergy”) to provide a comprehensive proposal for MW-sized based Solar PV Power Project Conceptualization Services in Rajasthan which includes: 1. Regulatory Services: a. Solar Site Identification and Selection Services; b. Project Registration Services 2. Technical Services 3. Financial Services The above proposal has been proposed for M/s IndoKorean Pvt Ltd (hereinafter together referred to as “the Client”).
  • 3. Scope of Activities The whole scope of work for conceptualizing a 50MWp Solar PV Project in Rajasthan is divided into following major activities: Scope of Work Deliverables 1. Solar Site Selection & Identification a. Demonstrating 3 viable Govt. or a. Solar Land Bank Assessment private land of around 300 acres. b. Solar Resource Assessment Studies b. Site Evaluation & Technical Feasibility Services. c. Energy Yield Studies c. Jamabandi Maps for the chosen d. Comparative Analysis of chosen sites location. d. Clearances on the land selected. e. Identifying suitable land brokers, patwaris for land acquisition pocess. 2. Project Registration Services a. Assistance for filing application with a. Project Registration at RREC. Govt. authorities. b. Necessary follow ups with each govt. b. Preparation of Preliminary DPR for offices involved. Govt. clearances. c. Power Evacuation Clearance. c. Power Evacuation Scheme & Grid Interfacing Clearances. d. DPR Approval d. Project Recommendation & e. Project Recommendation Certificate Clearance. from RREC. 3. Technology Services a. Preparation of final Bankable Detailed Project Report. a. Bankable 50MW DPR. b. Technology selection advisory which b. Technology Selection Strategy will include comparisons between Report. various prevalent global & upcoming c. BOQ Finalization, Shortlisting
  • 4. technologies. The technology view technology vendors, contracts for shall be substantiated with civil, electrical & mechanical works. concomitant MNRE regulations. d. Designing training modules for c. Detailed Engineering Consultancy as inhouse engineers for O&M, plant Owner’s Engineer. handling etc. d. Training of Personnel in Solar Plant Operations, Maintenance, Principles. 4. Financial Services a. Project Financial Analysis including Cash Flows, IRRs, P&L, DSCR etc. a. Financial Analysis Reports. b. Sensitivity Analysis based on variable technology cost, solar radiation, debt b. Debt Syndication Efforts. syndication etc. c. Sensitivity Analysis Charts. c. Reverse bidding, providing required d. Strong analysis for the rationale of market intelligence for effectively REC based Solar PV project. Some bidding in the process at RREC. of our REC (Renewable Energy d. Assisting the client in debt Certificate) clients are TATA Power, syndication based on the status of Abhijeet Industries etc. equity and other hygiene factors. e. Renewable Energy Certificate, REC based project assessment (recommended) PS: The actual land acquisition will be undertaken by the client itself and Exergy shall facilitate the process. Any incidental or liaisoning expenses shall be payable separately by the client. Exergy shall support the client during the acquisition process of the site. It will be part of initial deliberations with the brokers and the govt. officials responsible. In case of the failure of negotiations Exergy shall suggest another site in lieu of the previous one or another land broker as the case may be. For this purpose Exergy shall conduct a maximum of 3 site visits with the client.
  • 5. Consideration/ Project Cost & Timeline Zero date o Placement of a clear and confirmed order/Mandate in favor of Pan Exergy Pvt. Ltd. alongwith the payment of the agreed advance amount. Time Line  Exergy shall propose three sites within 2 weeks from the Zero date.  Exergy shall submit land selection-cum-feasibility report within 3 weeks from Zero date.  The necessary project documents shall be submitted at Rajasthan Renewable Energy Corp within 3~4 week time from Zero Date.  Tentative time schedule for RREC Recommendation shall be within 2-3 months provided all necessary data sought is provided in time. Consideration PS: This is a preliminary technical proposal and any budgetary cost shall be indicated in future proposals. Contact Us Contact Person: Rajat Sethi Head, Solar Infrastructure Services, Pan Exergy Pvt Ltd Website: www.exergy.in Email: Rajat@Exergy.in Address: D-32, Sector 7, Noida – 201301 Phone: +91-120-4243211; +91-9999676750; +91-9654436886.