Agneya Carbon Ventures                                                                                                                                       agneya
                                               List of Projects1 undertaken by Agneya Carbon Ventures


S.No.          Project             Client Name                                 Project Details                                          Project Impact
                Area
     1       Renewable                                    Name: Assisting the honourable Commission in                   The project outcome is expected to have
             Energy                                       amendment of MERC RE Tariff Regulation 2010.                   impact on
             Regulations                                  Details: Agneya has been given a mandate to                     - Eligibility criteria applied to wind power
                                                          assess the impact of MNRE circular removing                        projects for tariff
                                   Maharashtra
                                                          minimum WPD criterion for wind power projects                   - Wind zone definitions n Maharashtra
                               Electricity Regulatory
                                                          development. This change is a result of                         - Tariff determination for relevant wind
                               Commission (MERC)                                                                             zones
                                                          technological advancement in Wind Energy
                                                          making less windy sites commercially exploitable.               - Operationalization of regulations
                                                          Duration:2.5 months                                                including Hub height criteria
     2       Techno-                                      Name: Assessment and due diligence of wind                     Our analysis helped client make a decision
             Commercial-                                  energy project sites in Tamil Nadu and                         on choosing the most feasible wind
             Financial                                    Maharashtra                                                    energy project sites that will maximize
             Feasibility                                  Details: Agneya team carried out the detailed                  financial returns and minimize the risk to
                                Surana Corporation
             Analysis for                                 techno-commercial and financial feasibility of the             the project from various factors.
                                     Limited
             Wind Energy                                  wind energy project, technical suitability of the
             Projects                                     site, analysis of options for commercialization of
                                                          energy – including third party sale and RECs and
                                                          recommend most appropriate option to the client.
                                                          Duration:0.5 months




1
    This list is a snapshot of various projects and assignments Agneya Carbon Ventures has undertaken since its inception. Significant and prominent projects are featured here.



                                                                                                                                                                      Page 1 of 7
Agneya Carbon Ventures                                                                                                                agneya
S.No.      Project         Client Name                          Project Details                                    Project Impact
            Area
  3     Preparation                           Name: Preparation of DPR for setting up wind            DPR helped client to narrow down on
        of Detailed                           energy project of capacity 25 MW                        available choices for wind energy project
        Project                               Details: Agneya prepared DPR considering the            development. Eventually the analysis and
        Report for                            mapping of available wind project sites across five     recommendation helped Client in
                         Surana Corporation
        proposed                              states, comparison of all the sites on parameters       choosing the best site for setting up their
                              Limited
        investment in                         like financial returns, commercial benefits,            wind energy project.
        Renewable                             technical risk, developer, regulatory outlook etc
        Energy                                Duration: 0.5 months
  4     Preparation                           Name: Preparation of DPR for setting up wind            The outcome of the project was
        of Detailed                           energy project                                          - Wind potential assessment of available
        Project                               Details: Agneya team assessed the wind energy             site and micro-siting
        Report for                            potential of available site with effective liaisoning   - Recommendation on the suitable
                           Siddhivinayak
        proposed                              with C-WET and other competent bodies. Further            techno-commercial and financial model
                            Developers
        investment in                         we prepared DPR considering the wind energy               to maximize returns from investment.
        Renewable                             potential available and assessed the site on
        Energy                                parameters like – financial returns, commercial
                                              benefits, technical risk, developer, regulatory
                                              outlook etc.
                                              Duration:5 months




                                                                                                                                             Page 2 of 7
Agneya Carbon Ventures                                                                                                            agneya
S.No.     Project          Client Name                         Project Details                                   Project Impact
            Area
  5     Renewable                             Name: Comprehensive REC services for 10 MW             The project outcome was
        Energy                                of wind energy project                                 - Project accreditation
        Certificates                          Details: The project involved feasibility of project   - Project registration with NLDC
                                              REC registration and issuance, project REC             - Issuance of RECs and preparation of
                         Surana Corporation
                                              accreditation state nodal agency, project REC            REC issuance management framework
                              Limited
                                              registration with NLDC, issuance of RECs and           - Trading of RECs
                                              REC trading. Agneya also managed the
                                              Generation Based Incentives – procedures and
                                              modalities for the Client.
                                              Duration:5 months
  6     Renewable                             Name: Comprehensive REC services for 3 MW of           The project outcome was
        Energy                                co-generation project                                  - Project accreditation
        Certificates                          Details: The project involved feasibility of project   - Project registration with NLDC
                                              REC registration and issuance, project REC             - Issuance of RECs
                            Nava Bharat       accreditation state nodal agency, project REC
                          Ventures Limited    registration with NLDC and issuance of RECs
                                              Duration:6 months
  7     Renewable                             Name: Comprehensive REC services for 1 MW of           The project outcome was
        Energy                                wind energy project                                    - Project accreditation
        Certificates                          Details: The project involved feasibility of project   - Project registration with NLDC
                             SRS Ispat        REC registration and issuance, project REC             - Issuance of RECs
                                              accreditation state nodal agency, project REC
                                              registration with NLDC and issuance of RECs
                                              Duration:6 months




                                                                                                                                        Page 3 of 7
Agneya Carbon Ventures                                                                                                              agneya
S.No.     Project          Client Name                         Project Details                                    Project Impact
            Area
  8     Renewable                             Name: Comprehensive REC services for 1.75              The project outcome was
        Energy                                MW of wind energy project                              - Project accreditation
        Certificates        Mirra & Mirra     Details: The project involved feasibility of project   - Project registration with NLDC
                             Industries       REC registration and issuance, project REC             - Issuance of RECs
                                              accreditation state nodal agency, project REC
                                              registration with NLDC and issuance of RECs
                                              Duration:6 months
  9     Renewable                             Name: Comprehensive REC services for 4.5 MW            The project outcome was
        Energy                                of wind energy project                                 - Project accreditation
        Certificates                          Details: The project involved feasibility of project   - Project registration with NLDC
                                              REC registration and issuance, project REC             - Issuance of RECs
                                              accreditation state nodal agency, project REC          - Trading of RECs
                            MM Forgings
                                              registration with NLDC, issuance of RECs and
                                              REC trading
                                              Duration:6 months
 10     Assessment                            Name: Addressing Renewable Energy Purchase             Our analysis helped BMM to understand
        of                                    Obligation for BMM Ispat Ltd.                          their current and future energy profile and
        Renewable                             Details: The project involved comprehensive            find opportunities for energy efficiency
        Purchase                              analysis of current and future energy profile of       gains. RPO analysis on technical and
                         BMM Inspat Limited
        Obligation                            BMM Ispat, given their conventional generation         financial parameters provided them with
                                              capacity and future growth plan. Analysis was          multiple options to meet RPO – through
                                              carried to assess the total RPO liability for BMM      captive consumption of RE, third party
                                              and RE/REC based options to address it.                sourcing of RE and RECs procurement.
                                              Duration:5 months




                                                                                                                                            Page 4 of 7
Agneya Carbon Ventures                                                                                                            agneya
S.No.      Project        Client Name                         Project Details                                  Project Impact
            Area
 11     Assessment                            Name: Addressing Renewable Energy Purchase         Our analysis helped NBV to understand
        of                                    Obligation for NBV Steel division                  the RPO liability arising out of their captive
        Renewable                             Details: The project involved comprehensive        power plants supplying to Ferro Alloys
        Purchase                              analysis to assess the total RPO for NBV’s steel   Division. Separate sugestions were made
        Obligation         Nava Bharat        division and various options to address it.        to top management to address the RPO in
                         Ventures Limited     Duration: 0.5 months                               short term and medium term.
 12     Carbon                                Name: Preparation of response for CDP on behalf    The project outcome was
        Disclosure                            of GVK Power & Infrastructure Ltd                  - GVKPIL was ranked 8th among top 200
        and                                   Details: Agneya worked with core team to             Indian companies in Carbon Disclosure
        Reporting                             develop GHG Inventory of all group companies of      Leadership Index (CDLI) by CDP
        (CDP)                                 GVKPIL, assessment of climate change related       - GVKPIL filed the response to CDP for
                                              business risks and opportunities and preparation     the first time
                           GVK Power &
                                              and filing of response to CDP                      - GHG inventory of whole GVKPIL was
                         Infrastructure Ltd
                                              Duration: 1.5 months                                 accounted for 1st time
                              (GVKPIL)
                                                                                                 - CDP report was prepared and
                                                                                                   distributed to all stakeholders




                                                                                                                                          Page 5 of 7
Agneya Carbon Ventures                                                                                                                 agneya
S.No.     Project           Client Name                          Project Details                                    Project Impact
            Area
 13     Carbon                                  Name: Design, develop and implementation of            The project outcome was
        Management                              Carbon Accounting and Management System                - Chhatrapati Shivaji International Airport
        System                                  conforming to ISO 14064-1 at Chhatrapati Shivaji         became the 1st airport in India and 2nd
                                                International Airport                                    in Asia to account its Carbon Footprint
                         Mumbai International   Details: Agneya developed comprehensive                  according to ISO 14064-1
                           Airport Pvt. Ltd.    management system to account, report, monitor          - It carried out successful verification
                                                and manage carbon footprint of Chhatrapati               audit of its carbon footprint by 3rd party
                                                Shivaji International Airport (CSIA). The              - It helped CSIA meet regulatory norms
                                                management system was developed in                       set by DGCA
                                                conformance with international standard ISO            - Agneya developed and implemented
                                                14064-1                                                  web based software tool to measure
                                                Duration: 6.5 months                                     and monitor carbon footprint
 14     Sustainability                          Name: Design, develop and implement                    The project outcome was
        Management                              Sustainability Management Framework                    - All the employees of CSIA got
        Systems                                 conforming to GRI protocol and Sustainability            sensitized with sustainability issues and
                                                Reporting                                                their impact on business
                         Mumbai International   Details: Agneya developed comprehensive                - All department of CSIA now have
                           Airport Pvt. Ltd.    management framework to manage sustainability            sustainability agenda and framework to
                                                issues pertaining to operations of Chhatrapati           manage the business growth
                                                Shivaji International Airport (CSIA). Agneya is also     sustainability
                                                developing CSIA’s first Sustainability Development     - Key sustainability parameters are
                                                Report (SDR) which is being published along with         identified and tracked
                                                Annual Report
                                                Duration: 7 months




                                                                                                                                              Page 6 of 7
Agneya Carbon Ventures                                                                                                                    agneya
S.No.     Project           Client Name                            Project Details                                     Project Impact
            Area
 15     Carbon                                   Name: Design, develop and implement Carbon               The project outcome was
        Management                               Accounting and Management System conforming              - Rajiv Gandhi International Airport
        System                                   to ISO 14064-1 at Rajiv Gandhi Airport                     became the 2nd airport in India and 3rd
                                                 Details: Agneya developed comprehensive                    in Asia to account its Carbon Footprint
                           GMR Hyderabad         management system to account, report, monitor              according to ISO 14064-1
                         International Airport   and manage carbon footprint of Rajiv Gandhi              - It carried out successful verification
                               Limited           International Airport (RGIA). The management               audit of its carbon footprint by 3rd party
                                                 system was developed in conformance with                 - It helped RGIA meet regulatory norms
                                                 international standard ISO 14064-1                         set by DGCA
                                                 Duration: 2 months
 16     Carbon                                   Name: Design, develop and implementation of              - Core team members of the plant are
        Management                               Carbon Accounting and Management framework                 capable of managing carbon footprint
        System                                   at Kandivali Plant of FES division                         by themselves
                                                 Details: Agneya developed comprehensive                  - Various tools and procedures
                           Farm Equipment        management framework, tool and documents to                implemented at plant have successfully
                         Sector (FES) Division   manage carbon footprint of plant.                          demonstrated carbon management in
                             Mahindra &          Duration: 2 months                                         practice
                              Mahindra
 17     Carbon                                   Name: Assessment of Carbon Footprint of Steel            The project led to
        Management                               division of SIL                                          - Carbon footprint of steel division
        System                                   Details: Agneya accounted the carbon footprint           - Carbon intensity analysis showed need
                                                 of steel division, analysis of risks and opportunities     for energy efficiency initiatives at plant
                          Surana Industries      due to climate change and assessment of carbon           - Risks and opportunities, RPO
                              Limited            footprint reduction options
                                                 Duration: 1.5 months




                                                                                                                                                 Page 7 of 7

More Related Content

What's hot

Jukka Hellgren, Culmentor Oy vadovas (Suomija), „Suomijos įmonių dalyvavimas ...
Jukka Hellgren, Culmentor Oy vadovas (Suomija), „Suomijos įmonių dalyvavimas ...Jukka Hellgren, Culmentor Oy vadovas (Suomija), „Suomijos įmonių dalyvavimas ...
Jukka Hellgren, Culmentor Oy vadovas (Suomija), „Suomijos įmonių dalyvavimas ...Denis Senin
 
Managing Smart Grids, Power System Networks with Analytics
Managing Smart Grids, Power System Networks with Analytics Managing Smart Grids, Power System Networks with Analytics
Managing Smart Grids, Power System Networks with Analytics
HIMADRI BANERJI
 
Ninth Avenue Terminal Solar Proposal
Ninth Avenue Terminal Solar ProposalNinth Avenue Terminal Solar Proposal
Ninth Avenue Terminal Solar Proposalninthavenue
 
Energy Efficient Solutions for FPSO Applications
Energy Efficient Solutions for FPSO ApplicationsEnergy Efficient Solutions for FPSO Applications
Energy Efficient Solutions for FPSO Applications
IQPC
 
Challenges in building the 21st century energy infrastructure
Challenges in building the 21st century energy infrastructureChallenges in building the 21st century energy infrastructure
Challenges in building the 21st century energy infrastructure
HIMADRI BANERJI
 
Ex Stream Eng Design Group Corporate Profile
Ex Stream Eng Design Group Corporate ProfileEx Stream Eng Design Group Corporate Profile
Ex Stream Eng Design Group Corporate Profileggurudev
 
Lime Energy Banking Brochure
Lime Energy Banking BrochureLime Energy Banking Brochure
Lime Energy Banking Brochurelimeenergysurveys
 
110110r1 Brief Principio Photovoltaic Top Roof Projects In Italy March 2011
110110r1 Brief Principio Photovoltaic Top Roof Projects In Italy March 2011110110r1 Brief Principio Photovoltaic Top Roof Projects In Italy March 2011
110110r1 Brief Principio Photovoltaic Top Roof Projects In Italy March 2011
creymicolau
 
2010 11 16 Edward Kee - Nuclear Investment And Proj Finance Dc Final No ...
2010 11 16  Edward Kee - Nuclear Investment And Proj Finance Dc   Final   No ...2010 11 16  Edward Kee - Nuclear Investment And Proj Finance Dc   Final   No ...
2010 11 16 Edward Kee - Nuclear Investment And Proj Finance Dc Final No ...
Edward Kee
 
Energy Performance Contracting Uk Introduction
Energy Performance Contracting Uk IntroductionEnergy Performance Contracting Uk Introduction
Energy Performance Contracting Uk Introductiondrpaulfisher
 
BBP BL Case Study
BBP BL Case StudyBBP BL Case Study
BBP BL Case StudyEPTUK
 
EmberClear BAML Global Energy Conference 2012
EmberClear BAML Global Energy Conference 2012EmberClear BAML Global Energy Conference 2012
EmberClear BAML Global Energy Conference 2012
emberclear
 
US DOE funding and cost targets for CSP
US DOE funding and cost targets for CSP US DOE funding and cost targets for CSP
US DOE funding and cost targets for CSP
Smithers Apex
 
NREL, Shanti Pless
NREL, Shanti PlessNREL, Shanti Pless
NREL, Shanti Pless
shobart
 
Prgramme of activities fundamentals
Prgramme of activities  fundamentalsPrgramme of activities  fundamentals
Prgramme of activities fundamentals
RCREEE
 
Highlights from the Evaluation of California\'s Base Interruptible Program
Highlights from the Evaluation of California\'s Base Interruptible ProgramHighlights from the Evaluation of California\'s Base Interruptible Program
Highlights from the Evaluation of California\'s Base Interruptible Program
joshschel
 
Rajasthan-Solar-Policy 2011
Rajasthan-Solar-Policy 2011Rajasthan-Solar-Policy 2011
Rajasthan-Solar-Policy 2011
Exergy
 

What's hot (17)

Jukka Hellgren, Culmentor Oy vadovas (Suomija), „Suomijos įmonių dalyvavimas ...
Jukka Hellgren, Culmentor Oy vadovas (Suomija), „Suomijos įmonių dalyvavimas ...Jukka Hellgren, Culmentor Oy vadovas (Suomija), „Suomijos įmonių dalyvavimas ...
Jukka Hellgren, Culmentor Oy vadovas (Suomija), „Suomijos įmonių dalyvavimas ...
 
Managing Smart Grids, Power System Networks with Analytics
Managing Smart Grids, Power System Networks with Analytics Managing Smart Grids, Power System Networks with Analytics
Managing Smart Grids, Power System Networks with Analytics
 
Ninth Avenue Terminal Solar Proposal
Ninth Avenue Terminal Solar ProposalNinth Avenue Terminal Solar Proposal
Ninth Avenue Terminal Solar Proposal
 
Energy Efficient Solutions for FPSO Applications
Energy Efficient Solutions for FPSO ApplicationsEnergy Efficient Solutions for FPSO Applications
Energy Efficient Solutions for FPSO Applications
 
Challenges in building the 21st century energy infrastructure
Challenges in building the 21st century energy infrastructureChallenges in building the 21st century energy infrastructure
Challenges in building the 21st century energy infrastructure
 
Ex Stream Eng Design Group Corporate Profile
Ex Stream Eng Design Group Corporate ProfileEx Stream Eng Design Group Corporate Profile
Ex Stream Eng Design Group Corporate Profile
 
Lime Energy Banking Brochure
Lime Energy Banking BrochureLime Energy Banking Brochure
Lime Energy Banking Brochure
 
110110r1 Brief Principio Photovoltaic Top Roof Projects In Italy March 2011
110110r1 Brief Principio Photovoltaic Top Roof Projects In Italy March 2011110110r1 Brief Principio Photovoltaic Top Roof Projects In Italy March 2011
110110r1 Brief Principio Photovoltaic Top Roof Projects In Italy March 2011
 
2010 11 16 Edward Kee - Nuclear Investment And Proj Finance Dc Final No ...
2010 11 16  Edward Kee - Nuclear Investment And Proj Finance Dc   Final   No ...2010 11 16  Edward Kee - Nuclear Investment And Proj Finance Dc   Final   No ...
2010 11 16 Edward Kee - Nuclear Investment And Proj Finance Dc Final No ...
 
Energy Performance Contracting Uk Introduction
Energy Performance Contracting Uk IntroductionEnergy Performance Contracting Uk Introduction
Energy Performance Contracting Uk Introduction
 
BBP BL Case Study
BBP BL Case StudyBBP BL Case Study
BBP BL Case Study
 
EmberClear BAML Global Energy Conference 2012
EmberClear BAML Global Energy Conference 2012EmberClear BAML Global Energy Conference 2012
EmberClear BAML Global Energy Conference 2012
 
US DOE funding and cost targets for CSP
US DOE funding and cost targets for CSP US DOE funding and cost targets for CSP
US DOE funding and cost targets for CSP
 
NREL, Shanti Pless
NREL, Shanti PlessNREL, Shanti Pless
NREL, Shanti Pless
 
Prgramme of activities fundamentals
Prgramme of activities  fundamentalsPrgramme of activities  fundamentals
Prgramme of activities fundamentals
 
Highlights from the Evaluation of California\'s Base Interruptible Program
Highlights from the Evaluation of California\'s Base Interruptible ProgramHighlights from the Evaluation of California\'s Base Interruptible Program
Highlights from the Evaluation of California\'s Base Interruptible Program
 
Rajasthan-Solar-Policy 2011
Rajasthan-Solar-Policy 2011Rajasthan-Solar-Policy 2011
Rajasthan-Solar-Policy 2011
 

Similar to Agneya Clientele

Rajasthan Solar Policy PV Services
Rajasthan Solar Policy PV ServicesRajasthan Solar Policy PV Services
Rajasthan Solar Policy PV Services
Exergy
 
EPCM-WORK-PROFILE_+_+(EPCM-WORK-PROFILE)
EPCM-WORK-PROFILE_+_+(EPCM-WORK-PROFILE)EPCM-WORK-PROFILE_+_+(EPCM-WORK-PROFILE)
EPCM-WORK-PROFILE_+_+(EPCM-WORK-PROFILE)
MaxAlagoa
 
Operations & Maintenance Operator Forum brochure
Operations & Maintenance Operator Forum brochureOperations & Maintenance Operator Forum brochure
Operations & Maintenance Operator Forum brochurePolly Freeman
 
4th Annual Wind Operations and Maintenance Summit USA 2012
4th Annual Wind Operations and Maintenance Summit USA 20124th Annual Wind Operations and Maintenance Summit USA 2012
4th Annual Wind Operations and Maintenance Summit USA 2012
Jon Harman, Wind Energy Update
 
Catch The Wind Investor Presentation November 2009
Catch The Wind Investor Presentation November 2009Catch The Wind Investor Presentation November 2009
Catch The Wind Investor Presentation November 2009
TMX Equicom
 
Risk management in nuclear projects and strategy of small reactors [compatibi...
Risk management in nuclear projects and strategy of small reactors [compatibi...Risk management in nuclear projects and strategy of small reactors [compatibi...
Risk management in nuclear projects and strategy of small reactors [compatibi...
HIMADRI BANERJI
 
Climate benefits from improvement in Mobile Air Conditioning systems
Climate benefits from improvement in Mobile Air Conditioning systemsClimate benefits from improvement in Mobile Air Conditioning systems
Climate benefits from improvement in Mobile Air Conditioning systems
UNEP OzonAction
 
Renovation & Modernization - Practices in India against Global
Renovation & Modernization - Practices in India against GlobalRenovation & Modernization - Practices in India against Global
Renovation & Modernization - Practices in India against GlobalSayan Aich PE, MIET(UK)
 
Indurti - Energy Efficiency may2016
Indurti - Energy Efficiency may2016Indurti - Energy Efficiency may2016
Indurti - Energy Efficiency may2016Ramesh Kumar
 
Ozone - Solar Business
Ozone - Solar BusinessOzone - Solar Business
Ozone - Solar BusinessSetu Goyal
 
Offshore wind energy Development in India, MNRE, Government of India
Offshore wind energy Development in India, MNRE, Government of IndiaOffshore wind energy Development in India, MNRE, Government of India
Offshore wind energy Development in India, MNRE, Government of India
OECD Environment
 
News Release: Commerce Resources Corp. Completes Preliminary Evaluation for ...
News Release:  Commerce Resources Corp. Completes Preliminary Evaluation for ...News Release:  Commerce Resources Corp. Completes Preliminary Evaluation for ...
News Release: Commerce Resources Corp. Completes Preliminary Evaluation for ...
Commerce Resources Corp. (TSXv:CCE)
 
PROJECT MGT. PRESENTATION
PROJECT MGT. PRESENTATIONPROJECT MGT. PRESENTATION
PROJECT MGT. PRESENTATIONmaheshvkat1972
 
Wind Force Newsletter July, Edition, 2012
Wind Force Newsletter   July, Edition, 2012Wind Force Newsletter   July, Edition, 2012
Wind Force Newsletter July, Edition, 2012rupeshsingh_1
 

Similar to Agneya Clientele (20)

Rajasthan Solar Policy PV Services
Rajasthan Solar Policy PV ServicesRajasthan Solar Policy PV Services
Rajasthan Solar Policy PV Services
 
CV-VA- March2016
CV-VA- March2016CV-VA- March2016
CV-VA- March2016
 
EPCM-WORK-PROFILE_+_+(EPCM-WORK-PROFILE)
EPCM-WORK-PROFILE_+_+(EPCM-WORK-PROFILE)EPCM-WORK-PROFILE_+_+(EPCM-WORK-PROFILE)
EPCM-WORK-PROFILE_+_+(EPCM-WORK-PROFILE)
 
CV PMG
CV PMGCV PMG
CV PMG
 
Operations & Maintenance Operator Forum brochure
Operations & Maintenance Operator Forum brochureOperations & Maintenance Operator Forum brochure
Operations & Maintenance Operator Forum brochure
 
Solar tracking-systems-india
Solar tracking-systems-indiaSolar tracking-systems-india
Solar tracking-systems-india
 
CV_Cost Engineer
CV_Cost EngineerCV_Cost Engineer
CV_Cost Engineer
 
4th Annual Wind Operations and Maintenance Summit USA 2012
4th Annual Wind Operations and Maintenance Summit USA 20124th Annual Wind Operations and Maintenance Summit USA 2012
4th Annual Wind Operations and Maintenance Summit USA 2012
 
Catch The Wind Investor Presentation November 2009
Catch The Wind Investor Presentation November 2009Catch The Wind Investor Presentation November 2009
Catch The Wind Investor Presentation November 2009
 
Risk management in nuclear projects and strategy of small reactors [compatibi...
Risk management in nuclear projects and strategy of small reactors [compatibi...Risk management in nuclear projects and strategy of small reactors [compatibi...
Risk management in nuclear projects and strategy of small reactors [compatibi...
 
Climate benefits from improvement in Mobile Air Conditioning systems
Climate benefits from improvement in Mobile Air Conditioning systemsClimate benefits from improvement in Mobile Air Conditioning systems
Climate benefits from improvement in Mobile Air Conditioning systems
 
Gvt 02
Gvt 02Gvt 02
Gvt 02
 
Renovation & Modernization - Practices in India against Global
Renovation & Modernization - Practices in India against GlobalRenovation & Modernization - Practices in India against Global
Renovation & Modernization - Practices in India against Global
 
Indurti - Energy Efficiency may2016
Indurti - Energy Efficiency may2016Indurti - Energy Efficiency may2016
Indurti - Energy Efficiency may2016
 
Ozone - Solar Business
Ozone - Solar BusinessOzone - Solar Business
Ozone - Solar Business
 
Offshore wind energy Development in India, MNRE, Government of India
Offshore wind energy Development in India, MNRE, Government of IndiaOffshore wind energy Development in India, MNRE, Government of India
Offshore wind energy Development in India, MNRE, Government of India
 
Kona Rao -2015
Kona Rao  -2015Kona Rao  -2015
Kona Rao -2015
 
News Release: Commerce Resources Corp. Completes Preliminary Evaluation for ...
News Release:  Commerce Resources Corp. Completes Preliminary Evaluation for ...News Release:  Commerce Resources Corp. Completes Preliminary Evaluation for ...
News Release: Commerce Resources Corp. Completes Preliminary Evaluation for ...
 
PROJECT MGT. PRESENTATION
PROJECT MGT. PRESENTATIONPROJECT MGT. PRESENTATION
PROJECT MGT. PRESENTATION
 
Wind Force Newsletter July, Edition, 2012
Wind Force Newsletter   July, Edition, 2012Wind Force Newsletter   July, Edition, 2012
Wind Force Newsletter July, Edition, 2012
 

More from Agneya Carbon Ventures Private Limited

Wind Energy Available for Sale in Tamil Nadu
Wind Energy Available for Sale in Tamil NaduWind Energy Available for Sale in Tamil Nadu
Wind Energy Available for Sale in Tamil Nadu
Agneya Carbon Ventures Private Limited
 
Agneya\'s Newsletter on Renewable Energy Sector and REC market in India
Agneya\'s Newsletter on Renewable Energy Sector and REC market in IndiaAgneya\'s Newsletter on Renewable Energy Sector and REC market in India
Agneya\'s Newsletter on Renewable Energy Sector and REC market in India
Agneya Carbon Ventures Private Limited
 
Agneya\'s Newsletter on Renewable Energy Sector and REC market in India
Agneya\'s Newsletter on Renewable Energy Sector and REC market in IndiaAgneya\'s Newsletter on Renewable Energy Sector and REC market in India
Agneya\'s Newsletter on Renewable Energy Sector and REC market in India
Agneya Carbon Ventures Private Limited
 
Agneya\'s Newsletter on Renewable Energy Sector and REC market in India
Agneya\'s Newsletter on Renewable Energy Sector and REC market in IndiaAgneya\'s Newsletter on Renewable Energy Sector and REC market in India
Agneya\'s Newsletter on Renewable Energy Sector and REC market in India
Agneya Carbon Ventures Private Limited
 
Horizon V2 Issue 1
Horizon V2 Issue 1Horizon V2 Issue 1
Rec Newsletter V1 Issue 1 Sep
Rec Newsletter   V1 Issue 1 SepRec Newsletter   V1 Issue 1 Sep
Rec Newsletter V1 Issue 1 Sep
Agneya Carbon Ventures Private Limited
 
Rec Newsletter V1 Issue 3 Nov
Rec Newsletter   V1 Issue 3 NovRec Newsletter   V1 Issue 3 Nov
Rec Newsletter V1 Issue 3 Nov
Agneya Carbon Ventures Private Limited
 
Rec Newsletter V1 Issue 5 Jan
Rec Newsletter   V1 Issue 5 JanRec Newsletter   V1 Issue 5 Jan
Rec Newsletter V1 Issue 5 Jan
Agneya Carbon Ventures Private Limited
 
Rec Newsletter V1 Issue 6 Feb
Rec Newsletter   V1 Issue 6 FebRec Newsletter   V1 Issue 6 Feb
Rec Newsletter V1 Issue 6 Feb
Agneya Carbon Ventures Private Limited
 
Rec Newsletter V1 Issue 7 Mar
Rec Newsletter   V1 Issue 7 MarRec Newsletter   V1 Issue 7 Mar
Rec Newsletter V1 Issue 7 Mar
Agneya Carbon Ventures Private Limited
 
Agneya Introduction Presentation
Agneya Introduction PresentationAgneya Introduction Presentation
Agneya Introduction Presentation
Agneya Carbon Ventures Private Limited
 

More from Agneya Carbon Ventures Private Limited (20)

Wind Energy Available for Sale in Tamil Nadu
Wind Energy Available for Sale in Tamil NaduWind Energy Available for Sale in Tamil Nadu
Wind Energy Available for Sale in Tamil Nadu
 
Agneya\'s Newsletter on Renewable Energy Sector and REC market in India
Agneya\'s Newsletter on Renewable Energy Sector and REC market in IndiaAgneya\'s Newsletter on Renewable Energy Sector and REC market in India
Agneya\'s Newsletter on Renewable Energy Sector and REC market in India
 
Agneya\'s Newsletter on Renewable Energy Sector and REC market in India
Agneya\'s Newsletter on Renewable Energy Sector and REC market in IndiaAgneya\'s Newsletter on Renewable Energy Sector and REC market in India
Agneya\'s Newsletter on Renewable Energy Sector and REC market in India
 
Agneya\'s Newsletter on Renewable Energy Sector and REC market in India
Agneya\'s Newsletter on Renewable Energy Sector and REC market in IndiaAgneya\'s Newsletter on Renewable Energy Sector and REC market in India
Agneya\'s Newsletter on Renewable Energy Sector and REC market in India
 
Horizon V2 Issue 1
Horizon V2 Issue 1Horizon V2 Issue 1
Horizon V2 Issue 1
 
Rec Newsletter V1 Issue 1 Sep
Rec Newsletter   V1 Issue 1 SepRec Newsletter   V1 Issue 1 Sep
Rec Newsletter V1 Issue 1 Sep
 
Rec Newsletter V1 Issue 3 Nov
Rec Newsletter   V1 Issue 3 NovRec Newsletter   V1 Issue 3 Nov
Rec Newsletter V1 Issue 3 Nov
 
Rec Newsletter V1 Issue 5 Jan
Rec Newsletter   V1 Issue 5 JanRec Newsletter   V1 Issue 5 Jan
Rec Newsletter V1 Issue 5 Jan
 
Rec Newsletter V1 Issue 6 Feb
Rec Newsletter   V1 Issue 6 FebRec Newsletter   V1 Issue 6 Feb
Rec Newsletter V1 Issue 6 Feb
 
Rec Newsletter V1 Issue 7 Mar
Rec Newsletter   V1 Issue 7 MarRec Newsletter   V1 Issue 7 Mar
Rec Newsletter V1 Issue 7 Mar
 
Agneya Introduction Presentation
Agneya Introduction PresentationAgneya Introduction Presentation
Agneya Introduction Presentation
 
Rec newsletter v1 issue 1 sep
Rec newsletter   v1 issue 1 sepRec newsletter   v1 issue 1 sep
Rec newsletter v1 issue 1 sep
 
REC newsletter v1 issue 3 nov
REC newsletter   v1 issue 3 novREC newsletter   v1 issue 3 nov
REC newsletter v1 issue 3 nov
 
Rise of green buildings
Rise of green buildingsRise of green buildings
Rise of green buildings
 
Responsible investing
Responsible investingResponsible investing
Responsible investing
 
Introductory note on iso 14064
Introductory note on iso 14064Introductory note on iso 14064
Introductory note on iso 14064
 
Insight sustainability world_gbc
Insight sustainability world_gbcInsight sustainability world_gbc
Insight sustainability world_gbc
 
Insight climate change_india
Insight climate change_indiaInsight climate change_india
Insight climate change_india
 
Insight cdm redd
Insight cdm reddInsight cdm redd
Insight cdm redd
 
Carbon accounting advisory
Carbon accounting advisoryCarbon accounting advisory
Carbon accounting advisory
 

Agneya Clientele

  • 1. Agneya Carbon Ventures agneya List of Projects1 undertaken by Agneya Carbon Ventures S.No. Project Client Name Project Details Project Impact Area 1 Renewable Name: Assisting the honourable Commission in The project outcome is expected to have Energy amendment of MERC RE Tariff Regulation 2010. impact on Regulations Details: Agneya has been given a mandate to - Eligibility criteria applied to wind power assess the impact of MNRE circular removing projects for tariff Maharashtra minimum WPD criterion for wind power projects - Wind zone definitions n Maharashtra Electricity Regulatory development. This change is a result of - Tariff determination for relevant wind Commission (MERC) zones technological advancement in Wind Energy making less windy sites commercially exploitable. - Operationalization of regulations Duration:2.5 months including Hub height criteria 2 Techno- Name: Assessment and due diligence of wind Our analysis helped client make a decision Commercial- energy project sites in Tamil Nadu and on choosing the most feasible wind Financial Maharashtra energy project sites that will maximize Feasibility Details: Agneya team carried out the detailed financial returns and minimize the risk to Surana Corporation Analysis for techno-commercial and financial feasibility of the the project from various factors. Limited Wind Energy wind energy project, technical suitability of the Projects site, analysis of options for commercialization of energy – including third party sale and RECs and recommend most appropriate option to the client. Duration:0.5 months 1 This list is a snapshot of various projects and assignments Agneya Carbon Ventures has undertaken since its inception. Significant and prominent projects are featured here. Page 1 of 7
  • 2. Agneya Carbon Ventures agneya S.No. Project Client Name Project Details Project Impact Area 3 Preparation Name: Preparation of DPR for setting up wind DPR helped client to narrow down on of Detailed energy project of capacity 25 MW available choices for wind energy project Project Details: Agneya prepared DPR considering the development. Eventually the analysis and Report for mapping of available wind project sites across five recommendation helped Client in Surana Corporation proposed states, comparison of all the sites on parameters choosing the best site for setting up their Limited investment in like financial returns, commercial benefits, wind energy project. Renewable technical risk, developer, regulatory outlook etc Energy Duration: 0.5 months 4 Preparation Name: Preparation of DPR for setting up wind The outcome of the project was of Detailed energy project - Wind potential assessment of available Project Details: Agneya team assessed the wind energy site and micro-siting Report for potential of available site with effective liaisoning - Recommendation on the suitable Siddhivinayak proposed with C-WET and other competent bodies. Further techno-commercial and financial model Developers investment in we prepared DPR considering the wind energy to maximize returns from investment. Renewable potential available and assessed the site on Energy parameters like – financial returns, commercial benefits, technical risk, developer, regulatory outlook etc. Duration:5 months Page 2 of 7
  • 3. Agneya Carbon Ventures agneya S.No. Project Client Name Project Details Project Impact Area 5 Renewable Name: Comprehensive REC services for 10 MW The project outcome was Energy of wind energy project - Project accreditation Certificates Details: The project involved feasibility of project - Project registration with NLDC REC registration and issuance, project REC - Issuance of RECs and preparation of Surana Corporation accreditation state nodal agency, project REC REC issuance management framework Limited registration with NLDC, issuance of RECs and - Trading of RECs REC trading. Agneya also managed the Generation Based Incentives – procedures and modalities for the Client. Duration:5 months 6 Renewable Name: Comprehensive REC services for 3 MW of The project outcome was Energy co-generation project - Project accreditation Certificates Details: The project involved feasibility of project - Project registration with NLDC REC registration and issuance, project REC - Issuance of RECs Nava Bharat accreditation state nodal agency, project REC Ventures Limited registration with NLDC and issuance of RECs Duration:6 months 7 Renewable Name: Comprehensive REC services for 1 MW of The project outcome was Energy wind energy project - Project accreditation Certificates Details: The project involved feasibility of project - Project registration with NLDC SRS Ispat REC registration and issuance, project REC - Issuance of RECs accreditation state nodal agency, project REC registration with NLDC and issuance of RECs Duration:6 months Page 3 of 7
  • 4. Agneya Carbon Ventures agneya S.No. Project Client Name Project Details Project Impact Area 8 Renewable Name: Comprehensive REC services for 1.75 The project outcome was Energy MW of wind energy project - Project accreditation Certificates Mirra & Mirra Details: The project involved feasibility of project - Project registration with NLDC Industries REC registration and issuance, project REC - Issuance of RECs accreditation state nodal agency, project REC registration with NLDC and issuance of RECs Duration:6 months 9 Renewable Name: Comprehensive REC services for 4.5 MW The project outcome was Energy of wind energy project - Project accreditation Certificates Details: The project involved feasibility of project - Project registration with NLDC REC registration and issuance, project REC - Issuance of RECs accreditation state nodal agency, project REC - Trading of RECs MM Forgings registration with NLDC, issuance of RECs and REC trading Duration:6 months 10 Assessment Name: Addressing Renewable Energy Purchase Our analysis helped BMM to understand of Obligation for BMM Ispat Ltd. their current and future energy profile and Renewable Details: The project involved comprehensive find opportunities for energy efficiency Purchase analysis of current and future energy profile of gains. RPO analysis on technical and BMM Inspat Limited Obligation BMM Ispat, given their conventional generation financial parameters provided them with capacity and future growth plan. Analysis was multiple options to meet RPO – through carried to assess the total RPO liability for BMM captive consumption of RE, third party and RE/REC based options to address it. sourcing of RE and RECs procurement. Duration:5 months Page 4 of 7
  • 5. Agneya Carbon Ventures agneya S.No. Project Client Name Project Details Project Impact Area 11 Assessment Name: Addressing Renewable Energy Purchase Our analysis helped NBV to understand of Obligation for NBV Steel division the RPO liability arising out of their captive Renewable Details: The project involved comprehensive power plants supplying to Ferro Alloys Purchase analysis to assess the total RPO for NBV’s steel Division. Separate sugestions were made Obligation Nava Bharat division and various options to address it. to top management to address the RPO in Ventures Limited Duration: 0.5 months short term and medium term. 12 Carbon Name: Preparation of response for CDP on behalf The project outcome was Disclosure of GVK Power & Infrastructure Ltd - GVKPIL was ranked 8th among top 200 and Details: Agneya worked with core team to Indian companies in Carbon Disclosure Reporting develop GHG Inventory of all group companies of Leadership Index (CDLI) by CDP (CDP) GVKPIL, assessment of climate change related - GVKPIL filed the response to CDP for business risks and opportunities and preparation the first time GVK Power & and filing of response to CDP - GHG inventory of whole GVKPIL was Infrastructure Ltd Duration: 1.5 months accounted for 1st time (GVKPIL) - CDP report was prepared and distributed to all stakeholders Page 5 of 7
  • 6. Agneya Carbon Ventures agneya S.No. Project Client Name Project Details Project Impact Area 13 Carbon Name: Design, develop and implementation of The project outcome was Management Carbon Accounting and Management System - Chhatrapati Shivaji International Airport System conforming to ISO 14064-1 at Chhatrapati Shivaji became the 1st airport in India and 2nd International Airport in Asia to account its Carbon Footprint Mumbai International Details: Agneya developed comprehensive according to ISO 14064-1 Airport Pvt. Ltd. management system to account, report, monitor - It carried out successful verification and manage carbon footprint of Chhatrapati audit of its carbon footprint by 3rd party Shivaji International Airport (CSIA). The - It helped CSIA meet regulatory norms management system was developed in set by DGCA conformance with international standard ISO - Agneya developed and implemented 14064-1 web based software tool to measure Duration: 6.5 months and monitor carbon footprint 14 Sustainability Name: Design, develop and implement The project outcome was Management Sustainability Management Framework - All the employees of CSIA got Systems conforming to GRI protocol and Sustainability sensitized with sustainability issues and Reporting their impact on business Mumbai International Details: Agneya developed comprehensive - All department of CSIA now have Airport Pvt. Ltd. management framework to manage sustainability sustainability agenda and framework to issues pertaining to operations of Chhatrapati manage the business growth Shivaji International Airport (CSIA). Agneya is also sustainability developing CSIA’s first Sustainability Development - Key sustainability parameters are Report (SDR) which is being published along with identified and tracked Annual Report Duration: 7 months Page 6 of 7
  • 7. Agneya Carbon Ventures agneya S.No. Project Client Name Project Details Project Impact Area 15 Carbon Name: Design, develop and implement Carbon The project outcome was Management Accounting and Management System conforming - Rajiv Gandhi International Airport System to ISO 14064-1 at Rajiv Gandhi Airport became the 2nd airport in India and 3rd Details: Agneya developed comprehensive in Asia to account its Carbon Footprint GMR Hyderabad management system to account, report, monitor according to ISO 14064-1 International Airport and manage carbon footprint of Rajiv Gandhi - It carried out successful verification Limited International Airport (RGIA). The management audit of its carbon footprint by 3rd party system was developed in conformance with - It helped RGIA meet regulatory norms international standard ISO 14064-1 set by DGCA Duration: 2 months 16 Carbon Name: Design, develop and implementation of - Core team members of the plant are Management Carbon Accounting and Management framework capable of managing carbon footprint System at Kandivali Plant of FES division by themselves Details: Agneya developed comprehensive - Various tools and procedures Farm Equipment management framework, tool and documents to implemented at plant have successfully Sector (FES) Division manage carbon footprint of plant. demonstrated carbon management in Mahindra & Duration: 2 months practice Mahindra 17 Carbon Name: Assessment of Carbon Footprint of Steel The project led to Management division of SIL - Carbon footprint of steel division System Details: Agneya accounted the carbon footprint - Carbon intensity analysis showed need of steel division, analysis of risks and opportunities for energy efficiency initiatives at plant Surana Industries due to climate change and assessment of carbon - Risks and opportunities, RPO Limited footprint reduction options Duration: 1.5 months Page 7 of 7