R E S U M E
RAJKUMAR. A
B. E. (Electrical & Electronics)
Email: tonyraj.svp@gmail.com
Mobile: +91 78290 50050.
Objective:
Seeking Position Suiting my Skills, abilities and Experience in the field of Project Manager - MEP which
could be utilized fully and which offers Professional development. My core strength being the Resource,
Innovation and Flexibility.
Summary:
Having about 13 years of field experience in various capacities, I am confident of executing MEP (Electrical,
HVAC, FPS, FAPA & BMS) Works very professionally with ease and commitment.
Present Experience:
Currently working as, a Project Manager (MEP) in M/s. Cherry Hill Interiors Ltd @ Bangalore, India from Sep 2014.
Project Handled as a Project Manager (MEP):
• ITC Limited – PCP Pilot Plant, Bangalore (70Ksft),
• BT – Kolkata (125Ksft),
• Tektronics, Bangalore (175Ksft),
• Dell – 8, Bangalore (524Ksft).
• Shell – Bangalore (325Ksft).
Project Responsibilities In Charge of MEP :
Being an In-charge of MEP Projects, I have managed various Electrical, HVAC, FAPA, FPS & BMS Works and I am
fully conversant with project activities as briefed below.
• Costing of Electrical, HVAC, FAPA, FPS & BMS materials and works (Rate enquiry and vendor selection).
• Quoting of Tenders and attending to Tender negotiation / finalization of vendor.
• Planning and Scheduling (Micro / Macro) of every project activity including job allocation.
• Delegation of responsibilities and co-ordination of vendor for project works.
• Vendor registration procedures and ordering.
• Organizing the material regulating deliveries as per schedule to project sites.
• Issue instructions in carrying out jobs as per priority in co-ordination with other agencies.
• Expediting of deliveries from external agencies.
• Organizing vendor to provide the Manpower and Materials effectively as per timeline.
• Organizing regular co-ordination meetings and taking appropriate measures.
• Preparations of work progress reports periodically including material status.
• Effective communications to achieve work progress as per schedule.
• Organizing the safety awareness program on every week with prior intimation to vendors and their
employees.
• Monitoring and inspection of site works and take appropriate measures regular to achieve 100% quality and
maximize outputs.
C/O. S.G.Xavier,
#48,15th
Cross 5th
Main Road,
Subbaraju Layout,
Lakkasandra,
Bangalore– 560030,
• Monitoring of attendance and preparation of labour related reports, submission of documents periodically to
Client and EHS Team etc.,
• Study of Design schemes, review of Drawings and suggest for optimization.
• Erection, Testing & Commissioning of Various Plant as per stipulated norms. Preparation and compilation of
test reports & Documentation.
• Calibration of Instruments & Relays and maintain record.
• Organizing & checking vendor to prepare the Inventories and As-Built drawings to complete the handing
over.
• Quantity survey & Verification of Running Bills / Final Bills to reputed vendor and submitting the bill to
client.
• Design and Preparation of detailed Engineering drawings for mini project assignments including BOQ and
Tendering process.
• Compilation of documents and dwgs for CEIG / Govt submittals and co-ordination in getting approvals.
• Preparing Final Documents & Bill to achieve successful hand over with snag point Completion.
Critical Activities:
• Organizing and conducting preventive maintenance in association with other related agencies within critical
time schedules.
• Organizing shutdown activities in critical areas like improved system stability of Data Centers, Power
Installations, etc.,
• Implementation of industrial safety practices including conducting safety audit and safety awareness
programs.
Project Handled as a Manager (Projects):
• ITC Limited -International Travel House, Bangalore (70Ksft)
• ITC Limited -Health Centre, Bangalore (26Ksft)
• ITC Limited -Old Data Centre, Bangalore (28Ksft)
• ITC Limited -New Data Centre, Bangalore (35Ksft)
• ITC Limited -Infotech Park - Drishti GFL & FFL, Bangalore (40+40Ksft)
• Axis Concepts Construction Pvt.Ltd. (Mportal Wireless Solution Pvt.Ltd.) , Bangalore (45Ksft)
• ITC Infotech India Limited – PMD (Tripthi) , Bangalore (195Ksft)
• ITC Infotech India Limited – GDN- 9, , Bangalore (41Ksft)
• ITC Infotech India Limited – GDN- 10 & 10A (Riddhi) , Bangalore (42Ksft)
• WTC – 12TH
Floor KPMG, Bangalore (45Ksft)
• ITC Limited – Consumer Interaction Centre (CIC) , Bangalore (38.5Ksft)
• ITC Infotech India Limited – Trivandrum (Tejawini Building, Techno Park)
• ITC Infotech India Limited – Athithi, Bangalore (48Ksft)
• L & T Valdel, Bangalore (53Ksft)
• Chayawo Games, Bangalore (28Ksft)
• ITC Infotech India Limited – 5-8 (Pragathi) , Bangalore (225Ksft)
• ITC Infotech India Limited – Nidhi Noc Rooms, Bangalore (41Ksft)
• Brigade Corporate Show Room – WTC GFL & FFL, Bangalore (25Ksf)
• Mekong Restaurant, Bangalore (24Ksft)
• WTC – 19TH
Floor Incubation Center, Bangalore (18.5Ksft)
• WTC – 12TH
Floor – Coca Cola, Bangalore (25Ksft)
• ITC – Unnathi (Data centre) , Bangalore (23Ksft)
• WTC – High Ultra Lounge Restaurant, Bangalore (55Ksft)
• WTC – 5th
Floor – IEEE - 2 Office, Bangalore (25Ksft)
• ITC Infotech India Limited – Prakruthi, Bangalore (51Ksft)
• ITC Infotech India Limited – Riddhi, Bangalore (44Ksft)
• CKC Jewelers Internal Office, Bangalore (32Ksft)
• Frank Anthony Public School, Bangalore (121Ksft)
• ITC Infotech India Limited – Spoorthi, Bangalore (84Ksft)
Previous Experience:
 Worked as a Manager (Projects) in Priyanka Electricals at Bangalore, from Sep 2010 to Sep 2014.
Being an In-charge of Projects, I have managed various Electrical Works, FAPA, and HVAC from
Quoting of Tender to Handing Over.
 Worked as a service & sales co-coordinator in Eastman Auto & Power Ltd (ADDO Battery), Madurai,
from Jul 2009 to Aug 2010.
I was responsible for organizing and co-ordination of customer services including QC. (Attached to sales
team).
 Worked as a Project Engineer in EV Green Machine Tool & Automation Pvt.Ltd at Bangalore, from Nov
2008 to July 2009.
The company specialized in refurbishing of old CNC Machines, in which I was taking care of Electrical
and Automation part to achieve enhanced reliability with incorporation of fool-proof human safety
features.
 Worked as a Controller in Exide Industries Limited (Bat-Mobile Service) at Madurai from Jul 2007 to
Oct 2008.
I was responsible for organizing and co-ordination of customer services including QC. (Attached to sales
team).
 Worked as a Technical Engineer in Bharat Electronics Limited (BEL) at Bangalore from Oct 2001 to Oct
2003.
Testing, Fault Analyzing of various gadgets attached to Wireless communication (Defence Applications).
 Worked as a Service Engineer in Sunrise Services Limited at Bangalore from Jun 2000 to Sep 2001.
This Company was specialized in manufacturing of Boilers and related facilities applicable to Garments
industries, Industrials and Hotels. I was responsible for organizing and co-ordination of customer services
including QC. (Attached to sales team).
Academic Qualification:
• Bachelor of Engineering in Electrical & Electronics Engineering from KLN college of Information
Technology, Madurai, Tamil nadu, India (2004-2007)
• Diploma in Electrical & Electronics Engineering from S.K.A.Polytechnic College, Manamadurai. Tamil
nadu, India. (1997-2000)
Computer Skills:
• Operating System : Windows 98/2000/2003, Windows xp, Windows Vista
• Development tool: MS- office, AutoCAD 2008, PLC, CNC, SCADA.
Personnel Details:
Father’s Name : S. Alexis Roche
D.O.B : 05th June, 1982
Gender : Male
Nationality : Indian
Marital Status : Married
Languages Known : Tamil, English, Hindi and Kannada.
Permanent Address : #5B, Sengole Nagar 1st
Street,
Near ICC, Old Vilangudi Road,
Thathaneri (Po), Madurai – 625 018
Tamil Nadu, India.
Hope my above resume will be in line with your requirement and please feel free to call me for any more information.
I await for your call for next course of meeting.

RAJKUMAR A - 22 05 16

  • 1.
    R E SU M E RAJKUMAR. A B. E. (Electrical & Electronics) Email: tonyraj.svp@gmail.com Mobile: +91 78290 50050. Objective: Seeking Position Suiting my Skills, abilities and Experience in the field of Project Manager - MEP which could be utilized fully and which offers Professional development. My core strength being the Resource, Innovation and Flexibility. Summary: Having about 13 years of field experience in various capacities, I am confident of executing MEP (Electrical, HVAC, FPS, FAPA & BMS) Works very professionally with ease and commitment. Present Experience: Currently working as, a Project Manager (MEP) in M/s. Cherry Hill Interiors Ltd @ Bangalore, India from Sep 2014. Project Handled as a Project Manager (MEP): • ITC Limited – PCP Pilot Plant, Bangalore (70Ksft), • BT – Kolkata (125Ksft), • Tektronics, Bangalore (175Ksft), • Dell – 8, Bangalore (524Ksft). • Shell – Bangalore (325Ksft). Project Responsibilities In Charge of MEP : Being an In-charge of MEP Projects, I have managed various Electrical, HVAC, FAPA, FPS & BMS Works and I am fully conversant with project activities as briefed below. • Costing of Electrical, HVAC, FAPA, FPS & BMS materials and works (Rate enquiry and vendor selection). • Quoting of Tenders and attending to Tender negotiation / finalization of vendor. • Planning and Scheduling (Micro / Macro) of every project activity including job allocation. • Delegation of responsibilities and co-ordination of vendor for project works. • Vendor registration procedures and ordering. • Organizing the material regulating deliveries as per schedule to project sites. • Issue instructions in carrying out jobs as per priority in co-ordination with other agencies. • Expediting of deliveries from external agencies. • Organizing vendor to provide the Manpower and Materials effectively as per timeline. • Organizing regular co-ordination meetings and taking appropriate measures. • Preparations of work progress reports periodically including material status. • Effective communications to achieve work progress as per schedule. • Organizing the safety awareness program on every week with prior intimation to vendors and their employees. • Monitoring and inspection of site works and take appropriate measures regular to achieve 100% quality and maximize outputs. C/O. S.G.Xavier, #48,15th Cross 5th Main Road, Subbaraju Layout, Lakkasandra, Bangalore– 560030,
  • 2.
    • Monitoring ofattendance and preparation of labour related reports, submission of documents periodically to Client and EHS Team etc., • Study of Design schemes, review of Drawings and suggest for optimization. • Erection, Testing & Commissioning of Various Plant as per stipulated norms. Preparation and compilation of test reports & Documentation. • Calibration of Instruments & Relays and maintain record. • Organizing & checking vendor to prepare the Inventories and As-Built drawings to complete the handing over. • Quantity survey & Verification of Running Bills / Final Bills to reputed vendor and submitting the bill to client. • Design and Preparation of detailed Engineering drawings for mini project assignments including BOQ and Tendering process. • Compilation of documents and dwgs for CEIG / Govt submittals and co-ordination in getting approvals. • Preparing Final Documents & Bill to achieve successful hand over with snag point Completion. Critical Activities: • Organizing and conducting preventive maintenance in association with other related agencies within critical time schedules. • Organizing shutdown activities in critical areas like improved system stability of Data Centers, Power Installations, etc., • Implementation of industrial safety practices including conducting safety audit and safety awareness programs. Project Handled as a Manager (Projects): • ITC Limited -International Travel House, Bangalore (70Ksft) • ITC Limited -Health Centre, Bangalore (26Ksft) • ITC Limited -Old Data Centre, Bangalore (28Ksft) • ITC Limited -New Data Centre, Bangalore (35Ksft) • ITC Limited -Infotech Park - Drishti GFL & FFL, Bangalore (40+40Ksft) • Axis Concepts Construction Pvt.Ltd. (Mportal Wireless Solution Pvt.Ltd.) , Bangalore (45Ksft) • ITC Infotech India Limited – PMD (Tripthi) , Bangalore (195Ksft) • ITC Infotech India Limited – GDN- 9, , Bangalore (41Ksft) • ITC Infotech India Limited – GDN- 10 & 10A (Riddhi) , Bangalore (42Ksft) • WTC – 12TH Floor KPMG, Bangalore (45Ksft) • ITC Limited – Consumer Interaction Centre (CIC) , Bangalore (38.5Ksft) • ITC Infotech India Limited – Trivandrum (Tejawini Building, Techno Park) • ITC Infotech India Limited – Athithi, Bangalore (48Ksft) • L & T Valdel, Bangalore (53Ksft) • Chayawo Games, Bangalore (28Ksft) • ITC Infotech India Limited – 5-8 (Pragathi) , Bangalore (225Ksft) • ITC Infotech India Limited – Nidhi Noc Rooms, Bangalore (41Ksft) • Brigade Corporate Show Room – WTC GFL & FFL, Bangalore (25Ksf) • Mekong Restaurant, Bangalore (24Ksft) • WTC – 19TH Floor Incubation Center, Bangalore (18.5Ksft) • WTC – 12TH Floor – Coca Cola, Bangalore (25Ksft) • ITC – Unnathi (Data centre) , Bangalore (23Ksft) • WTC – High Ultra Lounge Restaurant, Bangalore (55Ksft) • WTC – 5th Floor – IEEE - 2 Office, Bangalore (25Ksft) • ITC Infotech India Limited – Prakruthi, Bangalore (51Ksft) • ITC Infotech India Limited – Riddhi, Bangalore (44Ksft) • CKC Jewelers Internal Office, Bangalore (32Ksft) • Frank Anthony Public School, Bangalore (121Ksft)
  • 3.
    • ITC InfotechIndia Limited – Spoorthi, Bangalore (84Ksft) Previous Experience:  Worked as a Manager (Projects) in Priyanka Electricals at Bangalore, from Sep 2010 to Sep 2014. Being an In-charge of Projects, I have managed various Electrical Works, FAPA, and HVAC from Quoting of Tender to Handing Over.  Worked as a service & sales co-coordinator in Eastman Auto & Power Ltd (ADDO Battery), Madurai, from Jul 2009 to Aug 2010. I was responsible for organizing and co-ordination of customer services including QC. (Attached to sales team).  Worked as a Project Engineer in EV Green Machine Tool & Automation Pvt.Ltd at Bangalore, from Nov 2008 to July 2009. The company specialized in refurbishing of old CNC Machines, in which I was taking care of Electrical and Automation part to achieve enhanced reliability with incorporation of fool-proof human safety features.  Worked as a Controller in Exide Industries Limited (Bat-Mobile Service) at Madurai from Jul 2007 to Oct 2008. I was responsible for organizing and co-ordination of customer services including QC. (Attached to sales team).  Worked as a Technical Engineer in Bharat Electronics Limited (BEL) at Bangalore from Oct 2001 to Oct 2003. Testing, Fault Analyzing of various gadgets attached to Wireless communication (Defence Applications).  Worked as a Service Engineer in Sunrise Services Limited at Bangalore from Jun 2000 to Sep 2001. This Company was specialized in manufacturing of Boilers and related facilities applicable to Garments industries, Industrials and Hotels. I was responsible for organizing and co-ordination of customer services including QC. (Attached to sales team). Academic Qualification: • Bachelor of Engineering in Electrical & Electronics Engineering from KLN college of Information Technology, Madurai, Tamil nadu, India (2004-2007) • Diploma in Electrical & Electronics Engineering from S.K.A.Polytechnic College, Manamadurai. Tamil nadu, India. (1997-2000) Computer Skills: • Operating System : Windows 98/2000/2003, Windows xp, Windows Vista • Development tool: MS- office, AutoCAD 2008, PLC, CNC, SCADA. Personnel Details: Father’s Name : S. Alexis Roche D.O.B : 05th June, 1982 Gender : Male Nationality : Indian Marital Status : Married Languages Known : Tamil, English, Hindi and Kannada. Permanent Address : #5B, Sengole Nagar 1st Street, Near ICC, Old Vilangudi Road,
  • 4.
    Thathaneri (Po), Madurai– 625 018 Tamil Nadu, India. Hope my above resume will be in line with your requirement and please feel free to call me for any more information. I await for your call for next course of meeting.