This document appears to be a materials takeoff or bill of materials for the construction of three buildings. It lists various construction items, materials, quantities, and unit costs. The items include concrete, masonry, wood framing, roofing, doors, windows, finishes, partitions, electrical components, and mechanical equipment for each of the three buildings.
From the June 30th BOE meeting is this presentation on the current progress of the buildings and grounds committee on the current state of the borough's school buildings
3BHK Villas for sale off Hosur Road, Bangalore at Kristal Aquamarine
2BHK Apartments in Bangalore
Site at Bangalore
Villa Houses in Bangalore
Apartments for sale at Electronic city
ForMore:http://bangalore5projects.blogspot.in/2015/12/3bhk-villas-for-sale-off-hosur-road.html
From the June 30th BOE meeting is this presentation on the current progress of the buildings and grounds committee on the current state of the borough's school buildings
3BHK Villas for sale off Hosur Road, Bangalore at Kristal Aquamarine
2BHK Apartments in Bangalore
Site at Bangalore
Villa Houses in Bangalore
Apartments for sale at Electronic city
ForMore:http://bangalore5projects.blogspot.in/2015/12/3bhk-villas-for-sale-off-hosur-road.html
The Superintendent presented the board with the district's assessment of the conditions of Haddonfield's schools and a preliminary budget to address the most pressing needs.
Am overview of the City of Pittsburgh's first ADU Zoning Overlay (Accessory Dwellling Unit). It allows single family homes to be built or renovated with an accessory dwelling. The Home must be owner occupied and has additional limitations outlined in this presentation to the Pittsburgh Community Reinvesment Group (PCRG) 2018 Summit. The Presentation includes the design for the first three houses to be developed by Bloomfield Garfield Corporation, Designed by Pfaffmann + Associates and built by Ecocraft Modular Homes.
PowerPoint rendering of the project goals as outlined by our team manual, prepared by myself and four team members at the 2014 International Builders Show Residential Construction Management Competition in Las Vegas, Nevada.
Economías colaborativas para emprendedoras en redMarcela Basch
Un paneo por las nuevas plataformas tecnológicas y sociales. Presentado en el seminario de Emprendedoras en Red en el Instituto Pyme de Banco Ciudad, 14 de junio de 2016.
The Superintendent presented the board with the district's assessment of the conditions of Haddonfield's schools and a preliminary budget to address the most pressing needs.
Am overview of the City of Pittsburgh's first ADU Zoning Overlay (Accessory Dwellling Unit). It allows single family homes to be built or renovated with an accessory dwelling. The Home must be owner occupied and has additional limitations outlined in this presentation to the Pittsburgh Community Reinvesment Group (PCRG) 2018 Summit. The Presentation includes the design for the first three houses to be developed by Bloomfield Garfield Corporation, Designed by Pfaffmann + Associates and built by Ecocraft Modular Homes.
PowerPoint rendering of the project goals as outlined by our team manual, prepared by myself and four team members at the 2014 International Builders Show Residential Construction Management Competition in Las Vegas, Nevada.
Economías colaborativas para emprendedoras en redMarcela Basch
Un paneo por las nuevas plataformas tecnológicas y sociales. Presentado en el seminario de Emprendedoras en Red en el Instituto Pyme de Banco Ciudad, 14 de junio de 2016.
La presentazione di Maria Chiara Pettenati, Maria Guida e Valentina Toci, ricercatrici Indire alla seconda giornata nazionale per i referenti della formazione Neoassunti 2015/2016 organizzata a Napoli il 10 marzo 2016.
Principales funciones del área de comprasLaura Lima
Para entender mejor el proceso de compras corporativas, es importante saber cuáles son las principales funciones del área encargada de efectuarlas. Más información: https://business.americanexpress.com/mx/soluciones-de-compra/control-de-compras
Lecture given at the May 5, 2021 Passive House Accelerator event illustrating the Lexington Pkwy Passive House Plus in St. Paul, Minnesota TE Studio Architecture
Credible Estimating is helping construction estimators throughout the United States with the estimating process. Our QTO helps estimators to apply appropriate costs to each line item because of the details of specs we put on the spreadsheets. We read the project construction drawings thoroughly, and make sure that each and every detail that may affect the cost of the project is taken into account.
1. ITEM
#
DESCRIPTION QTY. WAST
E
QTY. W/
WASTE
UNIT UNIT
COST
ITEM COST TRADE COST
GENERAL REQUIREMENT -$
Permits
Supervision
Site Safety plan
CONCRETE
FOOTING CONCRETE
Building 1
Building 2
Building 3
SLAB ON GRADE
Building 1
Building 2
Building 3
MASONRY
Faux Brick Veneer on Galv. Metal Lath at building 1
Faux Brick Veneer on Galv. Metal Lath at building 2
Faux Brick Veneer on Galv. Metal Lath at building 3
WOOD, PLASTICS & COMPOSITES
ROOF FRAMING
BUILDING 1
Pre-Engineered Roof Trusses @24" O.C.Max
2X10 P.T. SYP#2 Rafters @12" O.C. Max
BUILDING 2
Pre-Engineered Roof Trusses @24" O.C.Max
2X10 P.T. SYP#2 Rafters @12" O.C. Max
BUILDING 3
Pre-Engineered Roof Trusses @24" O.C.Max
2X10 P.T. SYP#2 Rafters @12" O.C. Max
THERMAL & MOISTURE PROTECTION
ROOFING
BUILDING 1
30 Yr roof shingles
BUILDING 2
30 Yr roof shingles
BUILDING 3
30 Yr roof shingles
OPENINGS
DOORS AT BUILDING 1
Door No. 1
Size: 3'-0" x 6'-8"
Material: Insulated Metal
Door No. 3
Size: 3'-0" x 8'-0"
Material: Insulated Metal
Door No. 4
Size: 2'-0" x 6'-8"
Material: Hardboard
Door No. 5
Size: (2) 2'-0" x 6'-8"
Material: Hardboard
Door No. 6
Size: 2'-4" x 6'-8"
Material: Hardboard
Door No. 7
Size: 2'-4" x 6'-8"
Material: Hardboard
Door No. 8
Size: (2) 2'-4" x 6'-8"
Material: Hardboard
Door No. 9
Size: 2'-8" x 6'-8"
Material: Hardboard
Door No. 10
Size: 2'-8" x 6'-8"
Material: Hardboard
Door No. 11
Size: (2) 2'-6" x 6'-8"
Material: Hardboard
Door No. 12
Size: 8'-0" x 8'-0"
Material: Insulated Metal
DOORS AT BUILDING 2
Door No. 1
Size: 3'-0" x 6'-8"
Material: Insulated Metal
Door No. 3
Size: 3'-0" x 8'-0"
Material: Insulated Metal
Door No. 4
Size: 2'-0" x 6'-8"
Material: Hardboard
Door No. 5
Size: (2) 2'-0" x 6'-8"
Material: Hardboard
Door No. 6
Size: 2'-4" x 6'-8"
Material: Hardboard
Door No. 7
Size: 2'-4" x 6'-8"
Material: Hardboard
Door No. 8
Size: (2) 2'-4" x 6'-8"
Material: Hardboard
Door No. 9
Size: 2'-8" x 6'-8"
Material: Hardboard
Door No. 10
Size: 2'-8" x 6'-8"
Material: Hardboard
Door No. 11
Size: (2) 2'-6" x 6'-8"
Material: Hardboard
Door No. 12
Size: 8'-0" x 8'-0"
Material: Insulated Metal
DOORS AT BUILDING 3
Door No. 1
Size: 3'-0" x 6'-8"
Material: Insulated Metal
2. ITEM
#
DESCRIPTION QTY. WAST
E
QTY. W/
WASTE
UNIT UNIT
COST
ITEM COST TRADE COST
Door No. 3
Size: 3'-0" x 8'-0"
Material: Insulated Metal
Door No. 4
Size: 2'-0" x 6'-8"
Material: Hardboard
Door No. 5
Size: (2) 2'-0" x 6'-8"
Material: Hardboard
Door No. 6
Size: 2'-4" x 6'-8"
Material: Hardboard
Door No. 7
Size: 2'-4" x 6'-8"
Material: Hardboard
Door No. 8
Size: (2) 2'-4" x 6'-8"
Material: Hardboard
Door No. 9
Size: 2'-8" x 6'-8"
Material: Hardboard
Door No. 10
Size: 2'-8" x 6'-8"
Material: Hardboard
Door No. 11
Size: (2) 2'-6" x 6'-8"
Material: Hardboard
Door No. 12
Size: 8'-0" x 8'-0"
Material: Insulated Metal
WINDOWS AT BUILDING 1
Window No. D
Size: 3'-0" x 6'-0"
Material: Aluminum single hung W/ Insulated Glass
Window No. E
Size: 3'-0" x 3'-0"
Material: Aluminum single hung W/ Insulated Glass
Window No. F
Size: 3'-0" x 1'-0"
Material: Aluminum single hung W/ Insulated Glass
WINDOWS AT BUILDING 2
Window No. D
Size: 3'-0" x 6'-0"
Material: Aluminum single hung W/ Insulated Glass
Window No. E
Size: 3'-0" x 3'-0"
Material: Aluminum single hung W/ Insulated Glass
Window No. F
Size: 3'-0" x 1'-0"
Material: Aluminum single hung W/ Insulated Glass
WINDOWS AT BUILDING 3
Window No. C
Size: (2) 3'-0" x 6'-0"
Material: Aluminum single hung W/ Insulated Glass
Window No. D
Size: 3'-0" x 6'-0"
Material: Aluminum single hung W/ Insulated Glass
Window No. E
Size: 3'-0" x 3'-0"
Material: Aluminum single hung W/ Insulated Glass
Window No. F
Size: 3'-0" x 1'-0"
Material: Aluminum single hung W/ Insulated Glass
FINISHES
FLOORING
BUILDING 1
Vinyl Planks
Light Weight Concrete
BUILDING 2
Vinyl Planks
Light Weight Concrete
BUILDING 3
Vinyl Planks
Light Weight Concrete
Exposed Concrete Flooring
CEILING
Tex. Gypsum Board Ceiling System with R-13 Batt
insulation
on Building 1
Tex. Gypsum Board Ceiling System with R-13 Batt
insulation
on Building 2
Tex. Gypsum Board Ceiling System with R-13 Batt
insulation
on Building 3
PARTITIONS
BUILDING 1
Typical Interior Wall Assembly (1Hr. Rated)
5/8" Thick Gypsum Board on both sides
2x4 wood studs @ 16" O.C
Typical Exterior Wall Assembly (1Hr. Rated)
5/8" Thick Gypsum Board
7/16" Thick Wood Structural Panel Sheathing
2x4 wood studs @ 16" O.C
3-1/2" Thick Fiberglass Batt Insulation
Typical Double Wall Assembly (1Hr. Rated)
5/8" Thick Gypsum Board on both sides
7/16" Thick Wood Structural Panel Sheathing
2x4 wood studs @ 24" O.C
3-1/2" Thick Fiberglass Batt Insulation
BUILDING 2
Typical Interior Wall Assembly (1Hr. Rated)
5/8" Thick Gypsum Board on both sides
2x4 wood studs @ 16" O.C
Typical Exterior Wall Assembly (1Hr. Rated)
5/8" Thick Gypsum Board
7/16" Thick Wood Structural Panel Sheathing
2x4 wood studs @ 16" O.C
3-1/2" Thick Fiberglass Batt Insulation
Typical Double Wall Assembly (1Hr. Rated)
5/8" Thick Gypsum Board on both sides
3. ITEM
#
DESCRIPTION QTY. WAST
E
QTY. W/
WASTE
UNIT UNIT
COST
ITEM COST TRADE COST
7/16" Thick Wood Structural Panel Sheathing
2x4 wood studs @ 24" O.C
3-1/2" Thick Fiberglass Batt Insulation
BUILDING 3
Typical Interior Wall Assembly (1Hr. Rated)
5/8" Thick Gypsum Board on both sides
2x4 wood studs @ 16" O.C
Typical Exterior Wall Assembly (1Hr. Rated)
5/8" Thick Gypsum Board
7/16" Thick Wood Structural Panel Sheathing
2x4 wood studs @ 16" O.C
3-1/2" Thick Fiberglass Batt Insulation
Typical Double Wall Assembly (1Hr. Rated)
5/8" Thick Gypsum Board on both sides
7/16" Thick Wood Structural Panel Sheathing
2x4 wood studs @ 24" O.C
3-1/2" Thick Fiberglass Batt Insulation
PAINT
Paint on Gypsum wall Board at Building 1
Paint on Gypsum wall Board at Building 2
Paint on Gypsum wall Board at Building 3
Paint on Ceiling at Building 1
Paint on Ceiling at Building 2
Paint on Ceiling at Building 3
BASE
Wood Base at building 1
Wood Base at building 2
Wood Base at building 3
EARTHWORK
Excavation for footing at Building 1
Excavation for footing at Building 2
Excavation for footing at Building 3
ELECTRICAL
SITE LIGHTING FIXTURES
Porch Entrance Light, Exterior Grade Carriage Fixture
Kichler #9788TZ (D)
Junction Box
BUILDING 1 LIGHTING FIXTURES
Surface Mounted With Decorative - (2) - 17W-LED
Progress #P3429-09 (C )
Surface Mounted With Opal Lens (2)-17W LED Lamps
Kichler #345WH (L)
Surface Mounted With Decorative Globe - Wet Location
Home Style #3100Z-30 Plus (1) 17W-LED ( E )
Surface Mounted On Flush Outlet - 6' - 6' High - (3) - 17W
Lamps A19 Hamptonbay 15041 (Or) Kichler #5337NI (B)
Surface Mounted (4) Lamp Flourescent Wrap-A-Round
(A)
Pendant Mounted Decorative Fixture [50 W Max] (MP)
Surface Mounted With Standard Globe, Hampton Bay
#HB1976-62-(1)-17W-LED (H)
Ceiling Fan, 5 Bladed 3 Speed Fan With Light Kit (3)-17W
LED Lamps (G)
Electric Motor
CO2 Detector With Integral Alarm, Battery Backup, 120V,
Connection And Multi Station Capability (CO)
Surface Mounted Flourescent Strip - 2 Lamp, Royal
Pacific #4213-Prismatic Acrylic Wrap-A-Round (FS)
Surface Miounted with Standard Globe (Hampton Bay
#HB1976-62-(1)-17W-LED Lamp (K)
BUILDING 2 LIGHTING FIXTURES
Surface Mounted With Decorative - (2) - 17W-LED
Progress #P3429-09 (C )
Surface Mounted With Opal Lens (2)-17W LED Lamps
Kichler #345WH (L)
Surface Mounted With Decorative Globe - Wet Location
Home Style #3100Z-30 Plus (1) 17W-LED ( E )
Surface Mounted On Flush Outlet - 6' - 6' High - (3) - 17W
Lamps A19 Hamptonbay 15041 (Or) Kichler #5337NI (B)
Surface Mounted (4) Lamp Flourescent Wrap-A-Round
(A)
Pendant Mounted Decorative Fixture [50 W Max] (MP)
Surface Mounted With Standard Globe, Hampton Bay
#HB1976-62-(1)-17W-LED (H)
Ceiling Fan, 5 Bladed 3 Speed Fan With Light Kit (3)-17W
LED Lamps (G)
Electric Motor
CO2 Detector With Integral Alarm, Battery Backup, 120V,
Connection And Multi Station Capability (CO)
Surface Mounted Flourescent Strip - 2 Lamp, Royal
Pacific #4213-Prismatic Acrylic Wrap-A-Round (FS)
Surface Miounted with Standard Globe (Hampton Bay
#HB1976-62-(1)-17W-LED Lamp (K)
BUILDING 3 LIGHTING FIXTURES
Combination Exit Sign/ Emergency Battery Packup
Lighting Fixture
Surface Mounted With Opal Lens (2)-17W LED Lamps
Kichler #345WH (L)
Surface Mounted With Decorative - (2) - 17W-LED
Progress #P3429-09 (C )
Emergency Light Two Light With Integral Battery Backup
Royal Pacific #REL1/REL1-SD-WH (EB)
CO2 Detector With Integral Alarm, Battery Backup, 120V,
Connection And Multi Station Capability (CO)
Lay-In (4) Lamp Flourescent W/ Virgin Acrylic Prismatic
Lens. Daybrite 428-120-EB Plus [4] 28W T8 (A4)
Surface Mounted Flourescent Strip - 2 Lamp, Royal
Pacific #4213-Prismatic Acrylic Wrap-A-Round (FS)
Pendant Mounted Decorative Fixture [50 W Max] (MP)
Ceiling Fan, 5 Bladed 3 Speed Fan With Light Kit (3)-17W
LED Lamps (G)
Surface Mounted (4) Lamp Flourescent Wrap-A-Round
(A)
Surface Mounted On Flush Outlet - 6' - 6' High - (3) - 17W
Lamps A19 Hamptonbay 15041 (Or) Kichler #5337NI (B)
Surface Mounted With Decorative Globe - Wet Location
Home Style #3100Z-30 Plus (1) 17W-LED ( E )
Electric Motor
Surface Mounted With Standard Globe, Hampton Bay
#HB1976-62-(1)-17W-LED (H)
4. ITEM
#
DESCRIPTION QTY. WAST
E
QTY. W/
WASTE
UNIT UNIT
COST
ITEM COST TRADE COST
Surface Miounted with Standard Globe (Hampton Bay
#HB1976-62-(1)-17W-LED Lamp (K)
BUILDING 1 OUTLETS AND SWITCHES
Safety Disconnect Switch
Ground Fault Circuit InterRupter Duplex Receptacle With
Nema 3R Cover.
Ground Fault Circuit InterRupter Duplex Receptacle
Duplex Receptacle
Combo Telecommunication Outlet And Tv
Duplex Receptacle Nema 5-20R
3 Way Switch
4Way Switch
Single Pole Switch
BUILDING 2 OUTLETS AND SWITCHES
Safety Disconnect Switch
Ground Fault Circuit InterRupter Duplex Receptacle With
Nema 3R Cover.
Ground Fault Circuit InterRupter Duplex Receptacle
Duplex Receptacle
Combo Telecommunication Outlet And Tv
Duplex Receptacle Nema 5-20R
3 Way Switch
4Way Switch
Single Pole Switch
BUILDING 3 OUTLETS AND SWITCHES
Safety Disconnect Switch
Ground Fault Circuit InterRupter Duplex Receptacle With
Nema 3R Cover.
Ground Fault Circuit InterRupter Duplex Receptacle
Duplex Receptacle
Combo Telecommunication Outlet And Tv
Duplex Receptacle Nema 5-20R
3 Way Switch
4Way Switch
Single Pole Switch
BUILDING 1 ELECTRIC PANELS
Typical Dwelling Unit Panel
Typical House Panel
Multi - Meter Center
Electric Wiring
BUILDING 2 ELECTRIC PANELS
Typical Dwelling Unit Panel
Typical House Panel
Multi - Meter Center
Electric Wiring
BUILDING 3 ELECTRIC PANELS
Typical Dwelling Unit Panel
Typical House Panel
Multi - Meter Center
Retail Panel Feeder
Electric Wiring
MECHANICAL
BUILDING 1
5" Dia Duct
7" Dia Duct
8" Dia Duct
12x10 Duct
12x4, 150 CFM Diffuser
12x4, 140 CFM Diffuser
12x4, 130 CFM Diffuser
8x6, 20 CFM Diffuser
8x6 30 CFM Diffuser
24x12 SRAG
12x6 SRAG
4" Dia Dryer Vent
50 CFM And 23 Watts Exhausr Fan
100 CFM And 129 Watts Exhausr Fan
1.5 Tons Air Handling Unit (600 CFM)
2 Tons Air Handling Unit (600 CFM)
6" Dia Exhaust Pipe
Carbon Mono-Oxide Detector
146 LB Heat Pump
156 LB Heat Pump
BUILDING 2
5" Dia Duct
7" Dia Duct
8" Dia Duct
12x10 Duct
12x4, 150 CFM Diffuser
12x4, 140 CFM Diffuser
12x4, 130 CFM Diffuser
8x6, 20 CFM Diffuser
8x6 30 CFM Diffuser
24x12 SRAG
12x6 SRAG
4" Dia Dryer Vent
50 CFM And 23 Watts Exhausr Fan
100 CFM And 129 Watts Exhausr Fan
1.5 Tons Air Handling Unit (600 CFM)
2 Tons Air Handling Unit (600 CFM)
6" Dia Exhaust Pipe
Carbon Mono-Oxide Detector
146 LB Heat Pump
156 LB Heat Pump
BUILDING 3
5" Dia Duct
7" Dia Duct
8" Dia Duct
12x10 Duct
12x4, 150 CFM Diffuser
12x4, 140 CFM Diffuser
12x4, 130 CFM Diffuser
8x6, 20 CFM Diffuser
5. ITEM
#
DESCRIPTION QTY. WAST
E
QTY. W/
WASTE
UNIT UNIT
COST
ITEM COST TRADE COST
8x6 30 CFM Diffuser
24x12 SRAG
12x6 SRAG
4" Dia Dryer Vent
50 CFM And 23 Watts Exhausr Fan
100 CFM And 129 Watts Exhausr Fan
1.5 Tons Air Handling Unit (600 CFM)
2 Tons Air Handling Unit (600 CFM)
6" Dia Exhaust Pipe
Carbon Mono-Oxide Detector
146 LB Heat Pump
156 LB Heat Pump
2.5 Tons Air Handling Unit
172 LB Heat Pump
PLUMBING
BUILDING 1
4" Sanitry Sewer
2" Sanitry Sewer
3" Sanitry Sewer
3/4" Water Line
1/2" Water Line
1 1/4" Water Line
Water Closet
Bath Tub
Lavatory
Kitchen Sink
Ice Maker Connection
Water Heater With 30 Gallon Storage And 4500 Watt
Electrical Input
BUILDING 2
4" Sanitry Sewer
2" Sanitry Sewer
3" Sanitry Sewer
3/4" Water Line
1/2" Water Line
1 1/4" Water Line
Water Closet
Bath Tub
Lavatory
Kitchen Sink
Ice Maker Connection
Water Heater With 30 Gallon Storage And 4500 Watt
Electrical Input
BUILDING 3
4" Sanitry Sewer
2" Sanitry Sewer
3" Sanitry Sewer
3/4" Water Line
1/2" Water Line
1 1/4" Water Line
Water Closet
Bath Tub
Lavatory
Kitchen Sink
Ice Maker Connection
Water Heater With 30 Gallon Storage And 4500 Watt
Electrical Input
Floor Clean Out
Water Heater With 19 Gallon Storage And 4500 Watt
Electrical Input
SUB TOTAL
INSURANCE
OVERHEAD AND PROFIT
TOTAL BASE BID
Legend
FT = Item difficulty or waste factor
W/ = with
sf = square feet
lf = linear feet
cy = cubic yard
ls= lump sum
ea = each
loc = location
sf flr. = square feet floor