Using Design for Six Sigma to achieve  Lean Software Development at  Raytheon Missile Systems Tony Strickland  Certified Raytheon Six Sigma Expert (520) 794-7855 [email_address] ®
Raytheon Six Sigma? Why not DMAIC? ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],®
Six Sigma Process ,[object Object]
Process Integration IPDS provides an integrated set of best practices for the entire product development life cycle using a just-in-time tailoring process. R6s is a business strategy for process improvement.  CMMI provides guidance for creating, measuring,managing, and improving specific processes. Each plays an integral role in the success of programs, projects and organizations
DFSS Design for Six Sigma  is a methodology used to predict, manage and improve  Producibility, Affordability , and  Robust Performance  for the benefit of the customers. DESIGNS THAT CONSISTENTLY ENSURE MISSION SUCCESS, MEET COST & SCHEDULE, AND CAN BE READILY PRODUCED IN THE FACTORY Design for Six Sigma Definition Affordability Producibility Robust Performance
Technical Components of DFSS  with Enablers ,[object Object],[object Object],[object Object],Affordability Affordability ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],Design For Performance Robust Performance ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],Design For Producibility Producibility
Traditional DFSS Investment: Non-Recurring Costs Engineering Hours 0 Months Desired Typical Development I&T Production WHY USE DFSS? Reactive   Proactive   Challenge DFSS Challenge: Non-Recurring Costs Potential Revenue Generation:  Recurring Costs
What does DFSS mean for Software? ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],vs
Effectively Applying DFSS in  Software Intensive Systems Program Execution Gates 5-11 Business Decision Gates 1-4 5 - System Integration, Verification and Validation 4 - Product Design and Development 1 - Capture/Proposal Development 7 8 10 9 = GATE Internal Preliminary Design Review Start-Up Review Internal System Functional Review Internal Critical Design Review Internal Test/Ship Readiness Review Internal Production Readiness Review Key Characteristics Management Cost Management 2 - Project Planning, Management and Control 1 2 3 4 Bid / Proposal Review 11 Test Optimization Architecture Evaluation QFD Visual Requirements Critical Chain Defect Prediction & Prevention Performance Modeling    Planning 6 - Production and Deployment Planning 7 - Operations and Support 3 - Requirements and Architecture Development 5 6
Implementation Strategy ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
DFSS in the  Software Engineering Center ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],Knowing the Customer’s Needs
Quality Function Deployment: Capturing the Voice of the Customer ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],VOICE OF THE CUSTOMER PRIORITIES COMPETITIVE EVALUATION HOWs DIRECTION OF IMPROVEMENT RELATIONSHIP MATRIX CORRELATION MATRIX HOW MUCHes RANKINGS / PRIORITIES REQUIREMENTS INTERACTION MATRIX
DFSS in the  Software Engineering Center ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],Executing the Value Stream
DFSS for Software:  Affordability ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Critical Chain Project Management ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Multi-Tasking is an Insidious Generator of  When (if) we look at “Resource Allocation”  we typically discover high degrees of multi-tasking  … waste Why software teams struggle to meet their schedule commitments Resource 1 Resource 3 Time Resource 2
[object Object],Effects of Multi-Tasking Expectations : Task A Task B Task C What happens: A B C A B C Lost Productivity due to context switching Should happen: Task A Task B Task C Priorities are established and followed
CCPM Typical Results- Notional  A B C A B C No Multi-Tasking   Multi-tasking  t = 0 Projects start later but  finish sooner t = n
CCPM Theory ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],95% Task Buffer 50%
Protecting Customers ,[object Object],[object Object],[object Object],1 2 4 3 5 6 7 8 9 Buffer 95% 50% Agreed Upon Delivery Date
DFSS in the  Software Engineering Center ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],Creating and Analyzing the System
It all starts with your model... ,[object Object],Input Output y = f(x) Spreadsheets Need to transform this deterministic approach  into a probabilistic approach.
A B C D E Y Y =  f  (A, B, C, D, E, F,...,M) 0 0.02 0.04 0.06 0.08 0.1 0.12 0.14 0.16 0.18 180 187 194 201 208 215 222 229 236 243 250 0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 17 17.6 18.2 18.8 19.4 20 20.6 21.2 21.8 22.4 23 0 0.2 0.4 0.6 0.8 1 1.2 1.4 15 15.8 16.6 17.4 18.2 19 19.8 20.6 21.4 22.2 23 0 0.2 0.4 0.6 0.8 1 1.2 1.4 15 16.5 18 19.5 21 22.5 24 25.5 27 28.5 30 0 0.2 0.4 0.6 0.8 1 1.2 1.4 15 16.5 18 19.5 21 22.5 24 25.5 27 28.5 30 Response F G H I J K L M Simulation or Multi-Variate Transfer Function Design Variables Input Variation Contributes To  Response Variation 0 0.05 0.1 0.15 0.2 0.25 15 16.5 18 19.5 21 22.5 24 25.5 27 28.5 30
A B C D E Y Y =  f  (A, B, C, D, E, F,...,M) 0 0.02 0.04 0.06 0.08 0.1 0.12 0.14 0.16 0.18 180 187 194 201 208 215 222 229 236 243 250 0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 17 17.6 18.2 18.8 19.4 20 20.6 21.2 21.8 22.4 23 0 0.2 0.4 0.6 0.8 1 1.2 1.4 15 15.8 16.6 17.4 18.2 19 19.8 20.6 21.4 22.2 23 0 0.2 0.4 0.6 0.8 1 1.2 1.4 15 16.5 18 19.5 21 22.5 24 25.5 27 28.5 30 0 0.2 0.4 0.6 0.8 1 1.2 1.4 15 16.5 18 19.5 21 22.5 24 25.5 27 28.5 30 Response F G H I J K L M Design Variables System/Sub-System Model f  (A, B, C, D, E, F,...,M) A Visual Representation of DFSS Statistical Requirements Analysis 0 0.05 0.1 0.15 0.2 0.25 15 16.5 18 19.5 21 22.5 24 25.5 27 28.5 30 Flow Down/Allocation Based on Output Variability
DFSS Performance Analysis results in... ,[object Object],[object Object],[object Object],Results from Crystal Ball   Monte Carlo SW A B C D E Y f  (A, B, C, D, E, F,...,M) Parameters Response F G H I J K L M Function G-Sys. Losses -.45 A-Pavg .35 D-Ant. Eff, .35 F-Integ. Eff. .34 J-Rec. BW -.34 B-Ant. Gain .29 H-Tgt RCS .23 C-Ant. Aperture .21 K-Pulse Width -.19 M-Rec. Out SNR -.15 I-Noise Figure -.12 L-Rep. Freq. -.03 -1 -0.5 0 0.5 1 Measured by Rank Correlation Prob(LL<Y<UL)  y ,   y ,   1y ,   2y PDF(Y)
[object Object],[object Object],LCAC Example:  Requirements Analysis Actual Behavior Factor Worst-Case Assumptions Wave Height (ft): Wave Period (s): Power (hp): 40  LSL STATISTICAL ANALYSIS 1.6 3 15000 40 LSL WORST-CASE ANALYSIS 35 Speed Speed 0.3 1.6 3 15 7 15000 16000
[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],Failure Modes and Effects Analysis
Using FMEA to Evaluate an Architecture ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
 
DFSS in the  Software Engineering Center ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],Communicating the Key Characteristics
KPC – Key Product Characteristic ,[object Object],LSL USL USL LSL Loss  Standard KPC Taguchi Loss Function
Key Product Characteristics ,[object Object],[object Object],[object Object],[object Object],[object Object]
Key Product Characteristic Tree Simple Example of a KCC Affecting Several KPCs Top-level KPCs 2nd level KPCs KCCs VOC
DFSS in the  Software Engineering Center ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],Predicting and Preventing Defects
Defect Containment Chart
Defect Density Predictive Model Motivation ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Defect Model Previous Program/Release Standard Defect Containment Chart Model Raw Defect Counts  Prorate the raw defect counts for the new program based upon SLOC counts Projected Raw Defect Counts For New Program New Program Defect Containment Current Raw Defect Counts New Program - Projected Defect Containment Sum of Current Raw Defect Counts Plus Raw Defects Not Yet Detected Defect Density Predictive Model Approach
Defect Density Stage Detected and Originated ,[object Object]
Defect Density Code Inspection Analysis When number of defects is between the control limits, fix findings and pass to next stage . When number of defects is below the lower limit, unit(s) may need more inspection. When number of defects is above the upper limit, unit(s) may need rework and a repeated inspection.
DFSS in the  Software Engineering Center ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],Optimizing Product Performance
Testing - An Opportunity for Leverage ,[object Object],[object Object]
Combinatorial Design Method ,[object Object],[object Object]
CDM Advantages ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Ground Satellite System Example ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Satellite Ground Systems Applied Case
Usage Based Testing  Using Markov Chains ,[object Object],[object Object],[object Object]
Y (0.5) X (0.5) Z (0.2) W (0.5) X (1) Y (0.3) Y (0.8) Y (0.3) X (0.7) Z (0.2) X (1) Y (0.75) Y (0.1) X (0.9) Z (0.3) Y (0.2) X (0.5) Visual Requirements ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],X (0.25) Z (1) S E
Raytheon Case Study Results ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Summary ,[object Object],[object Object],[object Object]
Resources ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Questions?

More Related Content

What's hot

What i es do iie iab v2
What i es do iie iab v2What i es do iie iab v2
What i es do iie iab v2
Jitesh Gaurav
 
Basic SPC Training
Basic SPC TrainingBasic SPC Training
Basic SPC Training
Tirupati kumar Tangellamudi
 
PFMEA
PFMEAPFMEA
7 qc tools
7 qc tools7 qc tools
Process Failure Modes & Effects Analysis (PFMEA)
Process Failure Modes & Effects Analysis (PFMEA)Process Failure Modes & Effects Analysis (PFMEA)
Process Failure Modes & Effects Analysis (PFMEA)
Anand Subramaniam
 
The 10 most common fmea mistakes
The 10 most common fmea mistakes The 10 most common fmea mistakes
The 10 most common fmea mistakes
ASQ Reliability Division
 
FMEA
FMEAFMEA
Process Control
Process ControlProcess Control
Process Control
Ronald Shewchuk
 
Process F.M.E.A
Process F.M.E.AProcess F.M.E.A
Process F.M.E.A
Pankaj Nalwa
 
Application of FMEA to a Sterility Testing Isolator: A Case Study
Application of FMEA to a Sterility Testing Isolator: A Case StudyApplication of FMEA to a Sterility Testing Isolator: A Case Study
Application of FMEA to a Sterility Testing Isolator: A Case Study
Tim Sandle, Ph.D.
 
Advanced Product Quality Planning presentation
Advanced Product Quality Planning presentationAdvanced Product Quality Planning presentation
Advanced Product Quality Planning presentation
PRASHANT KSHIRSAGAR
 
Fmea alignment aiag_and_vda_-_eng
Fmea alignment aiag_and_vda_-_engFmea alignment aiag_and_vda_-_eng
Fmea alignment aiag_and_vda_-_eng
erkinguler
 
FMEA training (AIAG VDA Edition 01)
FMEA training (AIAG VDA Edition 01)FMEA training (AIAG VDA Edition 01)
FMEA training (AIAG VDA Edition 01)
Ankit Gupta
 
Failure mode and effects analysis
Failure mode  and effects analysisFailure mode  and effects analysis
Failure mode and effects analysis
Andreea Precup
 
Failure Mode Effect Analysis (FMEA)
Failure Mode Effect Analysis (FMEA)Failure Mode Effect Analysis (FMEA)
Failure Mode Effect Analysis (FMEA)
DEEPAK SAHOO
 
Software QA Metrics Dashboard Benchmarking
Software QA Metrics Dashboard BenchmarkingSoftware QA Metrics Dashboard Benchmarking
Software QA Metrics Dashboard Benchmarking
John Carter
 
Capa quality system – more than just corrective action
Capa quality system – more than just corrective actionCapa quality system – more than just corrective action
Capa quality system – more than just corrective action
Quality Management
 

What's hot (20)

What i es do iie iab v2
What i es do iie iab v2What i es do iie iab v2
What i es do iie iab v2
 
Basic SPC Training
Basic SPC TrainingBasic SPC Training
Basic SPC Training
 
PFMEA
PFMEAPFMEA
PFMEA
 
7 qc tools
7 qc tools7 qc tools
7 qc tools
 
Process Failure Modes & Effects Analysis (PFMEA)
Process Failure Modes & Effects Analysis (PFMEA)Process Failure Modes & Effects Analysis (PFMEA)
Process Failure Modes & Effects Analysis (PFMEA)
 
The 10 most common fmea mistakes
The 10 most common fmea mistakes The 10 most common fmea mistakes
The 10 most common fmea mistakes
 
FMEA
FMEAFMEA
FMEA
 
Process Control
Process ControlProcess Control
Process Control
 
Process F.M.E.A
Process F.M.E.AProcess F.M.E.A
Process F.M.E.A
 
Application of FMEA to a Sterility Testing Isolator: A Case Study
Application of FMEA to a Sterility Testing Isolator: A Case StudyApplication of FMEA to a Sterility Testing Isolator: A Case Study
Application of FMEA to a Sterility Testing Isolator: A Case Study
 
Advanced Product Quality Planning presentation
Advanced Product Quality Planning presentationAdvanced Product Quality Planning presentation
Advanced Product Quality Planning presentation
 
Fmea alignment aiag_and_vda_-_eng
Fmea alignment aiag_and_vda_-_engFmea alignment aiag_and_vda_-_eng
Fmea alignment aiag_and_vda_-_eng
 
FMEA training (AIAG VDA Edition 01)
FMEA training (AIAG VDA Edition 01)FMEA training (AIAG VDA Edition 01)
FMEA training (AIAG VDA Edition 01)
 
Failure mode and effects analysis
Failure mode  and effects analysisFailure mode  and effects analysis
Failure mode and effects analysis
 
PI5_InspectAdapt
PI5_InspectAdaptPI5_InspectAdapt
PI5_InspectAdapt
 
Failure Mode Effect Analysis (FMEA)
Failure Mode Effect Analysis (FMEA)Failure Mode Effect Analysis (FMEA)
Failure Mode Effect Analysis (FMEA)
 
FMEA Final Project
FMEA Final ProjectFMEA Final Project
FMEA Final Project
 
Software QA Metrics Dashboard Benchmarking
Software QA Metrics Dashboard BenchmarkingSoftware QA Metrics Dashboard Benchmarking
Software QA Metrics Dashboard Benchmarking
 
Capa quality system – more than just corrective action
Capa quality system – more than just corrective actionCapa quality system – more than just corrective action
Capa quality system – more than just corrective action
 
RCM
RCMRCM
RCM
 

Similar to QM-007-Design for 6 sigma

Measure phase lean six sigma tollgate template
Measure phase   lean six sigma tollgate templateMeasure phase   lean six sigma tollgate template
Measure phase lean six sigma tollgate templateSteven Bonacorsi
 
Measure phase lean six sigma tollgate template
Measure phase   lean six sigma tollgate templateMeasure phase   lean six sigma tollgate template
Measure phase lean six sigma tollgate templateSteven Bonacorsi
 
Lean six sigma executive overview (case study) templates
Lean six sigma executive overview (case study) templatesLean six sigma executive overview (case study) templates
Lean six sigma executive overview (case study) templates
Steven Bonacorsi
 
Improve phase lean six sigma tollgate template
Improve phase   lean six sigma tollgate templateImprove phase   lean six sigma tollgate template
Improve phase lean six sigma tollgate templateSteven Bonacorsi
 
Improve phase lean six sigma tollgate template
Improve phase   lean six sigma tollgate templateImprove phase   lean six sigma tollgate template
Improve phase lean six sigma tollgate templateSteven Bonacorsi
 
QM-009-Design for Six Sigma 2
QM-009-Design for Six Sigma 2QM-009-Design for Six Sigma 2
QM-009-Design for Six Sigma 2handbook
 
6sigma
6sigma6sigma
6sigma
Yasser Hamed
 
Six sigma kavramlari: Gelistirme (DMAIC) ve Dizayn (IDDOV)
Six sigma kavramlari: Gelistirme (DMAIC)  ve Dizayn (IDDOV)Six sigma kavramlari: Gelistirme (DMAIC)  ve Dizayn (IDDOV)
Six sigma kavramlari: Gelistirme (DMAIC) ve Dizayn (IDDOV)
Mustafa Said YILDIZ
 
DFSS short
DFSS shortDFSS short
DFSS short
Chaitanya Chenna
 
Software Engineering Fundamentals in Computer Science
Software Engineering Fundamentals in Computer ScienceSoftware Engineering Fundamentals in Computer Science
Software Engineering Fundamentals in Computer Science
Arti Parab Academics
 
Six sigma training
Six sigma trainingSix sigma training
Six sigma training
Jitesh Gaurav
 
Six sigma training
Six sigma trainingSix sigma training
Six sigma training
Jitesh Gaurav
 
principle of six sigma
principle of six sigmaprinciple of six sigma
principle of six sigma
Lyceum of The Philippines University
 
BPM Implementation (downloadable)
BPM Implementation (downloadable)BPM Implementation (downloadable)
BPM Implementation (downloadable)
Mark Carlson
 
Sigma sdlc
Sigma sdlcSigma sdlc
Sigma sdlc
Jitesh Gaurav
 
SAP Solution Manager for CIOs
SAP Solution Manager for CIOsSAP Solution Manager for CIOs
SAP Solution Manager for CIOsTony de Thomasis
 
Get Smart About Technical Debt
Get Smart About Technical DebtGet Smart About Technical Debt
Get Smart About Technical Debt
CAST
 
Sure step methodology
Sure step methodologySure step methodology
Sure step methodologyTaringa!
 
Business Value of Lean Thinking
Business Value of Lean ThinkingBusiness Value of Lean Thinking
Business Value of Lean Thinking
David Rico
 

Similar to QM-007-Design for 6 sigma (20)

Measure phase lean six sigma tollgate template
Measure phase   lean six sigma tollgate templateMeasure phase   lean six sigma tollgate template
Measure phase lean six sigma tollgate template
 
Measure phase lean six sigma tollgate template
Measure phase   lean six sigma tollgate templateMeasure phase   lean six sigma tollgate template
Measure phase lean six sigma tollgate template
 
Lean six sigma executive overview (case study) templates
Lean six sigma executive overview (case study) templatesLean six sigma executive overview (case study) templates
Lean six sigma executive overview (case study) templates
 
Improve phase lean six sigma tollgate template
Improve phase   lean six sigma tollgate templateImprove phase   lean six sigma tollgate template
Improve phase lean six sigma tollgate template
 
Improve phase lean six sigma tollgate template
Improve phase   lean six sigma tollgate templateImprove phase   lean six sigma tollgate template
Improve phase lean six sigma tollgate template
 
QM-009-Design for Six Sigma 2
QM-009-Design for Six Sigma 2QM-009-Design for Six Sigma 2
QM-009-Design for Six Sigma 2
 
6sigma
6sigma6sigma
6sigma
 
Six sigma kavramlari: Gelistirme (DMAIC) ve Dizayn (IDDOV)
Six sigma kavramlari: Gelistirme (DMAIC)  ve Dizayn (IDDOV)Six sigma kavramlari: Gelistirme (DMAIC)  ve Dizayn (IDDOV)
Six sigma kavramlari: Gelistirme (DMAIC) ve Dizayn (IDDOV)
 
DFSS short
DFSS shortDFSS short
DFSS short
 
Software Engineering Fundamentals in Computer Science
Software Engineering Fundamentals in Computer ScienceSoftware Engineering Fundamentals in Computer Science
Software Engineering Fundamentals in Computer Science
 
Six sigma training
Six sigma trainingSix sigma training
Six sigma training
 
Six sigma training
Six sigma trainingSix sigma training
Six sigma training
 
principle of six sigma
principle of six sigmaprinciple of six sigma
principle of six sigma
 
BPM Implementation (downloadable)
BPM Implementation (downloadable)BPM Implementation (downloadable)
BPM Implementation (downloadable)
 
Sigma sdlc
Sigma sdlcSigma sdlc
Sigma sdlc
 
SAP Solution Manager for CIOs
SAP Solution Manager for CIOsSAP Solution Manager for CIOs
SAP Solution Manager for CIOs
 
Spi Cost Roi
Spi Cost RoiSpi Cost Roi
Spi Cost Roi
 
Get Smart About Technical Debt
Get Smart About Technical DebtGet Smart About Technical Debt
Get Smart About Technical Debt
 
Sure step methodology
Sure step methodologySure step methodology
Sure step methodology
 
Business Value of Lean Thinking
Business Value of Lean ThinkingBusiness Value of Lean Thinking
Business Value of Lean Thinking
 

More from handbook

IE-044-生產力分析與改善
IE-044-生產力分析與改善IE-044-生產力分析與改善
IE-044-生產力分析與改善handbook
 
IE-037-Basic Concepts Of Erp(Ok)
IE-037-Basic Concepts Of Erp(Ok)IE-037-Basic Concepts Of Erp(Ok)
IE-037-Basic Concepts Of Erp(Ok)handbook
 
HR-055-Philip人力資源管理
HR-055-Philip人力資源管理HR-055-Philip人力資源管理
HR-055-Philip人力資源管理handbook
 
HR-103-三陽工業人力資源管理
HR-103-三陽工業人力資源管理HR-103-三陽工業人力資源管理
HR-103-三陽工業人力資源管理handbook
 
HR-101-職業適性診斷測驗0
HR-101-職業適性診斷測驗0HR-101-職業適性診斷測驗0
HR-101-職業適性診斷測驗0handbook
 
HR-102-職業適性診斷測驗1
HR-102-職業適性診斷測驗1HR-102-職業適性診斷測驗1
HR-102-職業適性診斷測驗1handbook
 
HR-104-公務員核心價值及核心能力
HR-104-公務員核心價值及核心能力HR-104-公務員核心價值及核心能力
HR-104-公務員核心價值及核心能力handbook
 
HR-099-職場技巧與求職趨勢
HR-099-職場技巧與求職趨勢HR-099-職場技巧與求職趨勢
HR-099-職場技巧與求職趨勢handbook
 
HR-100-職場新鮮人必勝絕技
HR-100-職場新鮮人必勝絕技HR-100-職場新鮮人必勝絕技
HR-100-職場新鮮人必勝絕技handbook
 
HR-098-職能模式發展與評鑑
HR-098-職能模式發展與評鑑HR-098-職能模式發展與評鑑
HR-098-職能模式發展與評鑑handbook
 
HR-089-電信產業職業能力
HR-089-電信產業職業能力HR-089-電信產業職業能力
HR-089-電信產業職業能力handbook
 
HR-097-職能與績效管理 三陽
HR-097-職能與績效管理 三陽HR-097-職能與績效管理 三陽
HR-097-職能與績效管理 三陽handbook
 
HR-096-職能為本的領導與管理發展
HR-096-職能為本的領導與管理發展HR-096-職能為本的領導與管理發展
HR-096-職能為本的領導與管理發展handbook
 
HR-092-職能Competencies
HR-092-職能CompetenciesHR-092-職能Competencies
HR-092-職能Competencieshandbook
 
HR-091-數位學習導入與應用
HR-091-數位學習導入與應用HR-091-數位學習導入與應用
HR-091-數位學習導入與應用handbook
 
HR-090-網路自學與傳統自學比較
HR-090-網路自學與傳統自學比較HR-090-網路自學與傳統自學比較
HR-090-網路自學與傳統自學比較handbook
 
HR-084-從藍海策略談技職學生的生涯規劃
HR-084-從藍海策略談技職學生的生涯規劃HR-084-從藍海策略談技職學生的生涯規劃
HR-084-從藍海策略談技職學生的生涯規劃handbook
 
HR-082-個人優勢與職場發展
HR-082-個人優勢與職場發展HR-082-個人優勢與職場發展
HR-082-個人優勢與職場發展handbook
 
HR-087-設計有效率的組織
HR-087-設計有效率的組織HR-087-設計有效率的組織
HR-087-設計有效率的組織handbook
 
HR-072-光電工程
HR-072-光電工程HR-072-光電工程
HR-072-光電工程handbook
 

More from handbook (20)

IE-044-生產力分析與改善
IE-044-生產力分析與改善IE-044-生產力分析與改善
IE-044-生產力分析與改善
 
IE-037-Basic Concepts Of Erp(Ok)
IE-037-Basic Concepts Of Erp(Ok)IE-037-Basic Concepts Of Erp(Ok)
IE-037-Basic Concepts Of Erp(Ok)
 
HR-055-Philip人力資源管理
HR-055-Philip人力資源管理HR-055-Philip人力資源管理
HR-055-Philip人力資源管理
 
HR-103-三陽工業人力資源管理
HR-103-三陽工業人力資源管理HR-103-三陽工業人力資源管理
HR-103-三陽工業人力資源管理
 
HR-101-職業適性診斷測驗0
HR-101-職業適性診斷測驗0HR-101-職業適性診斷測驗0
HR-101-職業適性診斷測驗0
 
HR-102-職業適性診斷測驗1
HR-102-職業適性診斷測驗1HR-102-職業適性診斷測驗1
HR-102-職業適性診斷測驗1
 
HR-104-公務員核心價值及核心能力
HR-104-公務員核心價值及核心能力HR-104-公務員核心價值及核心能力
HR-104-公務員核心價值及核心能力
 
HR-099-職場技巧與求職趨勢
HR-099-職場技巧與求職趨勢HR-099-職場技巧與求職趨勢
HR-099-職場技巧與求職趨勢
 
HR-100-職場新鮮人必勝絕技
HR-100-職場新鮮人必勝絕技HR-100-職場新鮮人必勝絕技
HR-100-職場新鮮人必勝絕技
 
HR-098-職能模式發展與評鑑
HR-098-職能模式發展與評鑑HR-098-職能模式發展與評鑑
HR-098-職能模式發展與評鑑
 
HR-089-電信產業職業能力
HR-089-電信產業職業能力HR-089-電信產業職業能力
HR-089-電信產業職業能力
 
HR-097-職能與績效管理 三陽
HR-097-職能與績效管理 三陽HR-097-職能與績效管理 三陽
HR-097-職能與績效管理 三陽
 
HR-096-職能為本的領導與管理發展
HR-096-職能為本的領導與管理發展HR-096-職能為本的領導與管理發展
HR-096-職能為本的領導與管理發展
 
HR-092-職能Competencies
HR-092-職能CompetenciesHR-092-職能Competencies
HR-092-職能Competencies
 
HR-091-數位學習導入與應用
HR-091-數位學習導入與應用HR-091-數位學習導入與應用
HR-091-數位學習導入與應用
 
HR-090-網路自學與傳統自學比較
HR-090-網路自學與傳統自學比較HR-090-網路自學與傳統自學比較
HR-090-網路自學與傳統自學比較
 
HR-084-從藍海策略談技職學生的生涯規劃
HR-084-從藍海策略談技職學生的生涯規劃HR-084-從藍海策略談技職學生的生涯規劃
HR-084-從藍海策略談技職學生的生涯規劃
 
HR-082-個人優勢與職場發展
HR-082-個人優勢與職場發展HR-082-個人優勢與職場發展
HR-082-個人優勢與職場發展
 
HR-087-設計有效率的組織
HR-087-設計有效率的組織HR-087-設計有效率的組織
HR-087-設計有效率的組織
 
HR-072-光電工程
HR-072-光電工程HR-072-光電工程
HR-072-光電工程
 

Recently uploaded

Memorandum Of Association Constitution of Company.ppt
Memorandum Of Association Constitution of Company.pptMemorandum Of Association Constitution of Company.ppt
Memorandum Of Association Constitution of Company.ppt
seri bangash
 
falcon-invoice-discounting-a-premier-platform-for-investors-in-india
falcon-invoice-discounting-a-premier-platform-for-investors-in-indiafalcon-invoice-discounting-a-premier-platform-for-investors-in-india
falcon-invoice-discounting-a-premier-platform-for-investors-in-india
Falcon Invoice Discounting
 
Taurus Zodiac Sign_ Personality Traits and Sign Dates.pptx
Taurus Zodiac Sign_ Personality Traits and Sign Dates.pptxTaurus Zodiac Sign_ Personality Traits and Sign Dates.pptx
Taurus Zodiac Sign_ Personality Traits and Sign Dates.pptx
my Pandit
 
Lookback Analysis
Lookback AnalysisLookback Analysis
Lookback Analysis
Safe PaaS
 
3.0 Project 2_ Developing My Brand Identity Kit.pptx
3.0 Project 2_ Developing My Brand Identity Kit.pptx3.0 Project 2_ Developing My Brand Identity Kit.pptx
3.0 Project 2_ Developing My Brand Identity Kit.pptx
tanyjahb
 
April 2024 Nostalgia Products Newsletter
April 2024 Nostalgia Products NewsletterApril 2024 Nostalgia Products Newsletter
April 2024 Nostalgia Products Newsletter
NathanBaughman3
 
Discover the innovative and creative projects that highlight my journey throu...
Discover the innovative and creative projects that highlight my journey throu...Discover the innovative and creative projects that highlight my journey throu...
Discover the innovative and creative projects that highlight my journey throu...
dylandmeas
 
What are the main advantages of using HR recruiter services.pdf
What are the main advantages of using HR recruiter services.pdfWhat are the main advantages of using HR recruiter services.pdf
What are the main advantages of using HR recruiter services.pdf
HumanResourceDimensi1
 
Brand Analysis for an artist named Struan
Brand Analysis for an artist named StruanBrand Analysis for an artist named Struan
Brand Analysis for an artist named Struan
sarahvanessa51503
 
anas about venice for grade 6f about venice
anas about venice for grade 6f about veniceanas about venice for grade 6f about venice
anas about venice for grade 6f about venice
anasabutalha2013
 
Unveiling the Secrets How Does Generative AI Work.pdf
Unveiling the Secrets How Does Generative AI Work.pdfUnveiling the Secrets How Does Generative AI Work.pdf
Unveiling the Secrets How Does Generative AI Work.pdf
Sam H
 
5 Things You Need To Know Before Hiring a Videographer
5 Things You Need To Know Before Hiring a Videographer5 Things You Need To Know Before Hiring a Videographer
5 Things You Need To Know Before Hiring a Videographer
ofm712785
 
Cree_Rey_BrandIdentityKit.PDF_PersonalBd
Cree_Rey_BrandIdentityKit.PDF_PersonalBdCree_Rey_BrandIdentityKit.PDF_PersonalBd
Cree_Rey_BrandIdentityKit.PDF_PersonalBd
creerey
 
Affordable Stationery Printing Services in Jaipur | Navpack n Print
Affordable Stationery Printing Services in Jaipur | Navpack n PrintAffordable Stationery Printing Services in Jaipur | Navpack n Print
Affordable Stationery Printing Services in Jaipur | Navpack n Print
Navpack & Print
 
PriyoShop Celebration Pohela Falgun Mar 20, 2024
PriyoShop Celebration Pohela Falgun Mar 20, 2024PriyoShop Celebration Pohela Falgun Mar 20, 2024
PriyoShop Celebration Pohela Falgun Mar 20, 2024
PriyoShop.com LTD
 
CADAVER AS OUR FIRST TEACHER anatomt in your.pptx
CADAVER AS OUR FIRST TEACHER anatomt in your.pptxCADAVER AS OUR FIRST TEACHER anatomt in your.pptx
CADAVER AS OUR FIRST TEACHER anatomt in your.pptx
fakeloginn69
 
Global Interconnection Group Joint Venture[960] (1).pdf
Global Interconnection Group Joint Venture[960] (1).pdfGlobal Interconnection Group Joint Venture[960] (1).pdf
Global Interconnection Group Joint Venture[960] (1).pdf
Henry Tapper
 
Business Valuation Principles for Entrepreneurs
Business Valuation Principles for EntrepreneursBusiness Valuation Principles for Entrepreneurs
Business Valuation Principles for Entrepreneurs
Ben Wann
 
Skye Residences | Extended Stay Residences Near Toronto Airport
Skye Residences | Extended Stay Residences Near Toronto AirportSkye Residences | Extended Stay Residences Near Toronto Airport
Skye Residences | Extended Stay Residences Near Toronto Airport
marketingjdass
 
Meas_Dylan_DMBS_PB1_2024-05XX_Revised.pdf
Meas_Dylan_DMBS_PB1_2024-05XX_Revised.pdfMeas_Dylan_DMBS_PB1_2024-05XX_Revised.pdf
Meas_Dylan_DMBS_PB1_2024-05XX_Revised.pdf
dylandmeas
 

Recently uploaded (20)

Memorandum Of Association Constitution of Company.ppt
Memorandum Of Association Constitution of Company.pptMemorandum Of Association Constitution of Company.ppt
Memorandum Of Association Constitution of Company.ppt
 
falcon-invoice-discounting-a-premier-platform-for-investors-in-india
falcon-invoice-discounting-a-premier-platform-for-investors-in-indiafalcon-invoice-discounting-a-premier-platform-for-investors-in-india
falcon-invoice-discounting-a-premier-platform-for-investors-in-india
 
Taurus Zodiac Sign_ Personality Traits and Sign Dates.pptx
Taurus Zodiac Sign_ Personality Traits and Sign Dates.pptxTaurus Zodiac Sign_ Personality Traits and Sign Dates.pptx
Taurus Zodiac Sign_ Personality Traits and Sign Dates.pptx
 
Lookback Analysis
Lookback AnalysisLookback Analysis
Lookback Analysis
 
3.0 Project 2_ Developing My Brand Identity Kit.pptx
3.0 Project 2_ Developing My Brand Identity Kit.pptx3.0 Project 2_ Developing My Brand Identity Kit.pptx
3.0 Project 2_ Developing My Brand Identity Kit.pptx
 
April 2024 Nostalgia Products Newsletter
April 2024 Nostalgia Products NewsletterApril 2024 Nostalgia Products Newsletter
April 2024 Nostalgia Products Newsletter
 
Discover the innovative and creative projects that highlight my journey throu...
Discover the innovative and creative projects that highlight my journey throu...Discover the innovative and creative projects that highlight my journey throu...
Discover the innovative and creative projects that highlight my journey throu...
 
What are the main advantages of using HR recruiter services.pdf
What are the main advantages of using HR recruiter services.pdfWhat are the main advantages of using HR recruiter services.pdf
What are the main advantages of using HR recruiter services.pdf
 
Brand Analysis for an artist named Struan
Brand Analysis for an artist named StruanBrand Analysis for an artist named Struan
Brand Analysis for an artist named Struan
 
anas about venice for grade 6f about venice
anas about venice for grade 6f about veniceanas about venice for grade 6f about venice
anas about venice for grade 6f about venice
 
Unveiling the Secrets How Does Generative AI Work.pdf
Unveiling the Secrets How Does Generative AI Work.pdfUnveiling the Secrets How Does Generative AI Work.pdf
Unveiling the Secrets How Does Generative AI Work.pdf
 
5 Things You Need To Know Before Hiring a Videographer
5 Things You Need To Know Before Hiring a Videographer5 Things You Need To Know Before Hiring a Videographer
5 Things You Need To Know Before Hiring a Videographer
 
Cree_Rey_BrandIdentityKit.PDF_PersonalBd
Cree_Rey_BrandIdentityKit.PDF_PersonalBdCree_Rey_BrandIdentityKit.PDF_PersonalBd
Cree_Rey_BrandIdentityKit.PDF_PersonalBd
 
Affordable Stationery Printing Services in Jaipur | Navpack n Print
Affordable Stationery Printing Services in Jaipur | Navpack n PrintAffordable Stationery Printing Services in Jaipur | Navpack n Print
Affordable Stationery Printing Services in Jaipur | Navpack n Print
 
PriyoShop Celebration Pohela Falgun Mar 20, 2024
PriyoShop Celebration Pohela Falgun Mar 20, 2024PriyoShop Celebration Pohela Falgun Mar 20, 2024
PriyoShop Celebration Pohela Falgun Mar 20, 2024
 
CADAVER AS OUR FIRST TEACHER anatomt in your.pptx
CADAVER AS OUR FIRST TEACHER anatomt in your.pptxCADAVER AS OUR FIRST TEACHER anatomt in your.pptx
CADAVER AS OUR FIRST TEACHER anatomt in your.pptx
 
Global Interconnection Group Joint Venture[960] (1).pdf
Global Interconnection Group Joint Venture[960] (1).pdfGlobal Interconnection Group Joint Venture[960] (1).pdf
Global Interconnection Group Joint Venture[960] (1).pdf
 
Business Valuation Principles for Entrepreneurs
Business Valuation Principles for EntrepreneursBusiness Valuation Principles for Entrepreneurs
Business Valuation Principles for Entrepreneurs
 
Skye Residences | Extended Stay Residences Near Toronto Airport
Skye Residences | Extended Stay Residences Near Toronto AirportSkye Residences | Extended Stay Residences Near Toronto Airport
Skye Residences | Extended Stay Residences Near Toronto Airport
 
Meas_Dylan_DMBS_PB1_2024-05XX_Revised.pdf
Meas_Dylan_DMBS_PB1_2024-05XX_Revised.pdfMeas_Dylan_DMBS_PB1_2024-05XX_Revised.pdf
Meas_Dylan_DMBS_PB1_2024-05XX_Revised.pdf
 

QM-007-Design for 6 sigma

  • 1. Using Design for Six Sigma to achieve Lean Software Development at Raytheon Missile Systems Tony Strickland Certified Raytheon Six Sigma Expert (520) 794-7855 [email_address] ®
  • 2.
  • 3.
  • 4. Process Integration IPDS provides an integrated set of best practices for the entire product development life cycle using a just-in-time tailoring process. R6s is a business strategy for process improvement. CMMI provides guidance for creating, measuring,managing, and improving specific processes. Each plays an integral role in the success of programs, projects and organizations
  • 5. DFSS Design for Six Sigma is a methodology used to predict, manage and improve Producibility, Affordability , and Robust Performance for the benefit of the customers. DESIGNS THAT CONSISTENTLY ENSURE MISSION SUCCESS, MEET COST & SCHEDULE, AND CAN BE READILY PRODUCED IN THE FACTORY Design for Six Sigma Definition Affordability Producibility Robust Performance
  • 6.
  • 7. Traditional DFSS Investment: Non-Recurring Costs Engineering Hours 0 Months Desired Typical Development I&T Production WHY USE DFSS? Reactive Proactive Challenge DFSS Challenge: Non-Recurring Costs Potential Revenue Generation: Recurring Costs
  • 8.
  • 9. Effectively Applying DFSS in Software Intensive Systems Program Execution Gates 5-11 Business Decision Gates 1-4 5 - System Integration, Verification and Validation 4 - Product Design and Development 1 - Capture/Proposal Development 7 8 10 9 = GATE Internal Preliminary Design Review Start-Up Review Internal System Functional Review Internal Critical Design Review Internal Test/Ship Readiness Review Internal Production Readiness Review Key Characteristics Management Cost Management 2 - Project Planning, Management and Control 1 2 3 4 Bid / Proposal Review 11 Test Optimization Architecture Evaluation QFD Visual Requirements Critical Chain Defect Prediction & Prevention Performance Modeling Planning 6 - Production and Deployment Planning 7 - Operations and Support 3 - Requirements and Architecture Development 5 6
  • 10.
  • 11.
  • 12.
  • 13.
  • 14.
  • 15.
  • 16. Multi-Tasking is an Insidious Generator of When (if) we look at “Resource Allocation” we typically discover high degrees of multi-tasking … waste Why software teams struggle to meet their schedule commitments Resource 1 Resource 3 Time Resource 2
  • 17.
  • 18. CCPM Typical Results- Notional A B C A B C No Multi-Tasking Multi-tasking t = 0 Projects start later but finish sooner t = n
  • 19.
  • 20.
  • 21.
  • 22.
  • 23. A B C D E Y Y = f (A, B, C, D, E, F,...,M) 0 0.02 0.04 0.06 0.08 0.1 0.12 0.14 0.16 0.18 180 187 194 201 208 215 222 229 236 243 250 0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 17 17.6 18.2 18.8 19.4 20 20.6 21.2 21.8 22.4 23 0 0.2 0.4 0.6 0.8 1 1.2 1.4 15 15.8 16.6 17.4 18.2 19 19.8 20.6 21.4 22.2 23 0 0.2 0.4 0.6 0.8 1 1.2 1.4 15 16.5 18 19.5 21 22.5 24 25.5 27 28.5 30 0 0.2 0.4 0.6 0.8 1 1.2 1.4 15 16.5 18 19.5 21 22.5 24 25.5 27 28.5 30 Response F G H I J K L M Simulation or Multi-Variate Transfer Function Design Variables Input Variation Contributes To Response Variation 0 0.05 0.1 0.15 0.2 0.25 15 16.5 18 19.5 21 22.5 24 25.5 27 28.5 30
  • 24. A B C D E Y Y = f (A, B, C, D, E, F,...,M) 0 0.02 0.04 0.06 0.08 0.1 0.12 0.14 0.16 0.18 180 187 194 201 208 215 222 229 236 243 250 0 0.1 0.2 0.3 0.4 0.5 0.6 0.7 0.8 17 17.6 18.2 18.8 19.4 20 20.6 21.2 21.8 22.4 23 0 0.2 0.4 0.6 0.8 1 1.2 1.4 15 15.8 16.6 17.4 18.2 19 19.8 20.6 21.4 22.2 23 0 0.2 0.4 0.6 0.8 1 1.2 1.4 15 16.5 18 19.5 21 22.5 24 25.5 27 28.5 30 0 0.2 0.4 0.6 0.8 1 1.2 1.4 15 16.5 18 19.5 21 22.5 24 25.5 27 28.5 30 Response F G H I J K L M Design Variables System/Sub-System Model f (A, B, C, D, E, F,...,M) A Visual Representation of DFSS Statistical Requirements Analysis 0 0.05 0.1 0.15 0.2 0.25 15 16.5 18 19.5 21 22.5 24 25.5 27 28.5 30 Flow Down/Allocation Based on Output Variability
  • 25.
  • 26.
  • 27.
  • 28.
  • 29.  
  • 30.
  • 31.
  • 32.
  • 33. Key Product Characteristic Tree Simple Example of a KCC Affecting Several KPCs Top-level KPCs 2nd level KPCs KCCs VOC
  • 34.
  • 36.
  • 37. Defect Model Previous Program/Release Standard Defect Containment Chart Model Raw Defect Counts Prorate the raw defect counts for the new program based upon SLOC counts Projected Raw Defect Counts For New Program New Program Defect Containment Current Raw Defect Counts New Program - Projected Defect Containment Sum of Current Raw Defect Counts Plus Raw Defects Not Yet Detected Defect Density Predictive Model Approach
  • 38.
  • 39. Defect Density Code Inspection Analysis When number of defects is between the control limits, fix findings and pass to next stage . When number of defects is below the lower limit, unit(s) may need more inspection. When number of defects is above the upper limit, unit(s) may need rework and a repeated inspection.
  • 40.
  • 41.
  • 42.
  • 43.
  • 44.
  • 45. Satellite Ground Systems Applied Case
  • 46.
  • 47.
  • 48.
  • 49.
  • 50.

Editor's Notes

  1. Historically, six sigma has been tied to applying statistics to the way that we view and analyze processes for producing a product. This thought process has also been tied to the way that we design a product. A point to consider, is whether six sigma should be tied to the process for designing a product, or to the analysis of the performance of the product. A common theme we see in development program post-mortems is that the integrity and stability of system requirements are the predominant factors in our ability to meet PD milestones and budgets. Statistical methods and tools now exist for the System Engineer which will facilitate early requirements definition, and will assist in trade studies as far back as Science and Technology phases. Likewise, statistical and other DFSS methods and tools are available for detail design. These capabilities coupled with a well-defined integrated Product Development methodology give a whole new meaning and great improvements to the concept of “transition to production”. The result: more robust requirements, more robust designs, reduced production costs, but also reduced risk in meeting Product Development schedules.