4. BSC Upgrade
WB AMR
TFO for AMR
A5/3 Ciphering
AMR HO Signaling
Optimization
Automated log collection
Energy saving mode for
BCCH TRX
BCCH TRX Automated
power down
S14 Features
P
R
O
C
E
S
S ?
BSC Pre Checks
SW Files Transferring to BSC
Unzip the SW files
Conversion phase
Package creation
Restart the units
Flashing & Troubleshooting
Post checks
PREPARATION PHASE
ACTIVATION PHASE
8. MHA Cleanup
Change to UMTS RET.
Configure the MHAs to
Correct Antenna.
Assign License Capacity.
Delete Siemens RETs.
SCOPE
P
R
O
C
E
S
S
?
Site Information.
Back up Commissioning file
Alarm Status
Identifying the MHA type
Check & Assign antenna
settings
Commissioning
Troubleshooting
Post Site info & backup
commissioning files
PRE PHASE
POST PHASE
53 Sites
9. TMO RU20 PP2.11_11 SW Deployment
CMAS Parameter change
HSDPA Dynamic resource
allocation
Streaming QoS for HSPA
HSDSCH QoS Classes
EDCH QoS Classes
PriForBachARP1
DL & UL NBR for priority
values
Features
P
R
O
C
E
S
S
?
RNC Pre Checks
SW Files Transferring to RNC
Transfer the SW files to
directories
PR File update
Restart the units
Drive test , Trouble
shooting & Post checks
AFR KPI Troubleshooting
PREPARATION PHASE
ACTIVATION PHASE
11 RNC’s
10. Competence &Challenges
2G Systra Training
English
Communication Training
3G RAN Architecture
RNC Architecture
Handled 4 BSC’s in a shift
Handled BSC Prep work phase
for 1 Week.
BSC Troubleshooting
Handled 10 WBTS Flexi swap
in a shift
Supported Vodafone India
CM for a week
Class Room Trainings
Challenges