SlideShare a Scribd company logo
1 of 2
V I L L . - S E E N K T E H
- I S R AN A
D I S T T . - P AN I P AT
H AR Y AN A
 MOBILE : 08053634256
E-mail
 E-MAIL
SKYPE E-MAIL
DEEPAKMALIK062@GMAIL.COM
D E E P AK . M AL I K 4 2
DDEEPAK MALIKEEPAK MALIK
B - T E C H . & D I P L O M A I N C I V I L E N G I N E E R I N G + 5 Y E A R S R E L E V A N T
E X P E R I E N C E I N C O N S T R U C T I O N I N D U S T R Y
W O R K E X P E R I E N C E
•• Currently working inCurrently working in Hyundai Engineering & Construction Company LimitedHyundai Engineering & Construction Company Limited. In Kota (Rajasthan) on Chamble Cable. In Kota (Rajasthan) on Chamble Cable
Stayed Bridge as Construction Engineer. The Project cost is approximately $ 750Cr. (Revised Project Cost due to Extension ofStayed Bridge as Construction Engineer. The Project cost is approximately $ 750Cr. (Revised Project Cost due to Extension of
Time).Time).
ROLE AND RESPONSIBILITES
 Construction and supervision based on understanding of Construction Drawings, Construction Sequence, Bar Bending
Schedules
 Monitoring daily activities at Site and Co-ordination of Direct Manpower and Multiple Subcontractors.
 Ensuring Safety and Quality standards of works by checking material qualities tests in the laboratory and timely
completion of works.
 Checking of levels and alignment at all stages construction.
 Implementing issues of safety at construction site.
 Responsible for setting out of formwork, rebar, profile & construction of box segment, pylon pier, crush barrier etc.
 Analysis of staging/shuttering (Doka Shuttering, RMD System Supports and Peri Auto Climbing System Formwork) as per
site and design requirements.
 Inspection and maintaining profile for external and internal post tensing tendons, stressing & grouting of tendons.
 Inspection and installation of stay cable. i.e.: welding of stay cable duct, fixing of winch, installation of Stands, damper
fixing and waxing work etc.
 Operation and Setting out Form traveler lowering launching and preparation for the next segment casting (as per
designed segment casting cycle).
•• Two yearsTwo years Sadbhav Engineering LimitedSadbhav Engineering Limited inin DMRC (Delhi Metro Rail Corporation) from Mundka to Bahadurgar (GreenDMRC (Delhi Metro Rail Corporation) from Mundka to Bahadurgar (Green
Line) ProjectLine) Project andand KSHIP (KARNATAKA STATE HIGHWAY IMPROVEMENT PROJECT) SH-33KSHIP (KARNATAKA STATE HIGHWAY IMPROVEMENT PROJECT) SH-33 && SH-3SH-3 such as asuch as a
StructuralStructural Engineer (Engineer (from Feb 2014 to Jan 2016).from Feb 2014 to Jan 2016).
ROLE AND RESPONSIBILITES
 Construction of Pile – 538 Nos. (1.2 m dia and 35 m deep), Pile Cap – 130 Nos., Pier – 130 Nos, Box Culvert – 27 Nos.,
Pipe Culvert – 58 Nos., Raft Foundation, Retaining Wall and Deck slab etc approx. 5500 Cum.
 Improve technique of pilling by time consuming method.
 Preparation of sub-contractor monthly R/A Bills.
 Inspection of Pile Load Test by Anchor Pile Method.
 Implementing strict Safety and Quality norms of DMRC at construction site.
•• One year work withOne year work with M/S RSHSJV, Clint- Sintex Industries Ltd.M/S RSHSJV, Clint- Sintex Industries Ltd. The construction of five story low cost housing project withThe construction of five story low cost housing project with
Monolithic TechnologyMonolithic Technology as anas an EngineerEngineer in (from Mar-2012 to Feb 2014)The project cost is about 500 crore.in (from Mar-2012 to Feb 2014)The project cost is about 500 crore.
ROLE AND RESPONSIBILITES
 Undertaking Rapid construction system method to deliver of the project limited time schedule, contract agreement and
approved construction method which meets client satisfaction in short period of time.
 Achieving the target of building 7620 nos. of Flats with arrangement of (G+4) in a short construction period of 18 months.
 Time to time visit of RMC Plant to ensure the proper material stock at the time.
 Checking of Construction Drawings, Construction Sequence, Bar Bending Schedules.
 Checking of levels and alignment at all stages construction as per approved drawings.
 Checking material qualities tests in the laboratory and timely completion of works.
E D U C A T I O N A L Q U A L I F I C A T I O N S
 B. Tech from Kurukshetra University Kurukshetra.
 Three year Diploma of Civil Engineering from Govt. Polytechnic Jhajjar.
 12th
from Board of School Education, Haryana (Bhiwani).
 10th
from Board of School Education, Haryana (Bhiwani).
C O M P U T E R P R O F I C I E N C Y
 Three months Diploma of Auto-Cad.
 Basic knowledge internet operations etc.
 Can operate effectively with Microsoft office tools like Microsoft word, Microsoft excel, Microsoft Power Point Presentation
etc.
K E Y S T R E N G T H
 Hardworking, Adaptable, Team Worker and Sincere with good communication skills and an ability to deliver.
P E R S O N A L D E T A I L S
Father’s NameFather’s Name
Permanent AddressPermanent Address
Date of BirthDate of Birth
Marital StatusMarital Status
Languages KnownLanguages Known
: Dharambir Singh: Dharambir Singh
: Village – Seenk,: Village – Seenk,
Post office – SeenkPost office – Seenk
Distt - Panipat (Haryana)Distt - Panipat (Haryana)
: Apr. 17 1990: Apr. 17 1990
: Unmarried: Unmarried
: English, Hindi: English, Hindi
 Place :-Panipat
Deepak Malik

 Date :-

More Related Content

What's hot

Abdoul_original (1).doc- upated May'16
Abdoul_original (1).doc- upated May'16Abdoul_original (1).doc- upated May'16
Abdoul_original (1).doc- upated May'16
Abdoul Madjid
 
CV - AMIYA RANJAN HALDAR
CV - AMIYA RANJAN HALDARCV - AMIYA RANJAN HALDAR
CV - AMIYA RANJAN HALDAR
Amiya Halder
 
Resume -Vivek singh
Resume -Vivek singhResume -Vivek singh
Resume -Vivek singh
Vivek singh
 
cv of nirav parmar-sr.civil engg
cv of nirav parmar-sr.civil enggcv of nirav parmar-sr.civil engg
cv of nirav parmar-sr.civil engg
nirav parmar
 

What's hot (20)

Er. Anand Resume
Er. Anand ResumeEr. Anand Resume
Er. Anand Resume
 
Resume
ResumeResume
Resume
 
Abdoul_original (1).doc- upated May'16
Abdoul_original (1).doc- upated May'16Abdoul_original (1).doc- upated May'16
Abdoul_original (1).doc- upated May'16
 
CV-SITE SUPERVISOR
CV-SITE SUPERVISORCV-SITE SUPERVISOR
CV-SITE SUPERVISOR
 
A K GUPTA (B.E Mech)
A K GUPTA (B.E Mech)A K GUPTA (B.E Mech)
A K GUPTA (B.E Mech)
 
CV SYED QATAR
CV SYED QATARCV SYED QATAR
CV SYED QATAR
 
Civil engineer
Civil engineerCivil engineer
Civil engineer
 
RESUME
RESUMERESUME
RESUME
 
kiran qc inspector
kiran qc inspectorkiran qc inspector
kiran qc inspector
 
MECHANICAL CV
MECHANICAL CVMECHANICAL CV
MECHANICAL CV
 
rohit new cv
rohit new cvrohit new cv
rohit new cv
 
4 and half years experience in quality
4 and half years experience in quality4 and half years experience in quality
4 and half years experience in quality
 
CV of Adnan Altaf ( QA QC Inspector )
CV of Adnan Altaf ( QA QC Inspector )CV of Adnan Altaf ( QA QC Inspector )
CV of Adnan Altaf ( QA QC Inspector )
 
CV - AMIYA RANJAN HALDAR
CV - AMIYA RANJAN HALDARCV - AMIYA RANJAN HALDAR
CV - AMIYA RANJAN HALDAR
 
Veeru Resume
Veeru ResumeVeeru Resume
Veeru Resume
 
Resume -Vivek singh
Resume -Vivek singhResume -Vivek singh
Resume -Vivek singh
 
cv of nirav parmar-sr.civil engg
cv of nirav parmar-sr.civil enggcv of nirav parmar-sr.civil engg
cv of nirav parmar-sr.civil engg
 
dinesh resume
dinesh resumedinesh resume
dinesh resume
 
Quantity Surveyor
Quantity Surveyor Quantity Surveyor
Quantity Surveyor
 
Iliyas resume
Iliyas resumeIliyas resume
Iliyas resume
 

Similar to Deepak Malik Resume (20)

Resume_Akash Verma
Resume_Akash VermaResume_Akash Verma
Resume_Akash Verma
 
ANKUSH NEW CURRICULAM VITAE
ANKUSH NEW CURRICULAM VITAEANKUSH NEW CURRICULAM VITAE
ANKUSH NEW CURRICULAM VITAE
 
Sharma cv
Sharma  cv Sharma  cv
Sharma cv
 
Arun C.V (Civil) (1)
Arun C.V (Civil) (1)Arun C.V (Civil) (1)
Arun C.V (Civil) (1)
 
Arun C.V (Civil) (1)
Arun C.V (Civil) (1)Arun C.V (Civil) (1)
Arun C.V (Civil) (1)
 
Rajbir Singh-2
Rajbir Singh-2Rajbir Singh-2
Rajbir Singh-2
 
PROJECT ENGINEER - MANPREET SINGH
PROJECT ENGINEER - MANPREET SINGHPROJECT ENGINEER - MANPREET SINGH
PROJECT ENGINEER - MANPREET SINGH
 
---Ajinkya-- Resume
---Ajinkya-- Resume---Ajinkya-- Resume
---Ajinkya-- Resume
 
CONSTRUCTION ENGINEER
CONSTRUCTION ENGINEERCONSTRUCTION ENGINEER
CONSTRUCTION ENGINEER
 
CV_Debajit
CV_DebajitCV_Debajit
CV_Debajit
 
M.A.Iqbal C.V
M.A.Iqbal C.VM.A.Iqbal C.V
M.A.Iqbal C.V
 
Latest CV Engr. Zubair
Latest CV Engr. ZubairLatest CV Engr. Zubair
Latest CV Engr. Zubair
 
Latest cv engr. zubair
Latest cv engr. zubairLatest cv engr. zubair
Latest cv engr. zubair
 
cv piping(1)
cv piping(1)cv piping(1)
cv piping(1)
 
RESUME_of_manish-New
RESUME_of_manish-NewRESUME_of_manish-New
RESUME_of_manish-New
 
Shanmukharao K_resume
Shanmukharao K_resumeShanmukharao K_resume
Shanmukharao K_resume
 
BhavyaRaj CV
BhavyaRaj CVBhavyaRaj CV
BhavyaRaj CV
 
Civil Consultant Resume
Civil Consultant ResumeCivil Consultant Resume
Civil Consultant Resume
 
jyotithakurkumar@gmail.com
jyotithakurkumar@gmail.comjyotithakurkumar@gmail.com
jyotithakurkumar@gmail.com
 
C.v sudheer updated.
C.v sudheer   updated.C.v sudheer   updated.
C.v sudheer updated.
 

Deepak Malik Resume

  • 1. V I L L . - S E E N K T E H - I S R AN A D I S T T . - P AN I P AT H AR Y AN A  MOBILE : 08053634256 E-mail  E-MAIL SKYPE E-MAIL DEEPAKMALIK062@GMAIL.COM D E E P AK . M AL I K 4 2 DDEEPAK MALIKEEPAK MALIK B - T E C H . & D I P L O M A I N C I V I L E N G I N E E R I N G + 5 Y E A R S R E L E V A N T E X P E R I E N C E I N C O N S T R U C T I O N I N D U S T R Y W O R K E X P E R I E N C E •• Currently working inCurrently working in Hyundai Engineering & Construction Company LimitedHyundai Engineering & Construction Company Limited. In Kota (Rajasthan) on Chamble Cable. In Kota (Rajasthan) on Chamble Cable Stayed Bridge as Construction Engineer. The Project cost is approximately $ 750Cr. (Revised Project Cost due to Extension ofStayed Bridge as Construction Engineer. The Project cost is approximately $ 750Cr. (Revised Project Cost due to Extension of Time).Time). ROLE AND RESPONSIBILITES  Construction and supervision based on understanding of Construction Drawings, Construction Sequence, Bar Bending Schedules  Monitoring daily activities at Site and Co-ordination of Direct Manpower and Multiple Subcontractors.  Ensuring Safety and Quality standards of works by checking material qualities tests in the laboratory and timely completion of works.  Checking of levels and alignment at all stages construction.  Implementing issues of safety at construction site.  Responsible for setting out of formwork, rebar, profile & construction of box segment, pylon pier, crush barrier etc.  Analysis of staging/shuttering (Doka Shuttering, RMD System Supports and Peri Auto Climbing System Formwork) as per site and design requirements.  Inspection and maintaining profile for external and internal post tensing tendons, stressing & grouting of tendons.  Inspection and installation of stay cable. i.e.: welding of stay cable duct, fixing of winch, installation of Stands, damper fixing and waxing work etc.  Operation and Setting out Form traveler lowering launching and preparation for the next segment casting (as per designed segment casting cycle). •• Two yearsTwo years Sadbhav Engineering LimitedSadbhav Engineering Limited inin DMRC (Delhi Metro Rail Corporation) from Mundka to Bahadurgar (GreenDMRC (Delhi Metro Rail Corporation) from Mundka to Bahadurgar (Green Line) ProjectLine) Project andand KSHIP (KARNATAKA STATE HIGHWAY IMPROVEMENT PROJECT) SH-33KSHIP (KARNATAKA STATE HIGHWAY IMPROVEMENT PROJECT) SH-33 && SH-3SH-3 such as asuch as a StructuralStructural Engineer (Engineer (from Feb 2014 to Jan 2016).from Feb 2014 to Jan 2016). ROLE AND RESPONSIBILITES  Construction of Pile – 538 Nos. (1.2 m dia and 35 m deep), Pile Cap – 130 Nos., Pier – 130 Nos, Box Culvert – 27 Nos., Pipe Culvert – 58 Nos., Raft Foundation, Retaining Wall and Deck slab etc approx. 5500 Cum.  Improve technique of pilling by time consuming method.  Preparation of sub-contractor monthly R/A Bills.  Inspection of Pile Load Test by Anchor Pile Method.  Implementing strict Safety and Quality norms of DMRC at construction site.
  • 2. •• One year work withOne year work with M/S RSHSJV, Clint- Sintex Industries Ltd.M/S RSHSJV, Clint- Sintex Industries Ltd. The construction of five story low cost housing project withThe construction of five story low cost housing project with Monolithic TechnologyMonolithic Technology as anas an EngineerEngineer in (from Mar-2012 to Feb 2014)The project cost is about 500 crore.in (from Mar-2012 to Feb 2014)The project cost is about 500 crore. ROLE AND RESPONSIBILITES  Undertaking Rapid construction system method to deliver of the project limited time schedule, contract agreement and approved construction method which meets client satisfaction in short period of time.  Achieving the target of building 7620 nos. of Flats with arrangement of (G+4) in a short construction period of 18 months.  Time to time visit of RMC Plant to ensure the proper material stock at the time.  Checking of Construction Drawings, Construction Sequence, Bar Bending Schedules.  Checking of levels and alignment at all stages construction as per approved drawings.  Checking material qualities tests in the laboratory and timely completion of works. E D U C A T I O N A L Q U A L I F I C A T I O N S  B. Tech from Kurukshetra University Kurukshetra.  Three year Diploma of Civil Engineering from Govt. Polytechnic Jhajjar.  12th from Board of School Education, Haryana (Bhiwani).  10th from Board of School Education, Haryana (Bhiwani). C O M P U T E R P R O F I C I E N C Y  Three months Diploma of Auto-Cad.  Basic knowledge internet operations etc.  Can operate effectively with Microsoft office tools like Microsoft word, Microsoft excel, Microsoft Power Point Presentation etc. K E Y S T R E N G T H  Hardworking, Adaptable, Team Worker and Sincere with good communication skills and an ability to deliver. P E R S O N A L D E T A I L S Father’s NameFather’s Name Permanent AddressPermanent Address Date of BirthDate of Birth Marital StatusMarital Status Languages KnownLanguages Known : Dharambir Singh: Dharambir Singh : Village – Seenk,: Village – Seenk, Post office – SeenkPost office – Seenk Distt - Panipat (Haryana)Distt - Panipat (Haryana) : Apr. 17 1990: Apr. 17 1990 : Unmarried: Unmarried : English, Hindi: English, Hindi  Place :-Panipat Deepak Malik   Date :-