Skip to main content
NIRMALCHATTERJEE
EmailID: -nirmalchatterjee.60@rediffmail.com
: -chatterjeenirmal.60@gmail.com
~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
Diploma in Civil Engineeringwith 31 yearsof experience in
Project Construction andManagement Work including Finishing
Work and Maintenance Workis seeking an assignment.
Kind Attention:
To
Ref.
Application for a suitable post anywhere in India
Respected Sirs,
With reference to the above I would like to apply my candidature for the above
subjected post.I am a civil engineer having more than 31 years of experience in
maintenance work,building constructions and project management in
construction industries in the territory of India with civilconstruction &
maintenance work engaged in Hotel Industry,Building Construction&maximum
numbers of Maintenance of HotelBuilding (PSU) in Kolkata,Assam,Orissa &
Bihar.
I am enclosing here with my resume for your kind perusal and sympathetic
consideration. Hope you will be kind enough to offer me an opportunity in your
esteemed organization. I shallbring your adequate per excellence.
Thanking you in anticipation with best regards,
Yoursfaithfully
NirmalChatterjee
RESUME
NIRMAL CHATTERJEE
E-mail:-
nirmalchatterjee.60@rediffmail.com
chatterjeenirmal.60@gmail.com
Mobile. No:-+919433467265
KEY SKILLS: -Project Construction and Management
includingFinishing Work and Maintenance Work.
KEY QUALIFICATION:-
 More than 31 years of professional experience in various fields of civil engineering
Particularly inbuilding constructions& its maintenance works.
 Undergone Quality Control & Quality Assurance Works.
 Undergone Supervisory Development Programme from 21.11.1990 to 23.11.1990.
 Undergone Integrated Hotel Management Programme from Indian Tourism
Development Corporation from 01.03.1991 to 06.03.1991.
 Undergone Basic Course in Interior Designing from April 1991 to July 1991
.
 Undergone Training Programme on Maintenance from 01.09.1992 to 12.09.0992.from
National Productivity Council,Calcutta
 Undergone Training for Lay-out of Handling Materials from National Productivity
Council,Calcutta from 19.04.1993 to 24.04.1993.
 Undergone Training Programme for Employee Development from HRD,IVRCL
Infrastructures & Projects Ltd. On 26.11.2010.
 Expertise in structure,foundations & retaining walls.
 Having 21 years exposure & expertise in the maintenance of the Hotel Building.
 Flexible attitude, always willing to acquire and learn new skill and good team work.
EDUCATION:-
 MadhyamikParikshapassed from Dr.Shyamaprasad Mukherjee
Institution,Kolkata-54 in the year 1976.
 H.S.(10+2) passed from Dr.Shyamaprasad Mukherjee Institution, Kolkata-54 in
the year 1978.
TECHNICAL QUALIFICATION:-
 Licentiate in civil Engineering (LCE) Passed in 1984fromState Council for Engineering &
Technical Education,Govtof West Bengal.
 Basic Course in Interior Designing from Indo American Society, Kolkata in 1991.
Proposed Position : - Dy.ProjectManager (CIVIL)
Name of Applicant : - NIRMAL CHATTERJEE
Profession : - Civil Engineer.
Date of Birth : - 31.12.1960
Marital Status : - Married.
Nationality : - Indian.
Permanent Address: - NirmalChatterjeeBG-165/1,
Hanapara, Jorakhana, Kestopur,
Kolkata-700102, WestBengal,India
Mob: -+919433467265/9681358833
Professional Experiences:-
PROFESSIONAL EXPERIENCE :-
From : May 2013 totill this date
Position : Dy.Project Manager.
Employer :Paul Builders Pvt. Ltd.
Client : Indian Statistical Institution, Kolkata
Project : Construction of one 6-storied Building.
Project Cost : 20crores.
Responsibility:-
 Look after RCC frame structure,driven & bore piles,brick work,plaster,various types of
floorings,interior works including false flooring & false ceilings, various types of paving etc.
 Worked for Quality Control & Quality Assurance Worksviz.cement-testing, brick-
testing,reinforcement-testing, cube-testing etc.
 Preparation ofBar Bending Schedule(BBS) & sub contractors bill.
 Coordinate with supervisory personnel, contractors and consultants to discuss and resolve
matter such as complaints and construction problems.
 Supervision,quality control,checking of contractors’ bill for various type of structures.
 Safety practices & quality implemented from starting of construction and achieved 29 million
zero Hour loss.
 Coordinating project review meeting at site on weekly & monthly basis.
 Coordinating monthly safety meeting at site.
PROFESSIONAL EXPERIENCE:
From : Jan.2013to April 2013
Position : Dy.ProjectManager
Employer : SSP Associates Pvt.Ltd.
Client : Indian Steel Plant (ISP).
Projects : Construction of a Bridge & Road
Project Cost : 12 chores.
Location : Assansol (Burn-pur), West-Bengal
Responsibility:-
 Close co-ordination with design team,Architect for release the drawings as per priority for construction.
 Follow up contractors for material supply at site in time.
 Worked for Quality Control & Quality Assurance Works viz.cement-testing,brick-testing,
reinforcement-testing, cube-testing etc.
 Checking of civil drawings with electrical drawings so as to avoid any mismatch and thereby reducing Re-
work at site.
 Safety measure & quality implemented from the beginning of the project.
 Checking of contractors’ bill in time so that to release the payment in time.
 Coordinating with management,staffs,contractors,sub-contractors.
 Involving planning of manpower’s& resources.
 Involving Monthly meeting with management regarding work progress,contractor’s payment,timely
completion of project.
 Checking of materials and quality control during executions.
 Liasioning with Architect and Govt. approved test laboratory for testing and approval of materials.
PROFESSIONAL EXPERIENCE:
From : September 2010 to Dec. 2012
Position : Deputy ProjectManager.
Employer : IVRCL Infrastructures&Projects Ltd.
Client : IOCL & Irrigation Department,Govt. ofBihar
Location : Para deep,Orissa& North-Bihar (Birpur).
Project : Township Project – 28 Nos. Block &
Irrigation to Cosi –BarriageSystem (BECKS- Projects)
Project Cost : 400Chores&360Chores.
Responsibility:-
 Co-coordinating with designer & Architect for issuing drawings, approval of materials as per
contract Specifications.
 Co-ordination with management, supervisory staffs & contractors.
 Interaction with contractors,Govt.Authority and Architect ensuring the civil work is doing as per
Construction schedule with due adherence to quality & safety norms.
 Worked for Quality Control & Quality Assurance Works viz.cement-testing,brick-
testing,reinforcement-testing,cube-testing etc.
 Checking of contractor’s bills as per work done.
 Checking of construction drawings before execution.
 Supervision of all civil activities from starting to hand over of the project.
PROFESSIONAL EXPERIENCE:-
From : December2009 toAugust 2010
Position : Project Consultant Engineer.
Employer : TechcreteConstructionPvt. Ltd, Kolkata
Client : CCAP
Project : Construction of one Shopping Mall,4-storied bldg.
Location : Guwahati, Assam
Responsibility:-
 Responsible for all civil & mechanical works.
 Co-ordination with client,Architect & contractors.
 Preparation ofbar bending schedule(BBS),Monthly bill.
 Checking of centering & shuttering,steel binding as per drawing,
 Checking of sub-contractors bill.
 Planning & scheduling of materials,manpower & site executions.
 Checking of quality & safety measures.
 Checking of civil & mechanical so as to avoid mismatch & wastage of men&materials.
PROFESSIONAL EXPERIENCE:
From : April 2009 to November 2009
Position : Project Engineer.
Employer : M/SAPS Michigan Pvt. Ltd.
Client : Kolkata Municipal Corporation
Location : Kolkata
Project : Renovation & Reconstruction of the underground sewer line (a jnnurm-project)
Project Cost : 5 chores.
Responsibility:-
 Preparation of BBS & Monthly bill.
 Checking of shuttering&centering,reinforcement & RCC.
 Checking & monitoring of quality of work.
 Planning & scheduling of materials &manpower’s.
 Coordination with client & Architect.
 Preparation of DPR, Checking ofcontractors’ bill for various types of work like RCC
Structures,brickwork,plaster& all internal finishing works.
PROFESSIONAL EXPERIENCE:
From : January 2008 toMarch 2009
Position : SeniorProject Engineer.
Employer : Ganapati Projects
Client : Bengal Chemical Private Ltd.
Location : Kankurgachi, Kolkata, West Bengal
Project : Two Nos. (G+2) Building including bore-piling
Project cost : 21 Chores.
Responsibility:-
 Responsible for all constructional activities like centering &shuttering,RCC work,brick
work,inter & External plaster,water proofing &flooring works.
 Planning & scheduling of materials &manpower.
 Preparation of sub-contractors bills,BBS,DPR,
 Preparation and submission of all documents regarding execution to client & consultant.
 Co-ordination with client & consultants.
 Involving weekly meeting with client & consultants regarding progress,quality,target schedule.
 Worked for Quality Control & Quality Assurance Works viz.cement-testing,brick-
testing,reinforcement-testing,cube-testing etc.
PROFESSIONAL EXPERIENCES:
From : December 2005 to December 2007.
Position : Project Engineer.
Employer : M/S Simplex Projects Pvt. Ltd.
Client :West Bengal Housing Board (ABASAN)
Location : Rajarhat, New Town, West Bengal Projects : Driven Piling
6300 Nos. including Pile Cap for SankalpoProject (G+14)
Project Cost : 17 Chores
Responsibility:-
 Preparation &submission of all documents of civil activities like pore card,RFI,DPR& DLR.
 Preparation of Bar Bending Schedule(BBS),Sub-contractors bill,estimating of materials &
BOQ.
 Co-ordination with client & consultants.
 Checking and maintaining of quality & safety precautions during constructions.
 Worked for Quality Control & Quality Assurance Works viz.cement-testing, brick-testing,
reinforcement-testing, cube-testing etc.
 Planning and scheduling of materials and manpower’s.
PROFESSIONNAL EXPERIENCE :-
From : January 1984toNovember2005
Position : S.A.E. (Civil).
Employer : Great Eastern Hotel,(PSU) Govt.of West Bengal.
Client : 1, 2&3, Old Court House Street, Kolkata - 700069
Projects : Maintenance ofthe Hotel Building
Responsibility:-
 Supervision of all Maintenance activities& manpower.
 Monitoring of the total Preventive & Routine Maintenance works
 Maintaining of all paper work like pore cards,RFI,DLR & DPR.
 Checking of sub-contractors bills.
 Checking & maintaining of quality & safety precautions. Excellent outputs.
LANGUAGES KNOWN:-
SPEAK READ WRITE
Bengali Excellent Excellent
Hindi Excellent Excellent
English Excellent Excellent
Current CTC : Rs 6, 50,000 P.A.
Expected CTC : Negotiable.
Notice Period : One Month.
Declarations :One Month.
I,the undersigned certify that the data as furnished above is correct& the best of my knowledge &
belief.
Dated:
Place: Signature