Safety First and Always
Project Name
Project Charter
Executive Sponsors (SVP or SVP / VP):
Short Description of Project:
Supports Corporate Goal (rank numerically if selecting more than one):
___ Financial Strength ___ Customer Experience __ Reliable Energy Delivery Network
___ Operational Efficiency ___ Workplace Engagement __ Positive Company Image __ Make Safety a Priority
Project Complexity (choose one):
_____ Simple (short term, not cross-functional, 1-2 persons)
_____ Focused (< 6 mos., < 8 people, little cross-org integration)
_____ Full-Scale (up to 18 months, cross-organizational, critical integration points)
_____ Complex (portfolio of several projects, cross-organizational, critical integration points)
Project Uncertainty (choose one):
Traditional (clearly defined goal & approach) _____ Adaptive (clearly defined goal, unclear approach) _____
Discovery (unclear goal, clear approach) _____ Extreme (unclear goal & approach) _____
Business Background and Impact
Background of Project
Problem Statement:
Business Need:
Business Benefit:
- A
- B
- C
- D
Description of Current State:
Description of Proposed Future State:
End State Process Owner:
12/4/2015 1
Safety First and Always
Project Name
Project Charter
High Level Project Boundaries
Project Scope:
Provide a description of the project activities to be accomplished. This is often best done in an In-Frame/Out-of-Frame
approach to clarify project boundaries.
In Frame (in scope) Out of Frame (out of scope)
List activities / focus areas that are included in the scope of this
team’s work
Clarify activities / focus areas that could be
assumed to be part of the scope, but are not.
Potential Labor Impact:
High Level Cost Estimate for Project:
Items to Fund Estimate
High Level Obstacles & Risks for Project:
Risk or Obstacle Mitigation Plan
Dependencies on events, other projects, or other organizations:
Proposed Success Metrics:
12/4/2015 2
Safety First and Always
Project Name
Project Charter
Project Details
Participants in Project:
Role Name General Resource Needs
Sponsor Provide leadership and decision making as
required.
Steering Committee - Lead Coordinate and attend weekly meetings as
well as make decisions as required.
Steering Committee Attend weekly meetings and make decisions
as required.
Impacted by Project (key stakeholders):
Roles & Responsibilities Name Win
Project Plan: Key Milestones & Expected Completion Date:
Milestones Key Deliverable (if applic.) Responsibility Timeframe
Step 1
Step 2
Step 3
Step 4
Step 5
Step 6
Step 7
12/4/2015 3
Safety First and Always
Project Name
Project Charter
Communication Plan:
Target Audiences What We Want Them to
Know
When How
.
Approvals
Sponsor approval required. Approvals by others are optional and can be added below. Several options for the method of
“signature” exist, including a physical signature on a hard copy of this document, via email attachment, etc.
Title:
Role: Sponsor
Date:
Name:
Signature:
Revision History
Version/Date Description of Change
12/4/2015 4

More Related Content

What's hot

The Daily Scrum (The Scrum Events)
The Daily Scrum (The Scrum Events)The Daily Scrum (The Scrum Events)
The Daily Scrum (The Scrum Events)
George Psistakis
 
5 Levels of Agile Planning Explained Simply
5 Levels of Agile Planning Explained Simply5 Levels of Agile Planning Explained Simply
5 Levels of Agile Planning Explained SimplyRussell Pannone
 
Scrum Process
Scrum ProcessScrum Process
Scrum Process
Rodrigo Paolucci
 
Agile scrum brown bag
Agile scrum brown bagAgile scrum brown bag
Agile scrum brown bag
Bernadette Charlescar PMP, CSM
 
Team Lead presentation
Team Lead presentationTeam Lead presentation
Team Lead presentation
consy123
 
Leading the agile organization
Leading the agile organizationLeading the agile organization
Leading the agile organization
Dimitri Ponomareff
 
Inspect and Adapt in the Scaled Agile Framework
Inspect and Adapt in the Scaled Agile FrameworkInspect and Adapt in the Scaled Agile Framework
Inspect and Adapt in the Scaled Agile Framework
Kendis.io
 
Creative Problem Solving Skills For Staff
Creative Problem Solving Skills For StaffCreative Problem Solving Skills For Staff
Creative Problem Solving Skills For Staff
Paul Nguyen
 
RACI Matrix
RACI MatrixRACI Matrix
RACI Matrix
Anand Subramaniam
 
Agile Transformation | Mike Cottmeyer
Agile Transformation | Mike CottmeyerAgile Transformation | Mike Cottmeyer
Agile Transformation | Mike Cottmeyer
LeadingAgile
 
A Leadership Survival Guide to Transformation - Aldo Rall & Andy Cooper - Agi...
A Leadership Survival Guide to Transformation - Aldo Rall & Andy Cooper - Agi...A Leadership Survival Guide to Transformation - Aldo Rall & Andy Cooper - Agi...
A Leadership Survival Guide to Transformation - Aldo Rall & Andy Cooper - Agi...
AgileNZ Conference
 
Change Leadership Workshop: Managing the People Side of Change
Change Leadership Workshop: Managing the People Side of ChangeChange Leadership Workshop: Managing the People Side of Change
Change Leadership Workshop: Managing the People Side of Change
Jewel Celestine Anizor, SPHR, MHRM, M.Ed
 
The Lean Agile Portfolio
The Lean Agile PortfolioThe Lean Agile Portfolio
The Lean Agile Portfolio
TechWell
 
Technical Escalations Best Practices
Technical Escalations Best PracticesTechnical Escalations Best Practices
Technical Escalations Best Practicesmagalong
 
SMART objective setting
SMART objective settingSMART objective setting
SMART objective setting
Rev Marketing
 
Team building and team work
Team building and team workTeam building and team work
Team building and team work
Krishantha Jayasundara
 
Change Management Powerpoint Presentation Slides
Change Management Powerpoint Presentation SlidesChange Management Powerpoint Presentation Slides
Change Management Powerpoint Presentation Slides
SlideTeam
 
Agile Transformation Case Studies
Agile Transformation Case StudiesAgile Transformation Case Studies
Agile Transformation Case Studies
Chandan Patary
 
Clarity First - You
Clarity First - YouClarity First - You
Clarity First - You
TKMG, Inc.
 
Tips n' Tricks - Sprint Review
Tips n' Tricks - Sprint ReviewTips n' Tricks - Sprint Review
Tips n' Tricks - Sprint Review
Steve Greene
 

What's hot (20)

The Daily Scrum (The Scrum Events)
The Daily Scrum (The Scrum Events)The Daily Scrum (The Scrum Events)
The Daily Scrum (The Scrum Events)
 
5 Levels of Agile Planning Explained Simply
5 Levels of Agile Planning Explained Simply5 Levels of Agile Planning Explained Simply
5 Levels of Agile Planning Explained Simply
 
Scrum Process
Scrum ProcessScrum Process
Scrum Process
 
Agile scrum brown bag
Agile scrum brown bagAgile scrum brown bag
Agile scrum brown bag
 
Team Lead presentation
Team Lead presentationTeam Lead presentation
Team Lead presentation
 
Leading the agile organization
Leading the agile organizationLeading the agile organization
Leading the agile organization
 
Inspect and Adapt in the Scaled Agile Framework
Inspect and Adapt in the Scaled Agile FrameworkInspect and Adapt in the Scaled Agile Framework
Inspect and Adapt in the Scaled Agile Framework
 
Creative Problem Solving Skills For Staff
Creative Problem Solving Skills For StaffCreative Problem Solving Skills For Staff
Creative Problem Solving Skills For Staff
 
RACI Matrix
RACI MatrixRACI Matrix
RACI Matrix
 
Agile Transformation | Mike Cottmeyer
Agile Transformation | Mike CottmeyerAgile Transformation | Mike Cottmeyer
Agile Transformation | Mike Cottmeyer
 
A Leadership Survival Guide to Transformation - Aldo Rall & Andy Cooper - Agi...
A Leadership Survival Guide to Transformation - Aldo Rall & Andy Cooper - Agi...A Leadership Survival Guide to Transformation - Aldo Rall & Andy Cooper - Agi...
A Leadership Survival Guide to Transformation - Aldo Rall & Andy Cooper - Agi...
 
Change Leadership Workshop: Managing the People Side of Change
Change Leadership Workshop: Managing the People Side of ChangeChange Leadership Workshop: Managing the People Side of Change
Change Leadership Workshop: Managing the People Side of Change
 
The Lean Agile Portfolio
The Lean Agile PortfolioThe Lean Agile Portfolio
The Lean Agile Portfolio
 
Technical Escalations Best Practices
Technical Escalations Best PracticesTechnical Escalations Best Practices
Technical Escalations Best Practices
 
SMART objective setting
SMART objective settingSMART objective setting
SMART objective setting
 
Team building and team work
Team building and team workTeam building and team work
Team building and team work
 
Change Management Powerpoint Presentation Slides
Change Management Powerpoint Presentation SlidesChange Management Powerpoint Presentation Slides
Change Management Powerpoint Presentation Slides
 
Agile Transformation Case Studies
Agile Transformation Case StudiesAgile Transformation Case Studies
Agile Transformation Case Studies
 
Clarity First - You
Clarity First - YouClarity First - You
Clarity First - You
 
Tips n' Tricks - Sprint Review
Tips n' Tricks - Sprint ReviewTips n' Tricks - Sprint Review
Tips n' Tricks - Sprint Review
 

Viewers also liked

FS_ALGO_1401_VWAP Customizations - Order Logic on Best Quantities (No names)
FS_ALGO_1401_VWAP Customizations - Order Logic on Best Quantities (No names)FS_ALGO_1401_VWAP Customizations - Order Logic on Best Quantities (No names)
FS_ALGO_1401_VWAP Customizations - Order Logic on Best Quantities (No names)Milton Ko
 
B is for book
B is for bookB is for book
B is for book
em05015791
 
Get started with dropbox
Get started with dropboxGet started with dropbox
Get started with dropboxKai Korpela
 
Jordi
JordiJordi
Jordi
Yoko Bertu
 
¿Cómo se percibe la ciudadanía en el Perú desde la escuela pública? .
¿Cómo se percibe la ciudadanía en el Perú desde la escuela pública? .¿Cómo se percibe la ciudadanía en el Perú desde la escuela pública? .
¿Cómo se percibe la ciudadanía en el Perú desde la escuela pública? .
Jose Jara
 
La rivalutazione del limone-Classe 5^ G-Circolo Didattico V _Bagheria
La rivalutazione del limone-Classe 5^ G-Circolo Didattico V _BagheriaLa rivalutazione del limone-Classe 5^ G-Circolo Didattico V _Bagheria
La rivalutazione del limone-Classe 5^ G-Circolo Didattico V _Bagheria
francesca58
 
Endevina endevinalla!
Endevina endevinalla!Endevina endevinalla!
Endevina endevinalla!
itziargasconlopez
 
How Do You Locate the Information You Need for a Citation
How Do You Locate the Information You Need for a CitationHow Do You Locate the Information You Need for a Citation
How Do You Locate the Information You Need for a Citation
Sarah Uthoff
 
исеть1
исеть1исеть1
исеть1
nnzvp
 
loyalty and brand
loyalty and brandloyalty and brand
loyalty and brand
bit allahabad
 
Відкритий урок проектна робота
Відкритий урок проектна роботаВідкритий урок проектна робота
Відкритий урок проектна робота
YuliyaVladimirovna
 

Viewers also liked (13)

FS_ALGO_1401_VWAP Customizations - Order Logic on Best Quantities (No names)
FS_ALGO_1401_VWAP Customizations - Order Logic on Best Quantities (No names)FS_ALGO_1401_VWAP Customizations - Order Logic on Best Quantities (No names)
FS_ALGO_1401_VWAP Customizations - Order Logic on Best Quantities (No names)
 
B is for book
B is for bookB is for book
B is for book
 
Get started with dropbox
Get started with dropboxGet started with dropbox
Get started with dropbox
 
Jordi
JordiJordi
Jordi
 
¿Cómo se percibe la ciudadanía en el Perú desde la escuela pública? .
¿Cómo se percibe la ciudadanía en el Perú desde la escuela pública? .¿Cómo se percibe la ciudadanía en el Perú desde la escuela pública? .
¿Cómo se percibe la ciudadanía en el Perú desde la escuela pública? .
 
Firas Barahme
Firas BarahmeFiras Barahme
Firas Barahme
 
Mohamed Said CV1
Mohamed Said CV1Mohamed Said CV1
Mohamed Said CV1
 
La rivalutazione del limone-Classe 5^ G-Circolo Didattico V _Bagheria
La rivalutazione del limone-Classe 5^ G-Circolo Didattico V _BagheriaLa rivalutazione del limone-Classe 5^ G-Circolo Didattico V _Bagheria
La rivalutazione del limone-Classe 5^ G-Circolo Didattico V _Bagheria
 
Endevina endevinalla!
Endevina endevinalla!Endevina endevinalla!
Endevina endevinalla!
 
How Do You Locate the Information You Need for a Citation
How Do You Locate the Information You Need for a CitationHow Do You Locate the Information You Need for a Citation
How Do You Locate the Information You Need for a Citation
 
исеть1
исеть1исеть1
исеть1
 
loyalty and brand
loyalty and brandloyalty and brand
loyalty and brand
 
Відкритий урок проектна робота
Відкритий урок проектна роботаВідкритий урок проектна робота
Відкритий урок проектна робота
 

Similar to Project Charter Template

Six Sigma Green Belt Training Part 4
Six Sigma Green Belt Training Part 4Six Sigma Green Belt Training Part 4
Six Sigma Green Belt Training Part 4
Skillogic Solutions
 
Lean Six sigma Black Belt Training Part 6
Lean Six sigma Black Belt Training Part 6Lean Six sigma Black Belt Training Part 6
Lean Six sigma Black Belt Training Part 6
Lean Insight
 
2 a. project auditing
2 a. project auditing2 a. project auditing
2 a. project auditing
Dr.R. SELVAM
 
Project Manager Primer
Project Manager PrimerProject Manager Primer
Project Manager PrimerTom Cremins
 
Re-Aligning Project-Stakeholders Expectations
Re-Aligning Project-Stakeholders ExpectationsRe-Aligning Project-Stakeholders Expectations
Re-Aligning Project-Stakeholders Expectations
Dr. Thomas Juli
 
Final Class Presentation on Project Audit and Closure.ppt
Final Class Presentation on Project Audit and Closure.pptFinal Class Presentation on Project Audit and Closure.ppt
Final Class Presentation on Project Audit and Closure.ppt
GeorgeKabongah2
 
New projectplandefinition1
New projectplandefinition1New projectplandefinition1
New projectplandefinition1Jonathan Joyce
 
Modul 2.2: Project Charter
Modul 2.2: Project CharterModul 2.2: Project Charter
Modul 2.2: Project Charter
Lean Knowledge Base UG
 
PROJECT SCOPE STATEMENTPURPOSE Generally describes the proje.docx
PROJECT SCOPE STATEMENTPURPOSE  Generally describes the proje.docxPROJECT SCOPE STATEMENTPURPOSE  Generally describes the proje.docx
PROJECT SCOPE STATEMENTPURPOSE Generally describes the proje.docx
tarifarmarie
 
D09 Recognize and Overcome Resistance
D09 Recognize and Overcome ResistanceD09 Recognize and Overcome Resistance
D09 Recognize and Overcome ResistanceLeanleaders.org
 
D09 Recognize and Overcome Resistance
D09 Recognize and Overcome ResistanceD09 Recognize and Overcome Resistance
D09 Recognize and Overcome ResistanceLeanleaders.org
 
Assignment
Assignment Assignment
Assignment
BarryAllen147
 
Project management lecture 11 slide 11
Project management lecture 11 slide 11Project management lecture 11 slide 11
Project management lecture 11 slide 11beautyshine
 
Chap 2 Organization Strategy
Chap 2 Organization StrategyChap 2 Organization Strategy
Chap 2 Organization Strategy
project management
 
Implementation and Deployment - Best Practices for Managing Change
Implementation and Deployment - Best Practices for Managing ChangeImplementation and Deployment - Best Practices for Managing Change
Implementation and Deployment - Best Practices for Managing ChangePeter Quintana
 
Project management processes Groups
Project management processes GroupsProject management processes Groups
Project management processes Groups
Sourabh Kumar
 
PPM-Lec2.pptx
PPM-Lec2.pptxPPM-Lec2.pptx
PPM-Lec2.pptx
ameerkipsian
 

Similar to Project Charter Template (20)

Six Sigma Green Belt Training Part 4
Six Sigma Green Belt Training Part 4Six Sigma Green Belt Training Part 4
Six Sigma Green Belt Training Part 4
 
D06 Project Selection
D06 Project SelectionD06 Project Selection
D06 Project Selection
 
D06 Project Selection
D06 Project SelectionD06 Project Selection
D06 Project Selection
 
Lean Six sigma Black Belt Training Part 6
Lean Six sigma Black Belt Training Part 6Lean Six sigma Black Belt Training Part 6
Lean Six sigma Black Belt Training Part 6
 
2 a. project auditing
2 a. project auditing2 a. project auditing
2 a. project auditing
 
Project Manager Primer
Project Manager PrimerProject Manager Primer
Project Manager Primer
 
Re-Aligning Project-Stakeholders Expectations
Re-Aligning Project-Stakeholders ExpectationsRe-Aligning Project-Stakeholders Expectations
Re-Aligning Project-Stakeholders Expectations
 
Final Class Presentation on Project Audit and Closure.ppt
Final Class Presentation on Project Audit and Closure.pptFinal Class Presentation on Project Audit and Closure.ppt
Final Class Presentation on Project Audit and Closure.ppt
 
Spm unit 1
Spm unit 1Spm unit 1
Spm unit 1
 
New projectplandefinition1
New projectplandefinition1New projectplandefinition1
New projectplandefinition1
 
Modul 2.2: Project Charter
Modul 2.2: Project CharterModul 2.2: Project Charter
Modul 2.2: Project Charter
 
PROJECT SCOPE STATEMENTPURPOSE Generally describes the proje.docx
PROJECT SCOPE STATEMENTPURPOSE  Generally describes the proje.docxPROJECT SCOPE STATEMENTPURPOSE  Generally describes the proje.docx
PROJECT SCOPE STATEMENTPURPOSE Generally describes the proje.docx
 
D09 Recognize and Overcome Resistance
D09 Recognize and Overcome ResistanceD09 Recognize and Overcome Resistance
D09 Recognize and Overcome Resistance
 
D09 Recognize and Overcome Resistance
D09 Recognize and Overcome ResistanceD09 Recognize and Overcome Resistance
D09 Recognize and Overcome Resistance
 
Assignment
Assignment Assignment
Assignment
 
Project management lecture 11 slide 11
Project management lecture 11 slide 11Project management lecture 11 slide 11
Project management lecture 11 slide 11
 
Chap 2 Organization Strategy
Chap 2 Organization StrategyChap 2 Organization Strategy
Chap 2 Organization Strategy
 
Implementation and Deployment - Best Practices for Managing Change
Implementation and Deployment - Best Practices for Managing ChangeImplementation and Deployment - Best Practices for Managing Change
Implementation and Deployment - Best Practices for Managing Change
 
Project management processes Groups
Project management processes GroupsProject management processes Groups
Project management processes Groups
 
PPM-Lec2.pptx
PPM-Lec2.pptxPPM-Lec2.pptx
PPM-Lec2.pptx
 

Project Charter Template

  • 1. Safety First and Always Project Name Project Charter Executive Sponsors (SVP or SVP / VP): Short Description of Project: Supports Corporate Goal (rank numerically if selecting more than one): ___ Financial Strength ___ Customer Experience __ Reliable Energy Delivery Network ___ Operational Efficiency ___ Workplace Engagement __ Positive Company Image __ Make Safety a Priority Project Complexity (choose one): _____ Simple (short term, not cross-functional, 1-2 persons) _____ Focused (< 6 mos., < 8 people, little cross-org integration) _____ Full-Scale (up to 18 months, cross-organizational, critical integration points) _____ Complex (portfolio of several projects, cross-organizational, critical integration points) Project Uncertainty (choose one): Traditional (clearly defined goal & approach) _____ Adaptive (clearly defined goal, unclear approach) _____ Discovery (unclear goal, clear approach) _____ Extreme (unclear goal & approach) _____ Business Background and Impact Background of Project Problem Statement: Business Need: Business Benefit: - A - B - C - D Description of Current State: Description of Proposed Future State: End State Process Owner: 12/4/2015 1
  • 2. Safety First and Always Project Name Project Charter High Level Project Boundaries Project Scope: Provide a description of the project activities to be accomplished. This is often best done in an In-Frame/Out-of-Frame approach to clarify project boundaries. In Frame (in scope) Out of Frame (out of scope) List activities / focus areas that are included in the scope of this team’s work Clarify activities / focus areas that could be assumed to be part of the scope, but are not. Potential Labor Impact: High Level Cost Estimate for Project: Items to Fund Estimate High Level Obstacles & Risks for Project: Risk or Obstacle Mitigation Plan Dependencies on events, other projects, or other organizations: Proposed Success Metrics: 12/4/2015 2
  • 3. Safety First and Always Project Name Project Charter Project Details Participants in Project: Role Name General Resource Needs Sponsor Provide leadership and decision making as required. Steering Committee - Lead Coordinate and attend weekly meetings as well as make decisions as required. Steering Committee Attend weekly meetings and make decisions as required. Impacted by Project (key stakeholders): Roles & Responsibilities Name Win Project Plan: Key Milestones & Expected Completion Date: Milestones Key Deliverable (if applic.) Responsibility Timeframe Step 1 Step 2 Step 3 Step 4 Step 5 Step 6 Step 7 12/4/2015 3
  • 4. Safety First and Always Project Name Project Charter Communication Plan: Target Audiences What We Want Them to Know When How . Approvals Sponsor approval required. Approvals by others are optional and can be added below. Several options for the method of “signature” exist, including a physical signature on a hard copy of this document, via email attachment, etc. Title: Role: Sponsor Date: Name: Signature: Revision History Version/Date Description of Change 12/4/2015 4