The document outlines the production schedule for a student film, including dates for production and post-production tasks, locations, crew and cast needed, props and costumes, and equipment required. On January 30th, ordering props is scheduled to take place at the filmmaker's house. On February 13th, filming of Act 2 will occur at a second location, the theatre, with a camera operator, lighting crew, and two actors. Props including trophies and medals and costumes including a leotard and suit will be needed. Subsequent dates include making props, filming additional scenes, editing, exporting, uploading to YouTube, and evaluating the completed film.