This production schedule outlines the tasks and timeline for a project taking place from September 2016 through December 2016. It includes pre-production tasks like research, concept development, and drafting to be done by James H at various locations using a computer. Production tasks like filming are scheduled for November with James H, Elliot K, and Joe Elliott using a camera. Post-production work like editing the digipack cover and interior is assigned to James Head from November through December using Photoshop on a computer.