Er.Sartaj Singh Bajwa
 Preparation of production budget
 Devising manufacturing methods and
sequence of processes
 Prescribing the type of machines and
equipments
 To set plant layout
 To design tools
 To prepare operation sheets & instruction
cards
Er.Sartaj Singh Bajwa
 To undertake time and motion study for
operations
 To estimate material requirements
 To estimate manpower requirements
 To prepare master schedule of production
Er.Sartaj Singh Bajwa
 Planning
 Routing ( to decide the path & sequence of
production)
 Scheduling ( working out the time required to
perform each operation and also the time
required to complete the entire process)
 Production schedule (schedule the amount of work)
 Master schedule (schedule for weekly/monthly
production)
 Manufacturing schedule (schedule for type of process
to be used for production)
 Loading is assignment of work to the operators
at their machines or work places
Er.Sartaj Singh Bajwa
 Dispatching includes :
◦ Movement of material/tools to workstations
◦ Beginning of work on each station
◦ Recording of time and cost involved in each operation
◦ Supervision of work
 Following Up ( removing bottle necks in the flow
of work )
 Inspection
 Corrective ( rescheduling , repair & maintenance )
Er.Sartaj Singh Bajwa

Production planning and control

  • 1.
  • 2.
     Preparation ofproduction budget  Devising manufacturing methods and sequence of processes  Prescribing the type of machines and equipments  To set plant layout  To design tools  To prepare operation sheets & instruction cards Er.Sartaj Singh Bajwa
  • 3.
     To undertaketime and motion study for operations  To estimate material requirements  To estimate manpower requirements  To prepare master schedule of production Er.Sartaj Singh Bajwa
  • 4.
     Planning  Routing( to decide the path & sequence of production)  Scheduling ( working out the time required to perform each operation and also the time required to complete the entire process)  Production schedule (schedule the amount of work)  Master schedule (schedule for weekly/monthly production)  Manufacturing schedule (schedule for type of process to be used for production)  Loading is assignment of work to the operators at their machines or work places Er.Sartaj Singh Bajwa
  • 5.
     Dispatching includes: ◦ Movement of material/tools to workstations ◦ Beginning of work on each station ◦ Recording of time and cost involved in each operation ◦ Supervision of work  Following Up ( removing bottle necks in the flow of work )  Inspection  Corrective ( rescheduling , repair & maintenance ) Er.Sartaj Singh Bajwa