Lean Deployment Status2010
2Status Tracking
3Measurement of Cycle Time
4WC = 203’’WC = 203’’Cycle time diagram   Eliminate cycle time fluctuation
   Challenge cycle time with Takt Time5Standardized Work
6Standardized Work
7Standard Operation Procedure
8Tracking of Production (TRS)
9Tracking of Production (PPH)
10Tool Change Over Tracking
11Parts Board
12MIFA / MIFD
13Action Plan
14Kanban : Pull SystemWKPIKTruck preparationAAAaaaaABCbWKcbBBcWKbbbCCccbSupermarketAssemblylineProduction instruction Kanban loopWithdrawal Kanban loop

Production Efficiency July 2011