This document summarizes the findings of an inspection conducted by the Office of the National Rail Safety Regulator between Richmond and South Yarra in January 2019. The inspection found several areas of non-compliance regarding the role of Work Group Supervisors, management of Road Rail Vehicles, and fatigue risk management. Immediate actions are outlined focusing on these areas to ensure rail safety worker competencies are checked, plant is properly registered and managed, and fatigue risks are properly assessed and approved. Managers are to determine distribution of this alert to the appropriate areas within Metro Trains Melbourne.
Prj bul-04-2019 focus areas for in-field inspections
1. REFERENCE
PRJ-BUL-04-2019
ISSUE DATE
07/03/2019
CONTACT
Joseph Le,
joseph.le@metrotrains.com.au
L4-SQE-FOR-141(1)
Focus Areas for In-field Inspections
Background
The Office of the National Rail Safety Regulator (ONRSR) conducted an inspection between
Richmond and South Yarra between 10th
and 11th
of January 2019. Focus was placed on the
role of the Work Group Supervisor (WGS), management of Road Rail Vehicles (RRVs) and
Fatigue Risk Management.
ONRSR Inspection Findings
During the inspection the ONRSR team spoke to WGSs at various locations to verify that
they were conducting their roles and accountabilities in accordance with “Planning Work Site
Protection in the Rail Corridor” procedure L1-SQE-PRO-054 (Version 6).
Whilst WGS roles and accountabilities are clearly defined within MTM’s procedure several
areas of non-compliance were found:
Person(s) performing the role of WGS in respect of Railway Operations did not have
the necessary tools to check and validate rail safety worker competencies
Person(s) performing the role of WGS in respect of Railway Operations did not have
the necessary tools to validate the network acceptance status of RRVs
Person(s) performing the role of WGS in respect of Railway Operations were not
trained and inducted, and have an understanding of their work roles and
responsibilities in accordance with L1-SQE-PRO-054
Through inspection of the management of RRVs several areas of non-compliance were
found:
Several operators did not complete a Road Rail Usage Report and Pre-Start Vehicle
daily check. Accordingly, there was no evidence to demonstrate that the RRV was in
proper working order and therefore safe to use
Several RRVs did not contain Safe Work Method Statements (SWMS). Accordingly,
there was no evidence to demonstrate that the rail safety workers on site had been
inducted into the safe working in and around the RRV
Several RRVs did not contain a log book to report defects. Accordingly, there was no
evidence to demonstrate that the RRV did not contain defects and therefore safe to
use
Several RRV did not contain a vehicle operations manual. Accordingly, there was no
evidence to demonstrate that a person using the RRV had all the necessary
information regarding the proper use of the RRV
Through inspection of the fatigue risk management arrangements several areas of non-
compliance were found:
A number of rail safety workers had worked excessive hours during a two week
period, resulting in breaches of fatigue risk management procedure
There was no evidence to demonstrate that risk assessments were undertaken to
assess variances to the planned hours of work
There was no evidence of who had approved such risk assessments on these
variances
2. REFERENCE
PRJ-BUL-04-2019
ISSUE DATE
07/03/2019
CONTACT
Joseph Le,
joseph.le@metrotrains.com.au
L4-SQE-FOR-141(1)
Immediate Actions
When performing your respective infield inspections, focus on the following areas:
WGS roles and accountabilities
understanding of L1-SQE-PRO-054 (Version 6)
installation of RIW App and understand its use to check rail safety workers
competencies
installation of PlantGUARD App and understand its use to check plant
registration
Note: You cannot perform WGS duties if the above areas cannot be satisfied.
Management of RRVs
operations manual stored on the vehicle as per L4-CHE-FOR-058
plant risk / hazard assessment on the vehicle as per L1-CHE-STD-007 and L4-
CHE-FOR-058
log book stored on the vehicle as per L4-CHE-FOR-058
SWMS for specific task(s) associated with RRV as per L1-CHE-STD-007
Daily running sheet / (track vehicle) usage report maintained and kept with RRV
as per L1-CHE-STD-007
Daily checks as per L2-CHE-PRO-005
Note: The RRV operation must cease if the above areas cannot be satisfied.
Fatigue Risk Management
risk assessments of variances to planned hours of work
appropriate MTM endorsements for risk assessments in relation to variances to
planned hours of work
Note: non-compliance with the above will result in related person(s) performing
rail safety work to cease their duties immediately.
Report any non-conformances via INX.
Authorised by
Tim Maher
Executive Director | Safety, Environment, and Risk
3. REFERENCE
PRJ-BUL-04-2019
ISSUE DATE
07/03/2019
CONTACT
Joseph Le,
joseph.le@metrotrains.com.au
L4-SQE-FOR-141(1)
The Responsible Manager is to determine the following:
Which areas in MTM are to be notified of this alert?
Check Code Division/Department
MTM Entire MTM Network
CHE Engineering / Chief Engineer
HMR People & Performance
INF Infrastructure Delivery
ELN Electrical Networks
OCS Operational Control Systems
SIG Signals & OCS
STF Structures & Facilities
TRK Track Delivery
OPS Operations
TSD Train Service Delivery
SWS Safeworking / Signalling
NOS Network Operations
SER Metrol
Customer Experience
STO Stations Customer Experience
AOS Authorised Officers
PRJ Projects & Planning
ROS Rolling Stock
SQE Safety, Environment & Risk
Other (e.g. Other Divisions/Departments or people not listed):
Which contractors should be notified of this alert?
Note: This is undertaken by MetroSafe through the Avetta portal. All contractors/third parties have previously been
tagged into their relevant MTM areas.
Check Division/Department
All MTM Contractors and Third Parties
Corporate
Infrastructure
Projects
Rolling Stock
Operations
How should this alert be distributed and/or acknowledged?
Note: This section may be amended by the Division dependent on best method of distribution
Check Division/Department
Issued via email
Placed on Noticeboards
Placed in staff pigeon holes / letterboxes
Delivered during toolbox discussions
Employees to acknowledge receipt
L4-SQE-FOR-070 Alert Register
Toolbox Attendance Records
Weekly Operational Notice (WON)
Other (specify):