Electrical Safety Inspection
OBJECTIVES OF ELECTRICAL SAFETY AUDIT
1. The purpose of an electrical safety inpsection or audit is to:
The purpose of an electrical safety inspection or audit is to identify potentially hazardous
electrical situations and provide corrective actions for these situation.
2. Determine electrical system & electrical safety compliance with:
– National Electrical Code
– NFPA 70E
– NFPA 70B
– OSHA 1910.331-335
3. Review and provide corrective actions for electrical safety work processes
4. Review and provide corrective actions for electrical maintenance tools
5. Identify potential cost savings and efficiencies through modifications of electrical system
SCOPE OF WORK & PROCESS
The Martin Technical Electrical Safety Inspection Report will focus on installations and safe work
practices at your site (s) based on the National Electrical Code, NFPA 70E, NFPA 70B, and OSHA
1910.331-335. This report will be conducted by a specialist who has a strong understanding of these
various standards/laws and who is field experienced in electrical plant environments. It is important to
point out that that these standards and laws can, based on the official making the inspection, be subjective
to interpretation and site situation. Additionally, installations, practices and procedures changed, modified
or altered following the inspection. Thus, this inspection report will be a foundation in working towards a
safer workplace for your employees.
The report will focus on the following categories:
– NEC Compliance
– OSHA / NFPA 70E Arc Flash & Electrical Safety Compliance
– Assured Equipment Grounding
– Ground Fault Circuit Interruption Protection
– Lock Out / Tag Out
– Qualified Electrical Worker Training
Each site visit will entail an inspection of equipment and installations to identify items from the service
point of your buildings down through the feeder circuits to various branch circuits. Please note that the
inspectors will be taking pictures. Martin Technical will also examine and assess your personnel and
workplace procedures. Thus, Martin Technical will require all current recordkeeping on all electrical
maintenance personnel down to the maintenance shops, their tools, meters, PPE, workplace standards, and
maintenance record keeping and PM procedures. The Inspection/Report will itemize observations in
which CFR or NFPA standards not being met and the recommended corrective action. The criticality of
the items will be ranked on a subjective scale of 1 to 5. This ranking will serve as a “to do list” that your
maintenance and engineering teams can use as “road map” to corrective action.
For more information about electrical safety visit at: http://www.martechnical.com/

More Related Content

What's hot

Cygan Resume Senior Systems Engineer
Cygan Resume Senior Systems EngineerCygan Resume Senior Systems Engineer
Cygan Resume Senior Systems EngineerCarl Cygan, MSEE
 
Cygan Resume Senior Systems Engineer LinkedIn
Cygan Resume Senior Systems Engineer LinkedInCygan Resume Senior Systems Engineer LinkedIn
Cygan Resume Senior Systems Engineer LinkedInCarl Cygan, MSEE
 
CEP-Capabilities Listing SellSheet
CEP-Capabilities Listing SellSheetCEP-Capabilities Listing SellSheet
CEP-Capabilities Listing SellSheetBrian V. Wilson
 
Eric Bledsoe IT Resume
Eric Bledsoe IT ResumeEric Bledsoe IT Resume
Eric Bledsoe IT ResumeEric Bledsoe
 
VRM Online Support | Solution Far Beyond Classical Condition Monitoring
VRM Online Support | Solution Far Beyond Classical Condition MonitoringVRM Online Support | Solution Far Beyond Classical Condition Monitoring
VRM Online Support | Solution Far Beyond Classical Condition MonitoringLOESCHE
 
Smarter eit smarter electrical inspection and testing - slideshare 31 may2016
Smarter eit  smarter electrical inspection and testing - slideshare 31 may2016Smarter eit  smarter electrical inspection and testing - slideshare 31 may2016
Smarter eit smarter electrical inspection and testing - slideshare 31 may2016michaeljoubert
 
NFPA 70E Electrical Safety Resources
NFPA 70E Electrical Safety ResourcesNFPA 70E Electrical Safety Resources
NFPA 70E Electrical Safety ResourcesComplianceSigns, LLC
 
Preventive Maintenance Strategies for Power Distribution Systems- Charles Alvis
Preventive Maintenance Strategies for Power Distribution Systems- Charles AlvisPreventive Maintenance Strategies for Power Distribution Systems- Charles Alvis
Preventive Maintenance Strategies for Power Distribution Systems- Charles AlvisSchneider Electric
 
Instrumentation supervisor cv
Instrumentation supervisor cv Instrumentation supervisor cv
Instrumentation supervisor cv Yacine Sayad
 

What's hot (18)

Cygan Resume Senior Systems Engineer
Cygan Resume Senior Systems EngineerCygan Resume Senior Systems Engineer
Cygan Resume Senior Systems Engineer
 
Cygan Resume Senior Systems Engineer LinkedIn
Cygan Resume Senior Systems Engineer LinkedInCygan Resume Senior Systems Engineer LinkedIn
Cygan Resume Senior Systems Engineer LinkedIn
 
Corporate Brochure
Corporate BrochureCorporate Brochure
Corporate Brochure
 
casestudy1indd
casestudy1inddcasestudy1indd
casestudy1indd
 
Shahzad Khan
Shahzad KhanShahzad Khan
Shahzad Khan
 
CEP-Capabilities Listing SellSheet
CEP-Capabilities Listing SellSheetCEP-Capabilities Listing SellSheet
CEP-Capabilities Listing SellSheet
 
Eric Bledsoe IT Resume
Eric Bledsoe IT ResumeEric Bledsoe IT Resume
Eric Bledsoe IT Resume
 
VRM Online Support | Solution Far Beyond Classical Condition Monitoring
VRM Online Support | Solution Far Beyond Classical Condition MonitoringVRM Online Support | Solution Far Beyond Classical Condition Monitoring
VRM Online Support | Solution Far Beyond Classical Condition Monitoring
 
Smarter eit smarter electrical inspection and testing - slideshare 31 may2016
Smarter eit  smarter electrical inspection and testing - slideshare 31 may2016Smarter eit  smarter electrical inspection and testing - slideshare 31 may2016
Smarter eit smarter electrical inspection and testing - slideshare 31 may2016
 
EngineerResume
EngineerResumeEngineerResume
EngineerResume
 
NFPA 70E Electrical Safety Resources
NFPA 70E Electrical Safety ResourcesNFPA 70E Electrical Safety Resources
NFPA 70E Electrical Safety Resources
 
Masood cv
Masood cvMasood cv
Masood cv
 
Resume 091115
Resume 091115Resume 091115
Resume 091115
 
Preventive Maintenance Strategies for Power Distribution Systems- Charles Alvis
Preventive Maintenance Strategies for Power Distribution Systems- Charles AlvisPreventive Maintenance Strategies for Power Distribution Systems- Charles Alvis
Preventive Maintenance Strategies for Power Distribution Systems- Charles Alvis
 
Instrumentation supervisor cv
Instrumentation supervisor cv Instrumentation supervisor cv
Instrumentation supervisor cv
 
New2016Resume
New2016ResumeNew2016Resume
New2016Resume
 
Abrego, Francisco Javier - CV - 2016
Abrego, Francisco Javier - CV -  2016Abrego, Francisco Javier - CV -  2016
Abrego, Francisco Javier - CV - 2016
 
CV_E. R Caoile_rev
CV_E. R Caoile_revCV_E. R Caoile_rev
CV_E. R Caoile_rev
 

Similar to Electrical safety inspection

Electrical Safety Audit - FM Pvt ltd.pptx
Electrical Safety Audit - FM Pvt ltd.pptxElectrical Safety Audit - FM Pvt ltd.pptx
Electrical Safety Audit - FM Pvt ltd.pptxSyed Atif Naseem
 
arcflashsolutions2-160226132648
arcflashsolutions2-160226132648arcflashsolutions2-160226132648
arcflashsolutions2-160226132648Brian Y. Smith
 
Sespl Profile for Energy Auditing
Sespl Profile for Energy AuditingSespl Profile for Energy Auditing
Sespl Profile for Energy AuditingMaxpromotion
 
Trailblazers (Power) Install Substation Switchgear
Trailblazers (Power) Install Substation SwitchgearTrailblazers (Power) Install Substation Switchgear
Trailblazers (Power) Install Substation SwitchgearMarty Stevenson
 
Electrical FM Compiled.pdf
Electrical  FM Compiled.pdfElectrical  FM Compiled.pdf
Electrical FM Compiled.pdfSyed Atif Naseem
 
MM Electrical Safety Policy-Procedure draft 2
MM Electrical Safety Policy-Procedure draft 2MM Electrical Safety Policy-Procedure draft 2
MM Electrical Safety Policy-Procedure draft 2Benjamin Canaday
 
10 Essential steps to support arc flash incident energy analysis
10 Essential steps to support arc flash incident energy analysis10 Essential steps to support arc flash incident energy analysis
10 Essential steps to support arc flash incident energy analysisEaton Electrical
 
Lockout/Tagout Training (Contractor Version)
Lockout/Tagout Training (Contractor Version)Lockout/Tagout Training (Contractor Version)
Lockout/Tagout Training (Contractor Version)Panduit Safety
 
UPDATED Electrical Assembler Resume
UPDATED  Electrical Assembler ResumeUPDATED  Electrical Assembler Resume
UPDATED Electrical Assembler ResumePamela Bundros
 
Arc Flash - Safe Working On Or Near High Energy Electrical Sources (IET 2015)
Arc Flash - Safe Working On Or Near High Energy Electrical Sources (IET 2015)Arc Flash - Safe Working On Or Near High Energy Electrical Sources (IET 2015)
Arc Flash - Safe Working On Or Near High Energy Electrical Sources (IET 2015)Thorne & Derrick International
 
Arc Flash Calculations What Does It All Mean
Arc Flash Calculations What Does It All MeanArc Flash Calculations What Does It All Mean
Arc Flash Calculations What Does It All MeanB Bhargav Reddy
 
Electrical safety handbook
Electrical safety handbookElectrical safety handbook
Electrical safety handbookchandni shah
 
Jon_MacInnis_Electrical
Jon_MacInnis_ElectricalJon_MacInnis_Electrical
Jon_MacInnis_ElectricalJon MacInnis
 
Adil Field Instrument without apprentice Cv
Adil Field Instrument  without apprentice CvAdil Field Instrument  without apprentice Cv
Adil Field Instrument without apprentice CvMuhammad Adil
 

Similar to Electrical safety inspection (20)

EDS Services
EDS ServicesEDS Services
EDS Services
 
Electrical Safety Audit - FM Pvt ltd.pptx
Electrical Safety Audit - FM Pvt ltd.pptxElectrical Safety Audit - FM Pvt ltd.pptx
Electrical Safety Audit - FM Pvt ltd.pptx
 
Arc Flash Solutions
Arc Flash SolutionsArc Flash Solutions
Arc Flash Solutions
 
arcflashsolutions2-160226132648
arcflashsolutions2-160226132648arcflashsolutions2-160226132648
arcflashsolutions2-160226132648
 
Sespl Profile for Energy Auditing
Sespl Profile for Energy AuditingSespl Profile for Energy Auditing
Sespl Profile for Energy Auditing
 
My final resume
My final resumeMy final resume
My final resume
 
078 switchgear install 1.0
078 switchgear install 1.0078 switchgear install 1.0
078 switchgear install 1.0
 
Trailblazers (Power) Install Substation Switchgear
Trailblazers (Power) Install Substation SwitchgearTrailblazers (Power) Install Substation Switchgear
Trailblazers (Power) Install Substation Switchgear
 
Electrical FM Compiled.pdf
Electrical  FM Compiled.pdfElectrical  FM Compiled.pdf
Electrical FM Compiled.pdf
 
MM Electrical Safety Policy-Procedure draft 2
MM Electrical Safety Policy-Procedure draft 2MM Electrical Safety Policy-Procedure draft 2
MM Electrical Safety Policy-Procedure draft 2
 
10 Essential steps to support arc flash incident energy analysis
10 Essential steps to support arc flash incident energy analysis10 Essential steps to support arc flash incident energy analysis
10 Essential steps to support arc flash incident energy analysis
 
Lockout/Tagout Training (Contractor Version)
Lockout/Tagout Training (Contractor Version)Lockout/Tagout Training (Contractor Version)
Lockout/Tagout Training (Contractor Version)
 
UPDATED Electrical Assembler Resume
UPDATED  Electrical Assembler ResumeUPDATED  Electrical Assembler Resume
UPDATED Electrical Assembler Resume
 
CV Electrical Technician
CV Electrical TechnicianCV Electrical Technician
CV Electrical Technician
 
Arc Flash - Safe Working On Or Near High Energy Electrical Sources (IET 2015)
Arc Flash - Safe Working On Or Near High Energy Electrical Sources (IET 2015)Arc Flash - Safe Working On Or Near High Energy Electrical Sources (IET 2015)
Arc Flash - Safe Working On Or Near High Energy Electrical Sources (IET 2015)
 
Arc Flash Calculations What Does It All Mean
Arc Flash Calculations What Does It All MeanArc Flash Calculations What Does It All Mean
Arc Flash Calculations What Does It All Mean
 
Electrical safety handbook
Electrical safety handbookElectrical safety handbook
Electrical safety handbook
 
Jon_MacInnis_Electrical
Jon_MacInnis_ElectricalJon_MacInnis_Electrical
Jon_MacInnis_Electrical
 
Adil Field Instrument without apprentice Cv
Adil Field Instrument  without apprentice CvAdil Field Instrument  without apprentice Cv
Adil Field Instrument without apprentice Cv
 
2015 nfpa 70 e changes
2015 nfpa 70 e changes2015 nfpa 70 e changes
2015 nfpa 70 e changes
 

Electrical safety inspection

  • 1. Electrical Safety Inspection OBJECTIVES OF ELECTRICAL SAFETY AUDIT 1. The purpose of an electrical safety inpsection or audit is to: The purpose of an electrical safety inspection or audit is to identify potentially hazardous electrical situations and provide corrective actions for these situation. 2. Determine electrical system & electrical safety compliance with: – National Electrical Code – NFPA 70E – NFPA 70B – OSHA 1910.331-335 3. Review and provide corrective actions for electrical safety work processes 4. Review and provide corrective actions for electrical maintenance tools 5. Identify potential cost savings and efficiencies through modifications of electrical system SCOPE OF WORK & PROCESS The Martin Technical Electrical Safety Inspection Report will focus on installations and safe work practices at your site (s) based on the National Electrical Code, NFPA 70E, NFPA 70B, and OSHA 1910.331-335. This report will be conducted by a specialist who has a strong understanding of these various standards/laws and who is field experienced in electrical plant environments. It is important to point out that that these standards and laws can, based on the official making the inspection, be subjective to interpretation and site situation. Additionally, installations, practices and procedures changed, modified or altered following the inspection. Thus, this inspection report will be a foundation in working towards a safer workplace for your employees. The report will focus on the following categories: – NEC Compliance – OSHA / NFPA 70E Arc Flash & Electrical Safety Compliance – Assured Equipment Grounding – Ground Fault Circuit Interruption Protection – Lock Out / Tag Out – Qualified Electrical Worker Training Each site visit will entail an inspection of equipment and installations to identify items from the service point of your buildings down through the feeder circuits to various branch circuits. Please note that the inspectors will be taking pictures. Martin Technical will also examine and assess your personnel and workplace procedures. Thus, Martin Technical will require all current recordkeeping on all electrical maintenance personnel down to the maintenance shops, their tools, meters, PPE, workplace standards, and maintenance record keeping and PM procedures. The Inspection/Report will itemize observations in which CFR or NFPA standards not being met and the recommended corrective action. The criticality of the items will be ranked on a subjective scale of 1 to 5. This ranking will serve as a “to do list” that your maintenance and engineering teams can use as “road map” to corrective action. For more information about electrical safety visit at: http://www.martechnical.com/