PRISONS INFORMATION
SYSTEM
SUPERVISER :ENGR. ADNAN ALI
PRESENTED BY:
• FARID ULLAH KHAN
• FAIZUL HASSAN
• GHULAM SHABBIR
PROJECT OVERVIEW
• A Computerized Database System
• Keep The Records
• Manage The Records
• Reduce Inconsistency
• Saves Time
• Secures Data And Avoid Data Manipulation
• Powerful Searching
• Generates Report
2
PROJECT SCOPE
• To provide maximum services to the user
• Elimination of duplicate and inconsistent record keeping
• Faster response
• Facilitate for maintenance of details of criminals
• To reduce the errors and the paper work
• Generate various other reports required from time to time
• Introducing element of transparency in the working of police
3
SYSTEM ANALYSIS
• User friendliness with various controls
• System makes the overall project management much easier and flexible
• There is no risk of data mismanagement at any level
• It provides high level of security with different level of authentication
TOOLS
 DATABASE : MYSQL
 DEVELOPMENT TOOL : DREAM WEAVER / SUBLIME TEXT
 LANGUAGE : HTML / CSS / PHP
SYSTEM DESIGN
• Activity Diagram( is the highest level view of a system )
• Level-0 Diagram ( is the first level of data flow diagram )
• Entity Relationship Diagram ( graphical representation of entities and their relationships )
• Snapshots Of PIS
6
Snapshot 7
ENTITY RELATIONSHIP DIAGRAM (ERD) 11
Snapshots 12
BCRYPT HASHING ALGORITHM

Prisons Information System

  • 1.
    PRISONS INFORMATION SYSTEM SUPERVISER :ENGR.ADNAN ALI PRESENTED BY: • FARID ULLAH KHAN • FAIZUL HASSAN • GHULAM SHABBIR
  • 2.
    PROJECT OVERVIEW • AComputerized Database System • Keep The Records • Manage The Records • Reduce Inconsistency • Saves Time • Secures Data And Avoid Data Manipulation • Powerful Searching • Generates Report 2
  • 3.
    PROJECT SCOPE • Toprovide maximum services to the user • Elimination of duplicate and inconsistent record keeping • Faster response • Facilitate for maintenance of details of criminals • To reduce the errors and the paper work • Generate various other reports required from time to time • Introducing element of transparency in the working of police 3
  • 4.
    SYSTEM ANALYSIS • Userfriendliness with various controls • System makes the overall project management much easier and flexible • There is no risk of data mismanagement at any level • It provides high level of security with different level of authentication
  • 5.
    TOOLS  DATABASE :MYSQL  DEVELOPMENT TOOL : DREAM WEAVER / SUBLIME TEXT  LANGUAGE : HTML / CSS / PHP
  • 6.
    SYSTEM DESIGN • ActivityDiagram( is the highest level view of a system ) • Level-0 Diagram ( is the first level of data flow diagram ) • Entity Relationship Diagram ( graphical representation of entities and their relationships ) • Snapshots Of PIS 6
  • 7.
  • 11.
  • 12.
  • 15.