SlideShare a Scribd company logo
• WHS Legislation
Statutory Law
Common Law
• WHS Act 2011
• Act, Regulations and Codes of Practice
• Acts - Duties, Incident notification,
Consultation, WHS enforcement
• Regulations  High risk activities, Hazardous
chemicals, Asbestos
• Codes of Practice  Reference guides in
Plain English
SafeWork Australia
https://www.safeworkaustralia.go
WorkSafe ACT
https://www.worksafe.act.gov.au/
Key Players (PCBU, Officers and Workers)
High Risk Construction Activities
SWMS – Safe Work Method Statement
A PCBU is required to have a SWMS prepared for high risk
construction work before that work commences.
JSEA – Job Safety and Environment Analysis
Means the process used to break a task into steps; identify the
potential hazards and control measures; and implement these so that
the task can be completed safely.

More Related Content

Similar to Presentation2.pptx

Jimmy Walker, CSP
Jimmy Walker, CSPJimmy Walker, CSP
Jimmy Walker, CSP
Jimmy Walker
 
Joseph Nilemoa - CV 050615
Joseph Nilemoa - CV 050615Joseph Nilemoa - CV 050615
Joseph Nilemoa - CV 050615
Joe Nilemoa
 
CV-Manower-28Dec15
CV-Manower-28Dec15CV-Manower-28Dec15
CV-Manower-28Dec15
Mohammad Manower Hussain
 
Sharad Kumar Singh
Sharad Kumar SinghSharad Kumar Singh
Sharad Kumar Singh
Sharad Kumar Singh
 
Ohs risk management sydney ohs dilligenz
Ohs risk management sydney  ohs dilligenzOhs risk management sydney  ohs dilligenz
Ohs risk management sydney ohs dilligenz
ohsdilligen
 
Identify Construction Hazards and Select Risk Control Strategies Part 4.pptx
Identify Construction Hazards and Select Risk Control Strategies Part 4.pptxIdentify Construction Hazards and Select Risk Control Strategies Part 4.pptx
Identify Construction Hazards and Select Risk Control Strategies Part 4.pptx
Canberra Institute of technology
 
Veeraragavan-CV
Veeraragavan-CVVeeraragavan-CV
Curriculum vitae
Curriculum vitae Curriculum vitae
Curriculum vitae
Heny Manula
 
SHARON CARVOLTH - Resume
SHARON CARVOLTH - ResumeSHARON CARVOLTH - Resume
SHARON CARVOLTH - Resume
Sharon Carvolth
 
Hse resume(brief) roy stanley amuegbunem8z
Hse resume(brief)   roy stanley amuegbunem8zHse resume(brief)   roy stanley amuegbunem8z
Hse resume(brief) roy stanley amuegbunem8z
Roy Stanley Amuegbunem
 
Alan Stewart(AJ) CV 2
Alan Stewart(AJ) CV 2Alan Stewart(AJ) CV 2
Alan Stewart(AJ) CV 2
Alan Stewart
 
WHS presentation v3 (CPCCOHS2001A)
WHS presentation v3 (CPCCOHS2001A)WHS presentation v3 (CPCCOHS2001A)
WHS presentation v3 (CPCCOHS2001A)
Steve Forbes-Taber
 
Bruce Coull Resume Sep 2015 no referees
Bruce Coull Resume Sep 2015 no refereesBruce Coull Resume Sep 2015 no referees
Bruce Coull Resume Sep 2015 no referees
Bruce Coull
 
YaserSoltanCoverLetter
YaserSoltanCoverLetterYaserSoltanCoverLetter
YaserSoltanCoverLetter
Yaser Soltan
 
New resume 2015
New resume 2015New resume 2015
New resume 2015
Dustin Jones
 
Resume Craig Edwards 042016
Resume  Craig Edwards 042016Resume  Craig Edwards 042016
Resume Craig Edwards 042016
Craig Edwards
 
Berdian van wyk resume HSE manager v1
Berdian van wyk  resume HSE manager v1Berdian van wyk  resume HSE manager v1
Berdian van wyk resume HSE manager v1
Berdian van wyk
 
Midlands EIT
Midlands EITMidlands EIT
Midlands EIT
Dewald Els
 
Work Health and Safety changes in Australia
Work Health and Safety changes in AustraliaWork Health and Safety changes in Australia
Work Health and Safety changes in Australia
Occupational Health and Safety Industry Group
 
Sohail resume Safety specialist
Sohail resume Safety specialistSohail resume Safety specialist
Sohail resume Safety specialist
Sohail Akbar
 

Similar to Presentation2.pptx (20)

Jimmy Walker, CSP
Jimmy Walker, CSPJimmy Walker, CSP
Jimmy Walker, CSP
 
Joseph Nilemoa - CV 050615
Joseph Nilemoa - CV 050615Joseph Nilemoa - CV 050615
Joseph Nilemoa - CV 050615
 
CV-Manower-28Dec15
CV-Manower-28Dec15CV-Manower-28Dec15
CV-Manower-28Dec15
 
Sharad Kumar Singh
Sharad Kumar SinghSharad Kumar Singh
Sharad Kumar Singh
 
Ohs risk management sydney ohs dilligenz
Ohs risk management sydney  ohs dilligenzOhs risk management sydney  ohs dilligenz
Ohs risk management sydney ohs dilligenz
 
Identify Construction Hazards and Select Risk Control Strategies Part 4.pptx
Identify Construction Hazards and Select Risk Control Strategies Part 4.pptxIdentify Construction Hazards and Select Risk Control Strategies Part 4.pptx
Identify Construction Hazards and Select Risk Control Strategies Part 4.pptx
 
Veeraragavan-CV
Veeraragavan-CVVeeraragavan-CV
Veeraragavan-CV
 
Curriculum vitae
Curriculum vitae Curriculum vitae
Curriculum vitae
 
SHARON CARVOLTH - Resume
SHARON CARVOLTH - ResumeSHARON CARVOLTH - Resume
SHARON CARVOLTH - Resume
 
Hse resume(brief) roy stanley amuegbunem8z
Hse resume(brief)   roy stanley amuegbunem8zHse resume(brief)   roy stanley amuegbunem8z
Hse resume(brief) roy stanley amuegbunem8z
 
Alan Stewart(AJ) CV 2
Alan Stewart(AJ) CV 2Alan Stewart(AJ) CV 2
Alan Stewart(AJ) CV 2
 
WHS presentation v3 (CPCCOHS2001A)
WHS presentation v3 (CPCCOHS2001A)WHS presentation v3 (CPCCOHS2001A)
WHS presentation v3 (CPCCOHS2001A)
 
Bruce Coull Resume Sep 2015 no referees
Bruce Coull Resume Sep 2015 no refereesBruce Coull Resume Sep 2015 no referees
Bruce Coull Resume Sep 2015 no referees
 
YaserSoltanCoverLetter
YaserSoltanCoverLetterYaserSoltanCoverLetter
YaserSoltanCoverLetter
 
New resume 2015
New resume 2015New resume 2015
New resume 2015
 
Resume Craig Edwards 042016
Resume  Craig Edwards 042016Resume  Craig Edwards 042016
Resume Craig Edwards 042016
 
Berdian van wyk resume HSE manager v1
Berdian van wyk  resume HSE manager v1Berdian van wyk  resume HSE manager v1
Berdian van wyk resume HSE manager v1
 
Midlands EIT
Midlands EITMidlands EIT
Midlands EIT
 
Work Health and Safety changes in Australia
Work Health and Safety changes in AustraliaWork Health and Safety changes in Australia
Work Health and Safety changes in Australia
 
Sohail resume Safety specialist
Sohail resume Safety specialistSohail resume Safety specialist
Sohail resume Safety specialist
 

Recently uploaded

2. protection of river banks and bed erosion protection works.ppt
2. protection of river banks and bed erosion protection works.ppt2. protection of river banks and bed erosion protection works.ppt
2. protection of river banks and bed erosion protection works.ppt
abdatawakjira
 
UNIT 4 LINEAR INTEGRATED CIRCUITS-DIGITAL ICS
UNIT 4 LINEAR INTEGRATED CIRCUITS-DIGITAL ICSUNIT 4 LINEAR INTEGRATED CIRCUITS-DIGITAL ICS
UNIT 4 LINEAR INTEGRATED CIRCUITS-DIGITAL ICS
vmspraneeth
 
Object Oriented Analysis and Design - OOAD
Object Oriented Analysis and Design - OOADObject Oriented Analysis and Design - OOAD
Object Oriented Analysis and Design - OOAD
PreethaV16
 
Data Driven Maintenance | UReason Webinar
Data Driven Maintenance | UReason WebinarData Driven Maintenance | UReason Webinar
Data Driven Maintenance | UReason Webinar
UReason
 
Open Channel Flow: fluid flow with a free surface
Open Channel Flow: fluid flow with a free surfaceOpen Channel Flow: fluid flow with a free surface
Open Channel Flow: fluid flow with a free surface
Indrajeet sahu
 
4. Mosca vol I -Fisica-Tipler-5ta-Edicion-Vol-1.pdf
4. Mosca vol I -Fisica-Tipler-5ta-Edicion-Vol-1.pdf4. Mosca vol I -Fisica-Tipler-5ta-Edicion-Vol-1.pdf
4. Mosca vol I -Fisica-Tipler-5ta-Edicion-Vol-1.pdf
Gino153088
 
ITSM Integration with MuleSoft.pptx
ITSM  Integration with MuleSoft.pptxITSM  Integration with MuleSoft.pptx
ITSM Integration with MuleSoft.pptx
VANDANAMOHANGOUDA
 
smart pill dispenser is designed to improve medication adherence and safety f...
smart pill dispenser is designed to improve medication adherence and safety f...smart pill dispenser is designed to improve medication adherence and safety f...
smart pill dispenser is designed to improve medication adherence and safety f...
um7474492
 
Software Engineering and Project Management - Software Testing + Agile Method...
Software Engineering and Project Management - Software Testing + Agile Method...Software Engineering and Project Management - Software Testing + Agile Method...
Software Engineering and Project Management - Software Testing + Agile Method...
Prakhyath Rai
 
Accident detection system project report.pdf
Accident detection system project report.pdfAccident detection system project report.pdf
Accident detection system project report.pdf
Kamal Acharya
 
Tools & Techniques for Commissioning and Maintaining PV Systems W-Animations ...
Tools & Techniques for Commissioning and Maintaining PV Systems W-Animations ...Tools & Techniques for Commissioning and Maintaining PV Systems W-Animations ...
Tools & Techniques for Commissioning and Maintaining PV Systems W-Animations ...
Transcat
 
一比一原版(osu毕业证书)美国俄勒冈州立大学毕业证如何办理
一比一原版(osu毕业证书)美国俄勒冈州立大学毕业证如何办理一比一原版(osu毕业证书)美国俄勒冈州立大学毕业证如何办理
一比一原版(osu毕业证书)美国俄勒冈州立大学毕业证如何办理
upoux
 
Height and depth gauge linear metrology.pdf
Height and depth gauge linear metrology.pdfHeight and depth gauge linear metrology.pdf
Height and depth gauge linear metrology.pdf
q30122000
 
SENTIMENT ANALYSIS ON PPT AND Project template_.pptx
SENTIMENT ANALYSIS ON PPT AND Project template_.pptxSENTIMENT ANALYSIS ON PPT AND Project template_.pptx
SENTIMENT ANALYSIS ON PPT AND Project template_.pptx
b0754201
 
一比一原版(uoft毕业证书)加拿大多伦多大学毕业证如何办理
一比一原版(uoft毕业证书)加拿大多伦多大学毕业证如何办理一比一原版(uoft毕业证书)加拿大多伦多大学毕业证如何办理
一比一原版(uoft毕业证书)加拿大多伦多大学毕业证如何办理
sydezfe
 
一比一原版(uofo毕业证书)美国俄勒冈大学毕业证如何办理
一比一原版(uofo毕业证书)美国俄勒冈大学毕业证如何办理一比一原版(uofo毕业证书)美国俄勒冈大学毕业证如何办理
一比一原版(uofo毕业证书)美国俄勒冈大学毕业证如何办理
upoux
 
NATURAL DEEP EUTECTIC SOLVENTS AS ANTI-FREEZING AGENT
NATURAL DEEP EUTECTIC SOLVENTS AS ANTI-FREEZING AGENTNATURAL DEEP EUTECTIC SOLVENTS AS ANTI-FREEZING AGENT
NATURAL DEEP EUTECTIC SOLVENTS AS ANTI-FREEZING AGENT
Addu25809
 
一比一原版(USF毕业证)旧金山大学毕业证如何办理
一比一原版(USF毕业证)旧金山大学毕业证如何办理一比一原版(USF毕业证)旧金山大学毕业证如何办理
一比一原版(USF毕业证)旧金山大学毕业证如何办理
uqyfuc
 
Optimizing Gradle Builds - Gradle DPE Tour Berlin 2024
Optimizing Gradle Builds - Gradle DPE Tour Berlin 2024Optimizing Gradle Builds - Gradle DPE Tour Berlin 2024
Optimizing Gradle Builds - Gradle DPE Tour Berlin 2024
Sinan KOZAK
 
TIME TABLE MANAGEMENT SYSTEM testing.pptx
TIME TABLE MANAGEMENT SYSTEM testing.pptxTIME TABLE MANAGEMENT SYSTEM testing.pptx
TIME TABLE MANAGEMENT SYSTEM testing.pptx
CVCSOfficial
 

Recently uploaded (20)

2. protection of river banks and bed erosion protection works.ppt
2. protection of river banks and bed erosion protection works.ppt2. protection of river banks and bed erosion protection works.ppt
2. protection of river banks and bed erosion protection works.ppt
 
UNIT 4 LINEAR INTEGRATED CIRCUITS-DIGITAL ICS
UNIT 4 LINEAR INTEGRATED CIRCUITS-DIGITAL ICSUNIT 4 LINEAR INTEGRATED CIRCUITS-DIGITAL ICS
UNIT 4 LINEAR INTEGRATED CIRCUITS-DIGITAL ICS
 
Object Oriented Analysis and Design - OOAD
Object Oriented Analysis and Design - OOADObject Oriented Analysis and Design - OOAD
Object Oriented Analysis and Design - OOAD
 
Data Driven Maintenance | UReason Webinar
Data Driven Maintenance | UReason WebinarData Driven Maintenance | UReason Webinar
Data Driven Maintenance | UReason Webinar
 
Open Channel Flow: fluid flow with a free surface
Open Channel Flow: fluid flow with a free surfaceOpen Channel Flow: fluid flow with a free surface
Open Channel Flow: fluid flow with a free surface
 
4. Mosca vol I -Fisica-Tipler-5ta-Edicion-Vol-1.pdf
4. Mosca vol I -Fisica-Tipler-5ta-Edicion-Vol-1.pdf4. Mosca vol I -Fisica-Tipler-5ta-Edicion-Vol-1.pdf
4. Mosca vol I -Fisica-Tipler-5ta-Edicion-Vol-1.pdf
 
ITSM Integration with MuleSoft.pptx
ITSM  Integration with MuleSoft.pptxITSM  Integration with MuleSoft.pptx
ITSM Integration with MuleSoft.pptx
 
smart pill dispenser is designed to improve medication adherence and safety f...
smart pill dispenser is designed to improve medication adherence and safety f...smart pill dispenser is designed to improve medication adherence and safety f...
smart pill dispenser is designed to improve medication adherence and safety f...
 
Software Engineering and Project Management - Software Testing + Agile Method...
Software Engineering and Project Management - Software Testing + Agile Method...Software Engineering and Project Management - Software Testing + Agile Method...
Software Engineering and Project Management - Software Testing + Agile Method...
 
Accident detection system project report.pdf
Accident detection system project report.pdfAccident detection system project report.pdf
Accident detection system project report.pdf
 
Tools & Techniques for Commissioning and Maintaining PV Systems W-Animations ...
Tools & Techniques for Commissioning and Maintaining PV Systems W-Animations ...Tools & Techniques for Commissioning and Maintaining PV Systems W-Animations ...
Tools & Techniques for Commissioning and Maintaining PV Systems W-Animations ...
 
一比一原版(osu毕业证书)美国俄勒冈州立大学毕业证如何办理
一比一原版(osu毕业证书)美国俄勒冈州立大学毕业证如何办理一比一原版(osu毕业证书)美国俄勒冈州立大学毕业证如何办理
一比一原版(osu毕业证书)美国俄勒冈州立大学毕业证如何办理
 
Height and depth gauge linear metrology.pdf
Height and depth gauge linear metrology.pdfHeight and depth gauge linear metrology.pdf
Height and depth gauge linear metrology.pdf
 
SENTIMENT ANALYSIS ON PPT AND Project template_.pptx
SENTIMENT ANALYSIS ON PPT AND Project template_.pptxSENTIMENT ANALYSIS ON PPT AND Project template_.pptx
SENTIMENT ANALYSIS ON PPT AND Project template_.pptx
 
一比一原版(uoft毕业证书)加拿大多伦多大学毕业证如何办理
一比一原版(uoft毕业证书)加拿大多伦多大学毕业证如何办理一比一原版(uoft毕业证书)加拿大多伦多大学毕业证如何办理
一比一原版(uoft毕业证书)加拿大多伦多大学毕业证如何办理
 
一比一原版(uofo毕业证书)美国俄勒冈大学毕业证如何办理
一比一原版(uofo毕业证书)美国俄勒冈大学毕业证如何办理一比一原版(uofo毕业证书)美国俄勒冈大学毕业证如何办理
一比一原版(uofo毕业证书)美国俄勒冈大学毕业证如何办理
 
NATURAL DEEP EUTECTIC SOLVENTS AS ANTI-FREEZING AGENT
NATURAL DEEP EUTECTIC SOLVENTS AS ANTI-FREEZING AGENTNATURAL DEEP EUTECTIC SOLVENTS AS ANTI-FREEZING AGENT
NATURAL DEEP EUTECTIC SOLVENTS AS ANTI-FREEZING AGENT
 
一比一原版(USF毕业证)旧金山大学毕业证如何办理
一比一原版(USF毕业证)旧金山大学毕业证如何办理一比一原版(USF毕业证)旧金山大学毕业证如何办理
一比一原版(USF毕业证)旧金山大学毕业证如何办理
 
Optimizing Gradle Builds - Gradle DPE Tour Berlin 2024
Optimizing Gradle Builds - Gradle DPE Tour Berlin 2024Optimizing Gradle Builds - Gradle DPE Tour Berlin 2024
Optimizing Gradle Builds - Gradle DPE Tour Berlin 2024
 
TIME TABLE MANAGEMENT SYSTEM testing.pptx
TIME TABLE MANAGEMENT SYSTEM testing.pptxTIME TABLE MANAGEMENT SYSTEM testing.pptx
TIME TABLE MANAGEMENT SYSTEM testing.pptx
 

Presentation2.pptx

  • 1.
  • 2. • WHS Legislation Statutory Law Common Law • WHS Act 2011 • Act, Regulations and Codes of Practice • Acts - Duties, Incident notification, Consultation, WHS enforcement • Regulations  High risk activities, Hazardous chemicals, Asbestos • Codes of Practice  Reference guides in Plain English
  • 3. SafeWork Australia https://www.safeworkaustralia.go WorkSafe ACT https://www.worksafe.act.gov.au/ Key Players (PCBU, Officers and Workers) High Risk Construction Activities SWMS – Safe Work Method Statement A PCBU is required to have a SWMS prepared for high risk construction work before that work commences. JSEA – Job Safety and Environment Analysis Means the process used to break a task into steps; identify the potential hazards and control measures; and implement these so that the task can be completed safely.