Ramanand Sharma completed a 4-week internship at Banaras Locomotive Works in Varanasi, India. He observed operations in the Loco Assembly Shop, where electric locomotives have their propulsion systems and auxiliary components installed. He also visited the Loco Frame Shop, which fabricates locomotive underframes using heavy fixtures, and the Engine Erection Shop, where locomotive engines are assembled. During the internship, Ramanand learned about the submerged arc, manual metal arc, and MIG welding processes used at the Heavy Welding Shop to construct locomotive components.