The document outlines the manpower and production capacity for two shifts of an assembly machine fabrication process. The first shift has one foreman, one fitter, one helper, and one welder to use a manual process and increase production. The second shift has two operators, two helpers, one fitter, two helpers, one grinder, and four welders organized into seven groups, with each group having a daily production capacity of 3.5 tons for a total of 25 tons per day.