WS Atkins plc 
Analyst and investor visit to ITER 
2 October 2014
Uwe Krueger 
Chief executive officer
Simon Layzell 
Project Director, ITER
Today’s agenda 
4 
•Welcome 
•Health and safety 
•Atkins and ITER –project overview 
•Site visit 
•Our Energy business.
The ITER programme 
5 
•International Thermonuclear Experimental Reactor 
•A €15bn research & development programme to demonstrate the scientific and technological viability of controlled fusion for power production 
•Involvement of parties representing over half of the world’s population –the world’s largest R&D project 
•The world’s largest nuclear fusion machine, in the south of France (Cadarache).
The science of nuclear fusion 
6 
Limitless supply of fuel 
Deuterium is abundant 
Tritium can be bred from Lithium 
An enormous energy yield (250kg/year for 1GW) 
•No high activity waste 
•No chain reaction –stops if disturbed 
•Fusion machines have been around since the 1950’s but not on a commercial basis. 
http//www.iter.org : The Science
Development timetable 
7
The ITER organisation 8 
•Created in 1985 (Gorbachev & Reagan) 
•It is an umbrella organisation (designer of fusion process plant, programme manager, future operator and license holder) 
•There are 7 domestic agencies (DAs) –funding through ‘in kind’ delivery of engineering, equipment and construction services 
•Fusion for Energy (F4E ) represents the EU. 
F4E 
(Barcelona)
F4E Buildings Team 
Support to the Owner 
Internal and External 
Experts 
Health and SafetyCoordination 
Legal Inspection 
Architect Engineer 
Main contractor 
Project organisation 
OWNER 
ITER Buildings 
IMPLEMENTATION 
Main contractor 
Main contractor 
9
Engage’s customer 
10 
F4E –EU domestic agency 
•Responsible for 45% of the €15bn overall project 
•Based in Barcelona with limited on site representation 
•Provision of all 39 buildings and associated services (10% of project) 
•Supported by owner’s engineer (Energhia consortium).
EngageA joint venture operation 
11 
An equal partnership, international JV comprising: 
•Assystem 
•Atkins 
•EmpresariosAgrupados 
•Iosis/Egis 
Architect engineer for the buildings, services and site infrastructure.
•39 buildings and structures -€1.5bn of capital spend 
•Design stages: 
–Tender design 
–Construction design for nuclear buildings 
•Designdisciplines: 
–Civil&structuralengineering 
–HVAC,electrical(HV,MV,LV),C&I,piping 
–Mechanicalhandling 
–Nuclearenvironment:seismic,blast,aircraft,confinement 
–Architecture 
–Permitting 
•Support to the procurement process 
•Construction management for the buildings, including services and site infrastructure 
•Around €250m fee over nine years. 
12 
EngageDesigner and constructionsupervisor
Buildings and infrastructure€1.5bn project within the €15bn programme 
13 
Site layout 
View of Tokamakcomplex 
Tokamakcomplex
ITER buildings’ project 
14 
Site dimensions: 1,000m x 400m
15 
Construction of pit -March 2011 
15
16 
Construction - July 2012 
Anti-seismic pit
17 
Tokamakbasement slab -April 2013
Project complexity 
•Health & safety 
•Interfaces with a R&D project under development -configuration and change control 
•Process integration 
•Technical requirements 
•Embedded plates –80,000+ (forecast 110,000+) 
•Multiple stakeholders 
•Multiple cultures and languages 
•French nuclear regulator 
•Multiple contractors and interfaces. 
18
19 
Key challenges 
Technical change management 
Process integration
Interesting facts 
•ITER Tokamakweighs 23,000 tons (3x Eiffel Tower) 
•ITER produces 500 MW of output power for 50MW of input (Q=10). Current record 16MW 
•Temperature of sun at its core is 15 million ºC, ITER temperature will reach 150 million ºC 
•Steel frame buildings have a footprint of 29,000 m² and will incorporate 14,500 tons of structural steel 
•8km of underground tunnels for cables, pipes and other services. 
20
ITER –the future 
21
Summary 
•The ITER programme will deliver the world’s largest fusion machine 
•As part of the Engage joint venture Atkins is responsible for the design, support to procurement and construction management 
•This represents a €1.5bn project within the €15bn research and development programme 
•The ITER project represents progress in our strategy to increase our involvement in new build projects 
•It provides a showcase for our expertise with a global profile at the technical limits of our industry. 
22
Mike McNicholas 
Design and Engineering 
Managing Director
We deliver the design of the UK’s largest most critical 
infrastructure projects –with scale and complexity 
24
We excel in projects of scale and regulatory complexity -bringing our cross industry learning to the nuclear market 
25
New Build 
Generation 
Fuel 
Decommissioning 
We work across the nuclear market 
26
How do we create a winning proposition 
How do we create a winning proposition 
… it is about the whole integrated solution 27
This is what Energy do… 
This is what Energy does… 
……. process, plant and equipment 28
This is what D&E does… 
is what D&E do… 
……. buildings and infrastructure 29
It can be the hidden stuff-the tunnels and caverns that connect the plant –the early works that unlock the programme 
It can be the hidden structures -the tunnels and caverns that connect plant -the early works that unlock the programme 
……. getting to regulatory compliance more quickly, smartly and predictably
Laurent Schmeider 
F4E project manager for site, buildings and power supplies
Disclaimer 
32 
The information in this presentation pack, which does not purport to be comprehensive, has been provided by Atkins and has not been independently verified. While this information has been prepared in good faith, no representation or warranty, express or implied, is or will be made and no responsibility or liability is or will be accepted by Atkins as to or in relation to the accuracy or completeness of this presentation pack or any other written or oral information made available as part of the presentation and any such liability is expressly disclaimed. Further, whilst Atkins may subsequently update the information made available in this presentation, we expressly disclaim any obligation to do so. 
The presentation contains indications of likely future developments and other forward-looking statements that are subject to risk factors associated with, among other things, the economic and business circumstances occurring from time to time in the countries, sectors and business segments in which the Group operates.These and other factors could adversely affect the Group’s results, strategy and prospects.Forward-looking statements involve risks, uncertainties and assumptions.They relate to events and/or depend on circumstances in the future which could cause actual results and outcomes to differ materially from those currently expected.No obligation is assumed to update any forward-looking statements, whether as a result of new information, future events or otherwise.

More Related Content

Similar to Analyst and investor visit to ITER - 02 October 2014

Event Fuel Cells & Hydrogen | Campus Automobile Spa-Francorchamps - 02 octobr...
Event Fuel Cells & Hydrogen | Campus Automobile Spa-Francorchamps - 02 octobr...Event Fuel Cells & Hydrogen | Campus Automobile Spa-Francorchamps - 02 octobr...
Event Fuel Cells & Hydrogen | Campus Automobile Spa-Francorchamps - 02 octobr...
Cluster TWEED
 
Regulatory Innovation Zones for Smart Energy Networks
Regulatory Innovation Zones for Smart Energy NetworksRegulatory Innovation Zones for Smart Energy Networks
Regulatory Innovation Zones for Smart Energy Networks
Leonardo ENERGY
 
Sgcp13ellerington
Sgcp13elleringtonSgcp13ellerington
Sgcp13ellerington
Justin Hayward
 
Presentation-of-ITER-Project-France.pdf
Presentation-of-ITER-Project-France.pdfPresentation-of-ITER-Project-France.pdf
Presentation-of-ITER-Project-France.pdf
AnonymousTxhyGf
 
Offshore Wind Infrastructure Application Lab - Launch 2012-01-24 - Agoria Ren...
Offshore Wind Infrastructure Application Lab - Launch 2012-01-24 - Agoria Ren...Offshore Wind Infrastructure Application Lab - Launch 2012-01-24 - Agoria Ren...
Offshore Wind Infrastructure Application Lab - Launch 2012-01-24 - Agoria Ren...
Sirris
 
ETIP PV conference: 'Photovoltaics: centre-stage in the power system
ETIP PV conference: 'Photovoltaics: centre-stage in the power systemETIP PV conference: 'Photovoltaics: centre-stage in the power system
ETIP PV conference: 'Photovoltaics: centre-stage in the power system
Cluster TWEED
 
NNB 2nd_final 1 3222
NNB 2nd_final 1 3222NNB 2nd_final 1 3222
NNB 2nd_final 1 3222
Nicolas Turner
 
1 3 amec
1 3 amec1 3 amec
1 3 amec
Ahmed Awaise
 
The ORE Catapult and Future Opportunities,David Arnold,Technology strategy Board
The ORE Catapult and Future Opportunities,David Arnold,Technology strategy BoardThe ORE Catapult and Future Opportunities,David Arnold,Technology strategy Board
The ORE Catapult and Future Opportunities,David Arnold,Technology strategy Board
Invest Northern Ireland
 
Analyst presentation: Energy – 02 October 2014
Analyst presentation: Energy – 02 October 2014Analyst presentation: Energy – 02 October 2014
Analyst presentation: Energy – 02 October 2014
Atkins
 
Conferencia de Ignacio Martí, Director Técnico de ORE CATAPULT y Chairman del...
Conferencia de Ignacio Martí, Director Técnico de ORE CATAPULT y Chairman del...Conferencia de Ignacio Martí, Director Técnico de ORE CATAPULT y Chairman del...
Conferencia de Ignacio Martí, Director Técnico de ORE CATAPULT y Chairman del...
TECNALIA Research & Innovation
 
Catalysing Green Innovation Strand 2
Catalysing Green Innovation Strand 2Catalysing Green Innovation Strand 2
Catalysing Green Innovation Strand 2
KTN
 
road_map (1)
road_map (1)road_map (1)
road_map (1)
Stavros Thomas
 
Citec Group brochure 2016_lowres
Citec Group brochure 2016_lowresCitec Group brochure 2016_lowres
Citec Group brochure 2016_lowres
Austin Antony
 
Accessing 10Bn€ of EU capital for breakthrough innovation • EIC slides
Accessing 10Bn€ of EU capital for breakthrough innovation • EIC slidesAccessing 10Bn€ of EU capital for breakthrough innovation • EIC slides
Accessing 10Bn€ of EU capital for breakthrough innovation • EIC slides
Alexandre Terrien
 
CV-rev5
CV-rev5CV-rev5
ENERGIAS-MARINAS_CAT_EN
ENERGIAS-MARINAS_CAT_ENENERGIAS-MARINAS_CAT_EN
ENERGIAS-MARINAS_CAT_EN
TECNALIA Marine Energy
 
Nuclear: The Challenges for Investment
Nuclear: The Challenges for InvestmentNuclear: The Challenges for Investment
Nuclear: The Challenges for Investment
39 Essex Chambers
 
Christian Koch
Christian KochChristian Koch
Christian Koch
Svenskt Projektforum
 
Nuclear Showcase 27th January 'Making It Happen'
Nuclear Showcase 27th January 'Making It Happen' Nuclear Showcase 27th January 'Making It Happen'
Nuclear Showcase 27th January 'Making It Happen'
UKTI2014
 

Similar to Analyst and investor visit to ITER - 02 October 2014 (20)

Event Fuel Cells & Hydrogen | Campus Automobile Spa-Francorchamps - 02 octobr...
Event Fuel Cells & Hydrogen | Campus Automobile Spa-Francorchamps - 02 octobr...Event Fuel Cells & Hydrogen | Campus Automobile Spa-Francorchamps - 02 octobr...
Event Fuel Cells & Hydrogen | Campus Automobile Spa-Francorchamps - 02 octobr...
 
Regulatory Innovation Zones for Smart Energy Networks
Regulatory Innovation Zones for Smart Energy NetworksRegulatory Innovation Zones for Smart Energy Networks
Regulatory Innovation Zones for Smart Energy Networks
 
Sgcp13ellerington
Sgcp13elleringtonSgcp13ellerington
Sgcp13ellerington
 
Presentation-of-ITER-Project-France.pdf
Presentation-of-ITER-Project-France.pdfPresentation-of-ITER-Project-France.pdf
Presentation-of-ITER-Project-France.pdf
 
Offshore Wind Infrastructure Application Lab - Launch 2012-01-24 - Agoria Ren...
Offshore Wind Infrastructure Application Lab - Launch 2012-01-24 - Agoria Ren...Offshore Wind Infrastructure Application Lab - Launch 2012-01-24 - Agoria Ren...
Offshore Wind Infrastructure Application Lab - Launch 2012-01-24 - Agoria Ren...
 
ETIP PV conference: 'Photovoltaics: centre-stage in the power system
ETIP PV conference: 'Photovoltaics: centre-stage in the power systemETIP PV conference: 'Photovoltaics: centre-stage in the power system
ETIP PV conference: 'Photovoltaics: centre-stage in the power system
 
NNB 2nd_final 1 3222
NNB 2nd_final 1 3222NNB 2nd_final 1 3222
NNB 2nd_final 1 3222
 
1 3 amec
1 3 amec1 3 amec
1 3 amec
 
The ORE Catapult and Future Opportunities,David Arnold,Technology strategy Board
The ORE Catapult and Future Opportunities,David Arnold,Technology strategy BoardThe ORE Catapult and Future Opportunities,David Arnold,Technology strategy Board
The ORE Catapult and Future Opportunities,David Arnold,Technology strategy Board
 
Analyst presentation: Energy – 02 October 2014
Analyst presentation: Energy – 02 October 2014Analyst presentation: Energy – 02 October 2014
Analyst presentation: Energy – 02 October 2014
 
Conferencia de Ignacio Martí, Director Técnico de ORE CATAPULT y Chairman del...
Conferencia de Ignacio Martí, Director Técnico de ORE CATAPULT y Chairman del...Conferencia de Ignacio Martí, Director Técnico de ORE CATAPULT y Chairman del...
Conferencia de Ignacio Martí, Director Técnico de ORE CATAPULT y Chairman del...
 
Catalysing Green Innovation Strand 2
Catalysing Green Innovation Strand 2Catalysing Green Innovation Strand 2
Catalysing Green Innovation Strand 2
 
road_map (1)
road_map (1)road_map (1)
road_map (1)
 
Citec Group brochure 2016_lowres
Citec Group brochure 2016_lowresCitec Group brochure 2016_lowres
Citec Group brochure 2016_lowres
 
Accessing 10Bn€ of EU capital for breakthrough innovation • EIC slides
Accessing 10Bn€ of EU capital for breakthrough innovation • EIC slidesAccessing 10Bn€ of EU capital for breakthrough innovation • EIC slides
Accessing 10Bn€ of EU capital for breakthrough innovation • EIC slides
 
CV-rev5
CV-rev5CV-rev5
CV-rev5
 
ENERGIAS-MARINAS_CAT_EN
ENERGIAS-MARINAS_CAT_ENENERGIAS-MARINAS_CAT_EN
ENERGIAS-MARINAS_CAT_EN
 
Nuclear: The Challenges for Investment
Nuclear: The Challenges for InvestmentNuclear: The Challenges for Investment
Nuclear: The Challenges for Investment
 
Christian Koch
Christian KochChristian Koch
Christian Koch
 
Nuclear Showcase 27th January 'Making It Happen'
Nuclear Showcase 27th January 'Making It Happen' Nuclear Showcase 27th January 'Making It Happen'
Nuclear Showcase 27th January 'Making It Happen'
 

More from Atkins

Business uses for blockchain
Business uses for blockchainBusiness uses for blockchain
Business uses for blockchain
Atkins
 
Nuclear energy mythbuster
Nuclear energy mythbusterNuclear energy mythbuster
Nuclear energy mythbuster
Atkins
 
Sustainable Aerospace
Sustainable AerospaceSustainable Aerospace
Sustainable Aerospace
Atkins
 
Geospatial data infographic
Geospatial data infographicGeospatial data infographic
Geospatial data infographic
Atkins
 
Building what matters
Building what mattersBuilding what matters
Building what matters
Atkins
 
Electrification of aircraft
Electrification of aircraftElectrification of aircraft
Electrification of aircraft
Atkins
 
Atkins' End of Year Highlights 2017
Atkins' End of Year Highlights 2017Atkins' End of Year Highlights 2017
Atkins' End of Year Highlights 2017
Atkins
 
Digital Reality Report Infographic
Digital Reality Report InfographicDigital Reality Report Infographic
Digital Reality Report Infographic
Atkins
 
Procurement Made Simple
Procurement Made SimpleProcurement Made Simple
Procurement Made Simple
Atkins
 
Green Sky Thinking: bringing forest schools to the inner city
Green Sky Thinking: bringing forest schools to the inner cityGreen Sky Thinking: bringing forest schools to the inner city
Green Sky Thinking: bringing forest schools to the inner city
Atkins
 
Cyber resilient infrastructure
Cyber resilient infrastructureCyber resilient infrastructure
Cyber resilient infrastructure
Atkins
 
A glance at Atkins' landscape architecture projects
A glance at Atkins' landscape architecture projectsA glance at Atkins' landscape architecture projects
A glance at Atkins' landscape architecture projects
Atkins
 
Could you be an engineer?
Could you be an engineer?Could you be an engineer?
Could you be an engineer?
Atkins
 
8 ways to protect your digital footprint infographic
8 ways to protect your digital footprint infographic8 ways to protect your digital footprint infographic
8 ways to protect your digital footprint infographic
Atkins
 
The advent of digital engineering - a year in review
The advent of digital engineering - a year in reviewThe advent of digital engineering - a year in review
The advent of digital engineering - a year in review
Atkins
 
The renewable energy market in Asia
The renewable energy market in AsiaThe renewable energy market in Asia
The renewable energy market in Asia
Atkins
 
Cyber resilient infrastructure infographic
Cyber resilient infrastructure infographicCyber resilient infrastructure infographic
Cyber resilient infrastructure infographic
Atkins
 
Welcome to Atkins Acuity
Welcome to Atkins AcuityWelcome to Atkins Acuity
Welcome to Atkins Acuity
Atkins
 
Atkins: Preliminary results for the year ended 31 March 2016
Atkins: Preliminary results for the year ended 31 March 2016Atkins: Preliminary results for the year ended 31 March 2016
Atkins: Preliminary results for the year ended 31 March 2016
Atkins
 
Middle East Rail brochure
Middle East Rail brochureMiddle East Rail brochure
Middle East Rail brochure
Atkins
 

More from Atkins (20)

Business uses for blockchain
Business uses for blockchainBusiness uses for blockchain
Business uses for blockchain
 
Nuclear energy mythbuster
Nuclear energy mythbusterNuclear energy mythbuster
Nuclear energy mythbuster
 
Sustainable Aerospace
Sustainable AerospaceSustainable Aerospace
Sustainable Aerospace
 
Geospatial data infographic
Geospatial data infographicGeospatial data infographic
Geospatial data infographic
 
Building what matters
Building what mattersBuilding what matters
Building what matters
 
Electrification of aircraft
Electrification of aircraftElectrification of aircraft
Electrification of aircraft
 
Atkins' End of Year Highlights 2017
Atkins' End of Year Highlights 2017Atkins' End of Year Highlights 2017
Atkins' End of Year Highlights 2017
 
Digital Reality Report Infographic
Digital Reality Report InfographicDigital Reality Report Infographic
Digital Reality Report Infographic
 
Procurement Made Simple
Procurement Made SimpleProcurement Made Simple
Procurement Made Simple
 
Green Sky Thinking: bringing forest schools to the inner city
Green Sky Thinking: bringing forest schools to the inner cityGreen Sky Thinking: bringing forest schools to the inner city
Green Sky Thinking: bringing forest schools to the inner city
 
Cyber resilient infrastructure
Cyber resilient infrastructureCyber resilient infrastructure
Cyber resilient infrastructure
 
A glance at Atkins' landscape architecture projects
A glance at Atkins' landscape architecture projectsA glance at Atkins' landscape architecture projects
A glance at Atkins' landscape architecture projects
 
Could you be an engineer?
Could you be an engineer?Could you be an engineer?
Could you be an engineer?
 
8 ways to protect your digital footprint infographic
8 ways to protect your digital footprint infographic8 ways to protect your digital footprint infographic
8 ways to protect your digital footprint infographic
 
The advent of digital engineering - a year in review
The advent of digital engineering - a year in reviewThe advent of digital engineering - a year in review
The advent of digital engineering - a year in review
 
The renewable energy market in Asia
The renewable energy market in AsiaThe renewable energy market in Asia
The renewable energy market in Asia
 
Cyber resilient infrastructure infographic
Cyber resilient infrastructure infographicCyber resilient infrastructure infographic
Cyber resilient infrastructure infographic
 
Welcome to Atkins Acuity
Welcome to Atkins AcuityWelcome to Atkins Acuity
Welcome to Atkins Acuity
 
Atkins: Preliminary results for the year ended 31 March 2016
Atkins: Preliminary results for the year ended 31 March 2016Atkins: Preliminary results for the year ended 31 March 2016
Atkins: Preliminary results for the year ended 31 March 2016
 
Middle East Rail brochure
Middle East Rail brochureMiddle East Rail brochure
Middle East Rail brochure
 

Recently uploaded

AI assisted telemedicine KIOSK for Rural India.pptx
AI assisted telemedicine KIOSK for Rural India.pptxAI assisted telemedicine KIOSK for Rural India.pptx
AI assisted telemedicine KIOSK for Rural India.pptx
architagupta876
 
BRAIN TUMOR DETECTION for seminar ppt.pdf
BRAIN TUMOR DETECTION for seminar ppt.pdfBRAIN TUMOR DETECTION for seminar ppt.pdf
BRAIN TUMOR DETECTION for seminar ppt.pdf
LAXMAREDDY22
 
Transformers design and coooling methods
Transformers design and coooling methodsTransformers design and coooling methods
Transformers design and coooling methods
Roger Rozario
 
官方认证美国密歇根州立大学毕业证学位证书原版一模一样
官方认证美国密歇根州立大学毕业证学位证书原版一模一样官方认证美国密歇根州立大学毕业证学位证书原版一模一样
官方认证美国密歇根州立大学毕业证学位证书原版一模一样
171ticu
 
spirit beverages ppt without graphics.pptx
spirit beverages ppt without graphics.pptxspirit beverages ppt without graphics.pptx
spirit beverages ppt without graphics.pptx
Madan Karki
 
Software Engineering and Project Management - Introduction, Modeling Concepts...
Software Engineering and Project Management - Introduction, Modeling Concepts...Software Engineering and Project Management - Introduction, Modeling Concepts...
Software Engineering and Project Management - Introduction, Modeling Concepts...
Prakhyath Rai
 
Electric vehicle and photovoltaic advanced roles in enhancing the financial p...
Electric vehicle and photovoltaic advanced roles in enhancing the financial p...Electric vehicle and photovoltaic advanced roles in enhancing the financial p...
Electric vehicle and photovoltaic advanced roles in enhancing the financial p...
IJECEIAES
 
CHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECT
CHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECTCHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECT
CHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECT
jpsjournal1
 
Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...
Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...
Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...
IJECEIAES
 
john krisinger-the science and history of the alcoholic beverage.pptx
john krisinger-the science and history of the alcoholic beverage.pptxjohn krisinger-the science and history of the alcoholic beverage.pptx
john krisinger-the science and history of the alcoholic beverage.pptx
Madan Karki
 
学校原版美国波士顿大学毕业证学历学位证书原版一模一样
学校原版美国波士顿大学毕业证学历学位证书原版一模一样学校原版美国波士顿大学毕业证学历学位证书原版一模一样
学校原版美国波士顿大学毕业证学历学位证书原版一模一样
171ticu
 
Embedded machine learning-based road conditions and driving behavior monitoring
Embedded machine learning-based road conditions and driving behavior monitoringEmbedded machine learning-based road conditions and driving behavior monitoring
Embedded machine learning-based road conditions and driving behavior monitoring
IJECEIAES
 
132/33KV substation case study Presentation
132/33KV substation case study Presentation132/33KV substation case study Presentation
132/33KV substation case study Presentation
kandramariana6
 
IEEE Aerospace and Electronic Systems Society as a Graduate Student Member
IEEE Aerospace and Electronic Systems Society as a Graduate Student MemberIEEE Aerospace and Electronic Systems Society as a Graduate Student Member
IEEE Aerospace and Electronic Systems Society as a Graduate Student Member
VICTOR MAESTRE RAMIREZ
 
Software Quality Assurance-se412-v11.ppt
Software Quality Assurance-se412-v11.pptSoftware Quality Assurance-se412-v11.ppt
Software Quality Assurance-se412-v11.ppt
TaghreedAltamimi
 
原版制作(Humboldt毕业证书)柏林大学毕业证学位证一模一样
原版制作(Humboldt毕业证书)柏林大学毕业证学位证一模一样原版制作(Humboldt毕业证书)柏林大学毕业证学位证一模一样
原版制作(Humboldt毕业证书)柏林大学毕业证学位证一模一样
ydzowc
 
Welding Metallurgy Ferrous Materials.pdf
Welding Metallurgy Ferrous Materials.pdfWelding Metallurgy Ferrous Materials.pdf
Welding Metallurgy Ferrous Materials.pdf
AjmalKhan50578
 
Unit-III-ELECTROCHEMICAL STORAGE DEVICES.ppt
Unit-III-ELECTROCHEMICAL STORAGE DEVICES.pptUnit-III-ELECTROCHEMICAL STORAGE DEVICES.ppt
Unit-III-ELECTROCHEMICAL STORAGE DEVICES.ppt
KrishnaveniKrishnara1
 
Material for memory and display system h
Material for memory and display system hMaterial for memory and display system h
Material for memory and display system h
gowrishankartb2005
 
Optimizing Gradle Builds - Gradle DPE Tour Berlin 2024
Optimizing Gradle Builds - Gradle DPE Tour Berlin 2024Optimizing Gradle Builds - Gradle DPE Tour Berlin 2024
Optimizing Gradle Builds - Gradle DPE Tour Berlin 2024
Sinan KOZAK
 

Recently uploaded (20)

AI assisted telemedicine KIOSK for Rural India.pptx
AI assisted telemedicine KIOSK for Rural India.pptxAI assisted telemedicine KIOSK for Rural India.pptx
AI assisted telemedicine KIOSK for Rural India.pptx
 
BRAIN TUMOR DETECTION for seminar ppt.pdf
BRAIN TUMOR DETECTION for seminar ppt.pdfBRAIN TUMOR DETECTION for seminar ppt.pdf
BRAIN TUMOR DETECTION for seminar ppt.pdf
 
Transformers design and coooling methods
Transformers design and coooling methodsTransformers design and coooling methods
Transformers design and coooling methods
 
官方认证美国密歇根州立大学毕业证学位证书原版一模一样
官方认证美国密歇根州立大学毕业证学位证书原版一模一样官方认证美国密歇根州立大学毕业证学位证书原版一模一样
官方认证美国密歇根州立大学毕业证学位证书原版一模一样
 
spirit beverages ppt without graphics.pptx
spirit beverages ppt without graphics.pptxspirit beverages ppt without graphics.pptx
spirit beverages ppt without graphics.pptx
 
Software Engineering and Project Management - Introduction, Modeling Concepts...
Software Engineering and Project Management - Introduction, Modeling Concepts...Software Engineering and Project Management - Introduction, Modeling Concepts...
Software Engineering and Project Management - Introduction, Modeling Concepts...
 
Electric vehicle and photovoltaic advanced roles in enhancing the financial p...
Electric vehicle and photovoltaic advanced roles in enhancing the financial p...Electric vehicle and photovoltaic advanced roles in enhancing the financial p...
Electric vehicle and photovoltaic advanced roles in enhancing the financial p...
 
CHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECT
CHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECTCHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECT
CHINA’S GEO-ECONOMIC OUTREACH IN CENTRAL ASIAN COUNTRIES AND FUTURE PROSPECT
 
Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...
Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...
Redefining brain tumor segmentation: a cutting-edge convolutional neural netw...
 
john krisinger-the science and history of the alcoholic beverage.pptx
john krisinger-the science and history of the alcoholic beverage.pptxjohn krisinger-the science and history of the alcoholic beverage.pptx
john krisinger-the science and history of the alcoholic beverage.pptx
 
学校原版美国波士顿大学毕业证学历学位证书原版一模一样
学校原版美国波士顿大学毕业证学历学位证书原版一模一样学校原版美国波士顿大学毕业证学历学位证书原版一模一样
学校原版美国波士顿大学毕业证学历学位证书原版一模一样
 
Embedded machine learning-based road conditions and driving behavior monitoring
Embedded machine learning-based road conditions and driving behavior monitoringEmbedded machine learning-based road conditions and driving behavior monitoring
Embedded machine learning-based road conditions and driving behavior monitoring
 
132/33KV substation case study Presentation
132/33KV substation case study Presentation132/33KV substation case study Presentation
132/33KV substation case study Presentation
 
IEEE Aerospace and Electronic Systems Society as a Graduate Student Member
IEEE Aerospace and Electronic Systems Society as a Graduate Student MemberIEEE Aerospace and Electronic Systems Society as a Graduate Student Member
IEEE Aerospace and Electronic Systems Society as a Graduate Student Member
 
Software Quality Assurance-se412-v11.ppt
Software Quality Assurance-se412-v11.pptSoftware Quality Assurance-se412-v11.ppt
Software Quality Assurance-se412-v11.ppt
 
原版制作(Humboldt毕业证书)柏林大学毕业证学位证一模一样
原版制作(Humboldt毕业证书)柏林大学毕业证学位证一模一样原版制作(Humboldt毕业证书)柏林大学毕业证学位证一模一样
原版制作(Humboldt毕业证书)柏林大学毕业证学位证一模一样
 
Welding Metallurgy Ferrous Materials.pdf
Welding Metallurgy Ferrous Materials.pdfWelding Metallurgy Ferrous Materials.pdf
Welding Metallurgy Ferrous Materials.pdf
 
Unit-III-ELECTROCHEMICAL STORAGE DEVICES.ppt
Unit-III-ELECTROCHEMICAL STORAGE DEVICES.pptUnit-III-ELECTROCHEMICAL STORAGE DEVICES.ppt
Unit-III-ELECTROCHEMICAL STORAGE DEVICES.ppt
 
Material for memory and display system h
Material for memory and display system hMaterial for memory and display system h
Material for memory and display system h
 
Optimizing Gradle Builds - Gradle DPE Tour Berlin 2024
Optimizing Gradle Builds - Gradle DPE Tour Berlin 2024Optimizing Gradle Builds - Gradle DPE Tour Berlin 2024
Optimizing Gradle Builds - Gradle DPE Tour Berlin 2024
 

Analyst and investor visit to ITER - 02 October 2014

  • 1. WS Atkins plc Analyst and investor visit to ITER 2 October 2014
  • 2. Uwe Krueger Chief executive officer
  • 3. Simon Layzell Project Director, ITER
  • 4. Today’s agenda 4 •Welcome •Health and safety •Atkins and ITER –project overview •Site visit •Our Energy business.
  • 5. The ITER programme 5 •International Thermonuclear Experimental Reactor •A €15bn research & development programme to demonstrate the scientific and technological viability of controlled fusion for power production •Involvement of parties representing over half of the world’s population –the world’s largest R&D project •The world’s largest nuclear fusion machine, in the south of France (Cadarache).
  • 6. The science of nuclear fusion 6 Limitless supply of fuel Deuterium is abundant Tritium can be bred from Lithium An enormous energy yield (250kg/year for 1GW) •No high activity waste •No chain reaction –stops if disturbed •Fusion machines have been around since the 1950’s but not on a commercial basis. http//www.iter.org : The Science
  • 8. The ITER organisation 8 •Created in 1985 (Gorbachev & Reagan) •It is an umbrella organisation (designer of fusion process plant, programme manager, future operator and license holder) •There are 7 domestic agencies (DAs) –funding through ‘in kind’ delivery of engineering, equipment and construction services •Fusion for Energy (F4E ) represents the EU. F4E (Barcelona)
  • 9. F4E Buildings Team Support to the Owner Internal and External Experts Health and SafetyCoordination Legal Inspection Architect Engineer Main contractor Project organisation OWNER ITER Buildings IMPLEMENTATION Main contractor Main contractor 9
  • 10. Engage’s customer 10 F4E –EU domestic agency •Responsible for 45% of the €15bn overall project •Based in Barcelona with limited on site representation •Provision of all 39 buildings and associated services (10% of project) •Supported by owner’s engineer (Energhia consortium).
  • 11. EngageA joint venture operation 11 An equal partnership, international JV comprising: •Assystem •Atkins •EmpresariosAgrupados •Iosis/Egis Architect engineer for the buildings, services and site infrastructure.
  • 12. •39 buildings and structures -€1.5bn of capital spend •Design stages: –Tender design –Construction design for nuclear buildings •Designdisciplines: –Civil&structuralengineering –HVAC,electrical(HV,MV,LV),C&I,piping –Mechanicalhandling –Nuclearenvironment:seismic,blast,aircraft,confinement –Architecture –Permitting •Support to the procurement process •Construction management for the buildings, including services and site infrastructure •Around €250m fee over nine years. 12 EngageDesigner and constructionsupervisor
  • 13. Buildings and infrastructure€1.5bn project within the €15bn programme 13 Site layout View of Tokamakcomplex Tokamakcomplex
  • 14. ITER buildings’ project 14 Site dimensions: 1,000m x 400m
  • 15. 15 Construction of pit -March 2011 15
  • 16. 16 Construction - July 2012 Anti-seismic pit
  • 17. 17 Tokamakbasement slab -April 2013
  • 18. Project complexity •Health & safety •Interfaces with a R&D project under development -configuration and change control •Process integration •Technical requirements •Embedded plates –80,000+ (forecast 110,000+) •Multiple stakeholders •Multiple cultures and languages •French nuclear regulator •Multiple contractors and interfaces. 18
  • 19. 19 Key challenges Technical change management Process integration
  • 20. Interesting facts •ITER Tokamakweighs 23,000 tons (3x Eiffel Tower) •ITER produces 500 MW of output power for 50MW of input (Q=10). Current record 16MW •Temperature of sun at its core is 15 million ºC, ITER temperature will reach 150 million ºC •Steel frame buildings have a footprint of 29,000 m² and will incorporate 14,500 tons of structural steel •8km of underground tunnels for cables, pipes and other services. 20
  • 22. Summary •The ITER programme will deliver the world’s largest fusion machine •As part of the Engage joint venture Atkins is responsible for the design, support to procurement and construction management •This represents a €1.5bn project within the €15bn research and development programme •The ITER project represents progress in our strategy to increase our involvement in new build projects •It provides a showcase for our expertise with a global profile at the technical limits of our industry. 22
  • 23. Mike McNicholas Design and Engineering Managing Director
  • 24. We deliver the design of the UK’s largest most critical infrastructure projects –with scale and complexity 24
  • 25. We excel in projects of scale and regulatory complexity -bringing our cross industry learning to the nuclear market 25
  • 26. New Build Generation Fuel Decommissioning We work across the nuclear market 26
  • 27. How do we create a winning proposition How do we create a winning proposition … it is about the whole integrated solution 27
  • 28. This is what Energy do… This is what Energy does… ……. process, plant and equipment 28
  • 29. This is what D&E does… is what D&E do… ……. buildings and infrastructure 29
  • 30. It can be the hidden stuff-the tunnels and caverns that connect the plant –the early works that unlock the programme It can be the hidden structures -the tunnels and caverns that connect plant -the early works that unlock the programme ……. getting to regulatory compliance more quickly, smartly and predictably
  • 31. Laurent Schmeider F4E project manager for site, buildings and power supplies
  • 32. Disclaimer 32 The information in this presentation pack, which does not purport to be comprehensive, has been provided by Atkins and has not been independently verified. While this information has been prepared in good faith, no representation or warranty, express or implied, is or will be made and no responsibility or liability is or will be accepted by Atkins as to or in relation to the accuracy or completeness of this presentation pack or any other written or oral information made available as part of the presentation and any such liability is expressly disclaimed. Further, whilst Atkins may subsequently update the information made available in this presentation, we expressly disclaim any obligation to do so. The presentation contains indications of likely future developments and other forward-looking statements that are subject to risk factors associated with, among other things, the economic and business circumstances occurring from time to time in the countries, sectors and business segments in which the Group operates.These and other factors could adversely affect the Group’s results, strategy and prospects.Forward-looking statements involve risks, uncertainties and assumptions.They relate to events and/or depend on circumstances in the future which could cause actual results and outcomes to differ materially from those currently expected.No obligation is assumed to update any forward-looking statements, whether as a result of new information, future events or otherwise.