PREFABRICATED
BUILDING
Vargas, Valentina
Vásquez, Carla
CONTENT:
 Prefabricated housing
 Differences in the construction types
 Manufactured homes
 Construction sites
 The History of the prefabricated building
 Prefabs and the modernist movement
INTRODUCTION
 “Prefabrication is the practice of
assembling components of a structure in
a factory or other manufacturing site,
and transporting complete assemblies or
sub-assemblies to the construction site
where the structure is to be located”.
PREFABRICATED HOUSING
 "Prefabricated building is a type of building
that consists of several factory-built components
or units that are assembled on-site to complete
the unit. “Prefabricated” are built in:
 Components (panels)
 Modules (modular homes)
 Transportable sections (manufactured
homes)
 Mobile homes (houses on wheels)
DIFFERENCES IN THE
CONSTRUCTION TYPES
 Mobile and manufactured houses are constructed in
accordance with the HUD building codes in the U.S. while
modular houses are constructed in accordance with the
IBC (International Building Code).
 Modular homes are created in sections, and then
transported to the home site for construction and
installation.
 Manufactured homes are built onto steel beams, and are
transported in complete sections to the home site, where
they are assembled.
 Mobile homes built on wheels, which can be moved
MANUFACTURED HOMES
 Constructing manufactured homes typically involves
connecting plumbing and electrical lines across the
sections, and sealing the sections together.
 They can be built onto a permanent foundation, and if
designed correctly, can be difficult to distinguish from a
stick-built home.
 Manufactured homes are typically purchased from a retail
sales company, initially assembled by a local contracting
company, and follow-up repairs performed by the
manufactured home company under warranty.
 Manufactured homes, once assembled, go
through a "settling-in" period (the home will
settle into its location):
 During this period, some drywall cracking
may appear, and any incorrectly installed
appliances, wiring, or plumbing should be
repaired.
 A manufactured home it is not immediately
inhabitable; appropriate ventilation, heating,
plumbing, and electrical systems must be
installed by a set-up crew, otherwise, the
buyer must wait for the manufacturer repair
team or do it themselves.
CONSTRUCTION SITES
 Mobile homes and manufactured homes
can be placed in mobile home parks,
and manufactured homes can also be
placed on private land, providing the
land is zoned for manufactured homes.
 McDonalds use prefabricated structures
for their buildings, and set a record of
constructing a building and opening for
business within 13 hours
THE HISTORY OF THE
PREFABRICATED BUILDINGS
 Possibly the first advertised prefab house was the Manning
Portable Cottage. A London carpenter, H. Manning, constructed
a house that was built in components, then shipped and
assembled by British emigrants.
 The peak year for the importation of portable buildings to
Australia was 1853, when several hundred arrived.These have
been identified as coming from Liverpool, Boston and
Singapore (with Chinese instructions for re-assembly).
 In Barbados the Chattel house was a form of prefabricated
building which was developed by emancipated slaves who had
limited rights to build upon land they did not own. As the
buildings were moveable they were legally regarded as chattels.
 Another interesting building was the prefabricated hospital that
the British Army deployed in 1855 during the Crimean War
designed by Isambard Kingdom Brunel with innovations in
sanitation, ventilation and a flushing toilet.
 The world's first prefabricated, pre-cast
panelled apartment blocks were pioneered in
Liverpool
 Prefabricated homes were produced during the
Gold Rush in the United States, when kits were
produced to enable Californian prospectors to
quickly construct accommodation
 Prefabricated housing was popular during
World War II due to the need for mass
accommodation for military personnel.
 Many buildings were designed with a five-ten
year life span, but have far exceeded this, with
a number surviving today.
PREFABS AND THE
MODERNIST MOVEMENT
 Architects are incorporating modern designs into the
prefabricated houses of today, prefab housing should no
longer be compared to a mobile home in terms of
appearance.
 There has also been an increase in the use of "green"
materials in the construction of these prefab houses.
 Since these homes are built in parts, it is easy for a home
owner to add additional rooms or even solar panels to the
roofs.
 There is a zeitgeist in architectural circles and the spirit of
the age favors the small carbon footprint of "prefab."
 Eminent amongst the new breed of off the shelf luxury
modernist products is the Perrine pod, which has found
favor worldwide for its green credentials and three day
build time.
CONCLUSION
 Because of the design simplifications
modern architecture provides many in
the manufactured housing sector
generally feel that modern
architecture designs are better suited for
prefab home construction.
 Prefabricated housing
PREFABRICATED BUILDING.ppt

More Related Content

Similar to PREFABRICATED BUILDING.ppt

Skyscrapers ppt
Skyscrapers pptSkyscrapers ppt
Skyscrapers pptSAI KIRAN
 
HISTORY OF ARCHETICTURE.ppt
HISTORY OF ARCHETICTURE.pptHISTORY OF ARCHETICTURE.ppt
HISTORY OF ARCHETICTURE.pptAhmedAwad223862
 
Shipping container, design ideas
Shipping container, design ideasShipping container, design ideas
Shipping container, design ideasMel Fee
 
Chicago school (final ppt)
Chicago school (final ppt)Chicago school (final ppt)
Chicago school (final ppt)Kirubel Tilahun
 
Le corbusier major works 1910 1965
Le corbusier major works 1910 1965Le corbusier major works 1910 1965
Le corbusier major works 1910 1965harikrishna nambiar
 
Dynamic architecture 075bar024
Dynamic architecture 075bar024Dynamic architecture 075bar024
Dynamic architecture 075bar024Mahendra Shrestha
 
Lecture - 1 (building material c III).pptx
Lecture - 1 (building material c III).pptxLecture - 1 (building material c III).pptx
Lecture - 1 (building material c III).pptxHayleyesusSisay1
 
Semester 4 history
Semester 4   historySemester 4   history
Semester 4 historyAaqib Iqbal
 
PREFABRICATION BUILDING
PREFABRICATION BUILDINGPREFABRICATION BUILDING
PREFABRICATION BUILDINGsathish sak
 
KCC Art 211 Ch 13 Architecture
KCC Art 211 Ch 13 ArchitectureKCC Art 211 Ch 13 Architecture
KCC Art 211 Ch 13 ArchitectureKelly Parker
 
4329-curtain-wall-facades-on-the-new-generation-of-supertall-buildings-presen...
4329-curtain-wall-facades-on-the-new-generation-of-supertall-buildings-presen...4329-curtain-wall-facades-on-the-new-generation-of-supertall-buildings-presen...
4329-curtain-wall-facades-on-the-new-generation-of-supertall-buildings-presen...NguynSn329074
 
JACM2636_JacMax Lindsay Book Email FA
JACM2636_JacMax Lindsay Book Email FAJACM2636_JacMax Lindsay Book Email FA
JACM2636_JacMax Lindsay Book Email FAHilary Simmons
 
history of architecture II second lecture.pptx
history of architecture II second lecture.pptxhistory of architecture II second lecture.pptx
history of architecture II second lecture.pptxSharpEyu
 
William Le Baron Jenney
William Le Baron JenneyWilliam Le Baron Jenney
William Le Baron JenneyGrace Henry
 
Shipping container homes Benefits
Shipping container homes Benefits Shipping container homes Benefits
Shipping container homes Benefits SCF Containers
 
Chapter 15: The Twentieth Century and Modernism
Chapter 15: The Twentieth Century and ModernismChapter 15: The Twentieth Century and Modernism
Chapter 15: The Twentieth Century and ModernismDouglas Vail
 
Report on Design of a HighRise.pptx
Report on Design of a HighRise.pptxReport on Design of a HighRise.pptx
Report on Design of a HighRise.pptxRezwan Ahmed
 

Similar to PREFABRICATED BUILDING.ppt (20)

Lecture23 Dickson House Bt
Lecture23 Dickson House BtLecture23 Dickson House Bt
Lecture23 Dickson House Bt
 
Skyscrapers ppt
Skyscrapers pptSkyscrapers ppt
Skyscrapers ppt
 
HISTORY OF ARCHETICTURE.ppt
HISTORY OF ARCHETICTURE.pptHISTORY OF ARCHETICTURE.ppt
HISTORY OF ARCHETICTURE.ppt
 
Shipping container, design ideas
Shipping container, design ideasShipping container, design ideas
Shipping container, design ideas
 
Chicago school (final ppt)
Chicago school (final ppt)Chicago school (final ppt)
Chicago school (final ppt)
 
Le corbusier major works 1910 1965
Le corbusier major works 1910 1965Le corbusier major works 1910 1965
Le corbusier major works 1910 1965
 
Foundry
FoundryFoundry
Foundry
 
Dynamic architecture 075bar024
Dynamic architecture 075bar024Dynamic architecture 075bar024
Dynamic architecture 075bar024
 
Lecture - 1 (building material c III).pptx
Lecture - 1 (building material c III).pptxLecture - 1 (building material c III).pptx
Lecture - 1 (building material c III).pptx
 
Semester 4 history
Semester 4   historySemester 4   history
Semester 4 history
 
PREFABRICATION BUILDING
PREFABRICATION BUILDINGPREFABRICATION BUILDING
PREFABRICATION BUILDING
 
KCC Art 211 Ch 13 Architecture
KCC Art 211 Ch 13 ArchitectureKCC Art 211 Ch 13 Architecture
KCC Art 211 Ch 13 Architecture
 
4329-curtain-wall-facades-on-the-new-generation-of-supertall-buildings-presen...
4329-curtain-wall-facades-on-the-new-generation-of-supertall-buildings-presen...4329-curtain-wall-facades-on-the-new-generation-of-supertall-buildings-presen...
4329-curtain-wall-facades-on-the-new-generation-of-supertall-buildings-presen...
 
01 Chicago School
01 Chicago School01 Chicago School
01 Chicago School
 
JACM2636_JacMax Lindsay Book Email FA
JACM2636_JacMax Lindsay Book Email FAJACM2636_JacMax Lindsay Book Email FA
JACM2636_JacMax Lindsay Book Email FA
 
history of architecture II second lecture.pptx
history of architecture II second lecture.pptxhistory of architecture II second lecture.pptx
history of architecture II second lecture.pptx
 
William Le Baron Jenney
William Le Baron JenneyWilliam Le Baron Jenney
William Le Baron Jenney
 
Shipping container homes Benefits
Shipping container homes Benefits Shipping container homes Benefits
Shipping container homes Benefits
 
Chapter 15: The Twentieth Century and Modernism
Chapter 15: The Twentieth Century and ModernismChapter 15: The Twentieth Century and Modernism
Chapter 15: The Twentieth Century and Modernism
 
Report on Design of a HighRise.pptx
Report on Design of a HighRise.pptxReport on Design of a HighRise.pptx
Report on Design of a HighRise.pptx
 

Recently uploaded

High Profile Call Girls Nashik Megha 7001305949 Independent Escort Service Na...
High Profile Call Girls Nashik Megha 7001305949 Independent Escort Service Na...High Profile Call Girls Nashik Megha 7001305949 Independent Escort Service Na...
High Profile Call Girls Nashik Megha 7001305949 Independent Escort Service Na...Call Girls in Nagpur High Profile
 
What are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxWhat are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxwendy cai
 
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxDecoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxJoão Esperancinha
 
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escortsranjana rawat
 
Biology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxBiology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxDeepakSakkari2
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
Internship report on mechanical engineering
Internship report on mechanical engineeringInternship report on mechanical engineering
Internship report on mechanical engineeringmalavadedarshan25
 
Analog to Digital and Digital to Analog Converter
Analog to Digital and Digital to Analog ConverterAnalog to Digital and Digital to Analog Converter
Analog to Digital and Digital to Analog ConverterAbhinavSharma374939
 
Current Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCLCurrent Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCLDeelipZope
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSSIVASHANKAR N
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Dr.Costas Sachpazis
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )Tsuyoshi Horigome
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsCall Girls in Nagpur High Profile
 
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...ranjana rawat
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escortsranjana rawat
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxpurnimasatapathy1234
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSKurinjimalarL3
 

Recently uploaded (20)

High Profile Call Girls Nashik Megha 7001305949 Independent Escort Service Na...
High Profile Call Girls Nashik Megha 7001305949 Independent Escort Service Na...High Profile Call Girls Nashik Megha 7001305949 Independent Escort Service Na...
High Profile Call Girls Nashik Megha 7001305949 Independent Escort Service Na...
 
What are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptxWhat are the advantages and disadvantages of membrane structures.pptx
What are the advantages and disadvantages of membrane structures.pptx
 
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptxDecoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
Decoding Kotlin - Your guide to solving the mysterious in Kotlin.pptx
 
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
(MEERA) Dapodi Call Girls Just Call 7001035870 [ Cash on Delivery ] Pune Escorts
 
Biology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxBiology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptx
 
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANVI) Koregaon Park Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
Internship report on mechanical engineering
Internship report on mechanical engineeringInternship report on mechanical engineering
Internship report on mechanical engineering
 
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
★ CALL US 9953330565 ( HOT Young Call Girls In Badarpur delhi NCR
 
Analog to Digital and Digital to Analog Converter
Analog to Digital and Digital to Analog ConverterAnalog to Digital and Digital to Analog Converter
Analog to Digital and Digital to Analog Converter
 
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
9953056974 Call Girls In South Ex, Escorts (Delhi) NCR.pdf
 
Current Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCLCurrent Transformer Drawing and GTP for MSETCL
Current Transformer Drawing and GTP for MSETCL
 
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLSMANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
MANUFACTURING PROCESS-II UNIT-5 NC MACHINE TOOLS
 
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
Sheet Pile Wall Design and Construction: A Practical Guide for Civil Engineer...
 
SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )SPICE PARK APR2024 ( 6,793 SPICE Models )
SPICE PARK APR2024 ( 6,793 SPICE Models )
 
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Meera Call 7001035870 Meet With Nagpur Escorts
 
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
(ANJALI) Dange Chowk Call Girls Just Call 7001035870 [ Cash on Delivery ] Pun...
 
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptxExploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
Exploring_Network_Security_with_JA3_by_Rakesh Seal.pptx
 
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur EscortsHigh Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
High Profile Call Girls Nagpur Isha Call 7001035870 Meet With Nagpur Escorts
 
Microscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptxMicroscopic Analysis of Ceramic Materials.pptx
Microscopic Analysis of Ceramic Materials.pptx
 
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICSAPPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
APPLICATIONS-AC/DC DRIVES-OPERATING CHARACTERISTICS
 

PREFABRICATED BUILDING.ppt

  • 2. CONTENT:  Prefabricated housing  Differences in the construction types  Manufactured homes  Construction sites  The History of the prefabricated building  Prefabs and the modernist movement
  • 3. INTRODUCTION  “Prefabrication is the practice of assembling components of a structure in a factory or other manufacturing site, and transporting complete assemblies or sub-assemblies to the construction site where the structure is to be located”.
  • 4. PREFABRICATED HOUSING  "Prefabricated building is a type of building that consists of several factory-built components or units that are assembled on-site to complete the unit. “Prefabricated” are built in:  Components (panels)  Modules (modular homes)  Transportable sections (manufactured homes)  Mobile homes (houses on wheels)
  • 5. DIFFERENCES IN THE CONSTRUCTION TYPES  Mobile and manufactured houses are constructed in accordance with the HUD building codes in the U.S. while modular houses are constructed in accordance with the IBC (International Building Code).  Modular homes are created in sections, and then transported to the home site for construction and installation.  Manufactured homes are built onto steel beams, and are transported in complete sections to the home site, where they are assembled.  Mobile homes built on wheels, which can be moved
  • 6. MANUFACTURED HOMES  Constructing manufactured homes typically involves connecting plumbing and electrical lines across the sections, and sealing the sections together.  They can be built onto a permanent foundation, and if designed correctly, can be difficult to distinguish from a stick-built home.  Manufactured homes are typically purchased from a retail sales company, initially assembled by a local contracting company, and follow-up repairs performed by the manufactured home company under warranty.
  • 7.  Manufactured homes, once assembled, go through a "settling-in" period (the home will settle into its location):  During this period, some drywall cracking may appear, and any incorrectly installed appliances, wiring, or plumbing should be repaired.  A manufactured home it is not immediately inhabitable; appropriate ventilation, heating, plumbing, and electrical systems must be installed by a set-up crew, otherwise, the buyer must wait for the manufacturer repair team or do it themselves.
  • 8. CONSTRUCTION SITES  Mobile homes and manufactured homes can be placed in mobile home parks, and manufactured homes can also be placed on private land, providing the land is zoned for manufactured homes.  McDonalds use prefabricated structures for their buildings, and set a record of constructing a building and opening for business within 13 hours
  • 9. THE HISTORY OF THE PREFABRICATED BUILDINGS  Possibly the first advertised prefab house was the Manning Portable Cottage. A London carpenter, H. Manning, constructed a house that was built in components, then shipped and assembled by British emigrants.  The peak year for the importation of portable buildings to Australia was 1853, when several hundred arrived.These have been identified as coming from Liverpool, Boston and Singapore (with Chinese instructions for re-assembly).  In Barbados the Chattel house was a form of prefabricated building which was developed by emancipated slaves who had limited rights to build upon land they did not own. As the buildings were moveable they were legally regarded as chattels.  Another interesting building was the prefabricated hospital that the British Army deployed in 1855 during the Crimean War designed by Isambard Kingdom Brunel with innovations in sanitation, ventilation and a flushing toilet.
  • 10.  The world's first prefabricated, pre-cast panelled apartment blocks were pioneered in Liverpool  Prefabricated homes were produced during the Gold Rush in the United States, when kits were produced to enable Californian prospectors to quickly construct accommodation  Prefabricated housing was popular during World War II due to the need for mass accommodation for military personnel.  Many buildings were designed with a five-ten year life span, but have far exceeded this, with a number surviving today.
  • 11. PREFABS AND THE MODERNIST MOVEMENT  Architects are incorporating modern designs into the prefabricated houses of today, prefab housing should no longer be compared to a mobile home in terms of appearance.  There has also been an increase in the use of "green" materials in the construction of these prefab houses.  Since these homes are built in parts, it is easy for a home owner to add additional rooms or even solar panels to the roofs.  There is a zeitgeist in architectural circles and the spirit of the age favors the small carbon footprint of "prefab."  Eminent amongst the new breed of off the shelf luxury modernist products is the Perrine pod, which has found favor worldwide for its green credentials and three day build time.
  • 12. CONCLUSION  Because of the design simplifications modern architecture provides many in the manufactured housing sector generally feel that modern architecture designs are better suited for prefab home construction.