Click to edit position descriptionTetronics Int'l is a UK company, worldwide leader in plasma gasification technology for industrial applications and also for destruction of industrial hazardous waste and municipal solid waste. Tetronics has already built 90 plants across four continents around the globe and now the company is expanding its activities also in Latin America.
2. INTRODUCTION
Tetronics plasma recovery technology is widely recognised as the “go–to” technology for metal recovery, having supplied over 90 plasma systems
across 4 continents.
It has been used for decades to deliver rapid returns from the recovery of Precious Metal (PMs), especially Platinum Group Metals (PGMs) from spent
catalysts with class-leading recovery rates and the lowest environmental impact and cost base.
Thermal Oxidiser
Plasma Torches
Furnace
5 Axis Robot
Feed Station
Plant schematic view of a typical precious metal recovery facility
Internal view of a typical precious metal recovery facility
3. We are confident that
Tetronics’ plasma solution
provides higher levels of
technical recovery than any
competing technology.
Solar Applied Materials Technology Corp
Chief Operating Officer
FREQUENTLY ASKED QUESTIONS
WHAT ARE THE TYPICAL RECOVERY
RATES FOR PGMs/PRECIOUS METALS?
We normally guarantee 98% recovery for
Gold, Platinum, Palladium and Rhodium,
though in practise our customers recover
much more than this. It’s worth noting that
we can also recover Rhodium to the same
levels as Platinum and Palladium.
WHAT CAN THE PLASMAROK
®
BE USED
FOR - DOES IT HAVE ANY COMMERCIAL
VALUE?
Yes, Plasmarok
®
has very high compressive
qualities and the possibilities for use are vast.
It’s also classified as a product, not a waste,
within the EU by the UK Environment Agency.
IS THERE FLEXIBILITY IN SCOPE OF
SUPPLY?
Yes, Tetronics is able to supply a turnkey
solution, including a final refining option, or
core equipment only, depending on client
requirements.
WHAT IS THE DELIVERY TIME?
Typically 9-12 months from order.
DOES THE FURNACE HAVE TO RUN
CONTINUOUSLY?
No, in fact many customers shut down over
a weekend. Typical restarting time is 5-6
hours.
WHAT IS THE TYPICAL PLANT
FOOTPRINT?
The plant will be approx. 500m2
(5,400sq ft)
depending on scope of supply.
WHAT ELEMENTS CAN BE RECOVERED?
We have been able, in our previous work
on varying feed streams, to recover a huge
range of metals, including: Ag, Au, Co,
Cr, Cu, In, Ir, Fe, Mn, Mo, Ni, Pd, Pt, Re,
Rh, Ru, Sn and to our collector Metal and
Cd, Hg, Pb and Zn to our off-gas system.
However, we are also able to look into the
recovery of many more metals.
TYPICAL PLANT SPECIFICATIONS
TYPICAL PLANT DESIGN
CAPACITY
1850 tonnes per annum,
(500-50,000 tonnes per
annum available, depending
on feed material)
PGM PROCESSING
POTENTIAL
Circa 130,000 troy Oz
PGMs per annum (based
on typical European
autocat loadings for a
1850 tonne plant)
CAPACITY
TOTAL SPACE
2,300m2
(25,000sq ft)
SMELTING PLANT
SPACE
500m2
(5,400sq ft)
GROSS SYSTEM
POWER CONSUMPTION
Max 750 kW typical
(depending on scope)
POWER SUPPLY
Input: 11kV to 400V to suit
available site power
POWER
REQUIREMENTS
TYPICAL SITE
FOOTPRINT
IS AN ENVIRONMENTAL
PERMIT REQUIRED?
Every PMRS is supplied
with an off gas abatement
system that ensures the
plant meets compliance
with local emissions
regulations. The system
is approved by the
Environment Agency as
Best Available Technique
(BAT/BDAT).
PERMITS AND
LICENCES