The document provides details for the installation of a PlaySight tennis video analysis system at the Tennis Training Centre in Kashiwa-Shi, Chiba, Japan. It includes the installation schedule, network and camera placement requirements, and locations for the kiosk and debriefing stations. IT and maintenance staff should be on-site during installation to ensure all system components meet PlaySight's specifications. The courts should be available for the full installation period. Cameras must be mounted at specified heights and distances from the baselines and sidelines. Cables running from the cameras to the kiosk cannot exceed 100 meters. An indoor space with internet and power is needed for the debriefing station.