SlideShare a Scribd company logo
IMPLEMENTASI AUTOCAD DALAM PERANCANGAN
DESAIN AS-BUILT DRAWING TOWER
TELEKOMUNIKASI
PADA PT M. JUSUF & SONS
Mhd.Fikri Saragih
(5202151001)
DOSEN PEMBIMBING
Harvei Desmon Hutahaean, S.Kom., M.Kom.,
IPM.
DOSEN PENGUJI I
Fahmy Syahputra,S.Kom., M.Kom.
DOSEN PENGUJI II
Ali Akbar Lubis, S.Kom., M.T.I.
GAMBARAN UMUM
LOKASI TEMPAT
PRAKTIK PT. M.
JUSUF & SONS
MANFAAT
PRAKTIK KERJA
LAPANGAN
INDUSTRI
PENDAHULUAN
MAKSUD DAN
TUJUAN PKLI DI PT.
M. JUSUF & SONS
LANDASAN TEORI
01
04
02
05
03
06
TOWER
TELEKOMUNIK
ASI
AS-PLAN
DRAWING
SHOP
DRAWING
DESAIN USER-
CENTERED
DESIGN
AUTOCAD
04
AS-BUILT
DRAWING
TEKNIK PELAKSANAAN
DAN PENGALAMAN
LAPANGAN
1. Analisis Kegiatan PKLI
2. Prosedur Pekerjaan
Teknik Pelaksanaan
1. Pembahasan Hasil PKLI
2. Refleksi mahasiswa praktikan
Pengalaman Lapangan
PROSEDUR PEKERJAAN
01.
REQUIREMENT
02. ANALISIS
KEBUTUHAN
03. PERANCANGAN
KONSEP
04.
PROTOTYPING 05. EVALUASI
06.
IMPLEMENTASI
Selama melaksanakan PKLI, penulis melakukan pekerjaan
design proyek As-Built Drawing tower telekomunikasi.
Laporan berupa design tower telekomunikasi yang digambar
dengan AutoCAD. Pada dokumen akan dilengkapi dengan
detail dan spesifikasi akhir dari suatu struktur tower
telekomunikasi setelah design selesai seperti:
● logo klien
● logo kontraktor
● catatan/keterangan penting
● judul proyek
● judul gambar
● nama gambar
● site ID
serta item dan keterangan lainnya yang dibutuhkan.
PEMBAHASAN HASIL PKLI
Hasil Desain As-Built Drawing
Hasil Desain As-Built Drawing
REFLEKSI
Setelah melaksanakan kegiatan PKLI di PT M. JUSUF & SONS, penulis
mendapatkan banyak pengalaman karena terlibat langsung dalam
dunia kerja. Pekerjaan membuat design As-Built Drawing tower
telekomunikasi yang diberikan oleh industri tempat PKLI, dikerjakan
menggunakan software AutoCAD 2D yang sebelumnya belum pernah
penulis implementasikan dalam bangku perkuliahan. Pada program
PKLI di PT. M. JUSUF & SONS, penulis banyak mendpatkan ilmu
pengetahuan baru khusunya dalam penggunaan software AutoCAD
2D serta mengenai tata cara atau prosedur kerja yang tidak dipelajari
dibangku perkuliahan.
Saat berada dan terlibat langsung di dunia industri, seseorang
dituntut untuk bekerja secara nyaman dan praktis serta memiliki rasa
tanggung jawab yang besar tetapi tetap memiliki standar berdasarkan
ketetapan peraturan perusahaan. Dari sinilah penulis dapat belajar
dan berefleksi tentang bagaimana dunia pekerjaan yang
sesungguhnya tersebut. Pelaksanaan Praktik Kerja Lapangan Industri
(PKLI) menjadi wadah penulis untuk mengembangkan potensi diri
serta mengasah kemampuan berkomunikasi, berkolaborasi, dan
bersinergi bersama antar sesama pekerja, pembimbing lapangan,
1. Dalam konteks pembuatan As-Build Drawing tower
telekomunikasi, AutoCAD 2D mampu memenuhi kebutuhan
desain yang diperlukan. AutoCAD 2D menyediakan
berbagai fitur dan alat yang memudahkan pengguna untuk
membuat gambar teknik dengan presisi yang tinggi.
1. Dengan menggunakan AutoCAD 2D, perusahaan dapat
meningkatkan efisiensi dan akurasi dalam pembuatan As-
Build Drawing, sehingga memungkinkan pengembangan
infrastruktur telekomunikasi yang lebih baik.
2. Pemanfaatan solusi-solusi pada permasalahan yang
penulis jabarkan dapat mengatasi permasalahan dalam
pekerjaan dan meningkatkan produktivitas dan efektivitas
kerja perusahaan PT. M. JUSUF & SONS.
3. Pengalaman dan ilmu pengetahuan yang penulis peroleh
selama PKLI dapat meningkatkan kompetensi mahasiswa
baik dalam perkuliahan maupun dunia kerja.
KESIMPUL
AN
1. Dalam melakukan proses design As-Build
Drawing tower telekomunikasi
menggunakan AutoCAD 2D, harus
memperhatikan kesesuaian persyaratan
teknis design dan preferensi yang
diberikan oleh project manager.
1. Perusahaan dapat lebih memperhatikan
cara kerja para staf guna meningkatkan
efisiensi dan menunjang kinerja yang lebih
baik.
SARAN
THANKS!

More Related Content

Similar to ppt pkli.pptx

Proposal judul skripsi
Proposal judul skripsiProposal judul skripsi
Proposal judul skripsi
tjhand
 
K3 INDONESIA FOR TUKANG.pptx
K3 INDONESIA FOR TUKANG.pptxK3 INDONESIA FOR TUKANG.pptx
K3 INDONESIA FOR TUKANG.pptx
AlunSamudra
 
04 Contoh Praktik - Tatang A Taufik
04  Contoh Praktik - Tatang A Taufik04  Contoh Praktik - Tatang A Taufik
04 Contoh Praktik - Tatang A Taufik
pemetarencanaan
 
Menginstalasi software
Menginstalasi softwareMenginstalasi software
Menginstalasi software
Nuruzzu Cfc
 
Oilgascourse pds structure engineering training syllabus_prs
Oilgascourse pds structure engineering training syllabus_prsOilgascourse pds structure engineering training syllabus_prs
Oilgascourse pds structure engineering training syllabus_prs
DEVELOP
 
capaian pembelajaran.pptx
capaian pembelajaran.pptxcapaian pembelajaran.pptx
capaian pembelajaran.pptx
YogiAgungPrasetyo
 
1b8c0_Modul_5_Biaya_Penerapan_SMKK Konstruksi
1b8c0_Modul_5_Biaya_Penerapan_SMKK Konstruksi1b8c0_Modul_5_Biaya_Penerapan_SMKK Konstruksi
1b8c0_Modul_5_Biaya_Penerapan_SMKK Konstruksi
azjarmawi
 
Ardata Indonesia (Cv. Ardata Media) (Pembuatan Website Laundry Diracare Mengg...
Ardata Indonesia (Cv. Ardata Media) (Pembuatan Website Laundry Diracare Mengg...Ardata Indonesia (Cv. Ardata Media) (Pembuatan Website Laundry Diracare Mengg...
Ardata Indonesia (Cv. Ardata Media) (Pembuatan Website Laundry Diracare Mengg...
ValentinaPebriyanti1
 
Ardata Indonesia (Cv. Ardata Media) (Pembuatan Website Laundry Diracare Mengg...
Ardata Indonesia (Cv. Ardata Media) (Pembuatan Website Laundry Diracare Mengg...Ardata Indonesia (Cv. Ardata Media) (Pembuatan Website Laundry Diracare Mengg...
Ardata Indonesia (Cv. Ardata Media) (Pembuatan Website Laundry Diracare Mengg...
MAALKAUTSAR2
 
2007 01-uujk, smk3
2007 01-uujk, smk32007 01-uujk, smk3
2007 01-uujk, smk3
ahmad fuadi
 
BAB I fiks.docx
BAB I fiks.docxBAB I fiks.docx
BAB I fiks.docx
CakRohim
 
Pelatihan AL^LLLMDI^LLLMIL^LLLMTL Rev.RBP.03.pdf
Pelatihan AL^LLLMDI^LLLMIL^LLLMTL Rev.RBP.03.pdfPelatihan AL^LLLMDI^LLLMIL^LLLMTL Rev.RBP.03.pdf
Pelatihan AL^LLLMDI^LLLMIL^LLLMTL Rev.RBP.03.pdf
naztamabumiraya
 
Ets mppl aidil
Ets mppl aidilEts mppl aidil
Ets mppl aidil
abdulaziz1090
 
Makalah tahapan pendirian industri
Makalah tahapan pendirian industriMakalah tahapan pendirian industri
Makalah tahapan pendirian industri
Alens Guna Ganda
 
Teknik pemromgraman sem1
Teknik pemromgraman sem1Teknik pemromgraman sem1
Teknik pemromgraman sem1
setioaribowo
 
Laporan Final Project MPPL WorkIts
Laporan Final Project MPPL WorkItsLaporan Final Project MPPL WorkIts
Laporan Final Project MPPL WorkIts
Zidan Lutfi
 
1 11
1 111 11
EAS - MPPL
EAS - MPPLEAS - MPPL
EAS - MPPL
NavindaMeutia1
 

Similar to ppt pkli.pptx (20)

Proposal judul skripsi
Proposal judul skripsiProposal judul skripsi
Proposal judul skripsi
 
K3 INDONESIA FOR TUKANG.pptx
K3 INDONESIA FOR TUKANG.pptxK3 INDONESIA FOR TUKANG.pptx
K3 INDONESIA FOR TUKANG.pptx
 
Terms of reference
Terms of referenceTerms of reference
Terms of reference
 
04 Contoh Praktik - Tatang A Taufik
04  Contoh Praktik - Tatang A Taufik04  Contoh Praktik - Tatang A Taufik
04 Contoh Praktik - Tatang A Taufik
 
Menginstalasi software
Menginstalasi softwareMenginstalasi software
Menginstalasi software
 
Oilgascourse pds structure engineering training syllabus_prs
Oilgascourse pds structure engineering training syllabus_prsOilgascourse pds structure engineering training syllabus_prs
Oilgascourse pds structure engineering training syllabus_prs
 
Laporan Prakkerin
Laporan PrakkerinLaporan Prakkerin
Laporan Prakkerin
 
capaian pembelajaran.pptx
capaian pembelajaran.pptxcapaian pembelajaran.pptx
capaian pembelajaran.pptx
 
1b8c0_Modul_5_Biaya_Penerapan_SMKK Konstruksi
1b8c0_Modul_5_Biaya_Penerapan_SMKK Konstruksi1b8c0_Modul_5_Biaya_Penerapan_SMKK Konstruksi
1b8c0_Modul_5_Biaya_Penerapan_SMKK Konstruksi
 
Ardata Indonesia (Cv. Ardata Media) (Pembuatan Website Laundry Diracare Mengg...
Ardata Indonesia (Cv. Ardata Media) (Pembuatan Website Laundry Diracare Mengg...Ardata Indonesia (Cv. Ardata Media) (Pembuatan Website Laundry Diracare Mengg...
Ardata Indonesia (Cv. Ardata Media) (Pembuatan Website Laundry Diracare Mengg...
 
Ardata Indonesia (Cv. Ardata Media) (Pembuatan Website Laundry Diracare Mengg...
Ardata Indonesia (Cv. Ardata Media) (Pembuatan Website Laundry Diracare Mengg...Ardata Indonesia (Cv. Ardata Media) (Pembuatan Website Laundry Diracare Mengg...
Ardata Indonesia (Cv. Ardata Media) (Pembuatan Website Laundry Diracare Mengg...
 
2007 01-uujk, smk3
2007 01-uujk, smk32007 01-uujk, smk3
2007 01-uujk, smk3
 
BAB I fiks.docx
BAB I fiks.docxBAB I fiks.docx
BAB I fiks.docx
 
Pelatihan AL^LLLMDI^LLLMIL^LLLMTL Rev.RBP.03.pdf
Pelatihan AL^LLLMDI^LLLMIL^LLLMTL Rev.RBP.03.pdfPelatihan AL^LLLMDI^LLLMIL^LLLMTL Rev.RBP.03.pdf
Pelatihan AL^LLLMDI^LLLMIL^LLLMTL Rev.RBP.03.pdf
 
Ets mppl aidil
Ets mppl aidilEts mppl aidil
Ets mppl aidil
 
Makalah tahapan pendirian industri
Makalah tahapan pendirian industriMakalah tahapan pendirian industri
Makalah tahapan pendirian industri
 
Teknik pemromgraman sem1
Teknik pemromgraman sem1Teknik pemromgraman sem1
Teknik pemromgraman sem1
 
Laporan Final Project MPPL WorkIts
Laporan Final Project MPPL WorkItsLaporan Final Project MPPL WorkIts
Laporan Final Project MPPL WorkIts
 
1 11
1 111 11
1 11
 
EAS - MPPL
EAS - MPPLEAS - MPPL
EAS - MPPL
 

ppt pkli.pptx

  • 1. IMPLEMENTASI AUTOCAD DALAM PERANCANGAN DESAIN AS-BUILT DRAWING TOWER TELEKOMUNIKASI PADA PT M. JUSUF & SONS Mhd.Fikri Saragih (5202151001) DOSEN PEMBIMBING Harvei Desmon Hutahaean, S.Kom., M.Kom., IPM. DOSEN PENGUJI I Fahmy Syahputra,S.Kom., M.Kom. DOSEN PENGUJI II Ali Akbar Lubis, S.Kom., M.T.I.
  • 2. GAMBARAN UMUM LOKASI TEMPAT PRAKTIK PT. M. JUSUF & SONS MANFAAT PRAKTIK KERJA LAPANGAN INDUSTRI PENDAHULUAN MAKSUD DAN TUJUAN PKLI DI PT. M. JUSUF & SONS
  • 4. TEKNIK PELAKSANAAN DAN PENGALAMAN LAPANGAN 1. Analisis Kegiatan PKLI 2. Prosedur Pekerjaan Teknik Pelaksanaan 1. Pembahasan Hasil PKLI 2. Refleksi mahasiswa praktikan Pengalaman Lapangan
  • 5. PROSEDUR PEKERJAAN 01. REQUIREMENT 02. ANALISIS KEBUTUHAN 03. PERANCANGAN KONSEP 04. PROTOTYPING 05. EVALUASI 06. IMPLEMENTASI
  • 6. Selama melaksanakan PKLI, penulis melakukan pekerjaan design proyek As-Built Drawing tower telekomunikasi. Laporan berupa design tower telekomunikasi yang digambar dengan AutoCAD. Pada dokumen akan dilengkapi dengan detail dan spesifikasi akhir dari suatu struktur tower telekomunikasi setelah design selesai seperti: ● logo klien ● logo kontraktor ● catatan/keterangan penting ● judul proyek ● judul gambar ● nama gambar ● site ID serta item dan keterangan lainnya yang dibutuhkan. PEMBAHASAN HASIL PKLI
  • 9. REFLEKSI Setelah melaksanakan kegiatan PKLI di PT M. JUSUF & SONS, penulis mendapatkan banyak pengalaman karena terlibat langsung dalam dunia kerja. Pekerjaan membuat design As-Built Drawing tower telekomunikasi yang diberikan oleh industri tempat PKLI, dikerjakan menggunakan software AutoCAD 2D yang sebelumnya belum pernah penulis implementasikan dalam bangku perkuliahan. Pada program PKLI di PT. M. JUSUF & SONS, penulis banyak mendpatkan ilmu pengetahuan baru khusunya dalam penggunaan software AutoCAD 2D serta mengenai tata cara atau prosedur kerja yang tidak dipelajari dibangku perkuliahan. Saat berada dan terlibat langsung di dunia industri, seseorang dituntut untuk bekerja secara nyaman dan praktis serta memiliki rasa tanggung jawab yang besar tetapi tetap memiliki standar berdasarkan ketetapan peraturan perusahaan. Dari sinilah penulis dapat belajar dan berefleksi tentang bagaimana dunia pekerjaan yang sesungguhnya tersebut. Pelaksanaan Praktik Kerja Lapangan Industri (PKLI) menjadi wadah penulis untuk mengembangkan potensi diri serta mengasah kemampuan berkomunikasi, berkolaborasi, dan bersinergi bersama antar sesama pekerja, pembimbing lapangan,
  • 10. 1. Dalam konteks pembuatan As-Build Drawing tower telekomunikasi, AutoCAD 2D mampu memenuhi kebutuhan desain yang diperlukan. AutoCAD 2D menyediakan berbagai fitur dan alat yang memudahkan pengguna untuk membuat gambar teknik dengan presisi yang tinggi. 1. Dengan menggunakan AutoCAD 2D, perusahaan dapat meningkatkan efisiensi dan akurasi dalam pembuatan As- Build Drawing, sehingga memungkinkan pengembangan infrastruktur telekomunikasi yang lebih baik. 2. Pemanfaatan solusi-solusi pada permasalahan yang penulis jabarkan dapat mengatasi permasalahan dalam pekerjaan dan meningkatkan produktivitas dan efektivitas kerja perusahaan PT. M. JUSUF & SONS. 3. Pengalaman dan ilmu pengetahuan yang penulis peroleh selama PKLI dapat meningkatkan kompetensi mahasiswa baik dalam perkuliahan maupun dunia kerja. KESIMPUL AN
  • 11. 1. Dalam melakukan proses design As-Build Drawing tower telekomunikasi menggunakan AutoCAD 2D, harus memperhatikan kesesuaian persyaratan teknis design dan preferensi yang diberikan oleh project manager. 1. Perusahaan dapat lebih memperhatikan cara kerja para staf guna meningkatkan efisiensi dan menunjang kinerja yang lebih baik. SARAN